This document is a Task Assignment (TA) DC024B issued under Contract HW680 between the State of Florida Department of Environmental Protection (FDEP) and Arcadis U.S., Inc. The task assignment authorizes environmental assessment work at the Bartleys Laundry & Dry Cleaning Inc. facility located at 875 W Bay Drive, Largo, Pinellas County, Florida (ERIC_5262). The primary contact for FDEP is Theresa Pepe, with Gus Suarez serving as the Contractor's Project Manager. The work is performed under a fixed unit rate compensation structure with a total authorized value of $55,867.18.

Arcadis will complete a comprehensive site assessment including soil boring, groundwater profiling, monitor well installation, and Modified Active Gas Sampling (MAGS) testing to evaluate potential chlorinated solvent contamination from historical dry cleaning operations. The assessment includes three subtasks: Project Management ($2,962.95), Site Assessment/Field Activities ($42,822.56), and Site Assessment Report preparation ($10,081.67). Key subcontractors include Preferred Drilling Solutions ($12,920.00 for direct-push services), SiteLines LLC ($1,200.00 for GPR utility survey), and EnviroServe ($583.00 for investigative derived waste disposal). The initial fieldwork is scheduled for completion by December 2, 2022, with the final Site Assessment Report due by February 28, 2023. Invoicing occurs in two phases: upon FDEP approval of fieldwork activities ($42,822.56) and upon FDEP approval of the Site Assessment Report and documentation ($13,044.62).

View the file

Other files

File Type Posted
CN-370000-HW680-DC001A.pdf PDF
CN-370000-HW680-DC001D.pdf PDF
CN-370000-HW680-DC002A.pdf PDF
CN-370000-HW680-DC004D.pdf PDF
CN-370000-HW680-DC006A.pdf PDF
CN-370000-HW680-DC006B.pdf PDF
CN-370000-HW680-DC013C.pdf PDF
CN-370000-HW680-DC014E.pdf PDF
CN-370000-HW680-DC014F.pdf PDF
CN-370000-HW680-DC016B.pdf PDF
CN-370000-HW680-DC017B.pdf PDF
CN-370000-HW680-DC017C.pdf PDF
CN-370000-HW680-DC018B.pdf PDF
CN-370000-HW680-DC018C.pdf PDF
CN-370000-HW680-DC020A.pdf PDF
CN-370000-HW680-DC021D.pdf PDF
CN-370000-HW680-DC022C.pdf PDF
CN-370000-HW680-DC027A.pdf PDF
CN-370000-HW680-DC028A.pdf PDF
CN-370000-HW680-DC028B.pdf PDF
CN-370000-HW680-DC030B.pdf PDF
CN-370000-HW680-DC031B.pdf PDF
CN-370000-HW680-DC031E.pdf PDF
CN-370000-HW680-DC034B.pdf PDF
CN-370000-HW680-DC035B.pdf PDF
CN-370000-HW680-DC035C.pdf PDF
CN-370000-HW680-DC036B.pdf PDF
CN-370000-HW680-DC039A.pdf PDF
CN-370000-HW680-DC039C.pdf PDF
CN-370000-HW680-DC039D.pdf PDF
CN-370000-HW680-DC03ACO2.pdf PDF
CN-370000-HW680-DC042A.pdf PDF
CN-370000-HW680-DC043A.pdf PDF
CN-370000-HW680-DC044A.pdf PDF
CN-370000-HW680-DC046A.pdf PDF
CN-370000-HW680-DC047A.pdf PDF
CN-370000-HW680-DC06ACO1.pdf PDF
CN-370000-HW680-DC06ACO2.pdf PDF
CN-370000-HW680-DC09BCO1.pdf PDF
CN-370000-HW680-DC10BCO4.pdf PDF
CN-370000-HW680-DC11ACO1.pdf PDF
CN-370000-HW680-DC11CCO2.pdf PDF
CN-370000-HW680-DC14BCO2.pdf PDF
CN-370000-HW680-DC14BCO3.pdf PDF
CN-370000-HW680-DC14BCO4.pdf PDF
CN-370000-HW680-DC14BCO9.pdf PDF
CN-370000-HW680-DC14FCO1.pdf PDF
CN-370000-HW680-DC14FCO2.pdf PDF
CN-370000-HW680-DC14FCO4.pdf PDF
CN-370000-HW680-DC15ECO2.pdf PDF
Show 40 more

50 files listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Funding Information:

Org. Code E.O. Object Code Budget Entity Appropriation

Category Grant # Project # Year Amount

☐ Additional Funding Information attached on separate page.

Rev. 8/26/2020

STATE OF FLORIDA

DEPARTMENT OF ENVIRONMENTAL PROTECTION

Task Assignment This Task Assignment (TA) is entered into between the Parties named below, pursuant to Contract Number: .

1. TA Number: TA Completion Date:

TA Description:

2. Parties State of Florida Department of Environmental Protection (Department)

Department Project Manager: Department Project Manager Phone:

Contractor Name: (Contractor ) ntractor’st ’s Project Manager: ontractor’s t’s Project Manager Phone:

3. Project Number:

(If different from TA Number)

Project Location(s):

Project Name:

4. As consideration for the services rendered by Contractor under the terms of this TA, the Department shall pay the Contractor on the following bases, up to the Total TA Value as indicated below:

☐ Fixed Price:

☐ Fixed Unit Rate: (Extended Price)

☐ Cost Reimbursement:

Total TA Value:

5. The Parties agree to comply with the terms and conditions of the underlying the Contract, and the following attachments which are hereby incorporated by reference:

Attachment 1:

☐ Additional Attachments (if necessary):

IN WITNESS WHEREOF, this TA shall be effective on the last date signed below.

State of Florida Department of Environmental Protection

CONTRACTOR Department Name:

Title: Secretary or Designee

(Authorized Signature) (Authorized Signature) Date:

☐ Additional signatures attached on separate page.

HW680

DC024B Completion March 31, 2023

Arcadis will complete a Site Assessment according to the approved Work Plan.

Theresa Pepe 850-245-8966 Contractor Contractor

Contractor Contractor

Contractor Contractor

Contractor

Arcadis U.S. Inc.

Arcadis U.S. Inc.

Gus Suarez 813-205-4703

ERIC_5262

875 W Bay Dr, Largo, Pinellas County

Bartleys Laundry & Dry Cleaning Inc

✔ $ 55,867.18

$ 55,867.18

Scope of Work

Gus Suarez

Contract Manager

Gus Suarez, P.E. Digitally signed by Gus Suarez, P.E.

Date: 2022.10.21 15:18:01 -04'00'

Jennifer Farrell

Digitally signed by Jennifer Farrell Date: 2022.10.21 13:27:31 -04'00'

N/A

Task Assignment Notification/Change Order Deliverables and Invoice Schedule Attachment

WCP TAFORM 04-2017

Contract Number:

Task Assignment #:

Deliverables:

Deliverable Deliverable Due Date

Invoice Schedule:

Requirements for Invoice Submittal Amount to be Invoiced

TOTAL COST

Completion of Fieldwork Activities 12/02/2022

Site Assessment Report/IDW manifests/Project Management 02/28/2023

FDEP approval of Fieldwork Activities $ 42,822.56

FDEP approval of Site Assessment Report/IDW manifests/Project Management $ 13,044.62

$ 55,867.18

HW680

DC024B

FLORIDA DEPARTMENT OF

Environmental Protection

Bob Martinez Center

2600 Blair Stone Road Tallahassee, FL 32399-2400

Ron DeSantis Governor

Jeanette Nuñez

Lt. Governor

Shawn Hamilton Secretary

Memorandum

TO: Negotiation File Bartleys Laundry & Dry Cleaning Inc

FACID NO. 52-9500579; ERIC_5262

Largo, Pinellas County FROM: Theresa Pepe, Project Manager SUBJECT: Task Assignment DC024B (HW680) DATE: October 21, 2022

This Task Assignment authorizes Arcadis to complete a Site Assessment at the Bartleys Laundry site. The initial fieldwork will be completed in approximately ten days and a Site Assessment Report (SAR) will be submitted as the final deliverable. The assessment may be expanded or reduced via change order depending on the complexity of the site.

