Summary
This is a Task Assignment (TA) document issued by the State of Florida Department of Environmental Protection (FDEP) to Arcadis U.S. Inc. for operation and maintenance (O&M) services at the Town Custom Cleaners site located at 10201 Hammocks Boulevard, Miami, Miami-Dade County, Florida. The task assignment is executed pursuant to Contract Number HW680 and is designated as TA Number DC016A, with a completion date of February 28, 2023. The Department Project Manager is Theresa Pepe (850-245-8966), and the Contractor's Project Manager is Gus Suarez (813-205-4703).
Arcadis will conduct eight months of O&M activities including monthly site visits, bump tests, and vapor sampling of the soil vapor extraction (SVE) system as directed by FDEP. The work is performed according to the April 15, 2022 Work Plan submitted by Arcadis. The contract utilizes a fixed unit rate of $27,377.62 for O&M services and cost reimbursement of $3,200.00 for utilities, totaling $30,577.62. Utility invoices are the only portion classified as Cost Plus, with actual charges invoiced and adjustments made by change order. Deliverables include a quarterly O&M email update due October 7, 2022, four months of utility invoices due October 31, 2022, a semi-annual O&M report due January 20, 2023, and additional utility invoices due February 3, 2023. Subcontractors include Engineered Environmental Solutions, Inc. (EESI) for telemetry replacement ($4,845.00) and motor starter repair ($748.00), and FPL for utilities management.
View the file
Other files
Show 40 more
50 files listed here. See the rest on GovTribe.
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Funding Information:
Org. Code E.O. Object Code Budget Entity Appropriation
Category Grant # Project # Year Amount
☐ Additional Funding Information attached on separate page.
Rev. 8/26/2020
STATE OF FLORIDA
DEPARTMENT OF ENVIRONMENTAL PROTECTION
Task Assignment This Task Assignment (TA) is entered into between the Parties named below, pursuant to Contract Number: .
1. TA Number: TA Completion Date:
TA Description:
2. Parties State of Florida Department of Environmental Protection (Department)
Department Project Manager: Department Project Manager Phone:
Contractor Name: (Contractor ) ntractor’st ’s Project Manager: ontractor’s t’s Project Manager Phone:
3. Project Number:
(If different from TA Number)
Project Location(s):
Project Name:
4. As consideration for the services rendered by Contractor under the terms of this TA, the Department shall pay the Contractor on the following bases, up to the Total TA Value as indicated below:
☐ Fixed Price:
☐ Fixed Unit Rate: (Extended Price)
☐ Cost Reimbursement:
Total TA Value:
5. The Parties agree to comply with the terms and conditions of the underlying the Contract, and the following attachments which are hereby incorporated by reference:
Attachment 1:
☐ Additional Attachments (if necessary):
IN WITNESS WHEREOF, this TA shall be effective on the last date signed below.
State of Florida Department of Environmental Protection
CONTRACTOR Department Name:
Title: Secretary or Designee
(Authorized Signature) (Authorized Signature) Date:
☐ Additional signatures attached on separate page.
HW680
DC016A Completion February 28, 2023
Arcadis will conduct eight months of O&M activities at the site, including bump tests and additional vapor sampling as requested by FDEP. Work will be performed according to the April 15, 2022, Work Plan submitted by Arcadis.
The payment of utility invoices is the only portion of this Task Assignment that is Cost Plus.
Theresa Pepe 850-245-8966 Contractor Contractor
Contractor Contractor
Contractor Contractor
Contractor
Arcadis U.S. Inc.
Arcadis U.S. Inc.
Gus Suarez 813-205-4703
ERIC_4393
10201 Hammocks Boulevard, Miami, Miami-Dade County
Town Custom Cleaners
✔ $ 27,377.62 ✔ $ 3,200.00
$ 30,577.62
Scope of Work
Gus Suarez
Contract Manager
Gus Suarez, P.E. Digitally signed by Gus Suarez, P.E.
Date: 2022.04.19 16:01:22 -04'00'
William E. Burns, Jr.
William E. Burns, Jr. Digitally signed by William E. Burns, Jr.
