Attachment 1 - Statement of Work.pdf
PDF 233 KB Posted
- Attached to
- HVAC Repairs B3511/B3519 Federal contract opportunity
- Solicitation number
- FA303023Q0034
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Solicitation Amendment FA303023Q00340001 SF 30.pdf | ||
| Solicitation Amendment - FA303023Q00340001.pdf | ||
| Attachment 1 - Statement of Work (Revision 2).pdf | ||
| Record of Attendance - HVAC Repairs B3511_B3519.pdf | ||
| Attachment 4 - Base Access Letter.docx | DOCX document | |
| Solicitation - FA303023Q0034.pdf | ||
| Attachment 2 - AF Form 66 Schedule of Material Submittals.pdf | ||
| Attachment 1a - TE-1 Drawings and TE-2 Equipment.pdf | ||
| Attachment 5 - Davis-Bacon Act WD TX20230282.pdf | ||
| Attachment 6 - DoD Contractor Guide 2021.pdf | ||
| Attachment 3 - Environmental Protection.pdf |
Show all 11
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
STATEMENT OF WORK
FOR
HVAC Repair
BUILDINGS 3511 and 3519
Replace 14 VAV Boxes B3511, and
Replace 6 Mixed Air Units B3519
Project #1130569
MARCH 2023
PREPARED BY:
17TH CIVIL ENGINEER SQUADRON (AETC)
460 E. KEARNEY BOULEVARD
GOODFELLOW AFB, TX 76908-4104
PROJECT MANAGER: Andy Robinson
Table of Contents
PART 1.0 – SCOPE OF WORK
PART 2.0 – PRODUCTS
PART 3.0 – EXECUTION
PART 4.0 – UTILITY OUTAGES AND SPECIAL CONDITIONS
PART 5.0 - ENVIRONMENTAL REQUIREMENTS
PART 6.0 - SITE MAINTENANCE AND CLEANUP
PART 7.0 - ENERGY CONSERVATION
PART 8.0 – RESPONSIBILITY
PART 9.0 – STORAGE AND PARKING
PART 10.0 - COMPLETION OF WORK
Project Package Includes: Attachments
I. Technical Exhibits
Location Plans, Details and Pictures TE - 1
Equipment Service Order Report TE - 2
II. AF Form 66
III. Environmental Protection, Division I – General Requirements
STATEMENT OF WORK
FOR
HVAC Repair
BUILDINGS 3511 and 3519
Replace 14 VAV Boxes B3511, and
Replace 6 Mixed Air Units B3519
PREPARED BY:
17TH CIVIL ENGINEER SQUADRON (AETC)
460 E. KEARNEY BOULEVARD
GOODFELLOW AFB, TX 76908-4104
PART 1.0 – SCOPE OF WORK
1.1 GENERAL: The work to be performed under this contract and in accordance with this
Statement of Work shall consist of furnishing all necessary parts, labor, tools, transportation, supplies, supervision, equipment, materials, and incidentals necessary for providing all work shown on the drawings (Technical Exhibits), statement of work, and all applicable codes, regulations, standards, and criteria in effect at the date of solicitation. The work outlined below shall consist of, but not be limited to the following:
1.2 PROJECT DESCRIPTION: Replace: 14 VAV boxes and associated DDC Controls (B3311), 6 Gas Fired, Mixed Air Handler Units and associated thermostatic controls (B3519), and modify all ductwork as needed and specified by the Government. See Attachment I, TE -1
1.3 LOCATION: Goodfellow Air Force Base is located in Tom Green County, on the southeast side of San Angelo, TX. and is bounded to the north by Highway #388 (Paint Rock Rd.), to the west by Fort McKavitt Rd and Bell Street/Christoval Road, to the south by Highway #1223 (San
Antonio Hwy.) and to the east by the eastern city limits. Work locations are building 3511and 3519 at 460 E. Kearney Blvd., Goodfellow AFB, TX 76908-4804.