All work will be performed in accordance with the approved work plan.

The final task assignment total is $55,867.18. Arcadis may invoice according to the attached schedule.

Specific negotiated subtasks are as follows:

Subtask 1: Project Management Project Management is automatically calculated as a percentage of total labor.

Subtask 2: Site Assessment This subtask provides funds for soil, vapor and groundwater screening and monitor well installation at the facility. Arcadis will present the data in an interim deliverable after which a change order may be authorized for additional work, if needed. The Waste Site Cleanup Section’s geologist approved sampling locations and the overall approach to the assessment presented in the September 2022 Work Plan.

SiteLines will provide a GPR survey to check for underground utilities, based on their low bid of three bids solicited.

PDS was selected as the drilling subcontractor based on their low bid of three bids solicited.

Bartleys Laundry & Dry Cleaning (ERIC_5262)

EnviroServe (formerly Clark) will transport and dispose of IDW. Note: IDW is presumed to be non-hazardous but will be characterized before disposal.

Subtask 3: Site Assessment Report (SAR) All activities and analytical results obtained during site assessment work will be submitted to FDEP as a written report. This report will include appropriate figures, graphs, data tables, etc. IDW manifests will also be provided to FDEP as part of the final deliverable.

FDEP COST ESTIMATEContractor: Arcadis, U.S., Inc.

Date: 10/17/2022

Task #: DC024B SubTask 1 Project Management Site: Bartley Laundry & Drycleaning Inc. SubTask 2 Field Activities

Activity/Phase: Site Assessment SubTask 3 Site Assessment Report Project Manager: Gus Suarez SubTask 4

SubTask 5

Totals 1 2 3 4 5 Labor Rate Category

$84.18 Project Manager Suarez, Gus (GS) 13 12.7 $100.00 Principal Engineer Bedessem, Jim (JMB) 0 0 0 0 0 $86.94 Principal Engineer Burtnett, Susan (SB) 0 0 0 0 0 $84.18 Principal Engineer Suarez, Gus (GS) 0 0 0 0 0 $65.43 Principal Scientist Burke, Brian (BRB) 15 7 8 0 0$65.11 Principal Scientist McGlone, Douglas (DMc) 0 0 0 0 0 $65.28 Principal Engineer Perella, John (JP) 7 3 4 0 0$50.00 Senior Engineer Cardoso, Antonio (AC) 0 0 0 0 0 $48.63 Senior Engineer Hanna, Chad (CH) 58 18 40 0 0 $28.94 Scientist Brooks, Eric (EAB) 74 74 0 0 0$28.94 Scientist Salinas, Kendall (KS) 0 0 0 0 0 $34.89 Technician Welch, David (DJW) 20 20 0 0 0 $39.67 Drafter/Designer Oliva, Brian (BO) 12 0 12 0 0 $28.43 Document Technician Embras, Susan (SRE) 0 0 0 0 0 $35.81 Project Assistant Cruz, Michele (MC) 18 6 12 0 0

Total Hours 217 13 128 76 0 0

Direct Labor $9,287.39 $1,068.46 $4,583.41 $3,635.52 $0.00 $0.00

Overhead 79.00% $7,337.03 $844.08 $3,620.89 $2,872.06 $0.00 $0.00 Gen & Admin 36.00% $3,343.47 $384.65 $1,650.03 $1,308.79 $0.00 $0.00 Fringe 37.10% $3,445.63 $396.40 $1,700.45 $1,348.78 $0.00 $0.00 Total Labor $23,413.52 $2,693.59 $11,554.78 $9,165.15 $0.00 $0.00

Travel Vehicle Rental $840.00 $840.00 $0.00 $0.00 $0.00 Mileage Costs $0.00 $0.00 $0.00 $0.00 $0.00 Air Fare $0.00 $0.00 $0.00 $0.00 $0.00 Per diem + Hotel $0.00 $0.00 $0.00 $0.00 $0.00 Total Travel $840.00 $840.00 $0.00 $0.00 $0.00

Subcontractor (Equipment Procurement) $0.00 $0.00 $0.00 $0.00 $0.00

$0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Subcontractor Subtotal $0.00 $0.00 $0.00 $0.00 $0.00 Procurement Fee $0.00 $0.00 $0.00 $0.00 $0.00 Total Subcontractor Cost $0.00 $0.00 $0.00 $0.00 $0.00

Subcontractor (Services Procurement) PDS Drilling (Conventional) $12,920.00 $12,920.00 $0.00 $0.00 $0.00

Drilling (Non-conventional) $0.00 $0.00 $0.00 $0.00 $0.00 Mobile Laboratory $0.00 $0.00 $0.00 $0.00 $0.00 Surveying $0.00 $0.00 $0.00 $0.00 $0.00

EnviroServe IDW $583.00 $583.00 $0.00 $0.00 $0.00 Utilities $0.00 $0.00 $0.00 $0.00 $0.00

GPR - SiteLines $1,200.00 $1,200.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Subcontractor Subtotal $14,703.00 $14,703.00 $0.00 $0.00 $0.00 Handling Fee $1,470.30 $1,470.30 $0.00 $0.00 $0.00 Total Subcontractor Cost $16,173.30 $16,173.30 $0.00 $0.00 $0.00

Laboratory Analytical Costs $9,314.00 $9,314.00 $0.00 $0.00 $0.00 Fast Turnaround Charges $0.00 $0.00 $0.00 $0.00 $0.00 Sample Shipping $450.00 $450.00 $0.00 $0.00 $0.00 Total Laboratory $9,764.00 $9,764.00 $0.00 $0.00 $0.00

Field Expenses Personal Protection $0.00 $0.00 $0.00 $0.00 $0.00 Expendables $280.00 $280.00 $0.00 $0.00 $0.00 Equipment (Drilling related) $3,055.00 $3,055.00 $0.00 $0.00 $0.00 Equipment (Analytical related) $0.00 $0.00 $0.00 $0.00 $0.00 Equipment (IDW related) $0.00 $0.00 $0.00 $0.00 $0.00 Equipment (Other) $0.00 $0.00 $0.00 $0.00 $0.00 Total Field Expenses $3,335.00 $3,335.00 $0.00 $0.00 $0.00

Subtotal $53,525.82 $2,693.59 $41,667.08 $9,165.15 $0.00 $0.00 Completion Fee $2,341.36 $269.36 $1,155.48 $916.52 $0.00 $0.00

Total Estimated Cost $55,867.18 $2,962.95 $42,822.56 $10,081.67 $0.00 $0.00

REV: 02/03 CEF ARCADIS Page 1

SITE : Bartley Laundry & Drycleaning Inc.

