The document is an Air Force Form 66 Schedule of Material Submittals for a contract (FA461325Q0014) to maintain pump traps, lagoons, and septic tanks at 15 MAFs (Military Authorized Facilities). The form outlines seven key submittal requirements with specific timelines, including:
- Work Schedule (upon award)
- Record of Existing Conditions (15 days after award)
- Coordination Plan (10 working days after award)
- Post Project Report (10 working days after performance completion)
- EAL Documentation (upon award) 6-7. Respective Delivery Tickets for Lagoons and Septic tanks (per dump)
The document provides a structured tracking mechanism for contractors to submit required documentation, with columns for project engineer and contract administrator to monitor and approve each submittal throughout the project lifecycle.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Attachment 4 - Cost Breakdown.xlsx | XLSX spreadsheet | |
| Solicitation - FA461325Q0014.pdf | ||
| Attachment 2 - Wage Determination.pdf | ||
| Attachment 5 - Mission Essential Ktr Svc Plan.pdf | ||
| Attachment 1 - PWS 29 May 25.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
PROJECT NUMBER SOLICITATION/CONTRACT NUMBER
SCHEDULE OF MATERIAL SUBMITTALS
TO BE COMPLETED BY PROJECT ENGINEER TO BE COMPLETED BY CONTRACT ADMINISTRATOR
NUMBER OF COPIES REQUIRED
L
IN
E
N U
M B
E R
ITEM OR DESCRIPTION OF ITEM,
CONTRACT REFERENCE, TYPE OF
SUBMITTAL
C E
R T
IF
IC
A T
IO
N
O F
C
M
P L
IA
N
C E
S H
O P
D R
A W
IN
G
S
S A
M P
L E
S
C O
L O
R S
E L
E C
T
IO
N
M A
N U
F A
C T
U R
E 'S
R
C
O M
M E
N D
A T
IO
N
S M
A N
U F
A C
T U
R E
'S
W
A R
R A
N T
Y
C A
T A
L O
G D
A T
A
O P
E R
A T
IN
G
IN
S T
R U
C T
IO
N
S
T E
S T
S
R E
P O
R T
S
R E
Q U
IR
E
D S
U B
M
IS
S
IO
N
D
T
D
T E
R E
C E
IV
E
D I
C
N T
R A
C T
IN
G
D A
T E
T O
C
IV
IL
G
IN
E E
R
IN
G
R E
T U
R N
S U
S P
E N
S E
D A
T E
F O
L L
O W
-U P
DATE CONTRACTOR NOTIFIED
C O
N T
R A
C T
S
U B
M
IT
T A
L
F
IN
A L
A P
P R
O V
A L
REMARKS
APPROVED DISAPPROVED
1 Work Schedule X
Upon
Award
2 Record of Existing Conditions X
15 Days
3 Coordination Plan X
4 Post Project Report X
5 EAL Documentation X
AF Form 66, OCT 89 PREVIOUS EDITION WILL BE USED See Specifications for Frequency
Maintain Pump Traps/Lagoons/Septics Tanks at 15 MAFs GHLN 25-7591
PROJECT TITLE
FA461325Q0014
Award After
15 Days After Award
10 Working Days & Site
Preperations
10 Working Days After Performance is Complete
6 Respective Delivery Tickers for Lagoons, per dump.
7 Respective Delivery Tickets for Septic per dump.
File details come from the government source that posted it. Updated .