Task Assignment Summary
This is a Task Assignment (TA) document issued by the State of Florida Department of Environmental Protection (FDEP) under Contract Number HW680 with Arcadis U.S. Inc., a consulting firm, for environmental remediation work at the Dry Clean USA site located at 10333 Royal Palm Boulevard, Coral Springs, Broward County, Florida (FDEP Facility ID ERIC_4193). The Task Assignment Number is DC022B with a completion date of February 23, 2024. The contract is managed by Theresa Pepe (FDEP Project Manager) and Gus Suarez (Contractor Project Manager).
The scope of work authorizes Arcadis to install four monitor wells to delineate the groundwater plume, with all activities performed according to Arcadis's June 13, 2023 Work Plan. The total Task Assignment value is $34,599.57 under a fixed unit rate basis. Work is divided into four subtasks: Project Management, Site Access ($2,687.28), Well Installation and Sampling ($26,750.92), and Reporting ($5,161.37). The invoice schedule requires FDEP approval of deliverables at three phases: Site Access approval due September 8, 2023; Monitor Well Installation Field logs approval due October 2, 2023; and Well Installation & Sampling Report/IDW manifest/Project Management approval due December 11, 2023. The cost estimate itemizes labor for various professionals (Project Manager, Principal Scientist, Staff Scientist), subcontractor drilling services ($16,235.00 from Earth Tech Drilling), IDW disposal ($1,584.00), laboratory analysis ($402.00), and field equipment and supplies ($1,001.00), with overhead, general and administrative, and fringe benefit markups applied.
View the file
Other files
Show 40 more
50 files listed here. See the rest on GovTribe.
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Funding Information:
Org. Code E.O. Object Code Budget Entity Appropriation
Category Grant # Project # Year Amount
☐ Additional Funding Information attached on separate page.
Rev. 8/26/2020
STATE OF FLORIDA
DEPARTMENT OF ENVIRONMENTAL PROTECTION
Task Assignment This Task Assignment (TA) is entered into between the Parties named below, pursuant to Contract Number: .
1. TA Number: TA Completion Date:
TA Description:
2. Parties State of Florida Department of Environmental Protection (Department)
Department Project Manager: Department Project Manager Phone:
Contractor Name: (Contractor ) ntractor’st ’s Project Manager: ontractor’s t’s Project Manager Phone:
3. Project Number:
(If different from TA Number)
Project Location(s):
Project Name:
4. As consideration for the services rendered by Contractor under the terms of this TA, the Department shall pay the Contractor on the following bases, up to the Total TA Value as indicated below:
☐ Fixed Price:
☐ Fixed Unit Rate: (Extended Price)
☐ Cost Reimbursement:
Total TA Value:
5. The Parties agree to comply with the terms and conditions of the underlying the Contract, and the following attachments which are hereby incorporated by reference:
Attachment 1:
☐ Additional Attachments (if necessary):
IN WITNESS WHEREOF, this TA shall be effective on the last date signed below.
State of Florida Department of Environmental Protection
CONTRACTOR Department Name:
Title: Secretary or Designee
(Authorized Signature) (Authorized Signature) Date:
☐ Additional signatures attached on separate page.
HW680
DC022B Completion February 23, 2024
This task assignment authorizes Arcadis to install four monitor wells to help delineate the groundwater plume. All activities will be performed according to the June 13, 2023, Work Plan submitted by Arcadis.
Theresa Pepe 850-245-8966 Contractor Contractor
Contractor Contractor
Contractor Contractor
Contractor
Arcadis U.S. Inc.
Arcadis U.S. Inc.
Gus Suarez 813-205-4703
ERIC_4193
10333 Royal Palm Blvd, Coral Springs, Broward County
Dry Clean USA
✔ $ 34,599.57
$ 34,599.57
Scope of Work
Gus Suarez
Contract Manager
Gus Suarez, P.E. Digitally signed by Gus Suarez, P.E.
Date: 2023.06.22 08:34:28 -04'00'
Kelly Crain
Kelly Crain Digitally signed by Kelly Crain Date: 2023.06.20 16:52:53 -04'00'
N/A
Task Assignment Notification/Change Order Deliverables and Invoice Schedule Attachment
WCP TAFORM 04-2017
Contract Number:
Task Assignment #:
Deliverables:
Deliverable Deliverable Due Date
Invoice Schedule:
Requirements for Invoice Submittal Amount to be Invoiced
TOTAL COST
Site Access 09/08/2023
Monitor Well Installation Field logs 10/02/2023
Well Installation & Sampling Report/IDW manifest/Project Management 12/11/2023
FDEP approval of Site Access $ 2,687.28
FDEP approval of Monitor Well Installation Field logs $ 26,750.92
FDEP approval of Well Installation & Sampling Report/IDW manifest/Project Management $ 5,161.37
$ 34,599.57
HW680
DC022B
FLORIDA DEPARTMENT OF
Environmental Protection
Bob Martinez Center
2600 Blair Stone Road Tallahassee, FL 32399-2400
Ron DeSantis Governor
Jeanette Nuñez
Lt. Governor
Shawn Hamilton Secretary
Memorandum
TO: Negotiation File Dry Clean USA
FACID NO. 06-9502279; ERIC_4193
Coral Springs, Broward County FROM: Theresa Pepe, Project Manager SUBJECT: Task Assignment DC022B (HW680) DATE: June 20, 2023
Arcadis U.S. Inc. will install and sample four monitor wells to various depths to help delineate the groundwater plume. All activities will be conducted in accordance with the June 13, 2023, Work Plan submitted by Doug McGlone of Arcadis.
