af05801_TIE3_proposed-profile.pdf

PDF 48 KB Posted

Attached to
AK PFH 58(1), Neck Lake Road Reconstruction: NPOWI Hwy. to Marine Access Facility Jct.
Solicitation number
69056725B000001
Issued by

About this file

This document appears to be a profile for a proposed transportation tie-in station related to the federal contract opportunity for the AK PFH 58(1), Neck Lake Road Reconstruction project.

The federal contract opportunity is for roadway reconstruction work along 6 miles of Neck Lake Road in Alaska, including excavation, embankment, drainage, surfacing, guardrail, and other related work. The project is estimated to cost between $10-20 million and has a tentative completion date of Fall 2026. The contract will be a sealed bid, firm-fixed-price award. The project is being offered for full and open competition on an unrestricted basis and is anticipated to be solicited in Winter 2024/2025.

The profile document provides technical details on the proposed tie-in station from station 52+75 to 59+50, including station, elevation, grade, and curve data. This appears to be a supporting technical document related to the overall federal contract opportunity.

View the file

Other files

File Type Posted
BidTab Neck Lake Road Reconstruction.pdf PDF
BidSum-AK PFH 58(1).pdf PDF
Amendment A008.pdf PDF
QA_01-08-2025.pdf PDF
QA_01-07-2025.pdf PDF
Amendment A007.pdf PDF
Amendment A006.pdf PDF
QA_12-30-2024.pdf PDF
Amendment A005.pdf PDF
Amendment A004.pdf PDF
Amendment A003.pdf PDF
QA_12-16-2024.pdf PDF
QA_12-13-2024.pdf PDF
Amendment A002.pdf PDF
QA_12-18-2024.pdf PDF
QA_12-06-2024.pdf PDF
Amendment A001.pdf PDF
QA_12-05-2024.pdf PDF
QA_11-26-2024.pdf PDF
af05801_SEGMENT1_proposed-alignment.pdf PDF
af05801_XS_Labeled_SchA.pdf PDF
af05801_SEGMENT1_proposed-profile.pdf PDF
af05801_XS_SchA.pdf PDF
af05801_TIE4_Earthwork.pdf PDF
af05801_SchedA_Earthwork.pdf PDF
af05801_SchedB_Earthwork.pdf PDF
ak pfh 58(1)_Neck Lake ARD Technical Memorandum.pdf PDF
af05801_TIE4_proposed-alignment.pdf PDF
af05801_TIE1_Earthwork.pdf PDF
ak pfh 58(1)_GR1516_pp385-973.pdf PDF
af05801_TIE2_superelevation.pdf PDF
af05801_TIE1_proposed-profile.pdf PDF
af05801_TIE2_proposed-alignment.pdf PDF
af05801_TIE4_proposed-profile.pdf PDF
af05801_TIE4_superelevation.pdf PDF
IFB AK PFH 58(1) Neck Lake Road Reconstruction.pdf PDF
af05801_SchedC_Earthwork.pdf PDF
af05801_BULK_proposed-alignment.pdf PDF
ak pfh 58(1)_FinalHydraulicReport.pdf PDF
ak pfh 58(1)_XS Approaches_SchC.pdf PDF
aka-pfh58-1_SWPPP for compilation_Final.pdf PDF
af05801_BULK_Earthwork.pdf PDF
af05801_Segment1_superelevation.pdf PDF
af05801_TIE2_Earthwork.pdf PDF
af05801_XS_SchB.pdf PDF
ak pfh 58(1)_NeckLakeRoad_Rockery_TM 1.21.2019.pdf PDF
af05801_TIE1_superelevation.pdf PDF
af05801_TIE3_Earthwork.pdf PDF
ak pfh 58(1)_GR1516_pp1-384.pdf PDF
af05801_XS_Labeled_SchC.pdf PDF
Show 40 more

Latest 50 of 62 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Schedule B and C Profile tie in station 52+75 to 59+50

AK PFH 58(1),

Neck Lake Road Reconstruction: NPOWI Hwy. to Marine Access Facility Jct.

Copyright: (c) 2009 Bentley Systems, Incorporated. All rights reserved.

Project: NeckLake2017 Subject:

Job No. 581 Operator: OC Date: Tuesday August 20, 2024 9:12 am

SYSTEM FIX 3 ASEC 2 AZIM PRI 0 NOR NE STA 2 FILE: 'TIE3_P'

* 1 Print Profile TIE3_P

Beginning profile TIE3_P description:

STATION ELEV GRADE TOTAL L BACK L AHEAD L

VPI 1 52+75.00 123.400

VPC 53+15.00 123.040 ‐0.900 K = 23.4 SSD = 302.3

VPI 2 53+65.00 122.590 100.000 50.000 50.000

VPT 54+15.00 120.002 ‐5.176

VPC 54+50.00 118.190 ‐5.176 K = 49.8

VPI 3 57+00.00 105.250 500.000 250.000 250.000

Low Point 57+07.70 111.521

VPT 59+50.00 117.417 4.867

Ending profile TIE3_P description

File details come from the government source that posted it. Updated .