This Task Assignment (TA) DC003B is a contract between the State of Florida Department of Environmental Protection (FDEP) and GHD Services, Inc. for operations and maintenance services at the former Valet Cleaners site located at 123 E Bloomingdale Avenue, Brandon, Hillsborough County, Florida. The contract is issued under master contract HW684 and is managed by Department Project Manager Kevin Kane (850-245-8971) and Contractor Project Manager Brian Moore (813-257-0658). The task assignment is effective through July 26, 2024.

GHD Services, Inc. will conduct twelve months of operations and maintenance (O&M) activities at the site, including project management (Subtask 1), six months of O&M from April through September 2023 with well location and sampling efforts (Subtask 2), six months of O&M from October 2023 through March 2024 including shallow monitoring well installation and annual groundwater monitoring at six wells (Subtask 3), and twelve months of utility charges (Subtask 4). The total contract value is $12,902.95, comprising $12,242.95 in fixed unit rate charges and $660.00 in cost reimbursement for utilities plus a $240.00 handling fee. Payment is structured by deliverable: $3,390.10 upon approval of the Electronic O&M Summary (due 10/13/2023), $8,612.85 upon approval of the Remedial Action Status Report and Project Management deliverable (due 04/12/2024), and $900.00 upon submittal of paid utility invoices (due 04/26/2024). The contract incorporates the scope of work submitted on March 10, 2023, and requires compliance with FDEP standard operating procedures and EPA analytical methods for sample analysis and groundwater monitoring.

View the file

Other files

File Type Posted
CN-370000-GC922.pdf PDF
CN-370000-HW684-BIL01A.pdf PDF
CN-370000-HW684-BIL02C.pdf PDF
CN-370000-HW684-BIL02E.pdf PDF
CN-370000-HW684-BIL1ACO1.pdf PDF
CN-370000-HW684-BIL2CCO2.pdf PDF
CN-370000-HW684-CSS03A.pdf PDF
CN-370000-HW684-DC001C.pdf PDF
CN-370000-HW684-DC001E.pdf PDF
CN-370000-HW684-DC003A.pdf PDF
CN-370000-HW684-DC003C.pdf PDF
CN-370000-HW684-DC004B.pdf PDF
CN-370000-HW684-DC005C.pdf PDF
CN-370000-HW684-DC007B.pdf PDF
CN-370000-HW684-DC009A.pdf PDF
CN-370000-HW684-DC010A.pdf PDF
CN-370000-HW684-DC010B.pdf PDF
CN-370000-HW684-DC010C.pdf PDF
CN-370000-HW684-DC012A.pdf PDF
CN-370000-HW684-DC012B.pdf PDF
CN-370000-HW684-DC014B.pdf PDF
CN-370000-HW684-DC014C.pdf PDF
CN-370000-HW684-DC015D.pdf PDF
CN-370000-HW684-DC018E.pdf PDF
CN-370000-HW684-DC020C.pdf PDF
CN-370000-HW684-DC021B.pdf PDF
CN-370000-HW684-DC021E.pdf PDF
CN-370000-HW684-DC024A.pdf PDF
CN-370000-HW684-DC024B.pdf PDF
CN-370000-HW684-DC025D.pdf PDF
CN-370000-HW684-DC026A.pdf PDF
CN-370000-HW684-DC026C.pdf PDF
CN-370000-HW684-DC027B.pdf PDF
CN-370000-HW684-DC028A.pdf PDF
CN-370000-HW684-DC028E.pdf PDF
CN-370000-HW684-DC029A.pdf PDF
CN-370000-HW684-DC02A.pdf PDF
CN-370000-HW684-DC030A.pdf PDF
CN-370000-HW684-DC030B.pdf PDF
CN-370000-HW684-DC031D.pdf PDF
CN-370000-HW684-DC033A.pdf PDF
CN-370000-HW684-DC033B.pdf PDF
CN-370000-HW684-DC033C.pdf PDF
CN-370000-HW684-DC034A.pdf PDF
CN-370000-HW684-DC036A.pdf PDF
CN-370000-HW684-DC037A.pdf PDF
CN-370000-HW684-DC039B.pdf PDF
CN-370000-HW684-DC042A.pdf PDF
CN-370000-HW684-DC043C.pdf PDF
CN-370000-HW684-DC044B.pdf PDF
Show 40 more

50 files listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Funding Information:

Org. Code E.O. Object Code Budget Entity Appropriation

Category Grant # Project # Year Amount

☐ Additional Funding Information attached on separate page.

Rev. 8/26/2020

STATE OF FLORIDA

DEPARTMENT OF ENVIRONMENTAL PROTECTION

Task Assignment This Task Assignment (TA) is entered into between the Parties named below, pursuant to Contract Number: .

1. TA Number: TA Completion Date:

TA Description:

2. Parties State of Florida Department of Environmental Protection

(Department)

Department Project Manager: Department Project Manager Phone:

Contractor Name: (Contractor ) ntractor’st ’s Project Manager: ontractor’s t’s Project Manager Phone:

3. Project Number:

(If different from TA Number)

Project Location(s):

Project Name:

4. As consideration for the services rendered by Contractor under the terms of this TA, the Department shall pay the Contractor on the following bases, up to the Total TA Value as indicated below:

☐ Fixed Price:

☐ Fixed Unit Rate: (Extended Price)

☐ Cost Reimbursement:

Total TA Value:

5. The Parties agree to comply with the terms and conditions of the underlying the Contract, and the following attachments which are hereby incorporated by reference:

Attachment 1:

☐ Additional Attachments (if necessary):

IN WITNESS WHEREOF, this TA shall be effective on the last date signed below.

State of Florida Department of Environmental Protection CONTRACTOR Department Name:

Title:

Secretary or Designee

(Authorized Signature) (Authorized Signature) Date:

☐ Additional signatures attached on separate page.

HW684

DC003B Completion July 26, 2024

GHD Services, Inc. will conduct 12 months of operations and maintenance (O&M) at the former Valet Cleaners site located in Brandon, Florida. All work will be conducted in accordance with the scope of work and cost proposal submitted on March 10, 2023.

The payment of utility invoices associated with O&M activities under this Task Assignment is the only portion of this Task Assignment which is Cost Reimbursement.

Kevin Kane 850-245-8971 Contractor Contractor

Contractor Contractor

Contractor Contractor

Contractor

GHD Services, Inc.

GHD Services, Inc.