The final task assignment total is $34,599.57. Arcadis may invoice according to the attached schedule.
Specific negotiated subtasks are as follows:
Subtask 1: Project Management Project Management is automatically calculated as a percentage of total labor.
Subtask 2: Site Access Arcadis will obtain site access agreements for off-site properties before work commences. A site access form for the source property was obtained in April 2021. No changes in property ownership have occurred since that date.
Subtask 3: Well Installation and Sampling Arcadis will install four off-site monitor wells to delineate the downgradient plume.
Locations and depths have been approved by the Waste Site Cleanup Section geologist.
Earth Tech Drilling was chosen as the drilling subcontractor based on their low bid of three bids solicited. IDW will be drummed and disposed by a licensed waste hauler.
Subtask 4: Reporting Arcadis will submit a well installation and sampling report as the Final Deliverable.
FDEP COST ESTIMATEContractor: Arcadis, U.S., Inc.
Date: 6/15/2023
Task #: SubTask 1 Project Management Site: DCUSA Coral Springs SubTask 2 Site Access
Activity/Phase: Well Installation SubTask 3 Well Installations/Sampling Project Manager: Doug McGlone SubTask 4 Reporting
SubTask 5
Totals 1 2 3 4 5 Labor Rate Category
$67.07 Project Manager McGlone, Douglas (DMc) 8 8.2 $67.07 Principal Scientist McGlone, Douglas (DMc) 21 8 8 5 0$66.87 Principal Scientist Dellay, Leah (LD) 0 0 0 0 0 $67.57 Principal Engineer Perella, John (JP) 0 0 0 0 0 $39.34 Staff Scientist Riley, Joel (JR) 58 8 34 16 0 $39.67 Drafter/Designer Oliva, Brian (BO) 5 0 0 5 0 $34.40 Drafter/Designer Berndgen, Wendy (WDB) 0 0 0 0 0 $35.00 Document Technician Ballheim, Debra (DJB) 0 0 0 0 0 $30.00 Document Technician Embras, Susan (SRE) 0 0 0 0 0 $37.25 Project Assistant Cruz, Michele (MC) 9 2 3 4 0
Total Hours 101 8 18 45 30 0
Direct Labor $4,772.88 $549.09 $925.78 $1,985.87 $1,312.14 $0.00
Overhead 79.00% $3,770.58 $433.78 $731.37 $1,568.84 $1,036.59 $0.00 Gen & Admin 36.00% $1,718.23 $197.67 $333.28 $714.91 $472.37 $0.00 Fringe 37.10% $1,770.73 $203.71 $343.46 $736.76 $486.80 $0.00 Total Labor $12,032.42 $1,384.25 $2,333.89 $5,006.38 $3,307.90 $0.00
Travel Vehicle Rental $360.00 $120.00 $240.00 $0.00 $0.00 Mileage Costs $0.00 $0.00 $0.00 $0.00 $0.00 Air Fare $0.00 $0.00 $0.00 $0.00 $0.00 Per diem + Hotel $0.00 $0.00 $0.00 $0.00 $0.00 Total Travel $360.00 $120.00 $240.00 $0.00 $0.00
Subcontractor (Equipment Procurement) $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Subcontractor Subtotal $0.00 $0.00 $0.00 $0.00 $0.00 Procurement Fee $0.00 $0.00 $0.00 $0.00 $0.00 Total Subcontractor Cost $0.00 $0.00 $0.00 $0.00 $0.00
Subcontractor (Services Procurement) Drilling (Conventional) $0.00 $0.00 $0.00 $0.00 $0.00 Drilling (Non-conventional) $16,235.00 $0.00 $16,235.00 $0.00 $0.00 Mobile Laboratory $0.00 $0.00 $0.00 $0.00 $0.00 Surveying $0.00 $0.00 $0.00 $0.00 $0.00 IDW EnviroServe $1,584.00 $0.00 $1,584.00 $0.00 $0.00 Utilities $0.00 $0.00 $0.00 $0.00 $0.00
$0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00
Subcontractor Subtotal $17,819.00 $0.00 $17,819.00 $0.00 $0.00 Handling Fee $1,781.90 $0.00 $1,781.90 $0.00 $0.00 Total Subcontractor Cost $19,600.90 $0.00 $19,600.90 $0.00 $0.00
Laboratory Analytical Costs $292.00 $0.00 $292.00 $0.00 $0.00 Fast Turnaround Charges $0.00 $0.00 $0.00 $0.00 $0.00 Sample Shipping $110.00 $0.00 $110.00 $0.00 $0.00 Total Laboratory $402.00 $0.00 $402.00 $0.00 $0.00
Field Expenses Personal Protection $0.00 $0.00 $0.00 $0.00 $0.00 Expendables $80.00 $0.00 $80.00 $0.00 $0.00 Equipment (Drilling related) $0.00 $0.00 $0.00 $0.00 $0.00 Equipment (Analytical related) $81.00 $0.00 $81.00 $0.00 $0.00 Equipment (IDW related) $100.00 $0.00 $100.00 $0.00 $0.00 Equipment (Other) $740.00 $0.00 $740.00 $0.00 $0.00 Total Field Expenses $1,001.00 $0.00 $1,001.00 $0.00 $0.00
Subtotal $33,396.32 $1,384.25 $2,453.89 $26,250.28 $3,307.90 $0.00 Completion Fee $1,203.25 $138.43 $233.39 $500.64 $330.79 $0.00
Total Estimated Cost $34,599.57 $1,522.68 $2,687.28 $26,750.92 $3,638.69 $0.00
REV: 02/03 CEF ARCADIS Page 1
SITE : DCUSA Coral Springs SUBTASK 2: Site Access
DATE:
LABOR CATEGORY *PROVIDE TIME REQUIRED FOR EACH PERSON
STAFF-TITLE WORK DESCRIPTION HOURS
(Subtask Title) Principal (DMc) Owner verification and offsite access execution, mob for site meeting with owners 8 Staff Scientist (JR) Offsite access execution 8 Staff Scientist (JR) Project Asst (MMc) Insurance requirement and certificates 2 Drafter/Designer(BO)
