QA_12-18-2024.pdf

PDF 61 KB Posted

Attached to
AK PFH 58(1), Neck Lake Road Reconstruction: NPOWI Hwy. to Marine Access Facility Jct.
Solicitation number
69056725B000001
Issued by

About this file

This is a Questions and Answers document for solicitation #69056725B000001, AK PFH 58(1) Neck Lake Road Reconstruction project, containing 10 technical and general questions submitted through December 18, 2024.

Key clarifications include: submission of questions to wfl.contracts@dot.gov, fertilizer specifications to be addressed in Amendment A001, application rates for fertilizer and mulch found in Subsection 625.08A table 625-1, embankment and maintenance being incidental to roadway excavation, bridge load restrictions for FR 3060 access road (no restrictions for legal highway loads, permits required for overweight loads), and measurement specifications for streambed channel realignment and reconstruction items C1980 and C2000 according to Subsection 109.02(c)(1).

View the file

Other files

File Type Posted
BidTab Neck Lake Road Reconstruction.pdf PDF
BidSum-AK PFH 58(1).pdf PDF
Amendment A008.pdf PDF
QA_01-08-2025.pdf PDF
QA_01-07-2025.pdf PDF
Amendment A007.pdf PDF
Amendment A006.pdf PDF
QA_12-30-2024.pdf PDF
Amendment A005.pdf PDF
Amendment A004.pdf PDF
Amendment A003.pdf PDF
QA_12-16-2024.pdf PDF
QA_12-13-2024.pdf PDF
Amendment A002.pdf PDF
QA_12-06-2024.pdf PDF
Amendment A001.pdf PDF
QA_12-05-2024.pdf PDF
QA_11-26-2024.pdf PDF
af05801_SEGMENT1_proposed-alignment.pdf PDF
af05801_XS_Labeled_SchA.pdf PDF
af05801_SEGMENT1_proposed-profile.pdf PDF
af05801_XS_SchA.pdf PDF
af05801_TIE4_Earthwork.pdf PDF
af05801_SchedA_Earthwork.pdf PDF
af05801_SchedB_Earthwork.pdf PDF
ak pfh 58(1)_Neck Lake ARD Technical Memorandum.pdf PDF
af05801_TIE4_proposed-alignment.pdf PDF
af05801_TIE1_Earthwork.pdf PDF
ak pfh 58(1)_GR1516_pp385-973.pdf PDF
af05801_TIE2_superelevation.pdf PDF
af05801_TIE1_proposed-profile.pdf PDF
af05801_TIE2_proposed-alignment.pdf PDF
af05801_TIE4_proposed-profile.pdf PDF
af05801_TIE4_superelevation.pdf PDF
IFB AK PFH 58(1) Neck Lake Road Reconstruction.pdf PDF
af05801_SchedC_Earthwork.pdf PDF
af05801_BULK_proposed-alignment.pdf PDF
ak pfh 58(1)_FinalHydraulicReport.pdf PDF
ak pfh 58(1)_XS Approaches_SchC.pdf PDF
aka-pfh58-1_SWPPP for compilation_Final.pdf PDF
af05801_BULK_Earthwork.pdf PDF
af05801_Segment1_superelevation.pdf PDF
af05801_TIE2_Earthwork.pdf PDF
af05801_XS_SchB.pdf PDF
ak pfh 58(1)_NeckLakeRoad_Rockery_TM 1.21.2019.pdf PDF
af05801_TIE1_superelevation.pdf PDF
af05801_TIE3_Earthwork.pdf PDF
ak pfh 58(1)_GR1516_pp1-384.pdf PDF
af05801_XS_Labeled_SchC.pdf PDF
af05801_SEGMENT1_proposed-alignment.pdf PDF
Show 40 more

Latest 50 of 62 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

AK PFH 58(1)

Neck Lake Road Reconstruction NPOWI Hwy. to Marine Access Facility Jct

# General Technical Question Answer Date

1 X Is wfl.contracts@dot.gov the correct email to submit questions to for solicitation number 69056725B000001?

See Block 9 on Page A-5.

11/26/2024

2 X Why is there 10-20-10 and 46-0-0 fertilizer in the specifications? will be addressed undeer Amendment A001.

12/5/2024

3 X What is the application rate on fertilizer? Please see Subsection 625.08A table 625-1. Bid according to solicitation documents.

12/5/2024

4 X What is the application rate on the 713.05 mulch? Please see Subsection 625.08A table 625-1. Bid according to solicitation documents.

12/5/2024

5 X Are weed free straw wattles considered fiber rolls for section

713.12?

Please see FP-14 section subsection 713.12(b). Bid accroding to solicatitaion documents.

12/5/2024

6 X Where do I find section FP-14? To view the FP-14 electronically, go to:

https://highways.dot.gov/federal-lands/specs 12/6/2024

7 X Does the temporary turf establishment require fertilizer & mulch?

See the FP-14 subsection 157.12(b) Temporary soil stabilization 12/6/2024

8 X

It appears that all embankment is incidental to bid item C0400

Roadway Excavation. Please confirm this includes the soft ground embankment and surcharge embankment including settlement monitoring and maintenance due to settlement.

Please confirm that if the settlement exceeds the depth provided on sheet C.10, the contractor will be compensated for additional quantity of embankment to achieve the design grades.

All embankment and embankment maintenance is incidental to roadway excavation. Settlement monitoring is covered by item 62101-0000

Monument (Settlement Plate). If the settlement is greater than anticipated, more embankment will be needed. There is 7800 cuyd of surcharge embankment that needs to be hauled off after settlement is complete, and is paid for as additional roadway excavation.

12/18/2024

9 X

The PAG rock waste site access road, FR 3060, has a small bridge on it. Please confirm this bridge has been evaluated and can handle the load limits required for the project. E21

This bridge was inspected this year and the bridge is open with no load restrictions for highway vehicles with legal loads. Loads that are overweight will require a permit.

12/18/2024

10 X

Please provide clarification on the measurement of bid items

C1980 and C2000. They are shown as paid by CY but it is unclear how that volume is measured.

C1980 64704-1500 MITIGATION, STREAMBED CHANNEL REALIGNMENT

and C2000 64704-1600 MITIGATION, STREAMBED CHANNEL

RECONSTRUCTION (BEDROCK) volume is measured according to

Subsection 109.02(c)(1).

12/18/2024