Brian Moore 813-257-0658

ERIC_4731

123 E Bloomingdale Ave, Brandon, Hillsborough County

Valet Cleaners

✔ $ 12,242.95 ✔ $ 660.00

$ 12,902.95

Scope of Work

Brian Moore

Project Manager

Brian Moore Digitally signed by Brian Moore Date: 2023.04.10 15:34:26 -04'00'

Kelly Crain

Kelly Crain Digitally signed by Kelly Crain Date: 2023.04.10 11:34:59 -04'00'

N/A

Task Assignment Notification/Change Order Deliverables and Invoice Schedule Attachment

WCP TAFORM 04-2017

Contract Number:

Task Assignment #:

Deliverables:

Deliverable Deliverable Due Date

Invoice Schedule:

Requirements for Invoice Submittal Amount to be Invoiced

TOTAL COST

Electronic O&M Summary 10/13/2023

Remedial Action Status Report + Project Management 04/12/2024

Paid Utility Invoices 04/26/2024

Subtask 2: Upon submittal and FDEP approval of the Electronic O&M Summary $ 3,390.10

Subtasks 1 & 3: Upon submittal and FDEP approval of the Remedial Action Status Report + Project Management $ 8,612.85

Subtask 4: Upon submittal of Paid Utility Invoices Utilities (Cost Reimbursement) not to exceed $660 Utilities Handling Fee: $240

$ 900.00

$ 12,902.95

HW684

DC003B

Ron DeSantis Governor

Jeanette Nuñez Lt. Governor

Shawn Hamilton Interim Secretary

TO:

FROM:

DATE:

SUBJECT:

FLORIDA DEPARTMENT OF

Environmental Protection

Bob Martinez Center 2600 Blair Stone Road

Tallahassee, FL 32399-2400

HW684 Contract File Valet Cleaners

ERIC_4731

Brandon, Hillsborough County

Kevin Kane, Contract Manager

April 6, 2023

Task Assignment Summary

HW684 TA DC003B

Operations & Maintenance (O&M)

GHD Services, Inc. (GHD) will conduct 12 months of O&M. All work will be conducted in accordance with the scope of work and cost proposal submitted on March 10, 2023.

Specific subtasks are detailed below:

Subtask 1: Project Management Project Management is calculated at 13% of the direct labor.

Subtask 2: Six Months O&M (April 2023 through September 2023) GHD will mobilize to the site and attempt to locate interior monitor well MW014. If located, the well will be sampled in accordance with FDEP SOPs and the sample analyzed for volatile organic halocarbons by EPA Method 8260. GHD will conduct semi-annual site visits to verify system operations. During semi-annual site visits, GHD personnel will measure vacuums and flows and also collect one vapor discharge sample to verify compliance. Upon receipt of the analytical data, GHD will provide an email with field sampling logs and laboratory data to the Department. Recommendations will be included in the email based on the results.

Subtask 2: Six Months O&M (October 2023 through March 2024) GHD will conduct semi-annual site visits to verify system operations. During semi-annual site visits, GHD personnel will measure vacuums and flows and also collect one vapor discharge sample to verify compliance. GHD will also install a shallow monitoring well to the east of the site and Buckhorn Creek. The monitor well will be installed by-hand to a maximum depth of 10 feet and will be constructed with 5 feet of 1-inch diameter prepack well screen and blank casing. The well will be finished inside a boltdown steel manhole.

Following installation, the well will be surveyed relative to the existing well network. GHD will then conduct annual groundwater monitoring at six site monitoring wells in accordance with recent recommendations. GHD will conduct annual groundwater sampling in May/June 2023. The groundwater monitoring will consist of sampling deep monitor wells (MW018 and MW004) and shallow monitor wells (MW011, MW015, MW016, and MW019). Prior to sampling, a complete set of depth to water measurements will be gathered. Sampling will be conducted in accordance with FDEP SOPs. The groundwater samples will be analyzed for the presence of volatile organic compounds (BTEX and VOHs) by EPA Method 8260. The laboratory analytical results for the EPA Method 8260 parameters and the groundwater flow data will be analyzed and assimilated into a Remedial Action Status Report (RASR) describing contaminant trends, natural attenuation characteristics, and groundwater flow patterns, with recommendations. A RASR will be prepared that summarizes the six months of system operation, analytical data, and evaluation of data trends. The RASR will also include recommendations for additional system operations and/or monitoring.

Subtask 4: Utilities (12 months) Subtask 4 includes twelve months of utility charges (March 2023 through mid-February 2024). The utility charges are estimated at $55 per month.

Subcontractors for well installation and investigation derived waste (IDW) disposal were chosen on a lowest-cost basis.

The subject property sold in October of 2022. GHD has been given labor hours to negotiate site access and obtain a signed site access agreement from the current property owner prior to conducting any other work under this Task Assignment.

Documentation of the costs is included in the attached CEF, Level-of-Effort sheets, and the GHD proposal. The final deliverable due date is April 26, 2024, and the completion date for the task assignment is July 26, 2024.

The final cost total for Task Assignment DC003B is $12,902.95.

FDEP COST ESTIMATEContractor: GHD Services Inc.

Date: 04/06/23

Task #: DC003B SubTask 1 Project Management SubTask 6

Site: Valet Cleaners SubTask 2 O&M SubTask 7

Activity/Phase: O&M SubTask 3 O&M SubTask 8

Project Manager: Brian Moore, PE SubTask 4 Utilities (12 months) SubTask 9

SubTask 5 SubTask 10

Totals 1 2 3 4 5 6 7 8 9 10 Labor Rate Category

$44.81 Project Manager JM 7.40 7.4 $51.08 Sr Professional Engineer JH 1.00 0.00 1.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $44.81 Project Manager/ Engine JM 24.00 8.00 16.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $20.53 Senior Technician SA 14.00 6.00 8.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $24.89 Senior Technician WM 37.00 12.00 25.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $29.69 Drafting Technician PM 4.50 0.00 4.50 0.00 0.00 0.00 0.00 0.00 0.00 0.00 $23.16 Administrative Assistant DA 4.00 0.50 3.50 0.00 0.00 0.00 0.00 0.00 0.00 0.00

Total Hours 91.90 7.40 26.50 58.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

Direct Labor $2,894.07 $332.95 $791.92 $1,769.20 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Overhead 129.80% $3,756.50 $432.17 $1,027.91 $2,296.42 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Gen & Admin 0.00% $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Fringe 37.80% $1,093.97 $125.86 $299.35 $668.76 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Total Labor $7,744.54 $890.98 $2,119.18 $4,734.38 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Travel Vehicle Rental $600.00 $240.00 $360.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Mileage Costs $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Air Fare $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Per diem + Hotel $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Total Travel $600.00 $240.00 $360.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Subcontractor (Equipment Procurement) $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Subcontractor Subtotal $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Procurement Fee $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Total Subcontractor Cost $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

REV: 02/03 Page 1

FDEP COST ESTIMATEContractor: GHD Services Inc.

