Attachment 2 - AF Form 66 Schedule of Material Submittals.pdf

PDF 228 KB Posted

Attached to
HVAC Repairs B3511/B3519 Federal contract opportunity
Solicitation number
FA303023Q0034
Issued by
Department of the Air Force Air Education and Training Command

View the file

Other files for this federal contract opportunity

Show all 11

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

SCHEDULE OF MATERIAL SUBMITTALS

SOLICITATION/CONTRAC

T NO.:

TO BE COMPLETED BY THE PROJECT ENGINEER TO BE COMPLETED BY CONTRACT ADMINISTRATOR

NO. OF COPIES REQUIRED

DATE CONTRACTOR

NOTIFIED

APPROVED DISAPPROVED

Part 1, 1.5 in total Performance Period, Work Schedule/Plan

1 b GA

2 Part 1, 1.7.1 Safety 1 b

SoW Part 1, 1.12 Submittals: 1 2 1 1 1 1 b GA

SoW Part 1, 1.14 Warranties 1 1 e GA

SoW Part 4, 4.1 Work Clearance Request, AF Form

1 c FIO

SoW Part 4, 4.2 Utility Outages 1 c GA

SoW Part 1, 1.16 Digital As Built CAD Drawings

2 1 1 1 c/e FIO

Part 2, Attachment 3 Air Quality Reports 1 d/e GA

SoW Part 2 and Attachment 3, Part 4 Hazardous Wastes SDS and Report (If Applicable)

1 d/e FIO

L I N E

N U M B E R

ITEM OR DESCRIPTION

OF ITEM, CONTRACT

REFERENCE, TYPE OF

SUBMITTAL

(Ref spec & para no.)

CE

RT

IF

IC

AT

IO

N

OF

C

OM

PL

IA

NC

E

OP

ER

AT

IN

G

IN

ST

RU

CT

IO

NS

SH

OP

D

RA

W

IN

GS

MA

NU

FA

CT

UR

ER

'S A

ND

O

TH

ER

W

AR

RA

NT

IE

S

REMARKS

DATE

RECEIVED IN

CON-TRACTING

DATE TO CIVIL

ENGINEER-ING

RETURN

SUSPENSE

DATE

FOLLOW UP CONTRACT-TOR

RE-SUBMITTAL

B3511-B3519 HVAC Repair

FINAL

APPROVAL

MA

NU

FA

CT

UR

ER

'S R

EC

OM

ME

ND

AT

IO

NS

CO

LO

R

SE

LE

CT

IO

N

SE

E

P

AR

A

ON

C

OP

IE

S

OT

HE

RS

A

S

SP

EC

IF

IE

D

REQUIRED

SUBMISSION

DATE

ATTACHMENT 2

PROJECT NUMBER: 1128463

SA

MP

LE

S

FORM66.xls

SCHEDULE OF MATERIAL SUBMITTALS

SOLICITATION/CONTRAC

T NO.:

TO BE COMPLETED BY THE PROJECT ENGINEER TO BE COMPLETED BY CONTRACT ADMINISTRATOR

NO. OF COPIES REQUIRED

DATE CONTRACTOR

NOTIFIED

APPROVED DISAPPROVED

L I N E

N U M B E R

ITEM OR DESCRIPTION

OF ITEM, CONTRACT

REFERENCE, TYPE OF

SUBMITTAL

(Ref spec & para no.)

CE

RT

IF

IC

AT

IO

N

OF

C

OM

PL

IA

NC

E

OP

ER

AT

IN

G

IN

ST

RU

CT

IO

NS

SH

OP

D

RA

W

IN

GS

MA

NU

FA

CT

UR

ER

'S A

ND

O

TH

ER

W

AR

RA

NT

IE

S

REMARKS

DATE

RECEIVED IN

CON-TRACTING

DATE TO CIVIL

ENGINEER-ING

RETURN

SUSPENSE

DATE

FOLLOW UP CONTRACT-TOR

RE-SUBMITTAL

B3511-B3519 HVAC Repair

FINAL

APPROVAL

MA

NU

FA

CT

UR

ER

'S R

EC

OM

ME

ND

AT

IO

NS

CO

LO

R

SE

LE

CT

IO

N

SE

E

P

AR

A

ON

C

OP

IE

S

OT

HE

RS

A

S

SP

EC

IF

IE

D

REQUIRED

SUBMISSION

DATE

ATTACHMENT 2

PROJECT NUMBER: 1128463

SA

MP

LE

S

Attachment 3, Part 2 Disposal of Construction Waste

1 e GA

SoW Part 1, 1.2 Material Data/Certificates of Compliance

1 1 d/e GA

SoW Part 3, 3.3.o Test/balance Reports and Results

1 d GA

AF Form 66

(a) As soon as possible but in no case later than 45 calendar days after NTP for Basic Contract

(b) No Later Than 7 Calendar Days after Task Order NTP (c) (d)

(e) As Required per Specifications or Task Order

Prior to Final Inspection of Task Order No Later Than 3 Working Days Prior to Beginning On Site Work

FORM66.xls