This document is an AF Form 66, Schedule of Material Submittals, which details the required submittals for the Missile Alert Facilities HVAC Cleaning at FE Warren AFB, WY (Solicitation # FA461325Q0002) federal contract opportunity.
The key details are:
- The contract requires the contractor to provide all labor, materials, equipment, transportation, and other items/services necessary to clean HVAC systems for 15 Missile Alert Facilities (MAFs) located in Colorado, Nebraska, and Wyoming.
- Required submittals include EAL documentation, permits, safety data sheets, hazardous materials plans, project schedule, as-built drawings, NADCA work execution schedule, and visual inspection reports.
- Submittal due dates range from upon award to 30 days prior to contract close-out.
- The opportunity is being solicited by the Department of the Air Force Global Strike Command.
- Proposals are due no later than 11:00 am MT on Thursday, 7 Nov 2024.
View the file
Other versions and copies of AF Form 66
Show all 20
Who attaches AF Form 66
| State | Files |
|---|---|
| Iowa | 1 |
| Massachusetts | 1 |
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
PROJECT NUMBER SOLICITATION/CONTRACT NUMBER
SCHEDULE OF MATERIAL SUBMITTALS
TO BE COMPLETED BY PROJECT ENGINEER TO BE COMPLETED BY CONTRACT ADMINISTRATOR
NUMBER OF COPIES REQUIRED
L
IN
E
N U
M B
E R
ITEM OR DESCRIPTION OF ITEM,
CONTRACT REFERENCE, TYPE OF
SUBMITTAL
C E
R T
IF
IC
A T
IO
N
O F
C
M
P L
IA
N
C E
S H
O P
D R
A W
IN
G
S
S A
M P
L E
S
C O
L O
R S
E L
E C
T
IO
N
M A
N U
F A
C T
U R
E 'S
R
C
O M
M E
N D
A T
IO
N
S M
A N
U F
A C
T U
R E
'S
W
A R
R A
N T
Y
C A
T A
L O
G D
A T
A
O P
E R
A T
IN
G
IN
S T
R U
C T
IO
N
S
T E
S T
S
R E
P O
R T
S
R E
Q U
IR
E
D S
U B
M
IS
S
IO
N
D
T
D
T E
R E
C E
IV
E
D I
C
N T
R A
C T
IN
G
D A
T E
T O
C
IV
IL
G
IN
E E
R
IN
G
R E
T U
R N
S U
S P
E N
S E
D A
T E
F O
L L
O W
-U P
DATE CONTRACTOR NOTIFIED
C O
N T
R A
C T
S
U B
M
IT
T A
L
F
IN
A L
A P
P R
O V
A L
REMARKS
APPROVED DISAPPROVED
1 EAL Documentation X Upon Award
2 AF Form 103 - Dig Permit X 10 Days
After NTP
All Permits (Local, State, and Federal) NPDES, ROW, or Other
X Upon Award
4 Safety Data Sheets X Upon Award
5 Hazardous Materials X Upon Award
6 Storage Plan (if required) X Upon Award
7 Project Schedule X 15 Days
After Award
8 As-Built Drawings X 30 Days Prior to
Close Out
9 NADCA Work Execution Schedule x
10 Days of contract award
10 Visual Inspection x
Concerns discovered, location of discovery, and corrective action if taken during the PPP inspection conducted (see SOW pg 14)
AF Form 66, OCT 89 PREVIOUS EDITION WILL BE USED See Specifications for Frequency
Maintain HVAC & Dryer Vents at 15 MAFsGHLN 24-6381
PROJECT TITLE
FA461325Q0002