Date: 2022.04.19 15:44:19 -04'00'
N/A
Task Assignment Notification/Change Order Deliverables and Invoice Schedule Attachment
WCP TAFORM 04-2017
Contract Number:
Task Assignment #:
Deliverables:
Deliverable Deliverable Due Date
Invoice Schedule:
Requirements for Invoice Submittal Amount to be Invoiced
TOTAL COST
Quarterly O&M email update 10/07/2022
4 months Utility Invoices 10/31/2022
Semi-Annual O&M report/Project Management 01/20/2023
4 months utility invoices 02/03/2023
FDEP approval of Quarterly O&M email update $ 15,232.99
FDEP approval of 4 months utility invoices Utilities (Cost Plus Fixed Fee) = not to exceed $1,600.00 Utilities Handling Fee = $80
$ 1,680.00
FDEP approval of Semi-Annual O&M report/Project Management $ 11,984.63
FDEP approval of 4 months utility invoices Utilities (Cost Plus Fixed Fee)= not to exceed $1,600.00 Utilities Handling Fee = $80
$ 1,680.00
$ 30,577.62
HW680
DC016A
FLORIDA DEPARTMENT OF
Environmental Protection
Bob Martinez Center
2600 Blair Stone Road Tallahassee, FL 32399-2400
Ron DeSantis Governor
Jeanette Nuñez
Lt. Governor
Shawn Hamilton Secretary
Memorandum
TO: Negotiation File Town Custom Cleaners Facility ID No. 13-9501049; ERIC_4393 Miami, Miami-Dade County FROM: Theresa C. Pepe, Project Manager SUBJECT: Task Assignment DC016A (HW680) DATE: April 19, 2022
Task Assignment DC016A is for eight months of O&M activities at Town Custom Cleaners. Additional information is described in the April 15, 2022, Work Plan from Doug McGlone of Arcadis.
The final task assignment equals $30,577.62. Arcadis may invoice according to the attached schedule.
Specific negotiated subtasks are as follows:
Subtask 1: Project Management This subtask is calculated automatically based on a percentage of total labor.
Subtask 2: Quarterly O&M & Reporting This subtask provides costs for one quarter (May – July 2022) of monthly O&M site visits plus 1 month (August 2022) of bump test and additional vapor sampling as requested by FDEP’s engineer. Costs for new telemetry and system blower repair are included in this subtask. One email update will be submitted to FDEP summarizing the above data.
EESI was chosen as the subcontractor to replace the telemetry and to conduct remedial system repairs. No other bids were solicited. EESI is a local company; they are available immediately and they are familiar with the remedial system.
Purchasing new telemetry is justified because the remedial system can be reused at another site after work at Town Custom is completed.
Subtask 3: Quarterly O&M & Reporting This subtask provides costs for one quarter (September - November 2022) of monthly O&M site visits plus 1 month (December 2022) of bump test and additional vapor sampling as requested by FDEP’s engineer. One Semi-Annual report will be submitted to FDEP summarizing the above data.
Subtask 4: Utilities This subtask provides costs for eight months of utilities and associated handling fees.
Arcadis will only invoice for actual charges and any remainder will be adjusted by change order.
FDEP COST ESTIMATE
Contractor: Arcadis, U.S., Inc.