1.4 WORK AND MECHANICS: The work for this project shall be executed in the best and most workmanlike manner, by qualified and efficient mechanics/tradesmen, skilled in their respective trades. Only certified journeymen in each respective trade, or apprentices under the direct supervision of certified journeymen, shall be permitted to install and/or supervise installation for this project. Individual trade work for this project shall be performed and quality maintained by the applicable trade, only. All trades shall coordinate their work with that of other trades. The
Contractor shall coordinate and perform all operations in a manner that will result in a professional and expeditiously completed project. The work shall be in strict accordance with prevailing industry standards and manufacturer’s instructions. Work and materials shall comply with this
Statement of Work and the editions in effect at the time of this solicitation for all applicable criteria, regulations, guidelines, and codes, all of which are made a part thereof.
1.5 PERFORMANCE PERIOD: The Contractor shall have Two hundred-forty (240) calendar days to perform all work associated with this project.
1.6 WORKING CONDITIONS: The Contractor shall have Two hundred-forty (240) calendar days to perform all work after signing the Notice to Proceed (NTP). All Contractor operated/owned vehicles, equipment, tools, etc., shall be stored as prescribed in paragraph DELIVERY AND
STORAGE. Applicable traffic control signage must be implemented where required by the contract when remaining overnight. Parking on turf is not permitted without prior approval.
1.7 PHASING REQUIREMENTS: B3511 and B3519 are base Civil Engineering facilities. These facilities will be continually occupied and operational throughout the duration of the project. The
Contractor shall submit a phasing/work plan that will provide, to the greatest extent possible, minimal disruption to the mission and operation of the facility, to include a timeline/schedule for the execution of the contract and SoW.
1.8 WORK SCHEDULE: Workdays shall be from 0730 to 1630, Monday thru Friday; no weekend work allowed unless approved by the Contracting Officer. If weekend work is required Contractor shall submit request in writing to Contracting Office a minimum of 72 hours in advance. The
Contractor shall provide written notification to the Contracting Officer fourteen (14) calendar days lead time for work schedule.
1.9 WORK AREA ACCESS: Government escorts are not needed in these areas.
1.10 CONCRETE TRUCKS: Cleaning out of concrete trucks on Goodfellow AFB is prohibited.
Concrete truck chutes, only, may be rinsed at the construction site. Wastewater and concrete from this rinse shall be collected in a high-density polyethylene (HDPE) plastic-lined box or pit provided by the Contractor at the site. At the end of pouring operations, the Contractor shall excavate all the waste and liner and properly dispose of same. The Contractor shall dispose of all concrete debris to an authorized off base site and shall remove any and all concrete debris and residue at the end of the project at no additional cost to the Government. The pit shall be completely backfilled, and the site restored to original conditions.
1.11 REFERENCES: All publications listed herein shall be the most current editions in effect at the time of solicitation and form a part of this Statement of Work. The publications are referred to in the text by basic designation only and include the following:
GAFB INSTRUCTION
GAFBI 31-102 Installation Security Instruction
NATIONAL FIRE CODE
NATIONAL ELECTRIC CODE
INTERNATIONAL BUILDING CODE (IBC)
US ARMY CORPS OF ENGINEERS HEALTH AND SAFETY MANUAL
OCCUPATIONAL HEALTH AND SAFETY ADMINISTRATION (OSHA)
OSHA STD 29 CFR 1910 and 1926
OSHA STD 29 CFR 1910.252 Welding, Cutting and Brazing (General Requirements)
1.12 SUBMITTALS: The Contractor shall provide submittals in the form of manufacturer’s data, certificates of compliance and samples for all items provided and installed per the attached AF
Form 66. The Contractor will not be permitted to perform any work on site without approved submittals. The submittals listed on the attached AF Form 66 shall be required and shall be submitted for Government Approved (GA) or For Information Only (FIO). Use AF Form 3000 to process submittals. Submit One (1) digital copy of submittals to Contracting Officer. Contractor shall prepare and submit Draft DD Form 1354 Real Property Checklist prior to final inspection and submit finalized DD 1354 to Contracting Officer before final payment is issued.
1.12.1 EQUIPMENT LIST: Contractor shall prepare and provide a completed Equipment List AF
Form 3136 indicating all new equipment installed by the Contractor as part of this project including serial numbers, product model number, and product manufacturer.
1.13 MANUFACTURER’S CATALOG DATA: Data composed of catalog cuts, brochures, circulars, specifications and product data, and printed information in sufficient detail and scope to verify compliance with requirements of the contract documents.
