About this file
The document provided is an AF Form 66 - Schedule of Material Submittals related to the federal contract opportunity "B324 Add Sewer Line, FE Warren AFB, WY" (Solicitation # FA461324R0008). The contract requires the installation of a new 100-foot sanitary sewer line, including tapping two manholes, pouring a new invert, and installing 4-inch PVC pipe with all associated valves, fittings, and appurtenances. The contractor must submit various technical documents, product data, shop drawings, and test reports on a schedule, with most submittals due within 15 days of contract award. The contract opportunity has a site visit request deadline of May 23, 2024, post-site visit questions deadline of the next business day, and proposal due date of June 4, 2024. The solicitation includes additional attachments such as the Statement of Work, Installation Facility Standards, Hazardous Material Authorization Request, and Wage Determination.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Atch 4 Hazmat Auth Request.pdf | ||
| Atch 1 SOW 16 May 2024.pdf | ||
| Atch 5 MFR UNCI Control.pdf | ||
| Request for Proposal.pdf | ||
| Solicitation - FA461324R0008.pdf | ||
| Atch 7 AF Form 3052.xlsx | XLSX spreadsheet | |
| Atch 6 WD WY2024001 19 Apr 24.pdf | ||
| Atch 3 Installation Fac Stds.pdf | ||
| Atch 8 Q and A.pdf | ||
| Atch 5a SPRS Registration.pdf | ||
| Atch 5c NIST SP 800-171 Entry Guide.pdf | ||
| Atch 5b NIST SP 800-171 Assessment.pdf |
Show all 12
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Section 01
| SCHEDULE OF MATERIAL SUBMITTALS | PROJECT: Add 100' of Sanitary Sewer Line from BLDG 324 | SOLICITATION/CONTRACT NO. | ||
| AF FORM 66 | Page 1 of 1 | GHLN24-3875 | ||
| TO BE COMPLETED BY ARCHITECT-ENGINEER | TO BE COMPLETED BY CONTRACT ADMINISTRATOR |
LINE NUMBER ITEM OR DESCRIPTION OF ITEM, CONTRACT REFERENCE, TYPE OF SUBMITTAL CERTIFICATION OF COMPLIANCE SHOP DRAWINGS SAMPLES COLOR SELECTION SCHEDULE OF MATERIALS TECHNICAL DATA INSTALLATION INSTRUCTIONS OPERATING INSTRUCTIONS MSDS SHEETS TEST REPORTS MANUFACTURER'S WARRANTY REQUIRED SUBMISSION DATE fergusog: Enter the due date from the Contractor (DD/MMM/YY)
DATE RECEIVED IN CONTRACTING
fergusog: Enter the date received from the Contractor. (DD/MMM/YY)
DATE TO CIVIL ENGINEERING
fergusog: Enter the date submittal was given to CE for review. (DD/MMM/YY)
RETURN SUSPENSE DATE
fergusog: Enter the date the submittal is due back from CE
(DD/MMM/YY)
SUBMITTAL NUMBER
fergusog: Enter the Submittal Number
CONTRACTOR NOTIFIED CONTRACTOR RESUBMITTAL
fergusog: Enter Resubmittal Number
FINAL APPROVAL
fergusog: Enter the submittal final approval date
(DD/MMM/YY)
REMARKS
fergusog: Enter any comments pertaining to the sumittal
App'd fergusog: Enter date the Contractor was notified of submittal approval
(DD/MMM/YY)
fergusog: Enter any comments pertaining to the sumittal Disapp'd fergusog: Enter date the Contractor was notified of submittal disapproval
(DD/MMM/YY)
| 1 | Section 010100, General Requirements, Paragraph 15, Traffic Control Plan | X | 15 Days Post Award | ||||||||
| 2 | Section 010303, Environmental Requirements, Paragraph 3.2 Storm Water Pollution Prevention Plan | x | 10 Days Post Award | ||||||||
| 3 | Section 013300, Submittal Procedures, Paragraph | ||||||||||
| 2, Contractor Project Schedule | 10 Days Post Award | ||||||||||
| 4 | Section 013529, Safety and Occupational Health Requirements, Paragraph 1.2.1.1, Accident Prevention Plan (APP) | 10 Days Post Award | |||||||||
| 5 | Section 013529, Safety and Occupational Health Requirements, Paragraph 7, Compentent and Qualified Persons | X | 10 Days Post Award | ||||||||
| 6 | Section 017800, Task Order Closeout Requirements, Paragraph 2, As-Built Drawings | 90 Days Post Award | |||||||||
| 7 | Section 017823, Operation and Maintenance Data, Paragraph 1, O&M Manuals | X | X | 90 Days Post Award | |||||||
| 8 | Section 033000, Cast-In-Place Concrete, Paragraph 1.3, Submittals: Laboratory Accreditation, Product Data, Concrete Mix Design, Certificates | X | X | 15 Days Post Award | |||||||
| 9 | Section 033000, Cast-In-Place Concrete, Paragraph 1.3, Submittals: Test Reports | X | 5 Days Prior to Final Insp. | ||||||||
| 10 | Section 033900, Concrete Curing, Paragraph 1.2, Submittals: Product Data | X | x | 15 Days Post Award | |||||||
| 11 | Section 033000, Paragraph 1.3, Shop Drawings | X | 15 Days Post Award | ||||||||
| 12 | Section 033000, Paragraph 1.3, Test Reports: Aggregate, Concrete Mixture Properties, Compressive Strength Testing, Slump, Air Content, Water | X | 5 Days Prior to Final Insp. | ||||||||
| 13 | Section 033000, Paragraph 1.3, Certificates: Cementitious Materials, CPG for Recycled Materials or Waiver Form, Aggregates | X | 15 Days Post Award | ||||||||
| 14 | Section 033000, Paragraph 1.3, Certificates: Delivery Tickets | 5 Days Prior to Final Insp. | |||||||||
| 15 | Section 310000, Paragraph 1.4, Product Data | x | X | 15 Days Post Award | |||||||
| 16 | Section 310000, Paragraph 1.4, Test Reports: Compaction, Physical Properties | X | 5 Days Prior to Final Insp. | ||||||||
| 17 | Section 320533, Paragraph 1.4, Product Data: Fertilizer, Mulch, Certificates | X | x | X | X | 15 Days Post Award | |||||
| 18 | Section 328424, Paragraph 1.4, Product Data: Piping/Tubing, Valves, Valve Boxes, Accessories | x | X | X | 15 Days Post Award | ||||||
| 19 | Section 329223, Paragrpah 1.4, Product Data: Supplier, Certificates | X | x | X | 15 Days Post Award | ||||||
| 20 | Section 333000, Paragraph 1.2, Product Data and Certificates: Pipe, Pipe Fittings, Frames, Covers, Contractor's License | X | x | X | X | X | 15 Days Post Award | ||||
| 21 | Section 333000, Paragraph 1.2, Shop Drawings | X | 15 Days Post Award | ||||||||
| 22 | Section 333123, Paragrpah 1.2, Product Data: Piping, Fittings, Accessories | x | X | 15 Days Post Award | |||||||
| 23 | Section 333123, Paragrpah 1.2, Test Reports: Disposal of Waste Water | X | 5 Days Prior to Final Insp. |