Date: 04/06/23

Task #: DC003B SubTask 1 Project Management SubTask 6

Site: Valet Cleaners SubTask 2 O&M SubTask 7

Activity/Phase: O&M SubTask 3 O&M SubTask 8

Project Manager: Brian Moore, PE SubTask 4 Utilities (12 months) SubTask 9

SubTask 5 SubTask 10

Totals 1 2 3 4 5 6 7 8 9 10 Subcontractor (Services Procurement)

Drilling (Conventional) $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Drilling (Non-conventional) $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Mobile Laboratory $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Surveying $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

IDW $110.00 $0.00 $110.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Utilities $660.00 $0.00 $0.00 $660.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Atlantic Supply $114.50 $0.00 $114.50 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

$0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Subcontractor Subtotal $884.50 $0.00 $224.50 $660.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Handling Fee $262.45 $0.00 $22.45 $240.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Total Subcontractor Cost $1,146.95 $0.00 $246.95 $900.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Laboratory Analytical Costs $1,133.00 $273.00 $860.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Fast Turnaround Charges $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Sample Shipping $324.00 $162.00 $162.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Total Laboratory $1,457.00 $435.00 $1,022.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Field Expenses Personal Protection $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Expendables $200.00 $80.00 $120.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Equipment (Drilling related) $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Equipment (Analytical related) $855.00 $304.00 $551.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Equipment (IDW related) $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Equipment (Other) $125.00 $0.00 $125.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Total Field Expenses $1,180.00 $384.00 $796.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Subtotal $12,128.49 $890.98 $3,178.18 $7,159.33 $900.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Completion Fee $774.46 $89.10 $211.92 $473.44 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Total Estimated Cost $12,902.95 $980.08 $3,390.10 $7,632.77 $900.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

REV: 02/03 Page 2

LEVEL OF EFFORT/EXPENSE WORKSHEET

SITE : Valet Cleaners

SUBTASK 2: O&M

DATE: 04/06/23

LABOR CATEGORY *PROVIDE TIME REQUIRED FOR EACH PERSON

STAFF-TITLE WORK DESCRIPTION HOURS

Project Manager JM Field Work Preparation with Scope of Work 2 Project Manager JM Negotiate site access agreement 2 Project Manager JM site access for sampling (scheduling with owner) 1 Project Manager JM HASP Preparation 1 Project Manager JM Prepare Email Summary and Submit 2

Senior Technician WM Mob/demob 2 Senior Technician WM Locate MW014 and Sample 5 Senior Technician WM Semi-Annual O&M Site Visit 5

Senior Technician SA Mob/demob 1 Senior Technician SA Locate MW014 and Sample 5

Staff Assistants DA Data Entry and Table Generation 0.5 0.5

TOTAL LABOR 26.5

VEHICLE TYPE RATE UNIT USEAGE

Company Truck $120.00 day 2 $240.00

TOTAL VEHICLE $240.00

PER DIEM STAFF RATE UNIT USEAGE

$0.00 $0.00 $0.00

TOTAL PER DIEM $0.00

SUBCONTRACTOR COSTS

NAME PURPOSE COST

$0.00 $0.00

TOTAL $0.00

LABORATORY COSTS

PARAMETER RATE # SAMPLES #QAQC

TO15 $200.00 1 $200.00

VOHs EPA 8260 $73.00 1 $73.00 sample shipping (two day) $52.00 1 $52.00 sample shipping small (Next DAIR $110.00 1 $110.00

TOTAL LAB $435.00

EQUIPMENT ITEM RATE COSTING UNIT USEAGE TOTALS

Expendables

Expendables $40.00 day 2 $80.00

Equipment (Analytical Related)

Air Sampling Pump $27.00 Day 1 $27.00 Anemometer $33.00 Day 1 $33.00 Vacuum Gauges $19.00 Day 1 $19.00 OVA $125.00 Day 1 $125.00 Tedlar Air Bags $20.00 each 1 $20.00 Groundwater Sampling Kit $290.00 Day 0.25 $72.50 Poly Tubing $0.30 ft 15 $4.50 Silicone Tubing $3.00 ft 1 $3.00

Equipment (Other) $0.00

TOTAL EQUIPMENT $384.00

FINAL --7/24/96

SUBTASK 3: O&M

DATE: 04/06/23

LABOR CATEGORY *PROVIDE TIME REQUIRED FOR EACH PERSON

STAFF-TITLE WORK DESCRIPTION HOURS

Sr. Professional Engineer JH Conclusions/Recommendations-RASR 1

Professional Engineer JM Field Work Preparation (O&M and GW) 2 Professional Engineer JM Site Access 1 Professional Engineer JM Detail system operations (performance criteria, flow variations) - RASR 1.5 Professional Engineer JM Detail system troubleshooting (runtime, major repairs, operational issues)-RASR 1.5 Professional Engineer JM Detail system influent data (mass calculation, concentration trends)-RASR 1.5 Professional Engineer JM Groundwater Field Parameter Results and evaluation - RASR 1.5 Professional Engineer JM Water Level evaluation - RASR 1.5 Professional Engineer JM Groundwater analytical results evaluataion -RASR 2 Professional Engineer JM Characterize IDW for Disposal 1 Professional Engineer JM Laboratory Data Validation -RASR 1.5 Professional Engineer JM Conclustion and Recommendations-RASR 1

Senior Technician WM Mob/demob (3 day) 2 Senior Technician WM Semi-annual O&M visit 5 Senior Technician WM Well Installation (ditch right of way) 6 Senior Technician WM Survey new well 1 Senior Technician WM Water Levels (17 wells) 2 Senior Technician WM Groundwater sampling 6 wells 9

Senior Technician SA Mob/demob (1 day) 1 Senior Technician SA Well Installation (ditch right of way) 6 Senior Technician SA Survey new well 1

Drafting Technician PM Locate new well on site plan 0.5 Drafting Technician PM Prepare GW Flow Figures (shallow/deep) 2 Drafting Technician PM Prepare GW Analytical Figures (shallow/deep) 2

4.5

Staff Assistants DA Data Entry and Table Generation (new well, elevations, 6 wells) 1.5 Staff Assistants DA Document Preparation/Publishing 2

3.5

TOTAL LABOR 58

VEHICLE TYPE RATE UNIT USEAGE

Company Truck $120.00 day 3 $360.00

TOTAL VEHICLE $360.00

PER DIEM STAFF RATE UNIT USEAGE

$0.00 $0.00 $0.00 $0.00

TOTAL PER DIEM $0.00

SUBCONTRACTOR COSTS

NAME PURPOSE COST

Erwin Remediation IDW Disposal $110.00 drum 1 $110.00 Atlantic Supply Well Riser (1-inch - 5 ft) $12.80 each 1 $12.80 Atlantic Supply Prepack (1-inch 5 ft) $76.00 each 1 $76.00 Atlantic Supply Boltdown Manhole (6") $25.70 each 1 $25.70

TOTAL $224.50

LABORATORY COSTS

PARAMETER RATE # SAMPLES #QAQC

VOCs (BTEX and VOHs) (PID/Hall Series) $110.00 6 $660.00

TO15 $200.00 1 $200.00

sample shipping (Two Day) GW VOCs $52.00 1 $52.00 sample shipping (Next Day) AIR $110.00 1 $110.00

TOTAL LAB $1,022.00

EQUIPMENT ITEM RATE COSTING UNIT USEAGE TOTALS

Expendables

Expedanbles $40.00 day 3 $120.00

Equipment (Analytical Related)

Air Sampling Pump $27.00 Day 1 $27.00 Anemometer $33.00 Day 1 $33.00 Vacuum Gauges $19.00 Day 1 $19.00 Tedlar Air Bags $20.00 each 1 $20.00 OVA $125.00 Day 1 $125.00 Groundwater Sampling Kit $290.00 Day 1 $290.00 Poly Tubing $0.20 ft 125 $25.00 Silicone Tubing $2.00 ft 6 $12.00

Equipment (Other)

Total Survey Station $50.00 day 0.5 $25.00 Drum $100.00 drum 1 $100.00

TOTAL EQUIPMENT $796.00

SUBTASK 4: Utilities (12 months)