SAMPLES: NOT APPLICABLE
1.14 MANUFACTURERS WARRANTY: The Contractor shall identify all items being installed that are covered by manufacturer’s guarantee or warranty and provide validated copies of such.
The identification shall list the name of the company and the expiration date of the guarantee or warranty.
1.15 PRODUCT DATA: Manufacturer's installation and maintenance instructions for all new
VAV boxes, Gas fired mixed air units, and Automated Logic, Direct Digital Controls devices shall be provided to the Government through the Contracting Officer before final payment is made.
1.16 AS BUILT DRAWINGS: Following the project completion or turnover, within 14 days the
Contractor shall furnish 2 Digitally formatted dick containing: As-built drawings to include all new Mechanical and Direct Digital Control (DDC) equipment, devises, and point schedules. 1
Hard bound, hard copy of all new DDC point logic diagram/detail to the Contracting Officer for transfer to 17 CES.
1.17 DELIVERY AND STORAGE: All equipment and materials delivered and placed in storage shall be stored with protection from the weather, humidity and temperature variation, dirt and dust, and any other contaminants. Store all materials in a secure, clean, and dry location.
1.18 SAFETY: All Contractor operations shall be conducted and performed in accordance with
Department of Labor, OSHA requirements found in 29 CFR 1910 (1910.146 and 1910.147) and
29 CFR 1926, and Air Force Occupational Safety & Health (AFOSH) standards including AFI 91-
203, Air Force Consolidated Occupational Safety Instruction. The Contractor shall also ensure that all work is performed in accordance with project identified national standards, military manuals, instructions, pamphlets, standards, and handbooks, and with the edition in effect on the date of this solicitation of the Corps of Engineers (COE) Safety Manual 385-1-1. All job sites are subject to inspections by the Department of Labor. In the event of conflicts between the OSHA standards and these requirements, the most stringent shall apply.
1.18.1 Resolution of Department of Labor citations for violations of Occupational Safety and Health
Standards is a Contractor responsibility and shall provide for no basis of a claim against the
Government.
1.19 TEMPORARY FENCE: The Contractor shall install temporary safety fencing to secure
Laydown area and a single construction (ONLY) access point through the North entry doors for work in B3511. B3519 Laydown and entry areas shall be designated by the Government upon request. (See TE-1, General Plans and Specifications: Staging, Laydown and Access Details
1.20 DEMOLITION: Also see Section 3.2
1.20.1 The Contractor shall recycle or divert construction wastes from landfill disposal to the maximum extent practicable. Contractor shall track recycling and waste disposal and submit the report on the provided Construction Waste Management Form for Government Approval at the end of the project, and prior to final acceptance of the work. The Contractor shall take all necessary precautions to prevent damage to property to remain in place. Any damage to the aforementioned shall be repaired or replaced by the Contractor at no additional cost to the Government.
1.21 WELDING, CUTTING, AND BRAZING: Fire Protection shall complete inspection of all welding, cutting and brazing operations prior to any operation. The Contractor shall provide the appropriate operable fire extinguisher. Contractor shall comply be with OSHA STD29 CFR
1910.252 Welding, Cutting and Brazing (General Requirements) and AFOSH 91-5 Welding, Cutting and Brazing. Air Force Form 592 USAF Welding, Cutting and Brazing permit will be issued prior to any operation and shall be kept on site till completion of operation or permit expires.
Contact Fire Protection at (325) 654-3532/33/34 for issuance of permit.
1.22 OPERATIONS SECURITY (OPSEC) REQUIREMENTS: NOT APPLICABLE
1.23 UTILITY CONSERVATION: The Contractor will be required to participate in government energy conservation programs. For the purpose of this contract, utilities such as water, electricity, etc., will be furnished by the government at no cost to the Contractor. Long distance and Defense
Switched Network (DSN) telephone services will not be provided.
1.24 WORK SCHEDULE: Working hours for the Contractor will normally be between the hours of 7:30 A.M. and 4:30 P.M. excluding Saturdays, Sundays, and Federal holidays. Refer to Section
H of the solicitation/contract document for further information on working days. If the Contractor desires to work during periods other than above, a request must be made to the Contracting Officer in writing four (4) calendar days in advance of his/her intention. If the required base personnel are reasonably available, the Contracting Officer may authorize the Contractor to perform work during periods other than normal duty hours/days.
