Atch 2 AF Form 66.xlsx

XLSX spreadsheet 19 KB Posted

Attached to
B324 Add Sewer Line, FE Warren AFB, WY
Solicitation number
FA461324R0008
Issued by

About this file

The document provided is an AF Form 66 - Schedule of Material Submittals related to the federal contract opportunity "B324 Add Sewer Line, FE Warren AFB, WY" (Solicitation # FA461324R0008). The contract requires the installation of a new 100-foot sanitary sewer line, including tapping two manholes, pouring a new invert, and installing 4-inch PVC pipe with all associated valves, fittings, and appurtenances. The contractor must submit various technical documents, product data, shop drawings, and test reports on a schedule, with most submittals due within 15 days of contract award. The contract opportunity has a site visit request deadline of May 23, 2024, post-site visit questions deadline of the next business day, and proposal due date of June 4, 2024. The solicitation includes additional attachments such as the Statement of Work, Installation Facility Standards, Hazardous Material Authorization Request, and Wage Determination.

View the file

Other files

File Type Posted
Atch 4 Hazmat Auth Request.pdf PDF
Atch 1 SOW 16 May 2024.pdf PDF
Atch 5 MFR UNCI Control.pdf PDF
Request for Proposal.pdf PDF
Solicitation - FA461324R0008.pdf PDF
Atch 7 AF Form 3052.xlsx XLSX spreadsheet
Atch 6 WD WY2024001 19 Apr 24.pdf PDF
Atch 3 Installation Fac Stds.pdf PDF
Atch 8 Q and A.pdf PDF
Atch 5a SPRS Registration.pdf PDF
Atch 5c NIST SP 800-171 Entry Guide.pdf PDF
Atch 5b NIST SP 800-171 Assessment.pdf PDF
Show all 12

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Section 01

SCHEDULE OF MATERIAL SUBMITTALSPROJECT: Add 100' of Sanitary Sewer Line from BLDG 324SOLICITATION/CONTRACT NO.
AF FORM 66Page 1 of 1GHLN24-3875
TO BE COMPLETED BY ARCHITECT-ENGINEERTO BE COMPLETED BY CONTRACT ADMINISTRATOR

LINE NUMBER ITEM OR DESCRIPTION OF ITEM, CONTRACT REFERENCE, TYPE OF SUBMITTAL CERTIFICATION OF COMPLIANCE SHOP DRAWINGS SAMPLES COLOR SELECTION SCHEDULE OF MATERIALS TECHNICAL DATA INSTALLATION INSTRUCTIONS OPERATING INSTRUCTIONS MSDS SHEETS TEST REPORTS MANUFACTURER'S WARRANTY REQUIRED SUBMISSION DATE fergusog: Enter the due date from the Contractor (DD/MMM/YY)

DATE RECEIVED IN CONTRACTING

fergusog: Enter the date received from the Contractor. (DD/MMM/YY)

DATE TO CIVIL ENGINEERING

fergusog: Enter the date submittal was given to CE for review. (DD/MMM/YY)

RETURN SUSPENSE DATE

fergusog: Enter the date the submittal is due back from CE

(DD/MMM/YY)

SUBMITTAL NUMBER

fergusog: Enter the Submittal Number

CONTRACTOR NOTIFIED CONTRACTOR RESUBMITTAL

fergusog: Enter Resubmittal Number

FINAL APPROVAL

fergusog: Enter the submittal final approval date

(DD/MMM/YY)

REMARKS

fergusog: Enter any comments pertaining to the sumittal

App'd fergusog: Enter date the Contractor was notified of submittal approval

(DD/MMM/YY)

fergusog: Enter any comments pertaining to the sumittal Disapp'd fergusog: Enter date the Contractor was notified of submittal disapproval

(DD/MMM/YY)

1Section 010100, General Requirements, Paragraph 15, Traffic Control PlanX15 Days Post Award
2Section 010303, Environmental Requirements, Paragraph 3.2 Storm Water Pollution Prevention Planx10 Days Post Award
3Section 013300, Submittal Procedures, Paragraph
2, Contractor Project Schedule10 Days Post Award
4Section 013529, Safety and Occupational Health Requirements, Paragraph 1.2.1.1, Accident Prevention Plan (APP)10 Days Post Award
5Section 013529, Safety and Occupational Health Requirements, Paragraph 7, Compentent and Qualified PersonsX10 Days Post Award
6Section 017800, Task Order Closeout Requirements, Paragraph 2, As-Built Drawings90 Days Post Award
7Section 017823, Operation and Maintenance Data, Paragraph 1, O&M ManualsXX90 Days Post Award
8Section 033000, Cast-In-Place Concrete, Paragraph 1.3, Submittals: Laboratory Accreditation, Product Data, Concrete Mix Design, CertificatesXX15 Days Post Award
9Section 033000, Cast-In-Place Concrete, Paragraph 1.3, Submittals: Test ReportsX5 Days Prior to Final Insp.
10Section 033900, Concrete Curing, Paragraph 1.2, Submittals: Product DataXx15 Days Post Award
11Section 033000, Paragraph 1.3, Shop DrawingsX15 Days Post Award
12Section 033000, Paragraph 1.3, Test Reports: Aggregate, Concrete Mixture Properties, Compressive Strength Testing, Slump, Air Content, WaterX5 Days Prior to Final Insp.
13Section 033000, Paragraph 1.3, Certificates: Cementitious Materials, CPG for Recycled Materials or Waiver Form, AggregatesX15 Days Post Award
14Section 033000, Paragraph 1.3, Certificates: Delivery Tickets5 Days Prior to Final Insp.
15Section 310000, Paragraph 1.4, Product DataxX15 Days Post Award
16Section 310000, Paragraph 1.4, Test Reports: Compaction, Physical PropertiesX5 Days Prior to Final Insp.
17Section 320533, Paragraph 1.4, Product Data: Fertilizer, Mulch, CertificatesXxXX15 Days Post Award
18Section 328424, Paragraph 1.4, Product Data: Piping/Tubing, Valves, Valve Boxes, AccessoriesxXX15 Days Post Award
19Section 329223, Paragrpah 1.4, Product Data: Supplier, CertificatesXxX15 Days Post Award
20Section 333000, Paragraph 1.2, Product Data and Certificates: Pipe, Pipe Fittings, Frames, Covers, Contractor's LicenseXxXXX15 Days Post Award
21Section 333000, Paragraph 1.2, Shop DrawingsX15 Days Post Award
22Section 333123, Paragrpah 1.2, Product Data: Piping, Fittings, AccessoriesxX15 Days Post Award
23Section 333123, Paragrpah 1.2, Test Reports: Disposal of Waste WaterX5 Days Prior to Final Insp.