TOTAL LABOR 18
VEHICLE TYPE RATE UNIT USEAGE
Automobile $80.00 Per Day 0 $0.00 $0.00 Van/Truck $120.00 Per Day 1 $120.00 $120.00
TOTAL VEHICLE $120.00
PER DIEM STAFF RATE UNIT USEAGE
Meals Category/Staff Rate Unit Usage Totals
$36.00 Per Day 0 $0.00 $36.00 Per Day 0 $0.00
Hotel Category/Staff Rate Unit Usage Totals
$150.00 Per Day 0 $0.00 $150.00 Per Day 0 $0.00
Total Meal/Hotel: $0.00
TOTAL PER DIEM $0.00
SUBCONTRACTOR COSTS
Equipment Procurement
Name Equipment Rate Units Usage Totals $0.00 Per Day 0 $0.00
Total Equip.: $0.00 Services Procurement
Name Purpose Rate Units Usage Totals NAME OF COMPANY Direct-push services $0.00 Lump Sum 0 $0.00
Handling Fee $0.00 Per Month 0 $0.00
Total Services: $0.00
TOTAL $0.00
LABORATORY COSTS
Analytical Costs Parameter Method Media Rate Turn Around Total Samples Totals
TAT 24-hr=110% (2.1) 3-day=65% (1.65) 1-week=20% (1.20) Total Lab: $0.00
Rate Units Usage Shipping - Large (25 to 50 lbs.) --- --- $150.00 Per Cooler 0 $0.00 Shipping - Small (0 to 25 lbs.) --- --- $110.00 Per cooler 0 $0.00
Total Shipping: $0.00
TOTAL LAB $0.00
EQUIPMENT
Personal Protection
Item Rate Unit Usage Totals Total PPE: $0.00
Expendables
Total Expendables: $0.00 Equipment ItemsPID/FID Combo or FID $125.00 Per Day 0 $0.00
Total Equipment Items: $0.00 Equipment Kits
Total Equipment Kits: $0.00
TOTAL EQUIPMENT $0.00
SUBTASK 3: Well Installations/Sampling
DATE:
LABOR CATEGORY *PROVIDE TIME REQUIRED FOR EACH PERSON
STAFF-TITLE WORK DESCRIPTION HOURS
(Subtask Title) Principal (DMc) Field support & oversight, site owner/tenant access/discussions, IDW management 8
Staff Scientist (JR) Mob/demob (3 hrs), well installations (20 hrs) 23
Staff Scientist (JR) Mob/demob (3 hrs), survey (2 hrs), sample 4 wells, pack/ship (6 hrs) 11
Project Asst (MMc) Process field notes, data entry, sample tracking 3
Drafter/Designer(BO) 0
TOTAL LABOR 45
VEHICLE TYPE RATE UNIT USEAGE
Automobile $80.00 Per Day 0 $0.00 $0.00
Van/Truck $120.00 Per Day 2 $240.00 $240.00
TOTAL VEHICLE $240.00
PER DIEM STAFF RATE UNIT USEAGE
Meals Category/Staff Rate Unit Usage Totals
$36.00 Per Day 0 $0.00
$36.00 Per Day 0 $0.00
Hotel Category/Staff Rate Unit Usage Totals
$150.00 Per Day 0 $0.00
$150.00 Per Day 0 $0.00
Total Meal/Hotel: $0.00
TOTAL PER DIEM $0.00
SUBCONTRACTOR COSTS
Equipment Procurement
Name Equipment Rate Units Usage Totals $0.00 Per Day 0 $0.00
Total Equip.: $0.00 Services Procurement
Name Purpose Rate Units Usage Totals NAME OF COMPANY Direct-push services $0.00 Lump Sum 0 $0.00 ETD Drilling services $16,235.00 Lump Sum 1 $16,235.00 NAME OF COMPANY IDW $198.00 Drum 8 $1,584.00
Handling Fee $20.00 Per Month 0 $0.00
Total Services: $17,819.00
TOTAL $17,819.00
LABORATORY COSTS
Analytical Costs Parameter Method Media Rate Turn Around Total Samples Totals
VOC 8260 Aqueous $73.00 1.00 4 $292.00TRPH FL PRO Soil $88.00 1.00 0 $0.00
TAT 24-hr=110% (2.1) 3-day=65% (1.65) 1-week=20% (1.20) Total Lab: $292.00 Rate Units Usage
Shipping - Large (25 to 50 lbs.) --- --- $150.00 Per Cooler 0 $0.00
Shipping - Small (0 to 25 lbs.) --- --- $110.00 Per Cooler 1 $110.00
Total Shipping: $110.00
TOTAL LAB $402.00
EQUIPMENT
Personal Protection
Item Rate Unit Usage Totals Total PPE: $0.00
Expendables Miscellaneous Expendables $40.00 Per Day 2 $80.00
Total Expendables: $80.00 Equipment ItemsPID/FID Combo or FID $125.00 Per Day 0 $0.00
Tubing, Poly/HDPE $0.30 Per Foot 250 $75.00 Tubing, Silicon 3/16x3/8 $3.00 Per Foot 2 $6.00
55-gallon Drum $100.00 Each 1 $100.00
Total Equipment Items: $181.00 Equipment Kits Monitor Well Installation Kit $325.00 Day 1 $325.00Hydrogeological Evaluation Kit $295.00 Day 0 $0.00
Deep Groundwater Sampling Kit $415.00 Day 1 $415.00Shallow Groundwater / Soil Vapor Screening Kit $290.00 Day 0 $0.00
Total Equipment Kits: $740.00
TOTAL EQUIPMENT $1,001.00
SUBTASK 4: Reporting
DATE:
LABOR CATEGORY *PROVIDE TIME REQUIRED FOR EACH PERSON
STAFF-TITLE WORK DESCRIPTION HOURS
(Subtask Title)
Principal (DMc) Prepare and submit field notes, lab report, sample forms and deliverable to FDEP; Technical evaluation 5
Project Engineer (TH) 0
Staff Scientist (JR) Data evaluation and preparation of deliverable 16
Project Asst (MMc) Assemble report, ADaPT upload 4
Drafter/Designer(BO) Figures production for report 5
TOTAL LABOR 30
VEHICLE TYPE RATE UNIT USEAGE
Automobile $80.00 Per Day 0 $0.00 $0.00
Van/Truck $120.00 Per Day 0 $0.00 $0.00
TOTAL VEHICLE $0.00
PER DIEM STAFF RATE UNIT USEAGE
Meals Category/Staff Rate Unit Usage Totals
$36.00 Per Day 0 $0.00
