BidSum-AK PFH 58(1).pdf

PDF 113 KB Posted

Attached to
AK PFH 58(1), Neck Lake Road Reconstruction: NPOWI Hwy. to Marine Access Facility Jct.
Solicitation number
69056725B000001
Issued by

About this file

This is a bid opening summary document for Solicitation No. 69056725B000001 for the AK PFH 58(1) Neck Lake Road Reconstruction project from NPOWI Highway to Marine Access Facility Junction. The bid opening occurred on January 14, 2025 at 1:00 pm with 8 attendees present.

Three contractors submitted bids across three schedules: Glacier Construction Inc. (dba Southeast Road Builders) submitted the lowest bids at $18,751,434 for Schedule A, $20,503,340.50 for Schedule B, and $23,958,469 for Schedule C. ASRC Earthworks LLC and Granite Construction CO submitted higher bids, with all contractor bids exceeding the Engineer's Estimate ($13,396,438 for Schedule A, $14,561,799 for Schedule B, and $17,459,239 for Schedule C). The project involves different lengths of road reconstruction: Schedule A is 1.6 miles, Schedule B is 2.0 miles, and Schedule C is 2.4 miles. The low bidder's contact number for all schedules is 907-766-2833.

View the file

Other files

File Type Posted
BidTab Neck Lake Road Reconstruction.pdf PDF
Amendment A008.pdf PDF
QA_01-08-2025.pdf PDF
QA_01-07-2025.pdf PDF
Amendment A007.pdf PDF
Amendment A006.pdf PDF
QA_12-30-2024.pdf PDF
Amendment A005.pdf PDF
Amendment A004.pdf PDF
Amendment A003.pdf PDF
QA_12-16-2024.pdf PDF
QA_12-13-2024.pdf PDF
Amendment A002.pdf PDF
QA_12-18-2024.pdf PDF
QA_12-06-2024.pdf PDF
Amendment A001.pdf PDF
QA_12-05-2024.pdf PDF
QA_11-26-2024.pdf PDF
af05801_SEGMENT1_proposed-alignment.pdf PDF
af05801_XS_Labeled_SchA.pdf PDF
af05801_SEGMENT1_proposed-profile.pdf PDF
af05801_XS_SchA.pdf PDF
af05801_TIE4_Earthwork.pdf PDF
af05801_SchedA_Earthwork.pdf PDF
af05801_SchedB_Earthwork.pdf PDF
ak pfh 58(1)_Neck Lake ARD Technical Memorandum.pdf PDF
af05801_TIE4_proposed-alignment.pdf PDF
af05801_TIE1_Earthwork.pdf PDF
ak pfh 58(1)_GR1516_pp385-973.pdf PDF
af05801_TIE2_superelevation.pdf PDF
af05801_TIE1_proposed-profile.pdf PDF
af05801_TIE2_proposed-alignment.pdf PDF
af05801_TIE4_proposed-profile.pdf PDF
af05801_TIE4_superelevation.pdf PDF
IFB AK PFH 58(1) Neck Lake Road Reconstruction.pdf PDF
af05801_SchedC_Earthwork.pdf PDF
af05801_BULK_proposed-alignment.pdf PDF
ak pfh 58(1)_FinalHydraulicReport.pdf PDF
ak pfh 58(1)_XS Approaches_SchC.pdf PDF
aka-pfh58-1_SWPPP for compilation_Final.pdf PDF
af05801_BULK_Earthwork.pdf PDF
af05801_Segment1_superelevation.pdf PDF
af05801_TIE2_Earthwork.pdf PDF
af05801_XS_SchB.pdf PDF
ak pfh 58(1)_NeckLakeRoad_Rockery_TM 1.21.2019.pdf PDF
af05801_TIE1_superelevation.pdf PDF
af05801_TIE3_Earthwork.pdf PDF
ak pfh 58(1)_GR1516_pp1-384.pdf PDF
af05801_XS_Labeled_SchC.pdf PDF
af05801_SEGMENT1_proposed-alignment.pdf PDF
Show 40 more

Latest 50 of 62 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

BID OPENING SUMMARY Solicitation No. 69056725B000001 Bid Opening Date 01/14/2025 Time 1:00 pm AK PFH 58(1), Neck Lake Road Reconstruction: NPOWI Hwy. to Marine Access Facility Jct.

LOW BIDDER’S PHONE NUMBER Schedule A:__907-766-2833___ LOW BIDDER’S PHONE NUMBER Schedule B:__907-766-2833___ LOW BIDDER’S PHONE NUMBER Schedule C:__907-766-2833___

Attendance:______8________

Bid Opening Officer: Robert Kolln Assistants: Rebekah Webb

OFFER RECEIVED

REC'D

BY CONTRACTOR SCHEDULE A SCHEDULE B SCHEDULE C

DATE

TIME

1.

12/13/24 Mod 1/14//25

10:05am Mod 9:57am

RW

Mod

RW

Glacier Construction, Inc.

dba Southeast Road Builders

$18,751,434.00

$20,503,340.50

$23,958,469.00

2.

01/14/25 Mod 1/14/25

9:05 am Mod 11:59am

RW

Mod

RK

ASRC Earthworks LLC

$21,715,751.00

$22,689,830.00

$25,127,702.00

3.

01/14/25 12:05 pm RW Granite Construction CO

$21,828,935.00

$23,750,215.00

$27,385,235.00

4.

5.

Engineer’s Estimate $13,396,438.00 $14,561,799.00 $17,459,239.00

File details come from the government source that posted it. Updated .