SCHEDULE OF MATERIALS SUBMITTALS PROJECT NUMBER PROJECT TITLE SOLICITATION/CONTRACT NO.
FXSB 21-1068
TO BE COMPLETED BY PROJECT ENGINEER TO BE COMPLETED BY CONTRACT ADMINISTRATOR
NO. OF COPIES REQUIRED
L
I
N
E
U
M
B
E
R
ITEM OR DESCRIPTION OF ITEM,
CONTRACT PREFERENCE, TYPE OF
SUBMITTAL
C E
R T
IF
IC
A T
IO
N
O F
C O
M P
L
IA
N C
E
D R
A W
IN
G
S
P L
A N
M S
D S
M A
N F
'R R
E C
O M
M E
N D
A T
IO
N
S
R E
Q U
E S
T L
E T
T E
R
C A
T A
L O
G D
A T
A
R E
P O
R T
S
O T
H E
R D
A T
A
S a m p le s REQUIRED
SUBMISSION
DATE
DATE
RECEIVED IN
CONTRACTIN
G
DATE TO CIVIL
ENGINEERING
RETURN
SUSPENSE DATE
FOLLOW-UP
DATE CONTRACTOR
NOTIFIED
CONTRACTOR RE-
SUBMITTAL
FINAL APPROVAL REMARKS
1 Section 01010, para. 2.1
Notice of Start of Work
10 days prior to start of any work
2 Section 01010, para. 5.7
Record Drawings
30 days after completion of
Work
3 Section 01010, para. 26.7
Quality Control Plan 1 10 Days after
NTP
4 Section 01120, para. 5.1.2.1
Material Safety Data Sheet
10 days before brought on
Base
Rubber Cove Base Samples 3 NTP +10 Days
6 Rubber Cove Base Product
Data 1 NTP +10 Days
7 Paint Color Swatches 3 NTP +10 Days
8 Paint product data 1 NTP +10 Days
Repair Remove Wallpaper and Paint Offices
B11550
SCHEDULE OF MATERIALS SUBMITTALS PROJECT NUMBER PROJECT TITLE SOLICITATION/CONTRACT NO.
FXSB 21-1068
TO BE COMPLETED BY PROJECT ENGINEER TO BE COMPLETED BY CONTRACT ADMINISTRATOR
NO. OF COPIES REQUIRED
L
I
E
U
M
B
E
R
ITEM OR DESCRIPTION OF ITEM,
CONTRACT PREFERENCE, TYPE OF
SUBMITTAL
C E
R T
IF
IC
A T
IO
N
O F
C O
M P
L
IA
N C
E
D R
A W
IN
G
S
P L
A N
M S
D S
M A
N F
'R R
E C
O M
M E
N D
A T
IO
N
S
R E
Q U
E S
T L
E T
T E
R
C A
T A
L O
G D
A T
A
R E
P O
R T
S
O T
H E
R D
A T
A
S a m p le s REQUIRED
SUBMISSION
DATE
DATE
RECEIVED IN
CONTRACTIN
G
DATE TO CIVIL
ENGINEERING
RETURN
SUSPENSE DATE
FOLLOW-UP
DATE CONTRACTOR
NOTIFIED
CONTRACTOR RE-
SUBMITTAL
FINAL APPROVAL REMARKS
Repair Remove Wallpaper and Paint Offices
B11550