Date: 4/15/2022
Task #: SubTask 1 Project Management
Site: Town Custom Cleaners SubTask 2 Quarter 1 O&M
Activity/Phase: O&M SubTask 3 Quarter 2 O&M
Project Manager: Doug McGlone SubTask 4 Utilities
SubTask 5
Totals 1 2 3 4 5
Labor Rate Category
$79.12 Project Manager Suarez, Gus (GS) 9 8.8
$96.76 Principal Engineer Bedessem, Jim (JMB) 0 0 0 0 0
$79.12 Principal Engineer Suarez, Gus (GS) 0 0 0 0 0
$61.38 Principal Scientist McGlone, Douglas (DMc) 9 3 6 0 0
$43.88 Project Engineer Hays, Timothy (TH) 28 13 15 0 0$41.21 Staff Scientist Mott, Lyndi (LM) 0 0 0 0 0
$39.34 Staff Scientist Riley, Joel (JR) 76 38 38 0 0
$39.67 Drafter/Designer Oliva, Brian (BO) 10 4 6 0 0
$30.96 Project Assistant McLemore, Michele (MMc) 6 3 3 0 0
Total Hours 138 9 61 68 0 0
Direct Labor $6,049.30 $695.94 $2,501.06 $2,852.30 $0.00 $0.00
Overhead 79.00% $4,778.95 $549.79 $1,975.84 $2,253.32 $0.00 $0.00
Gen & Admin 36.00% $2,177.75 $250.54 $900.38 $1,026.83 $0.00 $0.00
Fringe 37.10% $2,244.28 $258.19 $927.89 $1,058.20 $0.00 $0.00
Total Labor $15,250.28 $1,754.46 $6,305.17 $7,190.65 $0.00 $0.00
Travel
Vehicle Rental $720.00 $360.00 $360.00 $0.00 $0.00
Mileage Costs $0.00 $0.00 $0.00 $0.00 $0.00
Air Fare $0.00 $0.00 $0.00 $0.00 $0.00
Per diem + Hotel $0.00 $0.00 $0.00 $0.00 $0.00
Total Travel $720.00 $360.00 $360.00 $0.00 $0.00
Subcontractor (Equipment Procurement)
$0.00 $0.00 $0.00 $0.00 $0.00
$0.00 $0.00 $0.00 $0.00 $0.00
$0.00 $0.00 $0.00 $0.00 $0.00
$0.00 $0.00 $0.00 $0.00 $0.00
Subcontractor Subtotal $0.00 $0.00 $0.00 $0.00 $0.00
Procurement Fee $0.00 $0.00 $0.00 $0.00 $0.00
Total Subcontractor Cost $0.00 $0.00 $0.00 $0.00 $0.00
Subcontractor (Services Procurement)
Drilling (Conventional) $0.00 $0.00 $0.00 $0.00 $0.00
Drilling (Non-conventional) $0.00 $0.00 $0.00 $0.00 $0.00
Mobile Laboratory $0.00 $0.00 $0.00 $0.00 $0.00
Surveying $0.00 $0.00 $0.00 $0.00 $0.00
IDW $0.00 $0.00 $0.00 $0.00 $0.00
Utilities $3,200.00 $0.00 $0.00 $3,200.00 $0.00 telemetry $4,845.00 $4,845.00 $0.00 $0.00 $0.00
EESI motor starter $748.00 $748.00 $0.00 $0.00 $0.00
$0.00 $0.00 $0.00 $0.00 $0.00
$0.00 $0.00 $0.00 $0.00 $0.00
Subcontractor Subtotal $8,793.00 $5,593.00 $0.00 $3,200.00 $0.00
Handling Fee $719.30 $559.30 $0.00 $160.00 $0.00
Total Subcontractor Cost $9,512.30 $6,152.30 $0.00 $3,360.00 $0.00
Laboratory
Analytical Costs $2,000.00 $1,000.00 $1,000.00 $0.00 $0.00
Fast Turnaround Charges $0.00 $0.00 $0.00 $0.00 $0.00
Sample Shipping $220.00 $110.00 $110.00 $0.00 $0.00
Total Laboratory $2,220.00 $1,110.00 $1,110.00 $0.00 $0.00
Field Expenses
Personal Protection $0.00 $0.00 $0.00 $0.00 $0.00
Expendables $240.00 $120.00 $120.00 $0.00 $0.00
Equipment (Drilling related) $0.00 $0.00 $0.00 $0.00 $0.00
Equipment (Analytical related) $660.00 $330.00 $330.00 $0.00 $0.00
Equipment (IDW related) $0.00 $0.00 $0.00 $0.00 $0.00
Equipment (Other - MAGS, recon) $450.00 $225.00 $225.00 $0.00 $0.00
Total Field Expenses $1,350.00 $675.00 $675.00 $0.00 $0.00
Subtotal $29,052.58 $1,754.46 $14,602.47 $9,335.65 $3,360.00 $0.00
Completion Fee $1,525.04 $175.45 $630.52 $719.07 $0.00 $0.00
Total Estimated Cost $30,577.62 $1,929.91 $15,232.99 $10,054.72 $3,360.00 $0.00
REV: 02/03 CEF ARCADIS Page 1
