Attachment 2 - AF Form 66.pdf

Air Force Form PDF 16 KB Posted

Attached to
FXSB 21 1068 Repair Remove Wallpaper and Paint Offices Building 11550
Solicitation number
FA500021Q0039
Issued by

View the file

Other versions and copies of AF Form 66

File Revision Posted Attached to
Attachment 2 AF Form 66.pdf Revision not stated REPAIR AC PAVING
AF form 66 Blank.pdf Revision not stated Demo Mini mute sites
Attach 9_AF Form 66 Submittal Register.pdf Revision not stated PKAA Dorm Water Damage Repair (Construction)
AF Form 66-EEPZ260842 Renovate Convert Comm to SAPR B730.xlsx Revision not stated B730 Renovate Convert Comm to SAPR
AF Form 66_EEPZ254664-B972 UOQ.xlsx Revision not stated B972 Renovate UOQ Community Commons
AF Form 66 B268.xlsx Revision not stated B268 Replace STUS Backup Generator
AF Form 66 B730.xlsx Revision not stated B730 - Renovate RM106 for Emergency Operations Center
AF Form 66.xlsx Revision not stated B836 Replace Electrical in Airfield Lighting Vault
AF Form 66 OSI Flooring.xlsx Revision not stated OSI B926 Flooring
EEPZ254660 Repair Control Tower HVAC B1806 - AF Form 66.xlsx Revision not stated B1806 Repair Control Tower HVAC
AF Form 66 Template.xlsx Revision not stated Replace AAS BAK-15 Controls, B2001, B2003
AF Form 66 EEPZ216808 Replace Security Forces Elevator B926.xlsx Revision not stated B926 Replace Security Forces Elevator
WT 17518487 AF Form 66.xlsx Revision not stated Repair Structural Fire Trainer B17903, 17904
AF Form 66.xlsx Revision not stated RENOVATE/CONVERT 50th 49th SQ OPS, B230
AF Form 66.xlsx Revision not stated T-6 Flightline Shacks
AF Form 66 Template.xlsx Revision not stated Replace Fire Alarms, Multi Facility
EEPZ248229 -- AF Form 66.xlsx Revision not stated Repair Kiddie Pool
Atch 2 AF Form 66.pdf Revision not stated Removal of Underground Storage Tank at Launch Facility E-10 (Laramie County, WY)
Attachment 4 - AF Form 66 Submittal Register.pdf Revision not stated Bldg 65 - Renovation of Telephone Office Area, FE Warren AFB, WY AMENDMENT 03
Attachment 7 - AF Form 66.xlsx Revision not stated Replace Chapel Windows B912
Show all 20

Who attaches AF Form 66

State Files
Iowa 1
Massachusetts 1

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

SCHEDULE OF MATERIALS SUBMITTALS PROJECT NUMBER PROJECT TITLE SOLICITATION/CONTRACT NO.

FXSB 21-1068

TO BE COMPLETED BY PROJECT ENGINEER TO BE COMPLETED BY CONTRACT ADMINISTRATOR

NO. OF COPIES REQUIRED

L

I

N

E

U

M

B

E

R

ITEM OR DESCRIPTION OF ITEM,

CONTRACT PREFERENCE, TYPE OF

SUBMITTAL

C E

R T

IF

IC

A T

IO

N

O F

C O

M P

L

IA

N C

E

D R

A W

IN

G

S

P L

A N

M S

D S

M A

N F

'R R

E C

O M

M E

N D

A T

IO

N

S

R E

Q U

E S

T L

E T

T E

R

C A

T A

L O

G D

A T

A

R E

P O

R T

S

O T

H E

R D

A T

A

S a m p le s REQUIRED

SUBMISSION

DATE

DATE

RECEIVED IN

CONTRACTIN

G

DATE TO CIVIL

ENGINEERING

RETURN

SUSPENSE DATE

FOLLOW-UP

DATE CONTRACTOR

NOTIFIED

CONTRACTOR RE-

SUBMITTAL

FINAL APPROVAL REMARKS

1 Section 01010, para. 2.1

Notice of Start of Work

10 days prior to start of any work

2 Section 01010, para. 5.7

Record Drawings

30 days after completion of

Work

3 Section 01010, para. 26.7

Quality Control Plan 1 10 Days after

NTP

4 Section 01120, para. 5.1.2.1

Material Safety Data Sheet

10 days before brought on

Base

Rubber Cove Base Samples 3 NTP +10 Days

6 Rubber Cove Base Product

Data 1 NTP +10 Days

7 Paint Color Swatches 3 NTP +10 Days

8 Paint product data 1 NTP +10 Days

Repair Remove Wallpaper and Paint Offices

B11550

SCHEDULE OF MATERIALS SUBMITTALS PROJECT NUMBER PROJECT TITLE SOLICITATION/CONTRACT NO.

FXSB 21-1068

TO BE COMPLETED BY PROJECT ENGINEER TO BE COMPLETED BY CONTRACT ADMINISTRATOR

NO. OF COPIES REQUIRED

L

I

E

U

M

B

E

R

ITEM OR DESCRIPTION OF ITEM,

CONTRACT PREFERENCE, TYPE OF

SUBMITTAL

C E

R T

IF

IC

A T

IO

N

O F

C O

M P

L

IA

N C

E

D R

A W

IN

G

S

P L

A N

M S

D S

M A

N F

'R R

E C

O M

M E

N D

A T

IO

N

S

R E

Q U

E S

T L

E T

T E

R

C A

T A

L O

G D

A T

A

R E

P O

R T

S

O T

H E

R D

A T

A

S a m p le s REQUIRED

SUBMISSION

DATE

DATE

RECEIVED IN

CONTRACTIN

G

DATE TO CIVIL

ENGINEERING

RETURN

SUSPENSE DATE

FOLLOW-UP

DATE CONTRACTOR

NOTIFIED

CONTRACTOR RE-

SUBMITTAL

FINAL APPROVAL REMARKS

Repair Remove Wallpaper and Paint Offices

B11550

File details come from the government source that posted it. Updated .