1.25 NORMAL WORK HOURS: The Contractor shall schedule all work to commence between the hours of 7:30 AM and 4:30 PM, Monday through Friday, except on the Federal holidays and days designated as “Family Days” by Air Education and Training Command (AETC) as listed below. Permission to work outside these normal business hours may be granted by the Contracting
Officer. Requests to work outside the normal work hours must be submitted in writing to the
Contracting Officer at least 3 working days in advance of the date requested.
2023 2024
Federal Holiday Holiday Family Day Holiday Family Day
New Year’s Day 02 Jan - 01 Jan 02 Jan
Birthday of Martin Luther King, Jr. 16 Jan - 15 Jan -
Washington’s Birthday 20 Feb - 19 Feb -
Memorial Day 29 May 26 May 27 May 24 May
Juneteenth Day 19 Jun - 19 Jun -
Independence Day 04 Jul 03 Jul 04 Jul 05 Jul
Labor Day 04 Sep 01 Sep 02 Sep 30 Aug
Columbus Day 09 Oct - Oct 14 -
Veterans Day 10 Nov - Nov 11 -
Thanksgiving Day 23 Nov 24 Nov Nov 28 29 Nov
Christmas Day 25 Dec 26 Dec Dec 25 24/31 Dec
While AETC Family Days have not been identified past calendar year 2024 it is anticipated that the same number of AETC Family days will be declared each year.
Any Holiday falling on a Saturday will be observed the preceding Friday. Any Holiday falling on a Sunday will be observed the following Monday.
The base could be closed because of security problems, adverse weather, or other events. Unless otherwise notified by the Government, the Contractor should monitor local television stations, radio stations, or Goodfellow’s Facebook page for notification of a possible base closure or late opening. The Contractor may not receive any other form of notification of a base closure from the
Government, unless contacted by the Contracting Officer (CO) or the COR. The Contractor is responsible for notifying his/her employees. Contractor(s) do not report when the base is closed due to security problems and/or adverse weather.
1.26 TOBACCO USE IN AETC FACILITIES: Contractors are advised that the Commander has placed restrictions on the smoking of tobacco products in AETC facilities. AFI 40-102, Tobacco
Use in the Air Force, outlines the procedures used by the commander to control smoking in our facilities. Contractor employees and visitors are subject to the same restrictions as government personnel. Smoking is permitted only in designated smoking areas. Additional information, to include locations of designated smoking areas, will be provided to the Contractor at the pre-performance conference.
1.27 BASE ACCESS SECURITY REQUIREMENTS: The Contractor shall comply at all times with base law enforcement and security requirements to include base pass requirements.
Goodfellow Air Force Base is a closed/controlled access base. As an effort to minimize peak traffic flows at the entry gates, the Contractor, his employees, and his subcontractors are highly encouraged to avoid scheduling deliveries through the entry control gates from 7:00 A.M. to 8:00
A.M. Monday through Friday as there could be significant delays.
The Government will conduct security/background checks on all construction personnel as required. Security requirements will be briefed at the pre-construction conference and handouts outlining specific requirements will be provided. Screening measures are in place and suitability for employees to access the installation will be determined during the conference. Requirements are subject to change dependent upon current world situations, potential threats, and base exercises. Full cooperation by Contractor work forces is required. Contractor should anticipate certain notification and reporting requirements, preparation of forms, and lists for pass and identification of employees and their vehicles, entry restrictions, key/lock control, and compliance with all base traffic rules and regulations. The Jacobson Gate Visitor Control Center 325-654-
4122 is the OPR for passes.
1.27.1 INSTALLATION ACCESS PASS: Before arrival, a government identification card-holding person from the sponsoring agency, Base Contracting office/administrator or applicable local project manager will submit a request for base access using the 17 Training Wing’s Base
Access List (BAL) memorandum as a form of registration for each credential applicant. The base sponsor/sponsoring agency/Contracting Officer and the contracted management team should establish an accountability process to account for each applicant, to oversee the BAL process, and to retrieve installation passes when access is no longer required. Base sponsors/sponsoring agencies or contract officers will ensure the BAL is accurate, it is signed and forwarded to the 17
SFS Pass & Registration section for completion of the vetting and fitness determination processes. The BAL should be delivered to Pass & Registration, located at the Visitor Control
Center (VCC). When delivery is not possible, the BAL may be forwarded to Pass & Registration via a “.mil” email account located on Goodfellow AFB. The BAL will include pertinent visitor information, reason for entry, frequency of entry, destination, times each day requiring entry, and duration of request.