SITE : Town Custom Cleaners SUBTASK 2: Quarter 1 O&M
DATE: 4/15/2022
LABOR CATEGORY *PROVIDE TIME REQUIRED FOR EACH PERSON
STAFF-TITLE WORK DESCRIPTION HOURS
Quarter 1 O&M Principal / DMc PG review of data, review report and email update 3 Staff Scientist / JR Mob (2 hrs x 3), Month 1-3 O&M visits (30 hrs), sample influent and 3 SVE wells 38
Project Engineer / TH System performance / data review, report prep/submittal 13 Drafter/Designer / BO Figures production for O&M update 4 Project Assistant / MMc Process field notes, sample tracking, data entry, report assembly, submittal 3
TOTAL LABOR 61
VEHICLE TYPE RATE UNIT USEAGE
Van/Truck $120.00 Per Day 3 $360.00 $360.00
TOTAL VEHICLE $360.00
SUBCONTRACTOR COSTS
Services Procurement
Name Purpose Rate Units Usage Totals NAME OF COMPANY Direct-push services $0.00 Lump Sum 0 $0.00 EESI Motor Starter Replacement $748.00 Lump Sum 1 $748.00 Clark Environmental IDW Disposal $150.00 Drum 0 $0.00 EESI Telemetry $4,845.00 Lump Sum 1 $4,845.00 NAME OF COMPANY Utility Locate / GPR Survey $0.00 Lump Sum 0 $0.00 NAME OF COMPANY Utilities -Telemetry $0.00 Per Month 0 $0.00
Handling Fee $0.00 Per Month 0 $0.00
Total Services: $5,593.00
TOTAL $5,593.00
LABORATORY COSTS
Analytical Costs Parameter Method Media Rate Turn Around Total Samples Totals
VOC (Halocarbons Only) 8260 Aqueous $73.00 1.00 0 $0.00 VOC Soil Vapor TO-15 Vapor $200.00 1.00 5 $1,000.00 Priority Pollutant Organics Full Suite Aqueous $735.00 1.00 0 $0.00 TAT 24-hr=110% (2.1) 3-day=65% (1.65) 1-week=20% (1.20) Total Lab: $1,000.00
Rate Units Usage Shipping - Large (25 to 50 lbs.) --- --- $150.00 Per Cooler 0 $0.00 Shipping - Small (0 to 25 lbs.) --- --- $110.00 Per cooler 1 $110.00
Total Shipping: $110.00
TOTAL LAB $1,110.00
EQUIPMENT
Personal Protection
Item Rate Unit Usage Totals Total PPE: $0.00
Expendables Miscellaneous Expendables $40.00 Per Day 3 $120.00
Total Expendables: $120.00 Equipment Items PID (ppbRae) $110.00 Per Day 3 $330.00
Total Equipment Items: $330.00 Equipment Kits Construction/O&M Supplies $75.00 Day 3 $225.00
Total Equipment Kits: $225.00
TOTAL EQUIPMENT $675.00
SITE : Town Custom Cleaners SUBTASK 3: Quarter 2 O&M
DATE: 4/15/2022
LABOR CATEGORY *PROVIDE TIME REQUIRED FOR EACH PERSON
STAFF-TITLE WORK DESCRIPTION HOURS
Reporting Principal / DMc PG review of data, review report, owner/operator discussions/coordination, utilities 6 Staff Scientist / JR Mob (2 hrs x 3), month 4-6 O&M visits (30 hrs), sample influent and 3 SVE wells 38 Project Engineer / TH System performance, data review, report prep/submittal 15 Drafter/Designer / BO Figure propduction for O&M report 6 Project Assistant / MMc Process field notes, data entry, sample tracking 3
TOTAL LABOR 68
VEHICLE TYPE RATE UNIT USEAGE
Van/Truck $120.00 Per Day 3 $360.00 $360.00
TOTAL VEHICLE $360.00
SUBCONTRACTOR COSTS
Services Procurement
Name Purpose Rate Units Usage Totals NAME OF COMPANY Direct-push services $0.00 Lump Sum 0 $0.00 NAME OF COMPANY Drilling services (DPT, MAG wells, SBs, VPs) $0.00 Lump Sum 0 $0.00
IDW $150.00 Drum 0 $0.00 NAME OF COMPANY On-site Mobile Laboratory analysis $0.00 Lump Sum 0 $0.00 NAME OF COMPANY Utility Locate / GPR Survey $0.00 Lump Sum 0 $0.00 FPL Utilities -Power $50.00 Per Month 0 $0.00
