Attachment 08 - AF Form 66.xls

Air Force Form XLS spreadsheet 47 KB Posted

Attached to
Construct Expeditionary Road South Fence
Solicitation number
FA481922R0030
Issued by

View the file

Other versions and copies of AF Form 66

File Revision Posted Attached to
Attachment 09-AF form 66 03.27.2025.pdf Mar 27, 2025 B611 HVAC Repair
Attachment 2 AF Form 66.pdf Revision not stated REPAIR AC PAVING
AF form 66 Blank.pdf Revision not stated Demo Mini mute sites
AF Form 66-EEPZ260842 Renovate Convert Comm to SAPR B730.xlsx Revision not stated B730 Renovate Convert Comm to SAPR
AF Form 66 B268.xlsx Revision not stated B268 Replace STUS Backup Generator
AF Form 66 B730.xlsx Revision not stated B730 - Renovate RM106 for Emergency Operations Center
AF Form 66.xlsx Revision not stated B836 Replace Electrical in Airfield Lighting Vault
AF Form 66 OSI Flooring.xlsx Revision not stated OSI B926 Flooring
EEPZ254660 Repair Control Tower HVAC B1806 - AF Form 66.xlsx Revision not stated B1806 Repair Control Tower HVAC
AF Form 66 Template.xlsx Revision not stated Replace AAS BAK-15 Controls, B2001, B2003
AF Form 66 EEPZ216808 Replace Security Forces Elevator B926.xlsx Revision not stated B926 Replace Security Forces Elevator
WT 17518487 AF Form 66.xlsx Revision not stated Repair Structural Fire Trainer B17903, 17904
AF Form 66.xlsx Revision not stated RENOVATE/CONVERT 50th 49th SQ OPS, B230
AF Form 66.xlsx Revision not stated T-6 Flightline Shacks
AF Form 66 Template.xlsx Revision not stated Replace Fire Alarms, Multi Facility
EEPZ248229 -- AF Form 66.xlsx Revision not stated Repair Kiddie Pool
Atch 2 AF Form 66.pdf Revision not stated Removal of Underground Storage Tank at Launch Facility E-10 (Laramie County, WY)
Attachment 4 - AF Form 66 Submittal Register.pdf Revision not stated Bldg 65 - Renovation of Telephone Office Area, FE Warren AFB, WY AMENDMENT 03
Attachment 7 - AF Form 66.xlsx Revision not stated Replace Chapel Windows B912
04 - AF form 66.xlsx Revision not stated New Poinsett Tower Installation
Show all 20

Who attaches AF Form 66

State Files
Iowa 1
Massachusetts 1

Other files

File Type Posted
Solicitation Amendment FA481922R00300002 SF 30.pdf PDF
Attachment 04 - Section L and M (revised).pdf PDF
Solicitaion Amendment FA481922R00300003 SF 30.pdf PDF
Solicitation - FA481922R0030.pdf PDF
Attachment 16 - Goverment Furnished Equipment.pdf PDF
Attachment 17 - R0030 Q and A.xlsx XLSX spreadsheet
RFP 01 - RFP SOW Title XLWU 20-4015 (revised).PDF PDF
Attachment 04 - Section L and M (revised).pdf PDF
ATtachment 02 - SOW Appendix A (revised).pdf PDF
Attachment 15 - HazWaste Determination Worksheet-BLANK.pdf PDF
Attachment 15 - Discovery trifold November2021.pdf PDF
Attachment 13 - Proof of Financial Responsibility.pdf PDF
Attachment 15 - Completed AF Form 813 Construct Expeditionary South Fence.pdf PDF
Attachment 11 - AF Form 3065.pdf PDF
Attachment 03 - SOW Appendix B.pdf PDF
Attachment 1 - RFP SOW Title_XLWU 22-4015.pdf PDF
Attachment 10 - Sample RFI.PDF PDF
Attachment 14 - Division Cost Estimate Worksheet (Not Correct).xlsx XLSX spreadsheet
Solicitation - FA481922R0030.pdf PDF
Attachment 2 - SOW Appendix A.pdf PDF
Attachment 04 - Section L M.pdf PDF
Attachment 09 - AF Form 3000.pdf PDF
Attachment 07 - AF Form 3064.pdf PDF
Attachment 05 - Other Contract Requirements.pdf PDF
Attachment 06 - Wage Determination FL20210105.pdf PDF
Solicitation Amendment FA481922R00300001 SF 30.pdf PDF
Attachment 12 - Base Access Request EAL.xlsx XLSX spreadsheet
Show all 27

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Material Submittals Schedule

Project Number:
[ enter here ]Project Title:
[ enter here ]Solicitation / Contract Number:

[ enter here ]

Line Number(To be completed by Project Engineer)(To be completed by Contract Administrator)
Number of Copies RequiredRemarks
Item or Description of Item, Contract Reference, Type of SubmittalCertificate of ComplianceShop DrawingsSamplesColor SelectionManufacturer's RecommendationManufacturer's WarrantyCatalog DataOperating InstructionsSchedules, Listings, Reports, PlansTechnical DataTest ReportsField ReportsRequired Submission DateDate Received in ContractingDate to Civil EngineeringReturn Suspense DateSubmittal NumbersDate Contractor
NotifiedContractor ResubmittalFinal Approval
ApprovedDisapproved
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25

&L&"Verdana,Bold"&12Schedule of Material Submittals&C&12Print on Legal size paper ( 8 x 14 ).

&R&P of &N Enter the due date from the Contractor (MM/DD/YY) Enter the date received from the Contractor. (MM/DD/YY) Enter the date submittal was given to CE for review. (MM/DD/YY) Enter the date the submittal is due back from CE

(MM/DD/YY)

Enter the Submittal Number Enter date the Contractor was notified of submittal approval

(MM/DD/YY)

Enter date the Contractor was notified of submittal disapproval

(MM/DD/YY)

Enter Resubmittal Number Enter the submittal final approval date

(MM/DD/YY)

File details come from the government source that posted it. Updated .