BALs once vetted, will be kept for 30 days starting on the first day access is scheduled to start.
After 30 days, BALs are removed from the VCC BAL binders, and a new BAL will need to be re-vetted. The new BAL cannot be back dated with the original entry date and must have a new start date.
Contractor Initial (and periodic) Installation Access Screening. The Contractor shall provide Pass and Registration with two forms of identification, one of which will be a state issued photo identification. Prior to being allowed access, a minimum of a background/National Crime
Information Center (NCIC) check will be completed on all Contractors, requesting unescorted access for official business. This screening process will validate the Contractor's suitability to visit
Goodfellow and certify that the Contractor does not pose an increased threat to the base populace.
The Contractor will then be issued a temporary Defense Biometric Identification System (DBIDS) pass or AF Form 75A, not to exceed 180 days at a time, through the expiration date on the BAL request. Possession of an authorized access pass does not automatically authorize or guarantee access to the installation. The individual must still have a valid purpose to be on the installation and properly sponsored, as applicable.
ESTABLISHING IDENTITY FOR UNESCORTED ACCESS. Identity is established either by presenting one “acceptable credential” or by presenting an acceptable combination of “source identity documents.” Acceptable credentials and source identity documents must:
1) Be original and current (unexpired). No photocopies.
2) Not contain the markings “Not Valid for Federal Purposes,” “Not For Use as Federal
Identification,” “Federal Limits May Apply,” or any other similar phrase.
3) In the case of a driver’s license or non-driver’s identification card issued by a State, territory, possession, or the District of Columbia, be compliant with the REAL ID Act of
2005.
1.27.2 Access Denial. If it is determined a Contractor requesting access has been convicted of a felony or pled guilty to a felony charge within the past 10 years or is considered not fit to obtain authorized access based on the information obtained during the identity vetting, or criminal history indicates the individual may present a threat to the good order, discipline and morale of the installation, Security Forces personnel will deny entry. The Contractor will be informed of the access denial, will be issued an Access Denial Letter, and will be informed on how they may appeal this order.
Access Denial Appeal Process. When denied access, contract visitors will be informed to report back their manager. If the contract worker and management are considering an appeal, it will be submitted by letter to the 17 SFS Commander, within 30 days of access denial. The contract manager should first contact the military contract officer/administrator or on-base sponsor for additional guidance and clarification. The appeal may be delivered to the installation Visitor
Control Section or mailed to Security Forces, addressed to 17 SFS/CC, 361 Apache Trail, Goodfellow AFB, 76908. The Contractor's appeal should discuss all facts and reasons to support rescinding access denial. The 17 TRW/CC will approve/disapprove all appeals for entry.
1.27.3 For installation access on non-duty hours or down days:
1) Identify which workers need access on weekends, federal holidays/family days, and down days.
2) Ensure only workers that are already vetted are on the Extended-Hours request (no new personnel). New personnel require a new BAL and formal vetting.
3) Complete the “After Hours” BAL for workers requiring down day access to the installation.
Identify the vehicle requirements. If operations cannot support the search procedures for large vehicles/special purpose equipment, the request may be declined unless arrangements are made to deliver the vehicle/equipment prior, during normal duty hours.
1.27.4 All BALs are accomplished each time employees or personnel change, not to exceed 180 days. Oversight for BAL updates and establishment of procedures to ensure Physical Access
Control System (PACS) credentials and locally created access credentials from individuals who no longer require installation access is the responsibility of the contracting officer/contract administrator.
When an employee (regardless of position) is no longer employed by the Contractor or Sub-
Contractor all DBIDS passes are to be returned to the Contract Officer/Administrator or to the
Visitor Control Center. If a local issued access credential/pass is not returned, the contract officer may withhold funds, or the Installation Commander may consider permanent debarment to the installation. Immediate access denial may be initiated by Pass & Registration updating the DBIDS database until disposition of the DBIDS pass is resolved.