$36.00 Per Day 0 $0.00
Hotel Category/Staff Rate Unit Usage Totals
$150.00 Per Day 0 $0.00
$150.00 Per Day 0 $0.00
Total Meal/Hotel: $0.00
TOTAL PER DIEM $0.00
SUBCONTRACTOR COSTS
Equipment Procurement
Name Equipment Rate Units Usage Totals $0.00 Per Day 0 $0.00
Total Equip.: $0.00 Services Procurement
Name Purpose Rate Units Usage TotalsNAME OF COMPANY Direct-push services $0.00 Lump Sum 0 $0.00 Handling Fee $20.00 Per Month 0 $0.00
Total Services: $0.00
TOTAL $0.00
LABORATORY COSTS
Analytical Costs Parameter Method Media Rate Turn Around Total Samples TotalsVOC 8260 Aqueous $150.00 1.00 0 $0.00
TAT 24-hr=110% (2.1) 3-day=65% (1.65) 1-week=20% (1.20) Total Lab: $0.00 Rate Units Usage
Shipping - Large (25 to 50 lbs.) --- --- $150.00 Per Cooler 0 $0.00
Shipping - Small (0 to 25 lbs.) --- --- $110.00 Per cooler 0 $0.00
Total Shipping: $0.00
TOTAL LAB $0.00
EQUIPMENT
Personal Protection
Item Rate Unit Usage Totals Total PPE: $0.00
Expendables Miscellaneous Expendables $40.00 Per Day 0 $0.00
Total Expendables: $0.00 Equipment Items
Total Equipment Items: $0.00 Equipment Kits
Total Equipment Kits: $0.00
TOTAL EQUIPMENT $0.00
Use or disclosure of information contained on this sheet is subject to the restriction and disclaimer located on the signature page of this document.
Arcadis U.S., Inc.
1500 Gateway Boulevard
Suite 200
Boynton Beach
Florida 33426
Tel 561 697 7000
Fax 561 369 4731 www.arcadis.com
Page:
1/2
Ms. Theresa Pepe, Project Manager Hazardous Waste Cleanup Section Florida Department of Environmental Protection Bob Martinez Center, MS 4520 2600 Blair Stone Road Tallahassee, FL 32399-2400
Subject:
Proposal for Additional Assessment Dry Clean USA Coral Springs 10333 Royal Palm Blvd., Coral Springs, FL FDEP Facility ID No. ERIC_4193
Dear Theresa:
As requested, Arcadis U.S., Inc. (Arcadis) is pleased to provide the Florida Department of Environmental Protection (FDEP) this proposal for monitor well installation and sampling and preparation of report of findings with recommendations as to whether the monitor well network is adequate.
PROPOSED SCOPE OF WORK
Task 1: Project Management
This task includes project management activities associated with completion of Tasks 2 through 4.
Task 2: Offsite Access
Arcadis will obtain site access to two offsite parcels (Folio Numbers 484121360011 and 484121360012). Ownership will be verified and the owners contacted and requested to execute FDEP offsite access agreements.
Task 3: Well Installations, Sampling/Analysis
The new wells will be constructed with 2-inch diameter pvc and 0.010-inch slotted screen. A total of four wells will be installed in two clusters. Each cluster
ENVIRONMENTAL
Date:
June 13, 2023
Contact:
Douglas J. McGlone
Phone:
561-662-7978
Email:
douglas.mcglone@arcadis.com
Our ref:
DC Coral Springs
Florida License Numbers
Engineering
Geology
GB564
Surveying
LB7062
This proposal and its contents shall not be duplicated, used or disclosed — in whole or in part — for any purpose other than to evaluate the proposal. This proposal is not intended to be binding or form the terms of a contract. The scope and price of this proposal will be superseded by the contract. If this proposal is accepted and a contract is awarded to Arcadis as a result of — or in connection with — the submission of this proposal, Arcadis and/or the client shall have the right to make appropriate revisions of its terms, including scope and price, for purposes of the contract. Further, client shall have the right to duplicate, use or disclose the data contained in this proposal only to the extent provided in the resulting contract.
arcadis.com C:\Users\Pepe_T\Desktop\DCUSA Coral Springs Proposal 6-15-23.docx
Theresa Pepe June 16, 2023
Page:
2/2 will contain a well screened 50-55 ft and 65-70 ft (one cluster per offsite parcel). The top of casing elevation of the newly installed wells will be surveyed and referenced to the existing well network. The four newly installed well for the presence of VOHs by EPA 8260
Task 4: Supplemental Groundwater Assessment Report
A brief letter report summarizing well installation and survey elevations, and groundwater monitoring methods and results including a table summarizing the groundwater analytical results and figures illustrating the extent and magnitude of the groundwater impacts and copies of sample lab reports will be provided to the FDEP, along with recommendations for future site activities. The report will be signed and sealed by a Florida registered professional geologist.