SUBTASK 2: Field Activities

DATE:

LABOR CATEGORY *PROVIDE TIME REQUIRED FOR EACH PERSON

STAFF-TITLE WORK DESCRIPTION HOURS

Soil Sampling, Vertical Profile GW Sampling, PZ/MW Install Principal Sci (BB) PG field support and daily updates (4 hrs) 4 Senior Eng (CH) HASP (5 hrs), Property owner updates and field event preparation, data evaluation (4 hrs) 9 Staff Sci (EB) GPR oversight (8 hrs), Prep (3 hrs), Soil sampling and VP GW sampling (4 x 12 hrs = 48), logs/paperwork (3 hrs) 62 Project Assistant (MC) HASP (3 hrs) 3

MAGS Testing and Monitor Well Sampling Principal Eng (JP) PE field support and MAGS data evaluation (3 hrs) 3 Senior Eng (CH) Field event preparation (2 hrs), IDW characterization and waste profiling for disposal (2 hrs) 4 Staff Sci (EB) MAGS Field Testing, restoration, and logs (12 hrs) 12 Technician (DW) MAGS Field Testing, restoration, and logs (12 hrs) 12 Technician (DW) Survey PZs, Guage WLs, Sample two wells: TMW-1, MW001 (8 hrs) 8

Initial Site Assessment Report Deliverable Principal Sci (BB) Teleconference call with FDEP, next assessment or remediation discussion planning 3 Senior Eng (CH) Sketch GW gradient and data figures. Field deliverable package submit to FDEP 5 Project Assistant (MC) Field support, database management, assemble field deliverable package, lab reports 3

TOTAL LABOR 128

VEHICLE TYPE RATE UNIT USEAGE

Automobile $80.00 Per Day 0 $0.00 $0.00 Van/Truck $120.00 Per Day 7 $840.00 $840.00

TOTAL VEHICLE $840.00

PER DIEM STAFF RATE UNIT USEAGE

Meals Category/Staff Rate Unit Usage Totals

$36.00 Per Day 0 $0.00 $36.00 Per Day 0 $0.00

Hotel Category/Staff Rate Unit Usage Totals

$150.00 Per Day 0 $0.00 $150.00 Per Day 0 $0.00

Total Meal/Hotel: $0.00

TOTAL PER DIEM $0.00

SUBCONTRACTOR COSTS

Equipment Procurement

Name Equipment Rate Units Usage Totals $0.00 Per Day 1 $0.00

Total Equip.: $0.00 Services Procurement

Name Purpose Rate Units Usage Totals PDS Direct-push services $12,920.00 Lump Sum 1 $12,920.00 EnviroServe IDW 4 drums $583.00 Lump Sum 1 $583.00 SiteLines LLC Utility Locate / GPR Survey $1,200.00 Lump Sum 1 $1,200.00

Total Services: $14,703.00

TOTAL $14,703.00

LABORATORY COSTS

Analytical Costs Parameter Method Media Rate Turn Around Total Samples Totals

VOC 8260 Aqueous $73.00 1.00 26 $1,898.00 VOC 8260 Soil $73.00 1.00 72 $5,256.00 SPLP Extraction 1311/1312 Soil/Sediment $50.00 1.00 5 $250.00 VOC analysis on SPLP extracted sample 8260 Soil/Sediment $73.00 1.00 5 $365.00 VOC TO-15 Vapor $200.00 1.00 6 $1,200.00 TCLP Benzene for IDW 1311/8260 Soil $210.00 1.00 1 $210.00 TCLP metals for IDW 1311/6010 Soil $135.00 1.00 1 $135.00

TAT 24-hr=110% (2.1) 3-day=65% (1.65) 1-week=20% (1.20) Total Lab: $9,314.00 Rate Units Usage

Shipping - Large (25 to 50 lbs.) --- --- $150.00 Per Cooler 3 $450.00 Shipping - Small (0 to 25 lbs.) --- --- $110.00 Per cooler 0 $0.00

Total Shipping: $450.00

TOTAL LAB $9,764.00

EQUIPMENT

Personal Protection

Item Rate Unit Usage Totals

Total PPE: $0.00 Expendables

Miscellaneous Expendables $40.00 Per Day 7 $280.00 Total Expendables: $280.00

Equipment Items

Survey Station transit/rod/level/tape $50.00 Per Day 1 $50.00 Tubing, Poly/HDPE $0.30 Per Foot 30 $9.00 Tubing, Silicon 3/16x3/8 $3.00 Per Foot 2 $6.00 EWE SVE Trailer for MAGS $1,850.00 Per Day 1 $1,850.00

Total Equipment Items: $1,915.00 Equipment Kits

Monitor Well Installation Kit $325.00 Day 1 $325.00 Shallow Groundwater Sampling Kit $290.00 Day 1 $290.00 Soil Assessment Kit $175.00 Day 3 $525.00

Total Equipment Kits: $1,140.00

TOTAL EQUIPMENT $3,335.00

SITE : Bartley Laundry & Drycleaning Inc.

SUBTASK 3: Site Assessment Report

DATE:

LABOR CATEGORY *PROVIDE TIME REQUIRED FOR EACH PERSON

STAFF-TITLE WORK DESCRIPTION HOURS

SAR

Principal Sci / BB PG write/certification of final SAR; results/risk-based mngt options with FDEP 8

Principal Engineer / JP PE analysis of SAR; remedial characterization data/preliminary remedial options evaluation 4

Senior / CH SAR writing (24 hrs); SAR figures/graphs generation (8 hrs); SAR tables (8 hrs) 40

Designer - Database Mgr / BO SAR figures/graphs generation (8 hrs); data mgmt, import to CAD (4 hrs) 12

Project Assistant / MMc Process field notes, sample tracking, database entry, report assembly, report submittal 12

TOTAL LABOR 76

VEHICLE TYPE RATE UNIT USEAGE

Automobile $80.00 Per Day 0 $0.00 $0.00

Van/Truck $120.00 Per Day 0 $0.00 $0.00

TOTAL VEHICLE $0.00PER DIEM STAFF RATE UNIT USEAGE

Total Meal/Hotel: $0.00

TOTAL PER DIEM $0.00

SUBCONTRACTOR COSTS

Equipment Procurement

Name Equipment Rate Units Usage Totals $0.00 Per Day 1 $0.00

Total Equip.: $0.00 Services Procurement

Name Purpose Rate Units Usage Totals

Total Services: $0.00

TOTAL $0.00

LABORATORY COSTS

Analytical Costs Parameter Method Media Rate Turn Around Total Samples Totals

TAT 24-hr=110% (2.1) 3-day=65% (1.65) 1-week=20% (1.20) Total Lab: $0.00

Rate Units Usage Shipping - Large (25 to 50 lbs.) --- --- $150.00 Per Cooler 0 $0.00

Shipping - Small (0 to 25 lbs.) --- --- $110.00 Per cooler 0 $0.00

Total Shipping: $0.00

TOTAL LAB $0.00

EQUIPMENT

Personal Protection

Item Rate Unit Usage TotalsPPE Level D $35.00 Per Man Day 0 $0.00

Total PPE: $0.00 Expendables Miscellaneous Expendables $40.00 Per Day 0 $0.00

Total Expendables: $0.00 Equipment Items

Total Equipment Items: $0.00 Equipment Kits

Total Equipment Kits: $0.00

TOTAL EQUIPMENT $0.00

INITIAL SITE ASSESSMENT WORK PLAN

www.arcadis.com

Former Bartley's Laundry ISA Work Plan 09092022_ 4 time of this submittal. Arcadis will forward information provided by the current owner should it become available in the future.

5 INITIAL SITE ASSESSMENT WORK PLAN

A flexible assessment approach will be used to create a site-specific unsaturated soil and groundwater database capable of determining the absence/presence and extent of chlorinated drycleaning solvents above soil and groundwater CTLs. In addition, potential risks and exposure pathways will be identified and a preliminary recommendations and design provided for remedial action, if justified. The proposed assessment activities will be completed in accordance with FDEP’s Standard Operating Procedures (SOP) (001/01), the site-specific HASP, Chapter 62-780 Florida Administrative Code (F.A.C.), and recent guidance provided in the July 13, 2022 Waste

Cleanup Program Pollution Response Action Contract (WCP PRAC) meeting in Tallahassee, Florida.