Handling Fee $20.00 Per Month 0 $0.00
Total Services: $0.00
TOTAL $0.00
LABORATORY COSTS
Analytical Costs Parameter Method Media Rate Turn Around Total Samples Totals
VOC (Halocarbons Only) 8260 Aqueous $73.00 1.00 0 $0.00 VOC Soil Vapor TO-15 Vapor $200.00 1.00 5 $1,000.00 Priority Pollutant Organics Full Suite Aqueous $735.00 1.00 0 $0.00
TAT 24-hr=110% (2.1) 3-day=65% (1.65) 1-week=20% (1.20) Total Lab: $1,000.00 Rate Units Usage
Shipping - Large (25 to 50 lbs.) --- --- $150.00 Per Cooler 0 $0.00 Shipping - Small (0 to 25 lbs.) --- --- $110.00 Per cooler 1 $110.00
Total Shipping: $110.00
TOTAL LAB $1,110.00
EQUIPMENT
Personal Protection
Item Rate Unit Usage Totals Total PPE: $0.00
Expendables Miscellaneous Expendables $40.00 Per Day 3 $120.00
Total Expendables: $120.00 Equipment Items PID (ppbRae) $110.00 Per Day 3 $330.0055-gallon Drum $100.00 Each 0 $0.00
Total Equipment Items: $330.00 Equipment Kits Construction/O&M Supplies $75.00 Day 3 $225.00
Total Equipment Kits: $225.00
TOTAL EQUIPMENT $675.00
SITE :
SUBTASK 4:
DATE:
LABOR CATEGORY *PROVIDE TIME REQUIRED FOR EACH PERSON
STAFF-TITLE WORK DESCRIPTION HOURS
(Subtask Title)
Principal 0
Senior Sci 0
Staff Sci 0
Technician 0
TOTAL LABOR 0
VEHICLE TYPE RATE UNIT USEAGE
Automobile $80.00 Per Day 0 $0.00 $0.00
TOTAL PER DIEM $0.00
SUBCONTRACTOR COSTS
Equipment Procurement
Name Equipment Rate Units Usage Totals $0.00 Per Day 1 $0.00
Total Equip.: $0.00 Services Procurement
Name Purpose Rate Units Usage Totals NAME OF COMPANY Utility Locate / GPR Survey $0.00 Lump Sum 0 $0.00 FPL Utilities $400.00 Per Month 8 $3,200.00
Handling Fee $20.00 Per Month 8 $160.00
Total Services: $3,360.00
TOTAL $3,360.00
LABORATORY COSTS
Analytical Costs
Parameter Method Media Rate Turn Around Total Samples TotalsVOC 8260 Aqueous $150.00 1.00 0 $0.00
TAT 24-hr=110% (2.1) 3-day=65% (1.65) 1-week=20% (1.20) Total Lab: $0.00
Rate Units Usage
Shipping - Large (25 to 50 lbs.) --- --- $150.00 Per Cooler 0 $0.00
Shipping - Small (0 to 25 lbs.) --- --- $110.00 Per cooler 0 $0.00
Total Shipping: $0.00
TOTAL LAB $0.00
EQUIPMENT
Personal Protection
Item Rate Unit Usage Totals
Total PPE: $0.00
Expendables
Miscellaneous Expendables $40.00 Per Day 0 $0.00
Total Expendables: $0.00
Equipment Items
Total Equipment Items: $0.00
Equipment Kits
Total Equipment Kits: $0.00
TOTAL EQUIPMENT $0.00
This proposal and its contents shall not be duplicated, used or disclosed — in whole or in part — for any purpose other than to evaluate the proposal. This proposal is not intended to be binding or form the terms of a contract. The scope and price of this proposal will be superseded by the contract. If this proposal is accepted and a contract is awarded to Arcadis as a result of — or in connection with — the submission of this proposal, Arcadis and/or the client shall have the right to make appropriate revisions of its terms, including scope and price, for purposes of the contract. Further, client shall have the right to duplicate, use or disclose the data contained in this proposal only to the extent provided in the resulting contract.