PART 2.0 – PRODUCTS
2.1 REFERENCES TO MATERIALS, MANUFACTURERS AND PRODUCTS: Materials and equipment shall be the standard products of a manufacturer or supplier regularly engaged in the manufacture of the products and shall essentially duplicate items that have been in satisfactory use for at least two (2) years prior. Submittal Required
2.2 WARRANTY: Manufactures standard equipment warranty, and One (1) Year Contractor
Construction warranty. Submittals Required
2.2 VERERIFICATION OF DIMENSIONS AND CONDITIONS: The Contractor is highly encouraged to visit the premises to become thoroughly familiar with details of the work and working conditions. The Contractor shall field verify all dimensions/information and advise the
Contracting Officer of any discrepancies prior to the work commencement.
2.3 GOVERNMENT FURNISHED EQUIPMENT (GFE): There are no Government furnished materials for this project.
2.4 CONTRACTOR PROVIDED MATERIALS (CPM): The Contractor shall provide all materials needed for HVAC repairs in accordance with the Statement of Work (SoW) and shall comply with Goodfellow AFB Standards. Contractor shall submit all material manufacture specifications via AF Form 3000 for GA.
2.4.1 Provide Fourteen (14) new Trane (or approved equal) VAV boxes with reheat coils, sized to match existing capabilities for existing equipment. To include fourteen (14) new Automated
Logic space sensors One (1) in conjunction with each new VAV box to be installed in place of existing sensors. Existing VAV equipment is Trane Manufacturing. Submittal Required
2.4.2 Provide Six (6) new Trane (or approved equal) gas fire Mixed air units (MAU) and associated temperature control devises (Thermostats). Existing MAU equipment is Trane
Manufacturing Submittal Required
2.4.3 Provide new drop ceiling grid materials and ceiling tile (as necessary) to restore areas where the existing ceiling grid has to be removed in the execution of the SoW. Submittal
Required (NOTE: As the existing ceiling is removed by the Contractor to execute the requirements of the SoW, they shall utilize care to disassemble, protect, and store for reinstallation, all materials to the best extent possible.)
2.4.4 Provide new service disconnect capability at each of the Fourteen (14) new VAV boxes (if not supplied by the manufacturer) and the Six (6) Mixed Air Units (as necessary), all sized appropriately for each specific piece of equipment Submittal Required
2.4.5 Provide all electrical components conduit (ridged, flex, and seal tight), junction boxes, connectors, and appropriately sized wire for new equipment in accordance with NEC and the overall SOW Submittal Required
2.4.6 Provide all hangers, anchors, and bracing needed to properly support all equipment, piping, and/or devices in accordance with Local, State and National Mechanical codes in the execution of the SOW to provide fully complete and durable HVAC systems as outlined in the contract and the overall SOW. Submittal Required
2.4.7 Provide all new metal ductwork, hangers, bracing, associated insulation, and duct sealant required to adapt the existing ductwork at each HVAC unit being installed in the execution of the overall SOW Submittal Required
2.4.8 Provide all new materials needed to adapt the new gas fired units to the existing gas vent piping in accordance with all Mechanical codes at each appropriate location Submittal
Required
2.4.9 Provide all new materials needed to reconnect the existing gas feed to the Six (6) new
Mixed Air Units installed in B3519. Submittal Required
2.4.10 Specifications: Contractor shall field verify all measurements and site conditions.
PART 3.0 – EXECUTION
3.1 GENERAL: All work shall be performed as shown and in accordance with the manufacturer’s diagrams and instructions, unless otherwise specified. The Contractor shall field verify all dimensions and site conditions. Price increase adjustments to the original contract price will not be issued because the Contractor was not aware of existing conditions. The Contractor shall provide all labor, materials, tools, and equipment required to perform all dismantling, repairs and installation as listed in this statement of work.