Based on the reported historical PCE contamination in the shallow soil (southeast corner of the former Bartley’s facility unit), the anticipated depth-to-water (~7 ft bg), multiple assessment methodologies are proposed.

Unsaturated soil assessment will be completed by the installation of soil borings to two feet into the water table, soil field screening using a PID capable of detecting to parts per billion (ppb), commonly referred to as a ppbRAE®, soil sampling for fixed-based laboratory analysis of volatile organic compounds (VOCs), and completing a Modified Active Soil Gas Survey (MAGS).

The first phase of groundwater assessment will be completed as follows:

installing a source area monitor well (MW001) inside the facility for fixed-based laboratory analysis of VOCs, completing vertical profiling using direct-push technology (DPT) for fixed-based laboratory analysis of VOCs;

and, installing piezometers to assess groundwater gradient conditions.

Following receipt and evaluation of the first phase of assessment, the scope of the next phase of investigation activities, such as additional monitor wells, will be developed in consultation with FDEP. The site assessment methods and techniques are described in detail below.

5.1 Site Preparation and Utility Locate

Arcadis will contact the current site operator and current property owner (Publix representative, Ms. Maya Moss) to share proposed sampling locations and advise schedule/notification requirements prior to completing field work. Arcadis will oversee a subsurface private utility locate using ground penetrating radar (GPS) on the site and surrounding areas. The purpose of the utility locate will be to establish/confirm the suspected locations of underground utilities (Sunshine State One Call will initially locate utilities on and surrounding the site). The initial site visit indicated the presence of underground water, sewer and electrical lines as shown on Figure 3.

Former Bartley's Laundry ISA Work Plan 09092022_ 5

5.2 Soil Assessment and Sub-Slab Soil-Gas Sampling

5.2.1 Unsaturated Soil Assessment

One continuous soil boring (SB010) will be installed in the rear of the facility to a depth of approximately 50 ft bg or into the basal confining clay at the bottom of the surficial aquifer to characterize site lithology and for field screening of the unsaturated zone for synthetic organic vapors. A lithologic log of the general geology at the site will be developed from the soil samples collected from this soil boring. Soil samples from each boring will be described by an onsite Arcadis geologist.

To confirm if past drycleaning operations at the site had an adverse impact to unsaturated soil quality conditions, up to 12 soil borings (SB001-SB012) for collection of soil samples are proposed for installation at the locations shown in Figure 3. The initial sample location will be placed in vicinity of the confirmed PCE soil impacts inside the unit; additional boring/sample locations will be placed within and surrounding the building. Soil boring locations may be adjusted based on the GPR results and location of the sewer lateral.

The soil borings will be installed using a hand auger and DPT. A concrete coring machine will be used to bore through the concrete floor inside the building to access the underlying soils. Soil samples at all soil borings will be collected at 0.5 ft bg, 2 ft bg, and then at two-foot depth intervals to a depth of two feet into the water table

(estimated to be at 7 ft bg). All soil samples (up to 6 samples/boring x 12 initial boring locations or a total of up to

72 soil samples) will be submitted to a fixed-based laboratory for confirmatory analysis of VOCs by EPA Method

8260. Each soil sample will also be collected in encore samplers in anticipation of SPLP analysis. Five SPLP analysis are included in the initial costs. Following the sampling, the boreholes will be sealed with cement grout.

Soil samples will also be transferred to mason jars, covered with aluminum foil and screened with a ppbRAE equipped with a photo-ionization detector to determine if the soils contain the presence of synthetic organic vapors.

5.2.2 Modified Active Gas Sampling

MAGS is proposed for completion inside and outside the building. MAGS will be completed in general agreement with the Modified Active Gas Sampling Manual, dated October 12, 2004. Six MAGS wells (MAG01 – MAG06).

One MAGS point will be installed near the front door because the previous soil impacts were detected in the southeastern corner of the building unit. The MAGS points will be constructed of 2-inch diameter PVC with 0.010-inch slotted screen set approximately one foot below ground surface to approximately one foot above water, estimated to be 7 ft bg, resulting in an assumed screen interval of 1 to 6 ft bg. Final MAGS well construction will be field determined. One vapor sample will be collected from each MAGS well at the end of the test for analysis of

VOCs by EPA Test Method TO-15. Proposed MAGS well layout locations are depicted on Figure 3.

5.3 Groundwater Assessment

5.3.1 Groundwater Vertical Profiling

Groundwater assessment will be conducted utilizing vertical profiling by a direct-push drill rig to collect water samples for VOCs analysis. Five vertical profile (VP) locations (VP001 – VP005) (at or near reported and suspected source areas and downgradient) are proposed as shown on Figure 3. Assuming the water table will be

Former Bartley's Laundry ISA Work Plan 09092022_ 6 encountered at approximately 7 ft bg and the base of the surficial aquifer is approximately 40 ft bg, samples starting at the water table and at 10-ft depth intervals to a total depth of 41 ft-bg (7-11, 17-21, 27-31, and 37-41 ft

bg) will be collected. Lithologic information from Soil Boring SB010 will be used to determine exact sample intervals. Each VP water sample will be submitted to a fixed-based laboratory for confirmatory analysis of VOCs by EPA Method 8260. Following sampling, each vertical profile borehole will be sealed with cement grout.

5.3.2 Piezometer Installation

Arcadis will install two piezometers and utilize the interior monitor well MW001 (described below) and the existing well (TMW-1) to provide groundwater gradient information. For purposes of this Work Plan, it is assumed that two shallow piezometers (PZ001 and PZ002) will be installed with 10-ft of 0.010-inch slot pre-pack screen, between 4 to 14 ft bg using DPT (Figure 3). Final location, dimensions, including depth, and screen interval will be determined based upon groundwater elevations encountered during the initial assessment activities. The piezometers will be developed and completed in a method to allow them to be converted to monitor wells in the future, if necessary. Arcadis will also survey the top of casing elevations of MW001, TMW-1, PZ001 and PZ002 relative to common point so that the groundwater gradient can be determined.

5.3.3 Monitor Well Installation and Sampling

Arcadis will hand-install a source area well inside the facility (MW001) into the water table to maximum depth possible at the location presented on Figure 3. The well will be constructed with 0.010-inch slot pre-pack screen, developed, and completed within a manhole. Arcadis will sample MW001 and existing well TMW-1 per SOP

001/01 methodology for laboratory analysis of VOCs using EPA Method 8260.

Based on the results of the initial assessment activities and vertical profiling results, the installation of additional monitor wells and sampling analyses in a subsequent phase will be developed in consultation with FDEP. Also, sampling for per- and polyfluoroalkyl substances (PFAS) will be screened per FDEP guidance and tasked separately.

6 REPORTING

An Initial Site Assessment Report (ISAR) including field logs, photographs, laboratory reports will be submitted to

FDEP within 30 days of receipt of laboratory data as an interim deliverable to document the fieldwork. The ISAR will provide a basis for the next phase of work which may include additional soil sampling, the installation of permanent monitor wells, a professional survey, etc. to be completed under a Task Assignment Change Order

(TACO).

A final Site Assessment Report (SAR) will serve as the final deliverable and will describe the results of the proposed site assessment tasks described herein will be delivered to FDEP within 60 days of completion of the field work. The SAR will contain field logs, laboratory reports, tables, and figures summarizing the results of assessment activities and include conclusions and recommendations based upon findings.