DATE: 04/06/23

LABOR CATEGORY *PROVIDE TIME REQUIRED FOR EACH PERSON

STAFF-TITLE WORK DESCRIPTION HOURS

TOTAL LABOR

VEHICLE TYPE RATE UNIT USEAGE

$0.00 $0.00

TOTAL VEHICLE $0.00

PER DIEM STAFF RATE UNIT USEAGE

$0.00 $0.00 $0.00 $0.00

TOTAL PER DIEM $0.00

SUBCONTRACTOR COSTS

NAME PURPOSE COST

Tampa Electric Monthly Electric 12 months $55.00 $660.00 Handling Fee 12 months $20.00 $240.00

TOTAL $900.00

LABORATORY COSTS

PARAMETER RATE # SAMPLES #QAQC

$0.00 $0.00 $0.00 $0.00 $0.00 $0.00

TOTAL LAB $0.00

EQUIPMENT ITEM RATE COSTING UNIT USEAGE TOTALS

Expendables $0.00 $0.00 $0.00 $0.00

Equipment (Analytical Related) $2.00 $0.00 $0.00

Equipment (Other) $0.00 $0.00

TOTAL EQUIPMENT $2.00

COST PROPOSAL FOR TASK DC003B

<Valet Cleaners, 299501431>

< SVE Operations & Maintenance > April 2023 through March 2024

1. INTRODUCTION: <DISCUSS SCOPE OF WORK, DATES >

GHD Services Inc. (GHD) installed and is overseeing operations of a low flow vapor recovery system in accordance with the approved Pilot Test Plan at the Valet Cleaners site. Task DC003B includes twelve (12) additional months of operations and maintenance of the existing system. Task DC003B also includes well installation and annual groundwater monitoring at six wells.

Subtask 1: Project Management Subtask 1 includes all activities associated with management of the operations and maintenance of the existing system for twelve (12) months.

Subtask 2: Six Months O&M (April 2023 through September 2023) Initially, GHD will mobilize to the site and attempt to locate interior monitor well MW014. If located, the well will be sampled in accordance with FDEP SOPs and the sample analyzed for volatile organic halocarbons by EPA Method 8260.

GHD will conduct semi-annual site visits to verify system operations. During semi-annual site visits, GHD personnel will measure vacuums and flows and also collect one vapor discharge sample to verify compliance. Upon receipt of the analytical data, GHD will provide an email with field sampling logs and laboratory data to the Department. Recommendations will be included in the email based on the results.

Subtask 3: Six Months O&M (October 2023 through March 2024) GHD will conduct semi-annual site visits to verify system operations. During semi-annual site visits, GHD personnel will measure vacuums and flows and also collect one vapor discharge sample to verify compliance.

GHD will also install a shallow monitoring well to the east of the site and Buckhorn Creek. The monitor well will be installed by-hand to a maximum depth of 10 feet and will be constructed with 5 feet of 1-inch diameter prepack well screen and blank casing. The well will be finished inside a boltdown steel manhole. Following installation, the well will be surveyed relative to the existing well network. GHD will then conduct annual groundwater monitoring at six site monitoring wells in accordance with recent recommendations. GHD proposes to conduct annual groundwater sampling in May/June 2023. The groundwater monitoring will consist of sampling deep monitor wells (MW018 and MW004) and shallow monitor wells (MW011, MW015, MW016, and the newly installed shallow well [MW019]). Prior to sampling, a complete set of depth to water measurements will be gathered. Sampling will be conducted in accordance with FDEP SOPs. The groundwater samples will be analyzed for the presence of volatile organic compounds (BTEX and VOHs) by EPA Method 8260. The laboratory analytical results for the EPA Method 8260 parameters and the groundwater flow data will be analyzed and assimilated into a Remedial Action Status Report (RASR) describing contaminant trends, natural attenuation characteristics, and groundwater flow patterns, with recommendations.

A RASR will be prepared that summarizes the six months of system operation, analytical data, and evaluation of data trends. The RASR will also include recommendations for additional system operations and/or monitoring.

Subtask 4: Utilities (12 months) Subtask 4 includes twelve months of utility charges (April 2023 through March 2024). The utility charges are estimated at $55 per month.

Deliverables:

Deliverable Deliverable Due Date Email with field notes and laboratory data 10/13/23

Remedial Action Status Report 4/12/24

12 month utilities (April 2023 through March 2024) 4/26/24

408 Ditmar Street

Pensacola, FL 32503

ErwinRemediation@Gmail.com - P.O. Box 884 Gulf Breeze, FL 32562

(850) 292-6511

To: Mr. Brian Moore

GHD

5904 Hampton Oaks Parkway – Suite F

Tampa, FL 33610

May 23, 2022

Re: Transportation and Disposal of Non-Hazardous Soil and Water – Florida

Mr. Moore:

The price for disposal of drums of non-hazardous soil or groundwater located in the State of Florida will be $110.00 per drum, for both transportation and disposal.

This pricing is valid for all regions in the State of Florida except for the Florida Keys.

Pricing for sites located in the Florida Keys will be bid on a case-by-case basis dependent on the volume of drums and the location.

This quote is valid for 180 days.

Respectfully, Jonathan Erwin

Erwin Remediation, Inc.

Email: ErwinRemediation@Gmail.com

Office: (850) 292-6511 mailto:Remediation@Gmail.com

6/28/22, 10:23 AM Clark Environmental Inc.: Quote Builder quote.clarkenvironmental.com/Quotes/ViewQuote?quoteId=19644 1/2

Quote Number: 19644

QUOTE

QUOTED TO: Brian Moore

QUOTE DATE: 1/1/2022

COMPANY NAME: GHD - 2022 QUOTED BY: Craig Burns

PHONE NUMBER:

Ext.

FAX NUMBER:

PROJECT REFERENCE: Drum Trans & Disposal for non-haz materials - Petro, Dry Cleaner & PFAS

CUSTOMER PO:

CONTACT EMAIL:

SITE ADDRESS: TBD

CLARK ENVIRONMENTAL, INC. IS PLEASED TO PROVIDE THE FOLLOWING

COST ESTIMATE FOR

THE SITE/ PROJECT LISTED ABOVE.

DESCRIPTION PRICE QTY. UNIT TOTAL

NON HAZ DRUM DISPOSAL**Soils, Solids, Sludges** $80.00 DRUM $0.00

NON HAZ DRUM DISPOSAL**Liquids, PPE, Pads/Rags** $60.00 DRUM $0.00

TRANSPORTATION: 0-100 miles from CLARK Mulberry FL <6 drums/site - surcharge of $50/site

$30.00 DRUM $0.00

TRANSPORTATION: 101-250 miles from CLARK Mulberry FL <6 drums/site - surcharge of $50/site

$40.00 DRUM $0.00

TRANSPORTATION: 251-400 miles from CLARK Mulberry FL <11 drums/site - surcharge of $200/site

$50.00 DRUM $0.00

Totes T&D is available. CLARK can also deliver new drums to each site if needed :$40 + tax

$0.00 . $0.00

HAZ Drums to be quoted case-by-case $0.00 . $0.00

OPTIONAL LINE ITEMS

***10% FSC applied to the total cost of the invoice*** $0.00 . $0.00

TOTAL REQUIRED ITEMS $0.00

TOTAL OPTIONAL ITEMS $0.00

GRAND TOTAL $0.00

NOTES: Rates apply for FL. Labs and profiles must be approved prior to pick ups.

