Attachment 4 - AF Form 66 Submittal - Lift Station.pdf

Air Force Form PDF 78 KB Posted

Attached to
B3456 Water Lift Station
Solicitation number
FA303021R0005
Issued by

View the file

Other versions and copies of AF Form 66

File Revision Posted Attached to
Attachment 2 AF Form 66.pdf Revision not stated REPAIR AC PAVING
AF form 66 Blank.pdf Revision not stated Demo Mini mute sites
Attach 9_AF Form 66 Submittal Register.pdf Revision not stated PKAA Dorm Water Damage Repair (Construction)
AF Form 66-EEPZ260842 Renovate Convert Comm to SAPR B730.xlsx Revision not stated B730 Renovate Convert Comm to SAPR
AF Form 66_EEPZ254664-B972 UOQ.xlsx Revision not stated B972 Renovate UOQ Community Commons
AF Form 66 B268.xlsx Revision not stated B268 Replace STUS Backup Generator
AF Form 66 B730.xlsx Revision not stated B730 - Renovate RM106 for Emergency Operations Center
AF Form 66.xlsx Revision not stated B836 Replace Electrical in Airfield Lighting Vault
AF Form 66 OSI Flooring.xlsx Revision not stated OSI B926 Flooring
EEPZ254660 Repair Control Tower HVAC B1806 - AF Form 66.xlsx Revision not stated B1806 Repair Control Tower HVAC
AF Form 66 Template.xlsx Revision not stated Replace AAS BAK-15 Controls, B2001, B2003
AF Form 66 EEPZ216808 Replace Security Forces Elevator B926.xlsx Revision not stated B926 Replace Security Forces Elevator
WT 17518487 AF Form 66.xlsx Revision not stated Repair Structural Fire Trainer B17903, 17904
AF Form 66.xlsx Revision not stated RENOVATE/CONVERT 50th 49th SQ OPS, B230
AF Form 66.xlsx Revision not stated T-6 Flightline Shacks
AF Form 66 Template.xlsx Revision not stated Replace Fire Alarms, Multi Facility
EEPZ248229 -- AF Form 66.xlsx Revision not stated Repair Kiddie Pool
Atch 2 AF Form 66.pdf Revision not stated Removal of Underground Storage Tank at Launch Facility E-10 (Laramie County, WY)
Attachment 4 - AF Form 66 Submittal Register.pdf Revision not stated Bldg 65 - Renovation of Telephone Office Area, FE Warren AFB, WY AMENDMENT 03
Attachment 7 - AF Form 66.xlsx Revision not stated Replace Chapel Windows B912
Show all 20

Who attaches AF Form 66

State Files
Iowa 1
Massachusetts 1

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

FORM66.xls

SCHEDULE OF MATERIAL SUBMITTALS

PROJECT: GAFB DoD Fire Academy B3453

Lift Station

SOLICITATION/CONTRACT NO.

TO BE COMPLETED BY THE PROJECT ENGINEER TO BE COMPLETED BY CONTRACT ADMINISTRATOR

NO. OF COPIES REQUIRED

DATE CONTRACTOR

NOTIFIED

APPROVED DISAPPROVED

1 Para. 1.5.1 - Work Schedule 1 14 Days Prior

(e) GA

Para 1.10 Portable toilet locations 1 (e) FIO

Para 1.7.2 Company Safety Policy and Accident Prevention Plan

1 x (c) FIO

Para 1.13 List of Warranties and Certificates 1

Upon Final Acceptance by

Gov

GA

Para 1.14.1 Parking & Storage 1 (e) GA

Para 1.15.1.1 AF Form 103 Base Work Clearance Request

1 (e) GA

Para 1.15.2 Utility Outages 1 14 Days Prior

(e) GA

Para 1.16 Waste Disposal 1 (d) GA

Para 2.2 Hazardous Waste Records 2 x (b) GA

Para 2.3 Haz. Material List with worksheet for each SDS 2 x (c) GA

Para 2.6 Air Emissions Reports 2 x (b) GA

CONTRACT-

TOR RE-

SUBMIT-

TAL

FINAL

APPROVAL REMARKS

DATE

RECEIVED

IN CON-

TRACTING

DATE TO

CIVIL

ENGINEER-

ING

RETURN

SUSPENSE

DATE

FOLLOW UP

IN

ST

RU

CT

IO

NS

SE

E

P

AR

A

OT

HE

RS

A

S

SP

EC

IF

IE

D

REQUIRED

SUBMISSION

DATE

RE

CO

MM

EN

DA

TI

ON

S

MA

NU

FA

CT

UR

ER

'S

W

AR

RA

NT

Y

OP

ER

AT

IN

G

SH

OP

D

RA

W

IN

GS

SA

MP

LE

S

CO

LO

R

SE

LE

CT

IO

N

MA

NU

FA

CT

UR

ER

'S

L I N E

N U M B E R

ITEM OR DESCRIPTION

OF ITEM, CONTRACT

REFERENCE, TYPE OF

SUBMITTAL

(Ref spec & para no.)

CE

RT

IF

IC

AT

IO

N

OF

C

OM

PL

IA

NC

E

FORM66.xls

SCHEDULE OF MATERIAL SUBMITTALS

PROJECT: GAFB DoD Fire Academy B3453

Lift Station

SOLICITATION/CONTRACT NO.

TO BE COMPLETED BY THE PROJECT ENGINEER TO BE COMPLETED BY CONTRACT ADMINISTRATOR

NO. OF COPIES REQUIRED

DATE CONTRACTOR

NOTIFIED

APPROVED DISAPPROVED

CONTRACT-

TOR RE-

SUBMIT-

TAL

FINAL

APPROVAL REMARKS

DATE

RECEIVED

IN CON-

TRACTING

DATE TO

CIVIL

ENGINEER-

ING

RETURN

SUSPENSE

DATE

FOLLOW UP

IN

ST

RU

CT

IO

NS

SE

E

P

AR

A

OT

HE

RS

A

S

SP

EC

IF

IE

D

REQUIRED

SUBMISSION

DATE

RE

CO

MM

EN

DA

TI

ON

S

MA

NU

FA

CT

UR

ER

'S

W

AR

RA

NT

Y

OP

ER

AT

IN

G

SH

OP

D

RA

W

IN

GS

SA

MP

LE

S

CO

LO

R

SE

LE

CT

IO

N

MA

NU

FA

CT

UR

ER

'S

L I N E

N U M B E R

ITEM OR DESCRIPTION

OF ITEM, CONTRACT

REFERENCE, TYPE OF

SUBMITTAL

(Ref spec & para no.)

CE

RT

IF

IC

AT

IO

N

OF

C

OM

PL

IA

NC

E

Para 2.7 Construction Waste Management Form 2 (b) GA

Para 3.3 CPM:

Manufacturer's Specifications

(e) FIO

Para 3.3 CPM: As-built drawings 3 (e) FIO

AF Form 66, SEP 86

(a) As soon as possible but in no case later than 45 calendar days after NTP.

(b) Prior to Final Inspection.

(c) Prior to Use.

(d) As Required.

(e) Prior to start of work.

(f) Weekly.

Sheet1

File details come from the government source that posted it. Updated .