arcadis.com C:\Users\Pepe_T\AppData\Local\Microsoft\Windows\INetCache\Content.Outlook\R01B7NH4\Town Custom SVE 2022 OMM Proposal_041522.docx
Page:
1/3
Ms. Theresa Pepe, Contract Manager Hazardous Waste Cleanup Section Florida Department of Environmental Protection Bob Martinez Center, MS 4520 2600 Blair Stone Road Tallahassee, Florida 32399-2400
Subject:
Proposal for Six Months of Operation and Maintenance Town Custom Cleaners (ERIC_4393), 10201 Hammocks Blvd, Miami, Florida
Dear Ms. Pepe:
Arcadis U.S., Inc. (Arcadis) is pleased to submit this proposal/cost estimate for the Town Custom Cleaners Site, located in Miami, Miami-Dade County, Florida.
This proposal includes operation, maintenance and monitoring (OM&M) of the soil vapor extraction (SVE) system for six months (May – October 2022), vapor sampling, one semi-annual remedial action status report and one e-mail update.
This proposal includes a description of the proposed scope of services, and an estimated cost and schedule for their completion.
TASK 1: PROJECT MANAGEMENT
As specified by FDEP, project management is calculated automatically in the CEF as the first subtask.
TASK 2 THROUGH TASK 3: GENERAL OM&M ACTIVITIES
The SVE system’s performance will be monitored monthly for six months (May – October 2022). System repairs, including replacement of SVE motor starter and telemetry system will be performed during the first month of system restart/operation (May 2022). The following will be performed during each monthly event:
• The ROI of the SVE system will be measured by sequentially isolating the
SVE wells and measuring the vacuum influence of the nearby SVE or monitor wells.
ENVIRONMENTAL
Date:
April 15, 2022
Contact:
Doug McGlone
Phone:
561.662.7978
Email:
Douglas.mcglone@arcadis.com
Our ref:
30041815
Florida License Numbers
Engineering
Geology
GB564
Surveying
LB7062
• Vapor extraction flow rate and vacuums will be recorded using meters and gauges located within the system. Adjustments will be made as necessary to optimize system performance.
The extraction blower will be inspected and adjusted for proper operation, including periodic oil changes, grease, and filter replacement.
• The SVE system will be operated to minimize the capture and entrainment of groundwater.
• The system interlocking controls and fail-safe mechanisms will be inspected for proper operation
Recovered vapors from the SVE system will be monitored quarterly. The SVE vapor sample will be collected from system influent to calculate mass removal.
TASK 2: SVE SYSTEM OM&M QUARTER 1 (MAY THROUGH AUGUST 2022)
Task 2 consists of system monthly OM&M visits for one quarter and semi-annual reporting. The SVE vapor sample will be collected from system influent to calculate mass removal. Following the three months of run time, the system will be shut off for one month, then influent and 3 individual SVE wells will be sampled for EPA Method TO-15.
A Quarterly email update consisting of tables and figures will be submitted at the completion of the quarter (i.e., May through August 2022).
TASK 3: SVE SYSTEM OM&M QUARTER 2 (SEPTEMBER THROUGH
DECEMBER 2022)
Task 3 consists of system monthly OM&M visits for one quarter and quarterly reporting. A vapor sample will be collected from the influent sample port in a Summa™ canister and analyzed for VOHs using EPA Method TO-15 to calculate mass removal. Following the three months of run time, the system will be shut off for one month, then influent and 3 individual SVE wells will be sampled for EPA Method TO-15.
