ATTACHMENT 3 Submittals MBMV222331 AF Form 66.pdf

Air Force Form PDF 66 KB Posted

Attached to
MBMV222331 Repair Drive Lanes
Solicitation number
W50S84-22-B-0014
Issued by

About this file

This document contains a solicitation for a construction project and related submittal requirements. The solicitation seeks bids for a project to repair drive lanes at Battle Creek, Michigan with a period of performance of 180 calendar days. The project value is estimated between $250,000 to $500,000. Interested parties are encouraged to attend a pre-bid conference on August 16, 2022. Bids are due by the date specified in the solicitation. Award will be made to the responsive bidder whose bid is most advantageous considering price. The work is set aside for small businesses with a size standard of $16.5 million. The NAICS code for this project is 238990. Submittal requirements include schedules, plans, warranties, and other construction documents that must be provided by deadlines indicated. The soliciting agency is the Department of the Army National Guard.

View the file

Other versions and copies of AF Form 66

File Revision Posted Attached to
Attachment 2 AF Form 66.pdf Revision not stated REPAIR AC PAVING
AF form 66 Blank.pdf Revision not stated Demo Mini mute sites
Attach 9_AF Form 66 Submittal Register.pdf Revision not stated PKAA Dorm Water Damage Repair (Construction)
AF Form 66-EEPZ260842 Renovate Convert Comm to SAPR B730.xlsx Revision not stated B730 Renovate Convert Comm to SAPR
AF Form 66_EEPZ254664-B972 UOQ.xlsx Revision not stated B972 Renovate UOQ Community Commons
AF Form 66 B268.xlsx Revision not stated B268 Replace STUS Backup Generator
AF Form 66 B730.xlsx Revision not stated B730 - Renovate RM106 for Emergency Operations Center
AF Form 66.xlsx Revision not stated B836 Replace Electrical in Airfield Lighting Vault
AF Form 66 OSI Flooring.xlsx Revision not stated OSI B926 Flooring
EEPZ254660 Repair Control Tower HVAC B1806 - AF Form 66.xlsx Revision not stated B1806 Repair Control Tower HVAC
AF Form 66 Template.xlsx Revision not stated Replace AAS BAK-15 Controls, B2001, B2003
AF Form 66 EEPZ216808 Replace Security Forces Elevator B926.xlsx Revision not stated B926 Replace Security Forces Elevator
WT 17518487 AF Form 66.xlsx Revision not stated Repair Structural Fire Trainer B17903, 17904
AF Form 66.xlsx Revision not stated RENOVATE/CONVERT 50th 49th SQ OPS, B230
AF Form 66.xlsx Revision not stated T-6 Flightline Shacks
AF Form 66 Template.xlsx Revision not stated Replace Fire Alarms, Multi Facility
EEPZ248229 -- AF Form 66.xlsx Revision not stated Repair Kiddie Pool
Atch 2 AF Form 66.pdf Revision not stated Removal of Underground Storage Tank at Launch Facility E-10 (Laramie County, WY)
Attachment 4 - AF Form 66 Submittal Register.pdf Revision not stated Bldg 65 - Renovation of Telephone Office Area, FE Warren AFB, WY AMENDMENT 03
Attachment 7 - AF Form 66.xlsx Revision not stated Replace Chapel Windows B912
Show all 20

Who attaches AF Form 66

State Files
Iowa 1
Massachusetts 1

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

PROJECT NO.

MBMV222331

APPROVED DISAPPROVED

1 Submittal Schedule - AF Form 66 1

2 Transfer and Acceptance of DOD Real Property - DD Form 1354 1

3 Contractor Hazardous Material Identification - SANGB Form 23 1

4 Solid Waste Recycling and Disposal Reporting Form 1

5 Affirmative Procurement Reporting Form 1

6 DD Form 1354 2

7 Construction Schedule 1

8 Construction Photos 2

9 Safety Documentation as stated 1

10 Permits, Licenses and Certificates 1

11 Quality Control Plan 1

12 Instructional Training Program is applicable 1

13 Asphalt Mix Design - Top Course

Product Data 1 2 2 O & M Data 2 Warranty 2

14 Asphalt Emulstions -

Product Data 1 1 Safety Data Sheet 1 O & M Data 2 Warranty 1

14 Top Soil

Product Data 2 2 15 As builts DWGs 2

SOLICITATION/CONTRACT NO.PROJECT TITLE

REPAIR DRIVELANES

SCHEDULE OF MATERIAL SUBMITTALS

(AF Form 66 Modified)

NO. OF COPIES REQUIRED

TO BE COMPLETED BY PROJECT ENGINEER

O

PE

R

AT

IN

G

IN

ST

R U

C

TI

O N

S

C

AT

AL

O

G D

AT

A

LI

N

E N

U M

BE

R

M

AN

U

FA

C

TU

R

ER

'S W

AR

R

AN

TY

M

IX

D

ES

IG

N

SH

O

P D

R

AW

IN

G

S

Te st

/D en si ty

/C om pa ct io n

R es ul ts

C O

LO

R

S

EL

EC

TI

O N

M

AN

U

FA

C

TU

R

ER

'S

R

EC

O M

M

EN

D

AT

IO

N

S

C

ER

TI

FI

C

AT

IO

N

O F

C O

M

PL

IA

N

C E

AN

D

C

LO

SE

O

U

T REMARKSFINAL

APPROVAL

CONTRACTOR

RESUBMITTAL

RETURN

SUSPENSION

DATE

ITEM OR DESCRIPTION OF ITEM,

CONTRACT REFERENCE, TYPE OF

SUBMITTAL

FOLLOW-UP

SUBMITTAL

REQUIRED

BY 14 DAYS

AFTER

NTP

DATE

RECEIVED

IN

CONTRACTING

DATE

TO

CIVIL

ENGINEERING

DATE CONTRACTOR NOTIFIED

File details come from the government source that posted it. Updated .