3.2 DEMOLITION: Contractor shall:
a. Remove and dispose of all mechanical, electrical, control devices, ductwork, hangers, bracing, and ancillary materials required in the execution of the SOW.
b. Provide all labor, materials, and support components necessary for the execution of the
SOW.
c. Lockout/tagout of all electrical services for the respective equipment during the execution of the SOW.
d. Remove (as needed), retain, protect for reinstallation (to the greatest extent possible) any drop ceiling grid components and associated ceiling tiles.
e. Remove Fourteen (14) existing VAV Boxes, necessary ductwork, and other components/connections (Take care to preserve and protect existing control components as needed for reuse) as specified in SOW. (B3511
f. Remove Six (6) existing Mixed air Units, necessary ductwork, and other components/connections (Take care to preserve and protect existing components for reuse) as specified in SOW. (B3519)
g. Remove, retain, protect, and re-install/reutilize existing HVAC system components as needed (to the greatest extent possible) in the execution of the SOW.
h. Remove, retain, and reutilize (to the greatest extent possible) all hangers, support, and bracing associated with HVAC system components in the execution of the SOW.
i. Protect all surrounding Government property; office space fixtures, furnishings and facility finish components (to the greatest extent possible)
j. Provide stable/durable protective measures for all materials left on-site for extended periods of time as safety measures for possible foot traffic and storage requirements in the execution of the SOW.
k. Remove, retain, protect, and re-install any existing Government; Office furnishings, fixtures, and/or components necessary for the execution of the contract and SOW.
3.3 INSTALLATION: All work shall be done with the building occupied and the customer (Rear drop off areas) may be occupied at times, but he (Mechanical rooms) will be unoccupied. The
Contractor shall coordinate with the Contract Inspector prior to start of work. (SEE
PROVIDED TE-1 Mechanical Drawings for general (NOT SPECIFIC) equipment specifications and locations.)
The Contractor shall:
a. Remove and dispose of all mechanical, electrical, control devices, ductwork, hangers, bracing, and ancillary materials required in the execution of the SOW.
b. Provide Fourteen (14) new Trane (or approved equal) VAV Boxes sized to match (to the greatest extent possible) existing equipment capabilities. (B3511) Submittal Required
c. Provide new service disconnect switch at each new VAV box, if not manufacturer supplied.
Submittal Required
d. Provide Fourteen (14) new associated Automated Logic Control, space temperature sensors. One (1) for each new VAV box. New sensors will be installed at the same location as the existing sensor. Submittal Required
e. Provide new control wire (as needed/required) for the new space temp sensors (B3511).
Submission Required
f. Provide new Automated Logic Control, Main controller. One (1) each for the Fourteen
(14) new VAV Boxes as required in accordance with the SOW. Submittal Required
g. Provide Six (6) new Trane, (or approved equal) gas fired, mixed air units, sized to match
(to the greatest extent possible) existing equipment capabilities. (B3519) Submittal
h. Reutilize the existing service disconnect located at each of the Six (6) mixed air units as appropriate unless the new equipment electrical requirements differ in-as-much as the existing disconnect does not meet the requirement according to NEC. NOTE: If the existing service disconnects cannot be reutilized the Contractor shall replace them with new appropriately sized disconnects in their current locations. Submission Required
i. Provide One (1) new thermostat and associated thermostat wire (one (1) each) with the
Six (6) new mixed air units being installed in the execution of the SOW. (B3519)
Submittal Required
j. Provide all electrical components: conduit, wire, junction boxes, connectors, anchors, and retention devices necessary for the execution of the full SOW. (B3511/B3519) Submittal
k. Provide all materials, hangers, anchors, and bracing needed for all aspects of execution of the full project SOW.(B3511/B3519) Submittal Required
l. Provide all ductwork components associated with the replacement of all VAV boxes and
Mixed air units to include duct sealant necessary for the full execution of the SOW.
(B3511/B3519) Submittal Required
m. Remove Lockout/Tagout systems to restore all electrical service to all equipment.
n. Preform full start up, balance/adjustment, and commissioning on the new HVAC equipment and existing air distribution devices (must meet the original design specifications and/or manufactures specification. Submittal Required
o. Provide all test/balance reports to the Contracting officer. Submittal Required
p. Provide manufacturer specification and service/maintenance manuals. Submittal
q. Provide training for all equipment and devices installed with 17 CES HVAC Shop
Personnel upon final inspection date. Submittal Required
r. Be responsible for all repairs to Government property resulting from unnecessary damage resulting from the Contractor’s operations, at no expense to the Government.
s. Be responsible for restoration and cleanup of all debris and materials in all areas involved in the execution of the SOW.
PART 4.0 – UTILITY OUTAGES AND SPECIAL CONDITIONS
4.1 BASE CIVIL ENGINEERING WORK CLEARANCE REQUEST: The Contractor shall obtain and process AF Form 103 for approval prior to commencement of work for this project.
