af05801_TIE1_proposed-profile.pdf

PDF 53 KB Posted

Attached to
AK PFH 58(1), Neck Lake Road Reconstruction: NPOWI Hwy. to Marine Access Facility Jct.
Solicitation number
69056725B000001
Issued by

About this file

This document is a Schedule A Profile for the AK PFH 58(1), Neck Lake Road Reconstruction project. The project involves approximately 1.6 miles of roadway reconstruction work, including activities such as roadway excavation, sub-excavation, soft ground embankment construction, grading, rock blasting, drainage installation, aggregate surface course placement, guardrail installation, erosion control, and turf establishment. The project is located 45 miles northwest of Coffman Cove, Alaska, on Prince of Wales Island, and has a tentative completion date of Fall 2026. The contract will be awarded as a sealed bid, firm-fixed-price contract, with an estimated price range between $10,000,000 and $20,000,000. The project is being solicited by the Department of Transportation Federal Highway Administration on an unrestricted, full and open competition basis, and is anticipated to be solicited in Winter 2024/2025.

View the file

Other files

File Type Posted
BidTab Neck Lake Road Reconstruction.pdf PDF
BidSum-AK PFH 58(1).pdf PDF
Amendment A008.pdf PDF
QA_01-08-2025.pdf PDF
QA_01-07-2025.pdf PDF
Amendment A007.pdf PDF
Amendment A006.pdf PDF
QA_12-30-2024.pdf PDF
Amendment A005.pdf PDF
Amendment A004.pdf PDF
Amendment A003.pdf PDF
QA_12-16-2024.pdf PDF
QA_12-13-2024.pdf PDF
Amendment A002.pdf PDF
QA_12-18-2024.pdf PDF
QA_12-06-2024.pdf PDF
Amendment A001.pdf PDF
QA_12-05-2024.pdf PDF
QA_11-26-2024.pdf PDF
af05801_SEGMENT1_proposed-alignment.pdf PDF
af05801_XS_Labeled_SchA.pdf PDF
af05801_SEGMENT1_proposed-profile.pdf PDF
af05801_XS_SchA.pdf PDF
af05801_TIE4_Earthwork.pdf PDF
af05801_SchedA_Earthwork.pdf PDF
af05801_SchedB_Earthwork.pdf PDF
ak pfh 58(1)_Neck Lake ARD Technical Memorandum.pdf PDF
af05801_TIE4_proposed-alignment.pdf PDF
af05801_TIE1_Earthwork.pdf PDF
ak pfh 58(1)_GR1516_pp385-973.pdf PDF
af05801_TIE2_superelevation.pdf PDF
af05801_TIE2_proposed-alignment.pdf PDF
af05801_TIE4_proposed-profile.pdf PDF
af05801_TIE4_superelevation.pdf PDF
IFB AK PFH 58(1) Neck Lake Road Reconstruction.pdf PDF
af05801_SchedC_Earthwork.pdf PDF
af05801_BULK_proposed-alignment.pdf PDF
ak pfh 58(1)_FinalHydraulicReport.pdf PDF
ak pfh 58(1)_XS Approaches_SchC.pdf PDF
aka-pfh58-1_SWPPP for compilation_Final.pdf PDF
af05801_BULK_Earthwork.pdf PDF
af05801_Segment1_superelevation.pdf PDF
af05801_TIE2_Earthwork.pdf PDF
af05801_XS_SchB.pdf PDF
ak pfh 58(1)_NeckLakeRoad_Rockery_TM 1.21.2019.pdf PDF
af05801_TIE1_superelevation.pdf PDF
af05801_TIE3_Earthwork.pdf PDF
ak pfh 58(1)_GR1516_pp1-384.pdf PDF
af05801_XS_Labeled_SchC.pdf PDF
af05801_SEGMENT1_proposed-alignment.pdf PDF
Show 40 more

Latest 50 of 62 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Schedule A

Profile 73+70.00 to 79+65.00

AK PFH 58(1),

Neck Lake Road Reconstruction: NPOWI Hwy. to Marine Access Facility Jct.

Copyright: (c) 2009 Bentley Systems, Incorporated. All rights reserved.

Project: NeckLake2017 Subject:

Job No. 581 Operator: OC Date: Tuesday August 20, 2024 9:11 am

SYSTEM FIX 3 ASEC 2 AZIM PRI 0 NOR NE STA 2 FILE: 'TIE1_P'

* 1 Print Profile TIE1_P

Beginning profile TIE1_P description:

STATION ELEV GRADE TOTAL L BACK L AHEAD L

VPI 1 73+70.00 118.350

VPC 73+75.00 118.122 ‐4.556 K = 54.5

VPI 2 74+15.00 116.300 80.000 40.000 40.000

VPT 74+55.00 115.065 ‐3.088

VPC 74+75.00 114.447 ‐3.088 K = 24.4 SSD = 678.3

VPI 3 74+95.00 113.830 40.000 20.000 20.000

VPT 75+15.00 112.885 ‐4.727

VPC 75+15.00 112.885 ‐4.727 K = 86.0

VPI 4 77+40.00 102.250 450.000 225.000 225.000

Low Point 79+21.33 103.282

VPT 79+65.00 103.393 0.508

Ending profile TIE1_P description