**Petro Sites required: TCLP 4 metals & TCLP Benzene**Dry Cleaner Sites require 8260 VOH's** Craig Burns

863.327.6289 - cburns@clarkenv.com

This quote will remain valid for 2022 and based on payment in net 30 days. Quote based on an accepted and approved profile. Please sign and return to accept this quotation and by signing agree to all terms and conditions.

quote.clarkenvironmental.com/Quotes/ViewQuote?quoteId=19644 2/2

Name (print) Title

Signature Date

CLARK ENVIRONMENTAL, INC. * 755 Prairie Industrial Pkwy. * Mulberry, Florida 33860 Telephone: 863-425-4884 * Fax: 863-425-2854

WWW.ClarkEnvironmental.com

From: Craig Burns To: Brian Moore Subject: GHD_IDW Drum Rates FL Date: Tuesday, June 28, 2022 10:26:46 AM Attachments: image001.png image002.png image003.png image004.png image005.png GHD Drum Rates FL 2022.pdf

Here you go Brian. I do this for a lot of engineering/consulting firms.

Be aware of the low stop less than 6 drums at $50/flat Be aware of the 10% to the total cost for FSC (implemented April 15).

Pass around the GHD Florida offices

From: Brian Moore <Brian.Moore@ghd.com> Sent: Tuesday, June 28, 2022 10:05 AM To: Craig Burns <cburns@clarkenvironmental.com> Subject: IDW Drums

Craig, Is it possible to provide a generic quote for IDW water disposal.

Assumption is non-haz with necessary analytical Maybe provide a range of locations

South florida or central florida, or both?

Thanks in advance

We have many sites that we generate 1 gw drum of IDW and would like to streamline the vendor coordination

BRIAN MOORE PE

GHD

Proudly employee owned | ghd.com 5904 Hampton Oaks Parkway Suite F Tampa FL 33610 USA O 813 971 3882 D 813 257 0658 M 813 335 2147 E brian.moore@ghd.com