7 INVESTIGATIVE DERIVED WASTE

Investigative derived wastes (IDW - drill cuttings and purge water) generated during site assessment activities will be drummed, labeled and temporarily staged on-site in Department of Transportation (DOT)-approved, 55-gallon

Former Bartley's Laundry ISA Work Plan 09092022_ 7 steel drums. Arcadis will coordinate with a waste disposal contractor for non-hazardous disposal of the IDW and provide copies of final disposal manifests to FDEP.

8 QUALITY ASSURANCE & QUALITY CONTROL

All fieldwork will be performed in accordance with FDEP’s SOP (001/01), and the site-specific HASP included under separate cover. Additionally, sample analyses will be performed by NELAP-certified laboratories to method practical quantitation limits. Appropriate QA/QC samples will be collected during the assessment.

9 PROJECT SCHEDULE AND COST

Cost estimate/level of effort (CEF-LOE) worksheets and subcontractor bid copies for the implementation of this

ISAWP will be provided separately upon approval of this Work Plan. A proposed schedule for the site assessment activities, ISAR, and the final SAR document package, is presented in Appendix C.

10 REFERENCES

Chastain-Skillman, Incorporated. 1999. Limited Site Assessment Report.

FDEP. 2022. Waste Cleanup Program Pollution Response Action Contract (WCP PRAC) Summary Slides.

Southwest Florida Water Management District, 1988. Ground-Water Resource Availability Inventory: Pinellas

County, 1988.

SITE ASSESSMENT WORKPLAN

SUMMARY CHECKLIST

Task No.: DC024A FDEP Contractor/Contract No.: HW680 Site Name: Site ID No.:

Site Address:

Subtask 1: Fieldwork Logistics

1.1 Offsite Property Access – Generally not applicable unless site is so small that this is required to complete initial site assessment phase Comments:

1.2 Utility Clearances

State-wide Utility Locating Service 1-800-432-4770 Private utility locate?

1.3 Other (specify)

Subtask 2:

2.2 Professional Survey of site features and soil/DPT/MW sample locations and TOC elevations (NAD 83 Florida North State Plane coordinate system and NAVD 1988)

2.3 MAGS

No. MAGS Points: Six (Hand-augered) No. Vacuum Monitoring Points:

Air Sample Analysis: TO-15 (specify Suma cannisters or tedlar bags) Screen Interval for MAGS:

Notes: 1) Soil samples must be collected from standard depth intervals from each MAGS point,

2) One, 3-vacuum level (low to high) step test must be conducted as the initial MAGS test, 3) bottom of screen must be set ~0.5’ to 1’ above water table as determined by concurrent measurement

2.4 Perform Soil Sampling and DPT Groundwater Profiling (See Figure 4 for sample locations) No. Sampling Locations: 1 DPT Lithology Boring(s) to max depth of penetration 12 DPT Soil Borings (DPSB) for soils below five feet: 6', 8', 10' 12 Hand Augered Soil Borings (HASB) to five feet: 0.5', 2', 4' 6 DPT water sampling (DPWS) vertical profiling to 41’

# Fixed/

Samples ID Matrix Samples Depth Mobile Methods SB001(0.5) Soil 0.5 and 2’to WT SB001(6) Soil below 5' VP001(711) GW Every 10’ to 50’

Former Bartley's Laundry 875 West Bay Drive, Largo, FL

ERIC_5262

Not applicable at this time.

Yes- GPR

Site Assessment (See Figure 3 for proposed sampling locations)

2.1 Number of Mobilizations: Two (1st: Soil borings, vertical profiling, MW/PZ install; 2nd: MW sampling and MAGS testing)

Professional survey anticipated for second phase of work after MWs are installed.

1-6 ft bg vacuum will be measured at MAGS points-

Fixed Fixed Fixed

EPA Method 8260 -VOCs EPA Method 8260 -VOCs EPA Method 8260 -VOCs

Expected DTW: 7 feet Expected Lithology: sand to 37 ft underlain by sandy clay and clay w/ phosphates Notes:

1) If DTW is >10’, collect soil to 10’ at 2’ intervals, then at 5’ intervals to water table

2) Include no QC samples unless for PFAS or other justifiable reason

3) If petroleum solvent DC machine is suspected/eligible, add 8260 full list, 8270 partial list

(e.g. no carcinogenic PAHs/BaP), and TRPH in primary source areas

4) Site Screening Report soil/GW sample(s) must be replicated, if feasible and concentrations exceeded CTLs

Total Numbers: Soil GW SW Sed Other

8260 VOHs

SPLP

Mobile Lab

2.5 Monitor Well Installation/Sampling (See Figure 3 for well locations)

Installed/ Well ID Existing Diameter Completion Depth Screened Interval

2.6 Groundwater Sampling/Analysis

Sample ID Well ID Analytical Method

Total Well Samples:

2.7 Other (e.g. NAM

parameters, Dhc, etc.)

Subtask 3: Investigation-Derived Waste (IDW) Management/Disposal

3.1 Soil Estimated # Drums:

3.2 Water Estimated # Drums:

3.3 Other (specify)

Subtask 4: Initial Site Assessment Report

72 24

TMW-1 Existing 2-in 10-feet unknown MW001 to be installed 1-in 14-feet 4-14-feet

TMW01

MW001

TMW-1

MW001

EPA Method 8260 -VOCs

EPA Method 8260 -VOCs

NAM parameters will be collected after initial phase of assessment, if warranted bburke Text Box (Pending parent sample results)

Preferred Drilling Solutions, Inc.

8820 66th St. North, Pinellas Park, FL 33782

Ph: 727-561-7477 Fax: 727-561-9028 www.pdsflorida.com

DIRECT PUSH TECHNOLOGY QUOTE FORM

Date: 9/28/22 FAC ID#: ERIC_5262

Unit Unit Rate Number of Units Extended Price whole day $1,875.00 4 7,500.00$ half day $1,350.00 -$ per foot $20.00 30 600.00$ each $110.00 5 550.00$ each $60.00 -$ each $30.00 3 90.00$ per well $125.00 9 1,125.00$ roundtrip $650.00 1 650.00$ per crew / per night $450.00 -$ each $110.00 -$ each $70.00 4 280.00$ each $75.00 1 75.00$ lump sum $350.00 1 350.00$ per day $75.00 4 300.00$ per day $350.00 4 1,400.00$ per day $75.00 4 300.00$

TOTAL QUOTE PRICE $12,920.00

Notes: 1. Includes expendables, tubing, points, liners, caps, plugs, saw cuts, development, standby time, steam cleaning decon, and grouting.

Project No.:

Subcontract Company Name: Preferred Drilling Solutions, Inc. (727) 561-7477

Subcontract Mailing Address: 8820 66th St, Pinellas Park, FL 33782

Signature and Title of Person Submitting Quote: ___________________________________Kevin Bonacum, Estimator Date: 9/28/22

Follow PFAS Protocol, Decon Pad, Decon between wells/borings

PFAS Free water delivered daily from PDS Lakeland Facility

875 W Bay Dr, Largo, Pinellas County, FL

Well Completion (includes MH w/ cover, concrete pad, and locking well cap)

Well Riser (includes all materials) ID 1" 5' Length

Slotted PVC Well Screen (includes all materials) 5' Length Pack OD 3.5"

Pre-Packed Well Screen (includes all materials) ID 1" 5' Length Pack OD 3.5"

2" Well Install via hand auger (included all materials)

Direct Push Half-Day Rate 1 - on-site half day

(1) DPT soil boring to 50', continuous soil sampling, disrete sampling required, drum cuttings, grout and restore grade

(6) Vertical profile points to 41', (4) grab groundwater samples per boring, drum cuttings, grout and restore grade

(2) 1" x 12 Piezometers with 10' .010 prepacked screen, soil sampling as needed, drum cuttings, pad and 8" manhole

Drum cuttings, development water, and decon fluids

Site Name and Location: Bartley's Laundry & Dry Cleaners Inc

Consultant Name: Arcadis U.S., Inc.