The Contractor shall have this approved form on the job site at all times.
4.1.1 Due to the requirement for multiple agencies to coordinate on these requests, expect 7 – 10 days for paperwork processing. Contractor requests should be submitted at the earliest possible date to preclude delays.
4.2 UTILITY OUTAGES: When a utility outage is necessary to perform the contract work in an occupied facility, regardless of whether the work area is occupied, the outage shall be performed by the Contractor during non-duty hours at no additional cost to the Government, unless otherwise approved by the Contracting Officer. The Contractor shall notify the Contract Inspector of outage requirements to include buildings affected; length of outage; and reasons for outage. The
Contractor must allow affected occupants a minimum of two – (2) weeks’ notice prior to outage.
The Contractor is also required to provide the Contracting Office a written notification of the requested outage.
4.3 BASE FIRE REGULATIONS: The Contractor shall use no explosives or fire in performing the work. All work shall be in strict compliance with all National Fire Codes.
4.4 CONFINED SPACE: NOT APPLICABLE
4.5 LOCKOUT/TAGOUT, HAZARDOUS ENERGY CONTROL: In addition to the requirements in OSHA Std. 1910.147, if a Contractor needs to lock or tag something out, the Contractor will ensure that affected employees are notified before and after the locks and tags are used.
PART 5.0 - ENVIRONMENTAL REQUIREMENTS: See Attachment III
PART 6.0 - SITE MAINTENANCE AND CLEANUP
6.1 SITE MAINTENANCE: The Contractor shall protect adjacent property, buildings and their contents from dust, dirt, or other materials. Work areas shall be maintained in a neat, clean, safe condition and shall, at a minimum, be cleaned at the end of each shift. All streets and roadways in/or adjacent to the site shall remain free of project generated trash and debris at all times.
6.2 CLEANUP: The Contractor shall collect any and all trash, debris, refuse, garbage, etc., that is generate and place it in appropriate containers with lids or approved covers on a periodic basis or as directed by the Contracting Officer’s representative. The aforementioned materials shall be hauled from the site by appropriate means on a daily basis, unless otherwise approved by the
Contracting Officer’s representative. Disposal shall be outside the limits of Government property.
Disposal shall be by sanitary landfill or other approved methods and shall conform to all local, state, and federal guidelines, criteria, and regulations. Upon completion of the work, the Contractor shall leave the work site and storage area(s) in a clean, neat, and workmanlike condition satisfactory to the Contracting Officer. It is anticipated that excavation, filling, and plowing of roadways shall be required to restore the area to near natural conditions that will permit the growth of vegetation thereon. Restoration to original contours is required unless otherwise directed by the
Contracting Officer.
PART 7.0 - ENERGY CONSERVATION
7.1 UTILITIES CONSERVATION: The Contractor shall instruct employees in utilities conservation practices. The Contractor shall be responsible for operating under conditions that preclude the waste of utilities, which shall include lights to be used only in areas where and when work is actually being performed. The Contractor shall not adjust mechanical equipment controls for heating, ventilation, and air conditioning systems. Water faucets or valves shall be turned off after the required usage has been accomplished. The Contractor shall use good judgment in the conservation of Government utilities. Prevailing energy conservation practices shall be adhered to and enforced by the Contractor.
PART 8.0 – RESPONSIBILITY
8.1 CONTRACTOR RESPONSIBILITY: The above Parts 1 through 7 do not in any way limit the responsibility of the Contractor to perform all work and furnish all plant, labor, and materials required by this Statement of Work.
PART 9.0 – STORAGE AND PARKING
9.1 CONTRACTOR STORAGE: The Contracting Officer’s representative will designate
Contractor storage and parking area. All project storage areas shall be kept free of debris, leaks, stains, or splashes and kept in a neat, clean, and safe condition. Any contamination of the storage area by a hazardous substance shall be immediately remediated by the Contractor, in accordance with the contract above at no additional expense to the Government. All hazardous materials shall be secured when not in use.
PART 10.0 - COMPLETION OF WORK
10.1 OPERATIONAL SYSTEMS: The Contractor shall insure that work for this project is performed in accordance with the criteria herein and that all equipment and systems shall be fully operational at the completion of work for this project.
END OF STATEMENT OF WORK