The Power of Commitment

Connect

Please consider our environment before printing this email

CONFIDENTIALITY NOTICE: This email, including any attachments, is confidential and may be privileged. If you are not the intended recipient please notify the sender immediately, and please mailto:cburns@clarkenvironmental.com mailto:Brian.Moore@ghd.com https://aus01.safelinks.protection.outlook.com/?url=https%3A%2F%2Furldefense.proofpoint.com%2Fv2%2Furl%3Fu%3Dhttps-3A__aus01.safelinks.protection.outlook.com_-3Furl-3Dhttp-253A-252F-252Fwww.ghd.com-252F-26data-3D04-257C01-257CBrian.Moore-2540ghd.com-257Cfa117ac0b4ea478d385e08d89e2a2290-257C5e4e864c3b824180a5155c8fb718fff8-257C0-257C0-257C637433251093857306-257CUnknown-257CTWFpbGZsb3d8eyJWIjoiMC4wLjAwMDAiLCJQIjoiV2luMzIiLCJBTiI6Ik1haWwiLCJXVCI6Mn0-253D-257C1000-26sdata-3DorO8Q-252BVqTyo6Ej-252F8ZwSbVyQzLpZtJywYELQonaQNZfo-253D-26reserved-3D0%26d%3DDwMFAg%26c%3DeuGZstcaTDllvimEN8b7jXrwqOf-v5A_CdpgnVfiiMM%26r%3Dhv7dluAS8UQz_IXXEGLvDVzJ2x4J8uCkF4c8FXTHlTQ%26m%3DJpAZt4T_rnkT_pB7eSktTYyhW2NA_zzo1v0y7ygI9EI%26s%3DsMxOUn-szAtJTATQBUgjjDdI6e6b1jo5alN-ez9vKSM%26e%3D&data=05%7C01%7CBrian.Moore%40ghd.com%7Caf4f3d316c0e40f0573508da59122c8b%7C5e4e864c3b824180a5155c8fb718fff8%7C0%7C0%7C637920232054565445%7CUnknown%7CTWFpbGZsb3d8eyJWIjoiMC4wLjAwMDAiLCJQIjoiV2luMzIiLCJBTiI6Ik1haWwiLCJXVCI6Mn0%3D%7C3000%7C%7C%7C&sdata=K3MyGMhP6XEk1ApT%2FRIPjGR%2BUFJFG9ahCVCi8Z9R1n0%3D&reserved=0 mailto:brian.moore@ghd.com https://aus01.safelinks.protection.outlook.com/?url=https%3A%2F%2Furldefense.proofpoint.com%2Fv2%2Furl%3Fu%3Dhttps-3A__aus01.safelinks.protection.outlook.com_-3Furl-3Dhttps-253A-252F-252Fwww.linkedin.com-252Fcompany-252Fghd-252F-26data-3D04-257C01-257CBrian.Moore-2540ghd.com-257Cfa117ac0b4ea478d385e08d89e2a2290-257C5e4e864c3b824180a5155c8fb718fff8-257C0-257C0-257C637433251093857306-257CUnknown-257CTWFpbGZsb3d8eyJWIjoiMC4wLjAwMDAiLCJQIjoiV2luMzIiLCJBTiI6Ik1haWwiLCJXVCI6Mn0-253D-257C1000-26sdata-3D5HB99sCNyHUdh3ySqo-252BMbX9lHf94JW-252BuI1gRPH6qLGY-253D-26reserved-3D0%26d%3DDwMFAg%26c%3DeuGZstcaTDllvimEN8b7jXrwqOf-v5A_CdpgnVfiiMM%26r%3Dhv7dluAS8UQz_IXXEGLvDVzJ2x4J8uCkF4c8FXTHlTQ%26m%3DJpAZt4T_rnkT_pB7eSktTYyhW2NA_zzo1v0y7ygI9EI%26s%3DBQdX3FW3jjZZNHH7wbXXUS30LUnS3GtU1HJ8G56Snwo%26e%3D&data=05%7C01%7CBrian.Moore%40ghd.com%7Caf4f3d316c0e40f0573508da59122c8b%7C5e4e864c3b824180a5155c8fb718fff8%7C0%7C0%7C637920232054565445%7CUnknown%7CTWFpbGZsb3d8eyJWIjoiMC4wLjAwMDAiLCJQIjoiV2luMzIiLCJBTiI6Ik1haWwiLCJXVCI6Mn0%3D%7C3000%7C%7C%7C&sdata=%2BQlcPM%2FGtFT%2FrIbbuGi0PnSgurtBD8yqWgV1hvkvk00%3D&reserved=0 https://aus01.safelinks.protection.outlook.com/?url=https%3A%2F%2Furldefense.proofpoint.com%2Fv2%2Furl%3Fu%3Dhttps-3A__aus01.safelinks.protection.outlook.com_-3Furl-3Dhttps-253A-252F-252Fwww.facebook.com-252FGHDGroup-26data-3D04-257C01-257CBrian.Moore-2540ghd.com-257Cfa117ac0b4ea478d385e08d89e2a2290-257C5e4e864c3b824180a5155c8fb718fff8-257C0-257C0-257C637433251093867263-257CUnknown-257CTWFpbGZsb3d8eyJWIjoiMC4wLjAwMDAiLCJQIjoiV2luMzIiLCJBTiI6Ik1haWwiLCJXVCI6Mn0-253D-257C1000-26sdata-3DKXDgOYLYSf-252BwLLtpvQNMpyPzR3DV5-252FDBogAW3HWif9Y-253D-26reserved-3D0%26d%3DDwMFAg%26c%3DeuGZstcaTDllvimEN8b7jXrwqOf-v5A_CdpgnVfiiMM%26r%3Dhv7dluAS8UQz_IXXEGLvDVzJ2x4J8uCkF4c8FXTHlTQ%26m%3DJpAZt4T_rnkT_pB7eSktTYyhW2NA_zzo1v0y7ygI9EI%26s%3DdHZdva6F1f6cSXNf7WLXU9x5VBxbTV01G78hKDk-cSA%26e%3D&data=05%7C01%7CBrian.Moore%40ghd.com%7Caf4f3d316c0e40f0573508da59122c8b%7C5e4e864c3b824180a5155c8fb718fff8%7C0%7C0%7C637920232054565445%7CUnknown%7CTWFpbGZsb3d8eyJWIjoiMC4wLjAwMDAiLCJQIjoiV2luMzIiLCJBTiI6Ik1haWwiLCJXVCI6Mn0%3D%7C3000%7C%7C%7C&sdata=142JKLTMfwfz%2FAO%2FXHrz%2FUodXSRzYWWBygfbg7vBIWs%3D&reserved=0 https://aus01.safelinks.protection.outlook.com/?url=https%3A%2F%2Furldefense.proofpoint.com%2Fv2%2Furl%3Fu%3Dhttps-3A__aus01.safelinks.protection.outlook.com_-3Furl-3Dhttps-253A-252F-252Ftwitter.com-252FGHDspeaks-26data-3D04-257C01-257CBrian.Moore-2540ghd.com-257Cfa117ac0b4ea478d385e08d89e2a2290-257C5e4e864c3b824180a5155c8fb718fff8-257C0-257C0-257C637433251093877221-257CUnknown-257CTWFpbGZsb3d8eyJWIjoiMC4wLjAwMDAiLCJQIjoiV2luMzIiLCJBTiI6Ik1haWwiLCJXVCI6Mn0-253D-257C1000-26sdata-3Duwh4lLmvdNCQkyPoUgiL7r2l9-252BmFgEv2JbZPLM3ptM0-253D-26reserved-3D0%26d%3DDwMFAg%26c%3DeuGZstcaTDllvimEN8b7jXrwqOf-v5A_CdpgnVfiiMM%26r%3Dhv7dluAS8UQz_IXXEGLvDVzJ2x4J8uCkF4c8FXTHlTQ%26m%3DJpAZt4T_rnkT_pB7eSktTYyhW2NA_zzo1v0y7ygI9EI%26s%3D6FLD5pJDe4zG94aUPcPkIB9mx5JTMUxrAOX-fjV9l3o%26e%3D&data=05%7C01%7CBrian.Moore%40ghd.com%7Caf4f3d316c0e40f0573508da59122c8b%7C5e4e864c3b824180a5155c8fb718fff8%7C0%7C0%7C637920232054565445%7CUnknown%7CTWFpbGZsb3d8eyJWIjoiMC4wLjAwMDAiLCJQIjoiV2luMzIiLCJBTiI6Ik1haWwiLCJXVCI6Mn0%3D%7C3000%7C%7C%7C&sdata=O7BUsLKToxyyPXzZcLcBA1z3Q7%2FKvVsiCNGMGHOzln0%3D&reserved=0 https://aus01.safelinks.protection.outlook.com/?url=https%3A%2F%2Furldefense.proofpoint.com%2Fv2%2Furl%3Fu%3Dhttps-3A__aus01.safelinks.protection.outlook.com_-3Furl-3Dhttps-253A-252F-252Fwww.youtube.com-252Fchannel-252FUCwUGfe6zgaddIXqA7entIwQ-26data-3D04-257C01-257CBrian.Moore-2540ghd.com-257Cfa117ac0b4ea478d385e08d89e2a2290-257C5e4e864c3b824180a5155c8fb718fff8-257C0-257C0-257C637433251093877221-257CUnknown-257CTWFpbGZsb3d8eyJWIjoiMC4wLjAwMDAiLCJQIjoiV2luMzIiLCJBTiI6Ik1haWwiLCJXVCI6Mn0-253D-257C1000-26sdata-3DVTPo9BdB-252FyUkff7ZLoE6J99Jt9f-252Fvtuta-252Fsm1KEOuNc-253D-26reserved-3D0%26d%3DDwMFAg%26c%3DeuGZstcaTDllvimEN8b7jXrwqOf-v5A_CdpgnVfiiMM%26r%3Dhv7dluAS8UQz_IXXEGLvDVzJ2x4J8uCkF4c8FXTHlTQ%26m%3DJpAZt4T_rnkT_pB7eSktTYyhW2NA_zzo1v0y7ygI9EI%26s%3D9S3nI6ai6gtzPu1y34Kb_OuqwixCpq0TgIkmYlOz0gk%26e%3D&data=05%7C01%7CBrian.Moore%40ghd.com%7Caf4f3d316c0e40f0573508da59122c8b%7C5e4e864c3b824180a5155c8fb718fff8%7C0%7C0%7C637920232054565445%7CUnknown%7CTWFpbGZsb3d8eyJWIjoiMC4wLjAwMDAiLCJQIjoiV2luMzIiLCJBTiI6Ik1haWwiLCJXVCI6Mn0%3D%7C3000%7C%7C%7C&sdata=YX45%2BiFGXo7axCd4VDmEIFdcmHajQE6n8KvktA7llOs%3D&reserved=0 quote.clarkenvironmental.com/Quotes/ViewQuote?quoteId=19644 1/2

Quote Number: 19644

QUOTE

QUOTED TO: Brian Moore

QUOTE DATE: 1/1/2022

COMPANY NAME: GHD - 2022 QUOTED BY: Craig Burns

PHONE NUMBER:

Ext.

FAX NUMBER:

PROJECT REFERENCE: Drum Trans & Disposal for non-haz materials - Petro, Dry Cleaner & PFAS

CUSTOMER PO:

CONTACT EMAIL:

SITE ADDRESS: TBD

CLARK ENVIRONMENTAL, INC. IS PLEASED TO PROVIDE THE FOLLOWING

COST ESTIMATE FOR

THE SITE/ PROJECT LISTED ABOVE.

