Attachment 4b - NIST SP 800-171 Entry Guide.pdf

Special Publication PDF 791 KB Posted

Attached to
Missile Alert Facilities HVAC Cleaning at FE Warren AFB, WY (Service)
Solicitation number
FA461325Q0002
Issued by

About this file

The document is an NIST SP 800-171 Quick Entry Guide for the SPRS (Supplier Performance Risk System) application. It provides step-by-step instructions for accessing the SPRS system, creating a header for the Highest Level Owner CAGE, viewing assessment details, and entering new NIST SP 800-171 assessments. The guide is intended to assist companies in complying with NIST SP 800-171 requirements for protecting Controlled Unclassified Information (CUI) in nonfederal systems.

The related federal contract opportunity is for Missile Alert Facilities HVAC Cleaning services at F.E. Warren AFB in Wyoming. The solicitation, numbered FA461325Q0002, requires the contractor to provide labor, materials, equipment, and other items/services to clean HVAC systems for 15 Missile Alert Facilities located in Colorado, Nebraska, and Wyoming. Proposals are due by 11:00 am MT on 7 Nov 2024. The solicitation includes a Performance Work Statement, wage determinations, SPRS registration requirements, and NIST SP 800-171 assessment details.

View the file

Other versions and copies of NIST SP 800-171

File Revision Posted Attached to
ATT 25_NIST SP 800-171 Rev 3.pdf Rev. 3 Andromeda Draft RFP
Attachment 7 - SPRS_Access_NISTSP800-171.pdf Revision not stated PKAB Maintain Missile Alert Fields (MAFs) Septic Tanks and Grease Traps (Services) AMENDMENT 03
Attachment 7a - NIST SP 800-171 Assessment.pdf Revision not stated PKAB Maintain Missile Alert Fields (MAFs) Septic Tanks and Grease Traps (Services) AMENDMENT 03
Attachment 7b - NIST SP 800-171 Entry Guide.pdf Same revision and size as this file Revision not stated PKAB Maintain Missile Alert Fields (MAFs) Septic Tanks and Grease Traps (Services) AMENDMENT 03
Atch 2a NIST SP 800-171 Assessment.pdf Revision not stated Combined Synopsis/Solicitation: Test and Replace Fire Suppression Sprinkler Heads at FE Warren AFB, WY (Service) AMENDMENT 02
Atch 2b NIST SP 800-171 Entry Guide.pdf Same revision and size as this file Revision not stated Combined Synopsis/Solicitation: Test and Replace Fire Suppression Sprinkler Heads at FE Warren AFB, WY (Service) AMENDMENT 02
Atch 2 SPRS_Access_NISTSP800-171.pdf Revision not stated Combined Synopsis/Solicitation: Test and Replace Fire Suppression Sprinkler Heads at FE Warren AFB, WY (Service) AMENDMENT 02
Attachment 9 - NIST SP 800-171 Entry Guide.pdf Same revision and size as this file Revision not stated Design and Build Covered Parking Structure for Fighter Aircraft
Attachment 8 - NIST SP 800-171 Assessment.pdf Revision not stated Design and Build Covered Parking Structure for Fighter Aircraft
Atch 3b NIST SP 800-171 Assessment.pdf Revision not stated Removal of Underground Storage Tank at Launch Facility E-10 (Laramie County, WY)
Atch 3c NIST SP 800-171 Entry Guide.pdf Same revision and size as this file Revision not stated Removal of Underground Storage Tank at Launch Facility E-10 (Laramie County, WY)
Atch 2a NIST SP 800-171 Assessment.pdf Revision not stated Amendment 03: Replace Underground Storage Tank (UST) at Launch Facility (LF) D-02 (Banner County, NE)
Atch 2b NIST SP 800-171 Entry Guide.pdf Same revision and size as this file Revision not stated Amendment 03: Replace Underground Storage Tank (UST) at Launch Facility (LF) D-02 (Banner County, NE)
Atch 3a NIST SP 800-171 Assessment.pdf Revision not stated AMENDMENT 02: Replace Site Lighting Electrical Conduits at 5 LFs
Atch 3b NIST SP 800-171 Entry Guide.pdf Same revision and size as this file Revision not stated AMENDMENT 02: Replace Site Lighting Electrical Conduits at 5 LFs
ATTACH_11_For Contractors - NIST SP 800-171 and SPRS.pdf Revision not stated Integrated Solid Waste Management Bulk Waste at Marine Corps Installations Pacific (MCI-PAC) Camp Smedley D. Butler, Okinawa Japan
Attachment 2b NIST SP 800-171 Assessment.pdf Revision not stated Decommission Missile Alert Field (MAF) R-01 Radio Tower and Generator AMENDMENT 01
Attachment 2c NIST SP 800-171 Entry Guide.pdf Same revision and size as this file Revision not stated Decommission Missile Alert Field (MAF) R-01 Radio Tower and Generator AMENDMENT 01
ATTACH_17_For_Contractors-NIST_SP_800-171_and_SPRS.pdf Revision not stated Integrated Solid Waste Management South at Marine Corps Installations Pacific (MCI-PAC) Camp Smedley D. Butler, Okinawa, Japan
ATTACHMENT 6_252-204-7019-Notice-of-NISTSP-800-171-DoD-Assessment-Requirements-.pdf Revision not stated FOREIGN MILITARY SALES (FMS) TECHNICAL ORDER (TO) & COMPUTER PROGRAM IDENTIFICATION NUMBER (CPIN) WORLDWIDE REVIEW (WWR)
Show all 20