SCHEDULE
Arcadis will begin implementing the proposed tasks upon receipt of a Task Assignment (TA) from FDEP.
We anticipate performing the well installations and groundwater sampling within 30 days of receiving Task Assignment. We anticipate submittal of the letter report within 45 days of completion of field work activities.
Cost Estimate
Cost Estimate and Level of Effort Forms (CEF-LOE) that present estimated project costs are enclosed in Attachment 1.
CLOSING REMARKS
Arcadis appreciates the opportunity to assist the FDEP with this site. If you have any questions or wish to discuss this proposal, please do not hesitate to contact us.
Sincerely, Arcadis U.S., Inc.
Douglas J. McGlone, P.G.
Principal Hydrogeologist c
F z t o (l
Io
I o i.
q ô t)-¡ f o
È
I a
?ó ði
@E 3É i!
õ ft9 ró z lìi g fr."ø qfr oo aõ l
-trrO,ì
-qf ñ'E c: t-5àoo9, >ú>õgÀ
E;1 õ t, ñ
DRY CTEAN USA
FDEP FACILITY l.D. NO. 06-9s02779 / ERIC 41S3
10333 ROYAL PALM BLVD., BROWARD COUNTY' FLORIDA
zn¿ -sÈrvli-ÀHÑÚÀt posr INJEGTIoN MoNlroRlNG REPoRT
D|STRIBUTION OF VOC COMP_OUN-D-q fn i¡¡renueD¡ATE zoNE (35-55 ft. BG)
GROUNDWATER
ARCADIS
FIGURE
LEGEND
CORA! 6PRINS6
qUMdTJ¡¡
OtJi¡PgfER
EN€LOSURE
SUILIN'S PßK ö I t
I
SHALLOW MONITOR WELL
INTERMEDIATE MONITOR WELL
DEEP/DEEPER MONITOR WELL
CLUSTÊR MONITOR WELL
¿5-55 FT- INJECTION WELL
UNDERGROUND NATURAL GAS
SANITARY SEWER
SAMPLE I D.
SAMPLË DAÏE
PCE CONCENTRATION (ug/L) TCE cONCENTRATION (ugll) cis-1,2-DCE CONCENTRATIoN (us/L) VINYL CHLORIDE CONÇENTRA-llON iug/Ll {BÕld ¡ndrcâles GCTL exceedance' iÓd¡cåtÊs NADC exceedance'
"U indicãles comPound was a¡âlyzed for bul nol det€cled "l" indicates resul{ ìs between laborãtory Pråclicâl ouanLitâlìon Limil IPOLI âñd laboratory lVethod Detecl¡on Limil [[rDL])
LINE OF CROSS SECTION
APPROXIMAÍE EXTENT OF VOH
IN GROUNDWATER ABOVF GCTL
APPROXIIVIATE EXTENT OF VOH
lN GROUNDV'/ATER ABOVË NADC
ENCLOSURE
1RANSFORI¡ER
-,Ët--"
I --t\ --''\, Ilä'ìGãiDl l-1t;îtâ-l ln4ooUl 10400 l_lI lqrso uJ L.- !..83- .=i l¿fv.¡ti
USA
INJ.1
!'i,r,,. rdÍ¡¡
FIRÉ HYORANT
FIRE H.i,I)R-ANT
O(¡¡PI'TER
ENCLOSURE
r:,l\..J- 1 ót)
A- -A\ ,/-\
\..//-.-'.t i,¡\.¡t r:
Ðþ:_:::::f,1tar., '
I
ROYAL PALI\¡I BLVD.
'"i"
I X tvtw-:g
. FIREhYDRANT
1ç \
I I I i
A t I i
I ilR íiliiñ 0ÂY ct.[¿\\ t-c oo F f an!azo u, oI
I t I
I I T a I
=:3&tefiûru@
I]IRY CLEAN EOUIPMENT LAYOUT DETAIL
0 S0' 160'
GRAPHIC SCALE
5egs ¡ ço ç' to <c çq t
I I
\I
O¿'{os'-to l'**,***"0*, ? - \\ ?\ur n-
Çt:
2A17, rr¿
?j/--.-i'"ì!i'.
'rnat, o38
1.4
ECOKIDS
PRESCHOOL
CENTRAL /
STAT'/
ÞANK
fi, ..21ß
I I I
--t-t'
MWO1l a
';1!t û¡ rt trlwooz,P
I
MW.34
3 ti', , a)o;
I l.rl !¡!!.2¿ rglcso
/ PLAY
AREA
a, -'1191 !-t-
,p,!!9!
o¿00il q-.!F_u,_
2.8 ¿ 17Á 1 ti?a
177 21ri I 7 6t, ts o o
É<
I
I t ô ì0 I f o
È
I a i,ò Fö
9õ
9ü -E.'?