DESCRIPTION PRICE QTY. UNIT TOTAL

NON HAZ DRUM DISPOSAL**Soils, Solids, Sludges** $80.00 DRUM $0.00

NON HAZ DRUM DISPOSAL**Liquids, PPE, Pads/Rags** $60.00 DRUM $0.00

TRANSPORTATION: 0-100 miles from CLARK Mulberry FL <6 drums/site - surcharge of $50/site

$30.00 DRUM $0.00

TRANSPORTATION: 101-250 miles from CLARK Mulberry FL <6 drums/site - surcharge of $50/site

$40.00 DRUM $0.00

TRANSPORTATION: 251-400 miles from CLARK Mulberry FL <11 drums/site - surcharge of $200/site

$50.00 DRUM $0.00

Totes T&D is available. CLARK can also deliver new drums to each site if needed :$40 + tax

$0.00 . $0.00

HAZ Drums to be quoted case-by-case $0.00 . $0.00

OPTIONAL LINE ITEMS

***10% FSC applied to the total cost of the invoice*** $0.00 . $0.00

TOTAL REQUIRED ITEMS $0.00

TOTAL OPTIONAL ITEMS $0.00

GRAND TOTAL $0.00

NOTES: Rates apply for FL. Labs and profiles must be approved prior to pick ups.

**Petro Sites required: TCLP 4 metals & TCLP Benzene**Dry Cleaner Sites require 8260 VOH's** Craig Burns

863.327.6289 - cburns@clarkenv.com

This quote will remain valid for 2022 and based on payment in net 30 days. Quote based on an accepted and approved profile. Please sign and return to accept this quotation and by signing agree to all terms and conditions.

quote.clarkenvironmental.com/Quotes/ViewQuote?quoteId=19644 2/2

Name (print) Title

Signature Date

CLARK ENVIRONMENTAL, INC. * 755 Prairie Industrial Pkwy. * Mulberry, Florida 33860 Telephone: 863-425-4884 * Fax: 863-425-2854

WWW.ClarkEnvironmental.com delete it; you should not copy it or use it for any purpose or disclose its contents to any other person. GHD and its affiliates reserve the right to monitor and modify all email communications through their networks.

Whatever Waste, LLC 3834 Mandarin Woods Dr. No.

Jacksonville, Florida 32223 United States 904.881.1957

Brian Moore PE

GHD

5904 Hampton Road Parkway Suite F Tampa, FL 33610

Estimate Number 062922.1

Notes Dry Cleaner Site Locations: Central and South Florida Regions excluding Florida Keys Required analytical data for non-haz disposal acceptance would be VOCs and includes waste profiling assistance if the IDW-GW drums don't fall under a blanket waste profile DOT shippable drums must be on a hard surface at each accessible location

Terms Non-hazardous IDW drum pickup, transport and disposal pricing is based on per service event No-load drum fee if unable to pickup drums on any site in Central FL is $150; in South FL is $200 Pricing is valid or subject to change on a monthly basis in part due to escalating fuel prices Payment required within 45 days after email receipt of invoice

Indemnification: Each party agrees to indemnify, defend and hold harmless each other for and from any loss

Estimate Date 06/29/2022

Description Rate Qty Line Total

IDW-GW Drum Transport & Disposal - Central FL Sites

(1) Regional Stop Fee $600 - then $150 per 55-gal drum < 10 drums

$150.00 1 $150.00

IDW-GW Drum Transport & Disposal - Central FL Sites

(1) Regional Stop Fee $300 - then $150 per 55-gal drum > 10 drums

$150.00 1 $150.00

IDW-GW Drum Transport & Disposal - South FL Sites

(1) Regional Stop Fee $850 - then $200 per 55-gal drum < 10 drums

$200.00 1 $200.00

IDW-GW Drum Transport & Disposal - South FL Sites

(1) Regional Stop Fee $425 - then $200 per 55-gal drum > 10 drums

$200.00 1 $200.00

Subtotal

Tax

700.00

0.00

Estimate Total (USD) $700.00 or liability arising out of the party's breach of this agreement, scope of work, except for gross negligence, willful misconduct or bad faith.

Quantity Product Description Unit Price Ext Price

PROVIDED TO: SHIP TO:

GHD SERVICES, INC.

5904 HAMPTON OAKS PKWY STE F

TAMPA, FL 33610

HILLSBOROUGH

MEEGHAN CASEYATTN:

PINELLAS

LARGO, FL 33773

6462 125TH AVENUE N.

727-530-9581

***PICK UP***

ATLANTIC SUPPLY

800-752-9416

PO BOX 17620

CLEARWATER, FL 33762

Number: 25252 08/11/22Date:

Page: 1 of 1

Q-

SalespersonTerms

NET 30 8

Your Reference

MEEGHAN

Ship ViaDescription

Product Code

QUOTATION

5.00 SCH40 2"X5' .010 FT SCREEN 159.25 31.8500A2ST4020005010

5.00 SCH40 2" FEMALE FT POINT 37.75 7.5500PNTA2F40200

1.00 SCH40 1"X5' FT CASING 12.80 12.8000A8CT4010005

1.00 PREPACK 1"X5' SCREEN FT .010 76.00 76.0000PP1X5010ADS

6.00 MANHOLE 6"X7-1/2" BOLT DOWN 154.20 25.7000A0721-106

TOTAL: $470.80

Subtotal: $440.00

QUOTATION

TAMPA BAY 727-530-9581

RIVIERA BEACH 561-844-3130

ORLANDO 407-246-6516

JACKSONVILLE 904-260-4288

ALABAMA 334-280-2712

Sales Tax: $30.80

THIS QUOTE IS GOOD FOR 30 DAYS

PLEASE CALL THE ORIGINATING

STORE TO PLACE YOUR ORDER,

OR IF YOU HAVE ANY QUESTIONS

REGARDING THIS QUOTE.

ID Task Mode

Task Name Duration Start Finish

1 LOE Submittal / Approval 27.2 wks Sat 9/10/22 Fri 3/17/23

2 Subtask 1: Project Management

250 days Fri 9/16/22 Thu 8/31/23

3 Subtask 2: O&M (6 mont 31 days Tue 4/4/23 Tue 5/16/23

4 Field Work Preparation 1 wk Tue 4/4/23 Mon 4/10/23

5 O&M Site Visit 1 day Tue 4/18/23 Tue 4/18/23

6 Email with Notes/Data 3 wks Wed 4/26/23 Tue 5/16/23

7 Subtask 3: O&M (6 mont 112 days Thu 5/18/23 Fri 10/20/23

8 Field Work Preparation 2 wks Tue 10/3/23 Mon 10/16/23

9 O&M site visit 1 day Fri 10/20/23 Fri 10/20/23

10 Well Installation 1 day Thu 5/18/23 Thu 5/18/23

11 Groundwater Sampling 1 day Mon 5/22/23 Mon 5/22/23

12 Remedial Action Status Report

6 wks Thu 6/1/23 Wed 7/12/23

13 Subtask 4: utilities (12 months)

12.5 mons Fri 3/17/23 Thu 2/29/24

8/28 9/4 9/11 9/18 9/25 10/2 10/910/1610/2310/3011/611/1311/2011/2712/412/111 September October November December

Task

Split

Milestone

Summary

Project Summary

Inactive Task

Inactive Milestone

Inactive Summary

Manual Task

Duration-only

Manual Summary Rollup

Manual Summary

Start-only

Finish-only

External Tasks

External Milestone

Deadline

Progress

Manual Progress

Schedule for the Implementation of Task DC003B at the Valet Cleaners site located in Brandon, Hillsborough County

