AK PFH 58(1), Neck Lake Road Reconstruction: NPOWI Hwy. to Marine Access Facility Jct.
Closed Solicitation Posted
This opportunity was awarded. See the award notice from .
- Solicitation number
- 69056725B000001
- Agency
-
Federal Highway Administration
Department of Transportation
- Responses due
- Set-aside
- No set-aside
Opportunity facts
- NAICS code
- 237310 Highway, Street, and Bridge Construction
- Place of performance
- Coffman Cove, Alaska, United States
- Points of contact
-
- Contracts G. Office wfl.contracts@dot.gov (360) 619-7520
Notice details come from SAM.gov. Updated .
About this opportunity
The Federal Highway Administration is seeking a contractor to reconstruct approximately 6 miles of Neck Lake Road located 45 miles northwest of Coffman Cove on Prince of Wales Island, Alaska. The project involves comprehensive roadway reconstruction including excavation, sub-excavation, soft ground embankment construction, grading, rock blasting, drainage installation, aggregate surface course placement, guardrail installation, erosion control, temporary traffic control, and turf establishment. The solicitation will be offered through a sealed bid, firm-fixed-price contract with full and open competition on an unrestricted basis. Potential bidders must submit their proposals by January 14, 2025, with questions to be submitted via email to wfl.contracts@dot.gov. The contract requires detailed technical capabilities, including experience with rock blasting, drainage construction, and potentially acid generating (PAG) rock management.
The project is not set aside for any specific contractor type and will be open to all qualified bidders. The estimated contract value ranges between $10,000,000 and $20,000,000, with the work divided into three separate bid schedules of 1.6, 2.0, and 2.4 miles, though only one schedule will be awarded. The tentative project completion date is Fall 2026, with a notice to proceed date of March 6, 2025, and all work required to be completed by October 31, 2026. The place of performance is in the Hyder Census Area of Prince of Wales Island, Alaska, specifically along the route connecting the North Prince of Wales Island Highway to the Marine Access Facility Junction. Bid evaluation will focus on technical capabilities, compliance with specifications, and competitive pricing across the proposed schedules.
Notice text
2 versions
Update #2 · Latest ·
UPDATE 11/19/2024: Physical data files updated af05801_SEGMENT1_proposed-alignment.pdf and af05801_SEGMENT1_proposed-profile.pdf. Physical data file added- af05801_XS_Labeled_SchA.pdf.
PROJECT: AK PFH 58(1), Neck Lake Rd. Reconstruction: NPOWI Hwy.to Marine Access Facility Jct.
LOCATION: 45 miles NW of Coffman Cove, Hyder Census Area, Prince of Wales Island, Alaska
WORK: Work consists of roadway excavation, sub-excavation, soft ground embankment construction (surcharge), grading, rock blasting, riprap placement, rockery, drainage (including large Aquatic Organism Pipes), embankment (including settlement monitoring), placement of aggregate surface course, guardrail installation, erosion control, temporary traffic control, permanent signage, and turf establishment. See “Project Description” for additional details
LENGTH:
Schedule A – 1.6 miles of road reconstruction
Schedule B – 2.0 miles of road reconstruction
Schedule C – 2.4 miles of road reconstruction
TENTATIVE COMPLETION DATE: Fall 2026
CONTRACT TYPE: Sealed Bid, Firm-Fixed-Price
ESTIMATED PRICE RANGE: Between $10,000,000 and $20,000,000
INTERESTED VENDORS LIST: To view the Interested Vendors List, you must register as a SAM user, be logged in, and linked to an entity. If you are signed into SAM.gov with your registered entity and you cannot see the Interested Vendors List, you will need to be assigned the Contract Opportunities Administrator role for your entity in SAM.gov. If you need assistance, call the Federal Service Desk at 866-606-8220.
THIS SOLICITATION IS OFFERED FOR FULL AND OPEN COMPETITION ON AN UNRESTRICTED BASIS
This project is anticipated to be solicited Winter 2024/2025
This project will include 3 bid schedules. Only one schedule will be awarded.
Update #1 ·
PROJECT: AK PFH 58(1), Neck Lake Rd. Reconstruction: NPOWI Hwy.to Marine Access Facility Jct.
LOCATION: 45 miles NW of Coffman Cove, Hyder Census Area, Prince of Wales Island, Alaska
WORK: Work consists of roadway excavation, sub-excavation, soft ground embankment construction (surcharge), grading, rock blasting, riprap placement, rockery, drainage (including large Aquatic Organism Pipes), embankment (including settlement monitoring), placement of aggregate surface course, guardrail installation, erosion control, temporary traffic control, permanent signage, and turf establishment. See “Project Description” for additional details
LENGTH:
Schedule A – 1.6 miles of road reconstruction
Schedule B – 2.0 miles of road reconstruction
Schedule C – 2.4 miles of road reconstruction
TENTATIVE COMPLETION DATE: Fall 2026
CONTRACT TYPE: Sealed Bid, Firm-Fixed-Price
ESTIMATED PRICE RANGE: Between $10,000,000 and $20,000,000
INTERESTED VENDORS LIST: To view the Interested Vendors List, you must register as a SAM user, be logged in, and linked to an entity. If you are signed into SAM.gov with your registered entity and you cannot see the Interested Vendors List, you will need to be assigned the Contract Opportunities Administrator role for your entity in SAM.gov. If you need assistance, call the Federal Service Desk at 866-606-8220.
THIS SOLICITATION IS OFFERED FOR FULL AND OPEN COMPETITION ON AN UNRESTRICTED BASIS
This project is anticipated to be solicited Winter 2024/2025
This project will include 3 bid schedules. Only one schedule will be awarded.
Files
Show 40 more
50 files listed here. See the rest on GovTribe.
Notice history
| Notice | Type | Posted |
|---|---|---|
| AK PFH 58(1), Neck Lake Road Reconstruction: NPOWI Hwy. to Marine Access Facility Jct. | Award Notice | |
| This notice | Solicitation | |
| AK PFH 58(1), Neck Lake Road Reconstruction: NPOWI Hwy. to Marine Access Facility Jct. | Pre-Solicitation |
Similar open opportunities
| Opportunity | Agency | Set-aside | Responses due |
|---|---|---|---|
| AK FLAP ANCHORAGE 2021(1), Far North Bicentennial Park Enhancements | Federal Highway Administration | No set-aside | |
| Acadia National Park | Federal Highway Administration | Total Small Business |
On GovTribe
Work this opportunity
- Track it in your pipeline
- Find teaming partners
- Similar opportunities
- Ask GovTribe AI about this opportunity