@5
>?ts9
6I-õñ o9 Þr¡ z ryF &-È
6i
OO
l óq {(\p ¿iB< os;
ZPrilÙ> )G2 ã93 9ù ø;f,
a) o, DRY CLEAN USA
FDEP FACltlrY LD. NO. 06-9502779 / ERIC 4193 r0333 RõVAL PALM BLVD,, BROWARD COUNTY. FLORIDA zn¿
-sÈrúl-ÀtuÈ¡Ùnl posr lNJEcrloN MoNlroRlNG REPoRT
DISTRIBUT¡ON OF VOC COMPOUNDS
rN DEEP ZONE (70-85 FT. BG)
GROUNDWATER
ffiARCADIS I o
LEGEND
coru sRlN@ sYrl{À6lu¡¡ q.|æglER Êr{cLoSuRE
CruffiPRK a t t x I lFw--rj,l tl/å49- t I 0,400 u i
I b-.{õõ.ü Ì lõ.¿õo=rl I l õroflú l
SHALLOW MONIlOR WELL
INTERMEDIATE MONITOR WELL
DEEP/TEEPER MONITOR WELL
CLUSTER MONITOR WELL
60-70 FT, INJECTION WELL
UNDERGROUND NATURAL GAS
SANITARY SEWER
SAI\¡PLE I.D.
SAMPLE DATE
PCË CONCENTRATION {ug/L) TCE CONCENTRATION (uglL) crs,1,2-DCE CONCENfRAf ION (ug/L) VINYL CHLORIDE CONCENTRATION {ug/L) (Bold ind¡cates GCTL exceedance ind¡câles NADC exceedânce, 'iU" indicales compound was analyzed lor bul nol de¡ecleci. "ì iodicales fes!l is beMee¡ lãbo¡âlory Prâclical QuanlÌtãl¡on Lrmú IPOL] and lâborãtory
Melhod Delertion Lìmil IMDLI)
LINE OF CROSS SFCTION
APPROXIMATE EXIËNT OF VOH
IN GROUNDWA II-R ABOVE GC I I
APPROXIMATE EXTËNT OF VOH
IN GROUNDWATER AãOVE NADC
IM¡{8FORTÆR
í,:,'. - i \ f\
I
-.ft)
I
+- ---tt-at-t' ----
'o iú!ì:.:.r -"-\"
I
---lì/]w--l-F i¿ - -\q Ð
DI'/iPEIEß ENCLOSTJRE il\'ii.16ùI
I
I I I
I
I
' 5S C.ÊA¡iOJt
I !-ìR--- -hli:.i.4 ? \--./-^\ I t
I
I I I
I I
U9A a
\.)t\ i'l \rr'".1 iI
('ltr.i/.O
X MW-2s
.a
MWO 1
FIRE I-{YDRANl
I
S. FIRE
I t" I'w' fcRilElì
DÀY CL,ÊAN
tJSA oôa Þ.
o{u og, o F a") fa rwol3 t I I tlì/'l' 1ÐR t
ROYAL PALM BLVD.
0?5
DEIAL GRAPHìC SCAI L
(,1-1a' ->g I
DRY CLEAN EOUIPMENT LAYOUT DETAIL
0 80, 160'
GRAPHIC SCALE
5 o -ÇÇ' I I ì I
I I I
I
(bç to ,1- tl tz\Otra
2017.
!!J.QJA.L1:JL\
ô3AU I 38
0.36 lJ 0.36 {J 0.36 U 471 2A0 H22 303 ¿t. a J.-aoq 23i 12iu I b969:-
I
I rÉlceo
/ PLAY
AREA
ECOKIDS
FRESCHOOL
CÊNTRAL , /
STATZ.
ÞANK
INJ-6
lll\r:¡.2Cts
. MWOOT
I o liñ'.lC: ?
I rr!/\r0f]r.
i"4t¡.Jû1-1
1t2t2L
-q.3q,!l-
0.36 U
zqo 26f, 157i37
ISAR'TIJ TECIJ
Dß-TLLTtvG
EnvtÍonmonttt I Geotechntcat
9 54.97 4- 2424
2703 NW 19th Street, Pompano Beach, FL 33069
Monitoring Wells Sparge Wells Direct Push
Geotechnical Drilling SONIC Drilling
6/13/2023DATE
PHONE (561) 662-7978Doug McGloneCLIENT: Arcadis
SITE: Former Dry Clean USA - 10333 Royal Palm Blvd. Coral Springs, FL
PROPOSED SCOPE OF WORK: Client to provide access to water source - Hand Clear to 5' or Refusal at all locations
(2) MW 2" x 55'w/ 5' .010" Screen (20/30 Sand) - 8" BD Completion - No Soil Sam
MW 2" x7O'wf 5' .010" Screen (2Ol3O Sand) - 8" BD Completion - No SoilSampling
Drums for Soil & Development Water
(21 pling
Unit Rate
Number of Units Extended PriceUnitSONIC DRILL
Sonic Daily Rate
Sonic Per Foot Rate
8" Sonic Over Ride Casing s7,800.00 so.o0
S1,1oo.ooCompact Track Loader / Water Support
Sonic Daily Rate (Compact Track) Price lncludes a ten hour work day ( 7 to 5 ) Unless otherwise stated ¡n this quote.