PROPOSED SCOPE OF WORK:

(6) 2" x 6' SVP's with 5' .010 screen, soil sampling as needed, drum soil & water, pad and 6" manhole

(1) 1" x 10' MW with 5' .010 prepacked screen, installed via hand auger, soil sampling as needed, drum soil & water, pad and 6" manhole

Days to Complete Scope of Work: 4

Direct Push Daily Rate 1 - on-site day

Equipment Type: Geoprobe 8040DT, Geoprobe 3230DT, Geoprobe 7822DT

*Note: It is against PDS policy to drill in Pea Gravel. Borings in Pea Gravel will be terminated or can proceed solely at the risk of the consultant, DEP or Property Owner

Steam Cleaner

Decon Pad

Poly Tank w/ Approved Water (from Lakeland, FL)

Refurbished - DOT Approved 55-gal Drum

NEW - DOT Approved 55-gal Drum

Per Diem

Mobilization

DIRECT PUSH TECHNOLOGY

MISCELLANEOUS

Permits

Concrete Core Drill w/ 6" Bit

Pepe_T Highlight

Sonic Auger DPT Injection Well Abandonment

DATE: 9/12/2022

ESTIMATE #: 922043

PFAS Protocals

ID QTY Unit Rate TOTAL

1 1 each 700.00$ 700.00$

2 Per Diem 4 night 250.00$ 1,000.00$

3 DPT Rig and Crew 5 day 1,650.00$ 8,250.00$

4 Materials: Water Sampling Expendables 24 each 12.00$ 288.00$

5 Materials: Macrocore Liners 9 each 3.00$ 27.00$

6 Materials: Borehole Grouting w/Concrete Cap 7 each 25.00$ 175.00$

7 Materials:1" Sch 40 PVC Well Installation (Indoor/PZ Wells) 34 foot 4.00$ 136.00$

8 Materials: 1" x 5' PVC .010 Prepack Screen (Indoor) 1 each 75.00$ 75.00$

8 Materials:(2) 1" x 5' PVC .010 Prepack Screen, 3" Exp Point 2 each 175.00$ 350.00$

9 Materials: 2" Sch 40 PVC Well Installation (MAGS/OBS) 36 foot 14.00$ 504.00$

10 Materials: 3" Brass Manhole w/Donut Pad (Indoor Well) 1 each 125.00$ 125.00$

11 2' x 2' Concrete Pad w/8" BD Completion 8 each 125.00$ 1,000.00$

12 Well Development (Up to 1/2 hour with pump) 3 each 75.00$ Included

13 Refurbished Drums (Soil) As Needed 0 each 65.00$ -$

14 Refurbished Drums (Water) Client Estimated 4 each 65.00$ 260.00$

15 Concrete Coring Machine/Generator (Indoor Work) 1 day 250.00$ 250.00$

16 Decon Pit 1 each 250.00$ 250.00$

17 Permits (N/A for FDEP Projetcs) -$

Subtotal 13,390.00$

Todd Hodgson

Todd Hodgson TOTAL 13,390.00$

Partner

Drum Purge and Decon Water (Client Estimate 4)

Mobilization

Locations must be accessible with track mounted Sonic Rig

Damage to utilities on private property are the responsibility of the client

Utility Locates on Private Property are the responsibility of the client

Borehole Clearance to 5’ bgs beyond 20 minutes may require a change order for additional time and costs.

THANK YOU FOR YOUR BUSINESS!

DESCRIPTION

If you have any questions concerning this proposal contact Todd Hodgson at (407) 426-7885 at Todd@drillprollc.com.

"Actual quantities used and days onsite will be invoiced"

Completion: 4-5 days

PROJECT

Former Bartley's Dry Cleaner 875 W. Bay Street

Brian R. Burke, P.G.

CUSTOMER

Arcadis

Project Description:

(2) 1" x 12' PVC PZW w/10' of .010 Prepack Screen, 8" BD Completion, No Soil Sampling

(1) DPT Litho Boring to ~50' (or refusal). Grout Borehole/Patch

(6) DPT GW Profiling to 41' BLS at 4 Intervals (7-11', 17-21', 27-31' and 37-41', Grout Borehole/Patch

(6) 2" x 6' PVC MAG Well w/5' of .010 Screen, 8" BD Completion, No Soil Sampling (4 Locations are indoors and 2 are outdoors installed with Hand Augers)

(1) 1" x 10' PVC MW w/5' of .010 Prepack Screen, Donut Pad w/3" Completion. (Indoors-Hand Auger)

Tampa, Florida 33607 Largo, Florida 4300 W Cypress Street, Suite 450

(813) 353-5755 DPT Soil/GW Sampling/MAGS and Well Installation

2300 Silver Star Road, Orlando, Florida (407) 426-7885 fax (407) 426-7586

EARTH TECH DRILLING

2703 NW 19TH STREET, POMPANO BEACH, FL 33069

954.974.2424 FAX:954.974.2423

Date: 9/29/2022

FAC ID#:

PROPOSED SCOPE OF WORK:

Drum Soil & Development water - 30 Minutes of Dev. Per well -

Access to PFAS Free Water supplied by client - We can try to bring some water from our shop but may need more.

Unit Unit Rate Number of Units Extended Price

Equipment Type: DPT Track Rig whole day $1,600.00 4 $6,400.00 half day $0.00 each $225.00 6 $1,350.00 each $0.00 each $100.00 5 $500.00 each $35.00 3 $105.00 per well $195.00 9 $1,755.00 roundtrip $1,200.00 1 $1,200.00 per crew / per night $475.00 4 $1,900.00 each $80.00 4 $320.00 each $50.00 0 $0.00 each $65.00 24 $1,560.00 each $95.00 7 $665.00

$0.00

TOTAL QUOTE PRICE $15,755.00

Notes:

Project No.: ___________________________

Date: 9/29/2022

(2) PZ 1"x12' w/ 10' Pre-Pack Screen & 8" BD Completion - No DPT Soil Sampling - Installed Using DPT Rods

Direct Push Daily Rate 1 - on-site day

Direct Push Half-Day Rate 1 - on-site half day

Vapor Point - 2" x 6' w/ 5' .010" Screen

Auger Attachment, 4" Surface Casing

(1) MW 1"x10' w/ 5' Pre-Pack Screen & 6" BD Completion - Inside Bldg. - Concrete Core - Installed by hand

DIRECT PUSH TECHNOLOGY

Contractor Name: Arcadis / Brian Burke / 813 298-2838

Site Name: Former Bartley's Dry Cleaners - 875 W Bay Street - Largo, FL

(HAND CLEAR ALL LOCATIONS TO 5' or REFUSAL)

(1) DPT Soil Borings to 50' - Grout Abandon

(6) DPT Water Sample Borings with Samples at 11', 21', 31' & 41' = 5 Samples per boring (Total of 24 Samples)

Permits - Install Well

Water Sample

Signature and Title of Person Submitting Quote: Charles Bucher

Concrete Core

Days to Complete Scope of Work: 4 Days

Subcontract Company Name: EARTH TECH DRILLING. Inc.

Subcontract Mailing Address: 2703 NW 19th Street, Pompano Beach, FL 33069

ETD Policy: If pea gravel is encountered, borehole advancement is terminated. If client would like to continue borehole advancement, it is at the risk of the consultant, FDEP or property owner.