A Semi-Annual OM&M Report update will be submitted to the FDEP following the December 2022 site visit and include eight months of system operational data. The semi-annual report will include results and data analysis of the vapor monitoring events and recommendations to optimize system operation.
TASK 4: UTILITIES MANAGEMENT
This task will be used to manage and process FPL invoices for eight months of system operation included in this proposal. Based upon prior FPL invoices, it is anticipated that the utility budget be estimated at $400 per month. A monthly handing fee of $20 per month is also included. Actual utility costs will be invoiced, and any differences will be adjusted through Task Assignment Change Orders.
SCHEDULE
Arcadis will begin implementing the OM&M activities in May 2022 upon receipt of a Task Assignment (TA) from the FDEP. The following deliverables and estimated timeframe for completion are included below:
Deliverable Anticipated Submittal
Date
Quarter 1 Email Update October 2022
Quarter 1 and 2 Semi-Annual Remedial Action Status Report January 2023
CLOSING REMARKS
Arcadis appreciates the opportunity to assist the FDEP at this site. If you have any questions or wish to discuss this proposal, please do not hesitate to contact us.
Sincerely, Arcadis U.S., Inc.
Doug McGlone, P.G.
Principal Scientist.
Enclosures:
CEF-LOE
PROPOSAL
Engineered Environmental Solutions, Inc. 13-Apr-22 601 N East Coast Avenue Proposal No.:
Lantana, FL 33462 561-721-0062 561-721-0127 Fax erockett@engineeredenvironmental.com
TO: JOB DESCRIPTION/LOCATION
Douglas J. McGlone PG Principal Geologist Town Custom Cleaners Arcadis 10201 Hammocks Blvd 1500 Gateway Boulevard, Suite 200 Miami, FL Boynton Beach, Florida 33426 Phone:
Fax:
ITEM DESCRIPTION RATE UNITS QTY AMOUNT
1 Mobilize equipment specialists to site and replace SVE blower motor starter. $748.00 Total 1 $748.00 All materials and labor. Test and trouble shoot entire system.
$748.00
Erika Rockett, Project Manager Signature, Title, Date
PAGE 1 ^
PROPOSAL
Engineered Environmental Solutions, Inc. 13-Apr-22 601 N East Coast Avenue Proposal No.:
Lantana, FL 33462 561-721-0062 561-721-0127 Fax erockett@engineeredenvironmental.com
TO: JOB DESCRIPTION/LOCATION
Douglas J. McGlone PG Principal Geologist Town Custom Cleaners Arcadis 10201 Hammocks Blvd 1500 Gateway Boulevard, Suite 200 Miami, FL Boynton Beach, Florida 33426 Phone:
Fax:
ITEM DESCRIPTION RATE UNITS QTY AMOUNT
1 -Replace obsolete telemetry system with new Mission Mydro 150 Cellular System. $4,845.00 Total 1 $4,845.00
- Install current switch on SVE blower for run time monitoring
- Integrate with existing control panel for alarm notifications, remote stop/start, and remote alarm reset.
- Provide, install, and integrate 4-20mA vacuum transmitter for remote vacuum monitoring. Includes 24 VDC power supply.
- Provide all programming, set up, and start up services.
- First year of monitoring fee.
$4,845.00
Erika Rockett, Project Manager Signature, Title, Date
PAGE 1 ^
| HW680_DC016A negsum.pdf |
| Subtask 1: Project Management |
| Subtask 2: Quarterly O&M & Reporting |
| Subtask 3: Quarterly O&M & Reporting |
| Subtask 4: Utilities |
| Town Custom SVE 2022 OMM Proposal_041522.pdf |
| task 1: Project Management |
| task 2 through task 3: General OM&M Activities |
| task 2: SVE System OM&M Quarter 1 (May through August 2022) |
| task 3: SVE System OM&M Quarter 2 (September through December 2022) |
| task 4: Utilities Management |
| Schedule |
| Closing Remarks |
File details come from the government source that posted it. Updated .