per day 5550.00 2 s3,goo.oo 2
$o.oo
So.oo per foot 520.00 p"j Ity per foot
WELL MATERIALS
5o.oo
S4,ooo.oo per foot4" PVC Well Material (includes all annular backfill) per foot
$o.oo
1" PVC Well Material (includes all annular backfill)
2" PVC Well Material (includes all annular backfill) per foot 516.00 250
So.oo so.o0
Well Completion (includes 30 min. development, bolt-down manhole, concrete pad(Z'x2'or L0" circle) & lockable well cap seoo.0o so.o0
So.oo s0.00per wellAbove Grade Protector (A luminum) per well 8" Bolt-down complet¡on l-2" Bolt-down completion per well 5225.00 4
MISCETTANEOUS
s1,ooo
& breakdown) per day each 575.00 0 each Sso.oo 8
S7s.oo 4 per hour 5550.00 0
Mobilization Sonic Drill with all associated equipment
Dai Mobilization (to and from site per day)
Stand / Difficult Moving Time
S49s.oo
So.ooPer Diem
Permits
Decontamination Pad incl. setu
Water Meter and usage
DOT Approved 55-gal Drum
Vacuum/Air Knife Bore Hole Cleari
Well Development
Onsite Pre-Drill Meeting lump sum
So.oo s0.00
So.oo s640.oo
So.oo
Ssoo.oo so.0o per night t/2hr each roundtrip 511000.0q s49s.00 t lump sum SL,000.oo so.o0 per day
516,235Days to Complete Scope of Work 2 Submitted By: B TOTAL QUOTE PRICE tr rreferreq unlllng Ð(,tutlons, lnc.
8820 66th St, Pinellas Park, FL 33782 Ph: 727 -561-7477 Fax= 727 -561 -9028 www.pdsflorida.com
SONIC DRILLING TECHNOLOGY QUOTE FORM
Date: 6/1 5/23
Consultant Name: Arcadis
Site Name and Location: Dry Clean USA
10333 Royal Palm Blvd, Coral Springs, Broward County, FL
PROPOSED SCOPE OF WORK:
FAC ID#:
l2l 2" r 55'MW's with 5' .0'10 screen sô¡l côres- drum soil & n¡¡l and 8" bolt riôwn mânhôleno l2l2" x7O' MW's with 5' .010 scrêên- nô sôil corês- drum so¡l & ôâal and 8" bolt dôwn manhôlê
"** All wells off s¡te and in ROW- client resnonsible for ROW end MOT as needed "**
*/Votêi to dr¡ll in Pea Gnvel. in Pea or can
SONIC DRILL¡NG TECHNOLOGY
Equipment Type: Geoprobe 8t 50LS, Terrasonic I 50CC
Sonic Da¡ly Rate & Crew (up to l0 hours on site)
Sonic Half Day Rate & crew (up to 5 hours on s¡te)
I " PVC Well lnstallation (includes all materials)
2" PVC well lnstallation (¡ncludes all materials)
4" PVC Well lnstallation (includes all materials)
Pre-Packed well Screen (includes all materials) lD 2" 5'Length
Wêll Completion (¡ncludes MH w/ cover, concrete pad, and locking well cap)
MISCELLANEOUS
Mob¡lization
Per Diem
DOT Approved 55-gal Drum
Permits
Other (specify)
Other (specify)
Other (specify)
Notes: 'l . lncludes caps, plugs, tubing, saw cuts, development, standby time, and decon'
Days to Complete Scope of Work: 3
Subcontract Company Name: Preferred Drill¡ng Solutions, lnc' (727) 561'7477
Subcontract Mailing Address: 8820 66th St, Pinellas Park, FL 33782 ì submitting auote, Katl)* Fenn¡ ',t+t' Kevin Bonacum, Estimator
DEP or
TOTAL QUOTE PRICE
Project No.:
Unit Rate
$4,000.00 J
Number of Units
Extended Price
1 .00per day
Unit
$3,000.00 $per day per foot $18.00
250 6,250.00$per foot $25.00
$35.00 $per foot
$each $125.00
500.00
I 575.00 per well $125.00 s 900.00per crew / per night $450.00
$70.00 17 1 ,190.00$eech
$200.00 2 $ 400.00each
G s
$22,815.00
Arcadis 6/15/2023 1500 Gateway Boulevard PN230615-125699rev Suite 200 6/16/2023 Boynton Beach, Florida 33426 Coral Springs, FL (2)
Douglas McGlone 10333 Royal Palm Boulevard douglas.mcglone@arcadis.com Coral Springs
561.662.7978 Florida
Cascade Rep Contact Information
Scope of Work
Quantity Unit Sales Price Subtotal Mobilization 1 Each 3,500.00$ 3,500.00$ Demobilization 1 Each 3,500.00$ 3,500.00$ Per Diem and Lodging (per worker) 12 Man/Day 225.00$ 2,700.00$ Move/Setup Drilling Locations 4 Hours 475.00$ 1,900.00$ Stage Drums at Central Location 2 Hours 475.00$ 950.00$ 6" Sonic Casing Advance (overburden) 250 Feet 45.00$ 11,250.00$ 7" Temporary Override Casing Feet 30.00$ 2" PVC Well Installation 250 Feet 30.00$ 7,500.00$ Flush Mount Completion w/ 2'x2' pad 4 Each 400.00$ 1,600.00$ 55-Gallon DOT Drums 16 Each 95.00$ 1,520.00$ Hydrant Meter if needed Lump Sum 1,600.00$ Skidsteer/Bobcat 1 Week 1,600.00$ 1,600.00$ Jackhammer 1 Day 125.00$ 125.00$ Concrete Saw and Blades 1 Day 125.00$ 125.00$ Standby Delays/Hydration or Curing Delays/Travel Between Jobsites Hours 525.00$ Permits as needed 4 Each 100.00$ 400.00$
Pre-Tax Total
Tax Percentage
Taxes
Quote Total
Contact Name Project Address Email Project City Phone Project State
Drill two borings to 55' and two borings to 70' with 4"x6" sonic (no temporary override expected). Install 2" Sch40 PVC well with 5' of regular .010-slot screen in each boring. Complete with a 2'x2' concrete pad and 8" flushmount manhole cut into an asphalt-paved area. Drum all cuttings and development water. Drums will be staged on site for disposal by others.