MISCELLANEOUS

(6) Vapor Points 2"x6' w/ 5' .010" Screen & 6" BD Completion - Inside Bldg. Concrete Core - Installed by hand

Mobilization

Per Diem

DOT Approved 55-gal Drum

Well Riser (includes all materials) ID ___1"___ 5' Length

Well Completion (includes 30 Min Dev. 8" B-D MH & locking well cap)

Pre-Packed PVC Well Screen (includes all materials) 5' Length Pack OD ___1"____

Monitoring Wells Sparge Wells Horizontal and Vertical Extraction Wells Geotechnical Drilling Direct Push

09/08/2022 12:30 PM PAGE 1 OF 7

Scope of Work

Blanket Quote based on one drum T&D , for service site specific quote - disposal approval required

TCLP Benzene and 4 Metals with Completed Profile required for each site

Drum Pickup /Transportation/Disposal

755 PRARIE INDUSTRIAL PKWY,

MULBERRY, FLORIDA, 33860

QUOTE #: 0030408

DATE: 09/08/2022 PROJECT PROPOSAL

CLIENT

BRIAN BURKE

ARCADIS

4300 W CYPRESS ST, SUITE 450, TAMPA, FLORIDA, 33607

P: (813) 298-2838

PROJECT DESCRIPTION

DRUM PICKUP

VARIOUS SITES CENTRAL FLORIDA

THE FOLLOWING DESCRIBES OUR UNDERSTANDING OF THE SCOPE OF SERVICES TO BE PERFORMED BY ENVIROSERVE, FOR THE

CLIENT, AT THE ABOVE REFERENCED LOCATION KNOWN AS THE JOB SITE.

FEE STRUCTURE

TRANSPORTATION

ITEM EST.QTY. UNIT PRICE UNIT TOTAL

TRANSPORTATION 55 GAL DRUMS

NOTES:SUBJECT TO FUEL SURCHARGE,

1.00 $40.00 DRUM $40.00

STOP FEE 6 DRUMS OR LESS PICKUP 1.00 $50.00 EACH $50.00

TRANSPORTATION SUBTOTAL: $90.00

DISPOSAL

ITEM EST.QTY. UNIT PRICE UNIT TOTAL

55 GALLON NON HAZ DRUM

NOTES: Drum DOT Shippable Drum accessible on hard Surface

80.00 $1.00 EACH $80.00

ENERGY SURCHARGE 10% INVOICE TOTAL 1.00 $17.00 EACH $17.00

DISPOSAL SUBTOTAL: $97.00

TOTAL JOB ESTIMATE: $187.00

bburke Text Box 4 drums bburke Text Box 4 drums bburke Text Box $160 bburke Text Box $320 bburke Text Box 4 drums = $530 x 10% = $583

SITE LINES PROPOSAL ACCEPTANCE

SIGNATURE PAGE

Site Lines Proposal Number: 01175p Proposal Date: October 12, 2022

Project Site: Barley’s Drycleaner Sites – 875 W. Bay Street, Largo, FL

Project Fee: $1,200.00

Payment Terms: [PAYABLE WITHIN 30-DAYS OF INVOICE]

INVOICE TO:

Client: ARCADIS Address: 4300 W Cypress St., Suite 450, Tampa, FL 33607 Attention: Brian Burke, P.G.

Phone: 813-353-5755 Email: brian.burke@ARCADIS.com

Special Instructions:

In witness thereof, the parties hereto have made and executed this agreement

FOR [CLIENT] FOR SITE LINES LLC

Signature: Signature:

By: By: William L. Hardy II

Title: Title: President

Date Signed: Date Signed: October 12, 2022

GEOVIEW, INC.

PROPOSAL ACCEPTANCE SHEET

Project Name: Former Bartley’s Drycleaners

Project Location Largo, Florida

GeoView Proposal #: 10208p

Proposal Date: October 14, 2022

Description of Services Provide Utility Designating and Mapping Services

Project Cost: $2,800 – see compensation, page 3

Payment Terms: Per MSA

CHARGE INVOICE TO THE ACCOUNT OF:

Client: ARCADIS

Address: 4300 W Cypress St., Suite 450 Tampa Tampa, FL 33607

Attention: Brian R. Burke, P.G.

Phone (Office): (813) 903-3151 Phone (Cell): (813) 298-2838

Email: Brian.Burke@arcadis-us.com

FOR APPROVAL OF CHARGES:

Firm:

Address:

Phone No.: Fax No:

Attention:

Special Instructions and/or Mutually Agreed Upon Changes to the Proposal:

In witness thereof, the parties hereto have made and executed this Agreement

Client: GeoView, Inc.

Signature

By: By: Chris Taylor, P.G.

Title: Title: Vice President

Date Signed: Date Signed: October 14, 2022

10220 U.S. Highway 92 East Phone: 813-621-4929 Tampa, Florida 33610 Fax: 813-621-7194 Web: www.survtechsolutions.com Email: Sales@survtechsolutions.com

PROPOSAL 221971

Subsurface Utility Designation

$2,640.00

PM, QA/QC, Clerical, Field Check

$1,425.00

TOTAL $4,065.00

Scope of Services: Subsurface Utility Designation

All SurvTech SUE services abide by the standards set forth by ASCE under (CI/ASCE 38-02)

1. By use of Ground Penetrating Radar (GPR) and Electromagnetic Induction (EM), Attempt to horizontally locate and field mark (paint & flags) all public subsurface utilities found excluding service lines, gravity sewer lines and irrigation within the area outlined on the attached Exhibit “B”.

Deliverables shall be surface marking (paint and/or flags) of horizontal location of found subsurface utilities and a utility designation field sketch(s) of the project area reflecting all obtained relevant data for your use.

TERMS AND CONDITIONS

It is understood that the Arcadis U.S., Inc. is responsible to abide by Sunshine 811, Florida State Statutes Chapter 556.106 and all applicable laws, and regulations that pertain to the services provided.

SurvTech expects Arcadis U.S., Inc. to supply any existing information pertaining to the location of underground utilities in the project area. In addition to any information provided by Arcadis U.S., Inc., SurvTech will proceed with retrieving records from regulatory agencies including but not limited to: Sunshine One Call, local and state utility departments, and private utility providers.

SurvTech will ensure that all reasonable efforts are made to identify the location of each underground utility and provide the best available information within the project area but makes no guarantees that all utilities and structures will be found.

Limitations including but not limited to the lack of or inaccuracy of prints, and restrictions with GPR technology exist due to the complexity of site conditions and circumstances beyond the control of SurvTech.

SurvTech expects that the proposed work area to be free and clear of objects or obstacles that might prohibit access in and around the proposed work area. This would include clearing vegetation, machinery, debris, or any other object that would prevent access to the proposed work area. Failure to do so could result in time delay or incomplete coverage of the proposed work area.

Arcadis U.S. will be responsible for verifying any information provided by SurvTech that is obtained via contact with utility providers as per the Underground Facility Damage Prevention and Safety Act.

The surface designation provided by SurvTech is certified to be within two (2) feet of the true underground position of the utility relative to the mark as shown on the surface.

SurvTech shall not be held liable for any latent or unreasonably discoverable utilities or structures in the project area.

Furthermore, in the event of a claim regarding the services provided in the proposal, SurvTech shall have liability for reasonable and necessary defense costs to the extent caused by SurvTech’s negligence.

SurvTech shall NOT obtain depths while designating utilities. If depths are required, the client must contract for verification (soft dig) services. Soft dig (vacuum excavation) services are NOT included in this proposal.