Who attaches NIST SP 800-171

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Approved for public release, distribution is unlimited.

NIST SP 800-171

QUICK ENTRY GUIDE

VERSION 3.2.13

NSLC PORTSMOUTH BLDG. 153-2 PORTSMOUTH NAVAL SHIPYARD, PORTSMOUTH, NH 03804-5000

NIST SP 800-171 Quick Entry Guide SPRS 3.2.13

Version 3.2.13 DEC 2020 1

1. NIST SP 800-171 Assessment Database: The purpose of the National Institute of

Standards and Technology (NIST) Special Publication (SP) 800-171 is to protect Controlled Unclassified Information (CUI) in Nonfederal Systems and Organizations.

This database contains data associated with NIST SP 800-171 Assessments.

2. PIEE Access: A “SPRS Cyber Vendor User” role is required to enter Basic Assessment information. Step-by-step PIEE Access Instructions can be found here.

https://www.sprs.csd.disa.mil/pdf/SPRS_Access_Instructions.pdf

3. SPRS Application Access: To Access SPRS, follow the below steps:

a. PIEE landing page: https://piee.eb.mil/piee-landing/

b. Click “log-in” and follow prompted log-in steps

1Screenshot Dtd 2 NOV 2020

c. Select the SPRS Icon:

d. Select NIST 800-171 Assessment:

3.1 Creating a Header: A “Header” is required for each Highest Level Owner (HLO)

CAGE. If one does not already exist for your HLO, it may be created by selecting the “+ Create New HLO CAGE” button and following all associated steps:

3.2 Header View: The header page only displays the HLO(s) for a company and will contain up to four rows per HLO, one for each Confidence Level (Basic, Medium, High Virtual, and High On-site).

https://www.sprs.csd.disa.mil/pdf/SPRS_Access_Instructions.pdf https://www.sprs.csd.disa.mil/pdf/SPRS_Access_Instructions.pdf https://piee.eb.mil/piee-landing/ https://piee.eb.mil/piee-landing/

NIST SP 800-171 Quick Entry Guide SPRS 3.2.13

Version 3.2.13 DEC 2020 2

*Note: CAGE Hierarchy is imported from the System for Award Management (SAM).

Please contact your company’s CAGE hierarchy authority to have your data updated in the SAM. Updates typically flow to SPRS within 48 hours.

3.3 Details View: From the header page select the company name at the desired confidence level to view Assessment Details associated with the HLO hierarchy (see arrow above, section 3.2):

3.4 Assessments Entry: Each user with a PIEE “SPRS Cyber Vendor User” role may enter NIST SP 800-171 Assessments for their company. To enter an assessment, follow the steps below:

a. Select “+ Add New Assessment” button at Details View (see arrow above, section

3.3)

b. Enter Assessment Details and select “Save”:

3.5 Assessment Edit: After entering an assessment, it may be updated as necessary to reflect the company’s current status. To edit, select the pencil button within Details View as described in section 3.3:

File details come from the government source that posted it. Updated .