Project: TA_003B Date: Fri 3/10/23

Task Name Duration Start Finish

1 LOE Submittal / Approval 27.2 wks Sat 9/10/22 Fri 3/17/23

2 Subtask 1: Project Management

250 days Fri 9/16/22 Thu 8/31/23

3 Subtask 2: O&M (6 mont 31 days Tue 4/4/23 Tue 5/16/23

4 Field Work Preparation 1 wk Tue 4/4/23 Mon 4/10/23

5 O&M Site Visit 1 day Tue 4/18/23 Tue 4/18/23

6 Email with Notes/Data 3 wks Wed 4/26/23 Tue 5/16/23

7 Subtask 3: O&M (6 mont 112 days Thu 5/18/23 Fri 10/20/23

8 Field Work Preparation 2 wks Tue 10/3/23 Mon 10/16/23

9 O&M site visit 1 day Fri 10/20/23 Fri 10/20/23

10 Well Installation 1 day Thu 5/18/23 Thu 5/18/23

11 Groundwater Sampling 1 day Mon 5/22/23 Mon 5/22/23

12 Remedial Action Status Report

6 wks Thu 6/1/23 Wed 7/12/23

13 Subtask 4: utilities (12 months)

12.5 mons Fri 3/17/23 Thu 2/29/24

12/1812/25 1/1 1/8 1/15 1/22 1/29 2/5 2/12 2/19 2/26 3/5 3/12 3/19 3/26 4/2 January February March April

Task

Split

Milestone

Summary

Project Summary

Inactive Task

Inactive Milestone

Inactive Summary

Manual Task

Duration-only

Manual Summary Rollup

Manual Summary

Start-only

Finish-only

External Tasks

External Milestone

Deadline

Progress

Manual Progress

Schedule for the Implementation of Task DC003B at the Valet Cleaners site located in Brandon, Hillsborough County

Task Name Duration Start Finish

1 LOE Submittal / Approval 27.2 wks Sat 9/10/22 Fri 3/17/23

2 Subtask 1: Project Management

250 days Fri 9/16/22 Thu 8/31/23

3 Subtask 2: O&M (6 mont 31 days Tue 4/4/23 Tue 5/16/23

4 Field Work Preparation 1 wk Tue 4/4/23 Mon 4/10/23

5 O&M Site Visit 1 day Tue 4/18/23 Tue 4/18/23

6 Email with Notes/Data 3 wks Wed 4/26/23 Tue 5/16/23

7 Subtask 3: O&M (6 mont 112 days Thu 5/18/23 Fri 10/20/23

8 Field Work Preparation 2 wks Tue 10/3/23 Mon 10/16/23

9 O&M site visit 1 day Fri 10/20/23 Fri 10/20/23

10 Well Installation 1 day Thu 5/18/23 Thu 5/18/23

11 Groundwater Sampling 1 day Mon 5/22/23 Mon 5/22/23

12 Remedial Action Status Report

6 wks Thu 6/1/23 Wed 7/12/23

13 Subtask 4: utilities (12 months)

12.5 mons Fri 3/17/23 Thu 2/29/24

Jenna Martin

William McKinney

Jenna Martin

William McKinney,Skylar Albritton

William McKinney

Jeremy

4/9 4/16 4/23 4/30 5/7 5/14 5/21 5/28 6/4 6/11 6/18 6/25 7/2 7/9 7/16 7/23 May June July

Task

Split

Milestone

Summary

Project Summary

Inactive Task

Inactive Milestone

Inactive Summary

Manual Task

Duration-only

Manual Summary Rollup

Manual Summary

Start-only

Finish-only

External Tasks

External Milestone

Deadline

Progress

Manual Progress

Schedule for the Implementation of Task DC003B at the Valet Cleaners site located in Brandon, Hillsborough County

Task Name Duration Start Finish

1 LOE Submittal / Approval 27.2 wks Sat 9/10/22 Fri 3/17/23

2 Subtask 1: Project Management

250 days Fri 9/16/22 Thu 8/31/23

3 Subtask 2: O&M (6 mont 31 days Tue 4/4/23 Tue 5/16/23

4 Field Work Preparation 1 wk Tue 4/4/23 Mon 4/10/23

5 O&M Site Visit 1 day Tue 4/18/23 Tue 4/18/23

6 Email with Notes/Data 3 wks Wed 4/26/23 Tue 5/16/23

7 Subtask 3: O&M (6 mont 112 days Thu 5/18/23 Fri 10/20/23

8 Field Work Preparation 2 wks Tue 10/3/23 Mon 10/16/23

9 O&M site visit 1 day Fri 10/20/23 Fri 10/20/23

10 Well Installation 1 day Thu 5/18/23 Thu 5/18/23

11 Groundwater Sampling 1 day Mon 5/22/23 Mon 5/22/23

12 Remedial Action Status Report

6 wks Thu 6/1/23 Wed 7/12/23

13 Subtask 4: utilities (12 months)

12.5 mons Fri 3/17/23 Thu 2/29/24

Jenna Martin

William McKin

Hess,Jenna Martin,Peter McLean,Debra Andrews

7/30 8/6 8/13 8/20 8/27 9/3 9/10 9/17 9/24 10/1 10/810/1510/2210/2911/511/121 August September October November

Task

Split

Milestone

Summary

Project Summary

Inactive Task

Inactive Milestone

Inactive Summary

Manual Task

Duration-only

Manual Summary Rollup

Manual Summary

Start-only

Finish-only

External Tasks

External Milestone

Deadline

Progress

Manual Progress

Schedule for the Implementation of Task DC003B at the Valet Cleaners site located in Brandon, Hillsborough County

Task Name Duration Start Finish

1 LOE Submittal / Approval 27.2 wks Sat 9/10/22 Fri 3/17/23

2 Subtask 1: Project Management

250 days Fri 9/16/22 Thu 8/31/23

3 Subtask 2: O&M (6 mont 31 days Tue 4/4/23 Tue 5/16/23

4 Field Work Preparation 1 wk Tue 4/4/23 Mon 4/10/23

5 O&M Site Visit 1 day Tue 4/18/23 Tue 4/18/23

6 Email with Notes/Data 3 wks Wed 4/26/23 Tue 5/16/23

7 Subtask 3: O&M (6 mont 112 days Thu 5/18/23 Fri 10/20/23

8 Field Work Preparation 2 wks Tue 10/3/23 Mon 10/16/23

9 O&M site visit 1 day Fri 10/20/23 Fri 10/20/23

10 Well Installation 1 day Thu 5/18/23 Thu 5/18/23

11 Groundwater Sampling 1 day Mon 5/22/23 Mon 5/22/23

12 Remedial Action Status Report

6 wks Thu 6/1/23 Wed 7/12/23

13 Subtask 4: utilities (12 months)

12.5 mons Fri 3/17/23 Thu 2/29/24 ney

11/1911/2612/312/1012/1712/2412/31 1/7 1/14 1/21 1/28 2/4 2/11 2/18 2/25 3/3 December January February March

Task

Split

Milestone

Summary

Project Summary

Inactive Task

Inactive Milestone

Inactive Summary

Manual Task

Duration-only

Manual Summary Rollup

Manual Summary

Start-only

Finish-only

External Tasks

External Milestone

Deadline

Progress

Manual Progress

Schedule for the Implementation of Task DC003B at the Valet Cleaners site located in Brandon, Hillsborough County