No union/prevailing wages or additional training is expected.
Work schedule will be 10/4 rotations with daily work hours of 7am - 5pm including lunch and safety meetings.
Level D PPE is expected.
Cascade estimates 4 days to complete this project. All quantities are estimates. Actual accrued totals will be invoiced. Cascade expects 4 permit will be needed for this project. If additional permits are required, they will be invoiced at cost to Arcadis.
Description
$36,670.00
Account Name Bid Date Address Quote Number
Quote Revision Date
Bill To Account Project Zip
Project Name
Number
Prepared By Email wburdette@cascade-env.comWill Burdette, Southeast Region Estimator
This quote is based on information provided by you and is valid for 45 days from the bid date. Unless previously agreed, Cascade requires a 2-week notice prior to mobilization. Your firm is responsible for 1) Obtaining any site specific permits, 2) Locating and clearly marking underground installations or utilities, 3) Furnishing dig
Alert numbers at least three working days prior to scheduled start date and proof of private locating services, 4) Obtaining access to site with no overhead wires within 20' of the holes. Cascade Drilling shall not be responsible for damages to underground improvements not clearly and accurately marked. If bedrock, cobbles, flowing sands or other adverse or unsafe drilling conditions are encountered, drilling may continue on a time and materials basis or be terminated at the discretion of Cascade.
Additional costs may apply if scope is significantly changed. Well development by others may void some or all of Cascade warranties of workmanship and materials.
Florida: 5785 SW 6TH PL STE 101, OCALA FL 34474 ♦ (352) 237-1995
$36,670.00
Arcadis 6/15/2023 1500 Gateway Boulevard PN230615-125699rev Suite 200 6/16/2023 Boynton Beach, Florida 33426 Coral Springs, FL (2)
Douglas McGlone 10333 Royal Palm Boulevard douglas.mcglone@arcadis.com Coral Springs
561.662.7978 Florida
Cascade Rep Contact Information
Contact Name Project Address Email Project City Phone Project State
Account Name Bid Date Address Quote Number
Quote Revision Date
Bill To Account Project Zip
Project Name
Number
Prepared By Email wburdette@cascade-env.comWill Burdette, Southeast Region Estimator
Signature of Authorized Cascade Representative
Name & Title of Authorized Cascade Representative
Date Date
Signature of Client/Owner Authorized Representative
Cascade will perform the Work as described in this proposal subject to the terms and conditions posted at https://cascade-env.com/resources/other/terms-and-conditions/ unless MSA is already established between Cascade and Client in which case MSA takes precedence over the aforementioned terms and conditions. By signing this proposal, Client agrees that this proposal together with the terms and conditions referenced above constitute a Subcontract. Client acknowledges that
Client has received and agrees with all such documents in the form provided by Cascade. Terms and Conditions are posted and accessible at the website location set forth above.
Name & Title of Authorized Representative and Company
09/07/2022 03:24 PM PAGE 1 OF 7
Scope of Work
Blanket Quote based on one drum T&D , for service site specific quote - disposal approval required
TCLP Benzene and 4 Metals with Completed Profile required for each site
Drum Pickup /Transportation/Disposal
Drums south of Miami not included (Keys) additional costs apply
755 PRARIE INDUSTRIAL PKWY,
MULBERRY, FLORIDA, 33860
QUOTE #: 0030388
DATE: 09/07/2022 PROJECT PROPOSAL
CLIENT
DOUGLAS MALONE
ARCADIS
1500 GATEWAY BLVD, SUITE 200, BOYTON BEACH, FLORIDA,
33426
P: (561) 662-7978
PROJECT DESCRIPTION
DRUM PICKUP
VARIOUS SITES SOUTH FLORIDA
THE FOLLOWING DESCRIBES OUR UNDERSTANDING OF THE SCOPE OF SERVICES TO BE PERFORMED BY ENVIROSERVE, FOR THE
CLIENT, AT THE ABOVE REFERENCED LOCATION KNOWN AS THE JOB SITE.
FEE STRUCTURE
TRANSPORTATION
ITEM EST.QTY. UNIT PRICE UNIT TOTAL
TRANSPORTATION 55 GAL DRUMS
NOTES:SUBJECT TO FUEL SURCHARGE,
1.00 $50.00 DRUM $50.00
STOP FEE 6 DRUMS OR LESS PICKUP 1.00 $50.00 EACH $50.00
TRANSPORTATION SUBTOTAL: $100.00
DISPOSAL
ITEM EST.QTY. UNIT PRICE UNIT TOTAL
55 GALLON NON HAZ DRUM
NOTES: Drum DOT Shippable Drum accessible on hard Surface
1.00 $80.00 EACH $80.00
ENERGY SURCHARGE 10% INVOICE TOTAL 1.00 $18.00 EACH $18.00
DISPOSAL SUBTOTAL: $98.00
TOTAL JOB ESTIMATE: $198.00
| HW680_DC022B negsum.pdf |
| Subtask 1: Project Management |
| Subtask 2: Site Access |
| Subtask 3: Well Installation and Sampling |
| Subtask 4: Reporting |
| DCUSA Coral Springs Proposal 6-15-23.pdf |
| Proposed Scope of Work |
| Task 1: Project Management |
| Task 2: Offsite Access |
| Task 3: Well Installations, Sampling/Analysis |
| Task 4: Supplemental Groundwater Assessment Report |
| Schedule |
| Cost Estimate |
Closing Remarks
File details come from the government source that posted it. Updated .