Notes:

Paint marks will be color coded based upon suspected underground utility, according to the American Public Works Association Uniform Color Code Guide.

Poor conditions for GPR utilization include sites with high water tables (especially saltwater); heavily vegetated areas; heavily rooted soils; ground conditions such as clay and heavily fertilized soil, reinforced concrete; and/or detecting for very smal l, non-metallic lines, such as PVC (2” and smaller).

http://www.survtechsolutions.com/

10220 U.S. Highway 92 East Phone: 813-621-4929 Tampa, Florida 33610 Fax: 813-621-7194 Web: www.survtechsolutions.com Email: Sales@survtechsolutions.com

CLIENT AND SURVTECH SOLUTIONS, INC.

PROFESSIONAL SERVICES AGREEMENT - (SHORT FORM)

This agreement is made and entered into and made effective Wednesday, September 7, 2022 , by and between:

SurvTech Solutions, Inc. Client: Arcadis U.S., Inc.

Name: Raymondjames U. Hicks Name: Brian Burke Address: 10220 U.S. Highway 92 East Address: 14025 Riveredge Drive, Suite 600 Address cont: Tampa, Florida 33610 Address cont:

Phone: 813-621-4929 Address cont: Tampa, FL 33637 Fax: 813-621-7194 Phone: +18133535755 Project No.: N/A Email: Brian.Burke@arcadis.com Estimate No.: 221971

The property upon which the services hereinafter described are to be performed is located at 883 W Bay Dr, Largo, FL, 33770-3221; Property Appraiser Parcel No.: N/A ("the property")

Services: Surveying and mapping services as described in “Scope of Services” as attached herein.

Fee & Time frame: Payment for the hereinabove described services will be $4,065.00. Estimated time frame is 30 days. All government fees or miscellaneous expenses will be incurred by the Client. SurvTech will notify the client of any such fees or expenses prior to the expenses being incurred.

12. By execution of this agreement Client accepts the terms hereof, acknowledges receipt of a copy hereof, including all exhibits, and authorizes Consultant to proceed with the work. In the event Client is not the owner of the property. Client represents that Client has obtained permission from said owner for Consultant to proceed.

IN WITNESS THEREOF, the parties hereby execute this agreement upon the terms and conditions stated above and on the date first above written.

CONSULTANT: SurvTech Solutions, Inc. CLIENT: Arcadis U.S., Inc.

By: _______________________________ By: ________________________________

Name: Raymondjames U. Hicks Name: ______________________________

Title: SUE Division Leader Title: _______________________________

Date: _______________________________ http://www.survtechsolutions.com/

5315 56th Commerce Park Blvd.

Tampa, FL 33610

Phone (813) 413-7760 eWe – Your Partner in Remediation Fax (813) 413-7761

- 2 - EWE-Proposal

PROPOSAL

8 Hr Mags Testing

Arcadis U.S., Inc.

Former Bartley’s Laundry and Dry Cleaning

875 W Bay Drive Largo, FL

Please initial and return to the attention of: Thomas Twitmyer – Tomt@ewithe.net

APPROVED ITEM DESCRIPTION RATES UNIT QUANTITY COST

Remedial Equipment SVE mobile unit $1,200 /job 1 $1,200

Transportation $150 /job 1 $150

Power Supply 55 KW three phase generator $500 /job 1 $500

Effluent Treatment Vapor Phase Carbon $900 /job 0 $0

TOTAL ESTIMATED COSTS $1,850

NOTES:

Estimate valid for 90 days

DATE SERVICES NEEDED: PROPOSAL PREPARED: 10/14/2022

START TIME: ESTIMATED HOURS ON SITE:

PURCHASE ORDER NO.: EWE JOB NO.: EWE -2337

PAYMENT TERMS: Net 30 Days APPROVED COST

BILLING INFORMATION: Officer* Date *Signature Acts as Notice to Proceed at Contract Price

Payment Remitted to: ATTENTION: Mr. Chad Hanna Equipment with Experience, LLC Arcadis U.S., Inc.

5315 56th Commerce Park Blvd 3109 Martin Luther King Blvd, Suite 350 Tampa, FL 33610 Tampa, FL 33607

PHONE: (813) 353-5765

FAX: (813) 903-9115

Email: Chad.Hanna@arcadis-us.com

Thomas F. Twitmyer, EWE Arcadis U.S., Inc.

mailto:Tomt@ewithe.net

ID Task Name Duration Start Finish

1 Receipt of TA for Assessment & Notifications 1 day Mon 9/26/22 Mon 9/26/22

2 Commence Site Assessment Activities 1 day Mon 9/26/22 Mon 9/26/22

3 Coordinate Field Sampling & Subcontractor Management

5 days Mon 9/26/22 Fri 9/30/22

4 Field Activities: MW, PZs, VPs, Soil Sampling, and MAGS

10 days Mon 10/3/22 Fri 10/14/22

5 Lab Results Available 10 days Mon 10/17/22 Fri 10/28/22

6 ISAR Deliverable Preparation 10 days Mon 10/31/22 Fri 11/11/22

7 Second Phase of Assessment Planning 15 days Mon 11/14/22 Fri 12/2/22

8 Field Activities: MW Installation, Sampling and Survey

10 days Mon 12/5/22 Fri 12/16/22

9 Lab Results Available 10 days Mon 12/19/22 Fri 12/30/22

10 Prepare SAR and submit 60 days after field activities

44 days Mon 12/19/22 Thu 2/16/23

18 25 2 9 16 23 30 6 13 20 27 4 11 18 25 1 8 15 22 29 5 12 19 26 5 Oct '22 Nov '22 Dec '22 Jan '23 Feb '23 Mar '23

Former Bartley's Laundromat & Dry Cleaning Proposed Schedule 875 West Bay Drive

Largo, Pinellas County, FL

ERIC_5262

Peerless Cleaners #3416 Annual Monitoring Proposal 4-18-2022.pdf
Annual Groundwater Monitoring
Annual Groundwater Monitoring Report
Schedule
Cost Estimate
Closing Remarks
HW680_DC024B negsum.pdf
Subtask 2: Site Assessment
Subtask 3: Site Assessment Report (SAR)
Driller Bids.pdf
Direct Push
Invoice
Direct Push
GPR bids.pdf
SITE: Bartley’s Drycleaner Site – Largo, Florida
Dear Mr. Burke:
If you have any questions, please feel free to contact me. I look forward to working with you.
Sincerely,
Site Lines LLC
William L. Hardy II
Enclosure
SITE LOCATION
PROPOSED SCOPE OF WORK
RESULTS OF THE INVESTIGATION
PROJECT FEE
CLIENT REQUIREMENTS
DESCRIPTION OF COMPANY INVESTIGATION AND LIMITATIONS
SITE LINES PROPOSAL ACCEPTANCE
SIGNATURE PAGE
Site Lines Proposal Number: 01175p Proposal Date: October 12, 2022
Project Site: Barley’s Drycleaner Sites – 875 W. Bay Street, Largo, FL
Project Fee: $1,200.00
Payment Terms: [PAYABLE WITHIN 30-DAYS OF INVOICE]
INVOICE TO:
Client: ARCADIS
Address: 4300 W Cypress St., Suite 450, Tampa, FL 33607
Attention: Brian Burke, P.G.
Phone: 813-353-5755 Email: brian.burke@ARCADIS.com
Special Instructions:
In witness thereof, the parties hereto have made and executed this agreement
FOR [CLIENT] FOR SITE LINES LLC
HW680_DC024B negsum.pdf
Subtask 2: Site Assessment
Subtask 3: Site Assessment Report (SAR)