af05801_SchedB_Earthwork.pdf

PDF 115 KB Posted

Attached to
AK PFH 58(1), Neck Lake Road Reconstruction: NPOWI Hwy. to Marine Access Facility Jct.
Solicitation number
69056725B000001
Issued by

About this file

This document is a Earthwork Schedule B from 54+50 to 76+00 for the Neck Lake Road Reconstruction project. The project is located 45 miles northwest of Coffman Cove, Alaska and consists of 2.0 miles of road reconstruction work including roadway excavation, sub-excavation, embankment construction, grading, drainage, aggregate surface course, guardrail, erosion control, and other related construction activities. The work is part of a larger multi-schedule project solicited by the Department of Transportation Federal Highway Administration with an estimated price range between $10,000,000 and $20,000,000. The project is anticipated to be solicited in Winter 2024/2025 with a tentative completion date in Fall 2026.

View the file

Other files

File Type Posted
BidTab Neck Lake Road Reconstruction.pdf PDF
BidSum-AK PFH 58(1).pdf PDF
Amendment A008.pdf PDF
QA_01-08-2025.pdf PDF
QA_01-07-2025.pdf PDF
Amendment A007.pdf PDF
Amendment A006.pdf PDF
QA_12-30-2024.pdf PDF
Amendment A005.pdf PDF
Amendment A004.pdf PDF
Amendment A003.pdf PDF
QA_12-16-2024.pdf PDF
QA_12-13-2024.pdf PDF
Amendment A002.pdf PDF
QA_12-18-2024.pdf PDF
QA_12-06-2024.pdf PDF
Amendment A001.pdf PDF
QA_12-05-2024.pdf PDF
QA_11-26-2024.pdf PDF
af05801_SEGMENT1_proposed-alignment.pdf PDF
af05801_XS_Labeled_SchA.pdf PDF
af05801_SEGMENT1_proposed-profile.pdf PDF
af05801_XS_SchA.pdf PDF
af05801_TIE4_Earthwork.pdf PDF
af05801_SchedA_Earthwork.pdf PDF
ak pfh 58(1)_Neck Lake ARD Technical Memorandum.pdf PDF
af05801_TIE4_proposed-alignment.pdf PDF
af05801_TIE1_Earthwork.pdf PDF
ak pfh 58(1)_GR1516_pp385-973.pdf PDF
af05801_TIE2_superelevation.pdf PDF
af05801_TIE1_proposed-profile.pdf PDF
af05801_TIE2_proposed-alignment.pdf PDF
af05801_TIE4_proposed-profile.pdf PDF
af05801_TIE4_superelevation.pdf PDF
IFB AK PFH 58(1) Neck Lake Road Reconstruction.pdf PDF
af05801_SchedC_Earthwork.pdf PDF
af05801_BULK_proposed-alignment.pdf PDF
ak pfh 58(1)_FinalHydraulicReport.pdf PDF
ak pfh 58(1)_XS Approaches_SchC.pdf PDF
aka-pfh58-1_SWPPP for compilation_Final.pdf PDF
af05801_BULK_Earthwork.pdf PDF
af05801_Segment1_superelevation.pdf PDF
af05801_TIE2_Earthwork.pdf PDF
af05801_XS_SchB.pdf PDF
ak pfh 58(1)_NeckLakeRoad_Rockery_TM 1.21.2019.pdf PDF
af05801_TIE1_superelevation.pdf PDF
af05801_TIE3_Earthwork.pdf PDF
ak pfh 58(1)_GR1516_pp1-384.pdf PDF
af05801_XS_Labeled_SchC.pdf PDF
af05801_SEGMENT1_proposed-alignment.pdf PDF
Show 40 more

Latest 50 of 62 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Earthwork

Schedule B

54+50 to 76+00

AK PFH 58(1),

Neck Lake Road Reconstruction: NPOWI Hwy. to Marine Access Facility Jct.

Material Name End Areas Unadjusted Adjusted Mult Mass Accum Station Volumes Volumes Factor Ordinate Unadj Vol

(sq. ft.) (cu. yd.) (cu. yd.) (cu. yd.)

SKIP STATION RANGE = 35+58.00 to 37+00.00

54+50.00 RDWYEXC

Excavation 0.00 0 0 0.85 0 Subsoil Exc 0.00 0 0 1.00 0 Fill 45.52 0 0 1.00 0 0

ACP

Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 5.53 0 0 0.00 0 0

AGG_BASE

Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 12.91 0 0 0.00 0 0

SHOULDERBACKFILL

Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 0.15 0 0 0.00 0 0

55+00.00 RDWYEXC

Excavation 0.56 1 0 0.85 1 Subsoil Exc 0.00 0 0 1.00 0 Fill 77.71 114 114 1.00 ‐114 114

ACP

Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 5.53 10 0 0.00 ‐114 10

AGG_BASE

Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 12.91 24 0 0.00 ‐114 24

SHOULDERBACKFILL

Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 0.15 0 0 0.00 ‐114 0

55+50.00 RDWYEXC

Excavation 5.57 6 5 0.85 7 Subsoil Exc 0.00 0 0 1.00 0 Fill 66.95 134 134 1.00 ‐243 248

ACP

Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 5.53 10 0 0.00 ‐243 20

AGG_BASE

Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 12.91 24 0 0.00 ‐243 48

SHOULDERBACKFILL

Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 0.15 0 0 0.00 ‐243 0

56+00.00 RDWYEXC

Excavation 22.98 27 22 0.85 34 Subsoil Exc 0.00 0 0 1.00 0 Fill 50.95 109 109 1.00 ‐330 357

ACP

Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 5.53 10 0 0.00 ‐330 30

AGG_BASE

Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 12.91 24 0 0.00 ‐330 72

SHOULDERBACKFILL

Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 0.15 0 0 0.00 ‐330 0

56+21.46 RDWYEXC

Excavation 2.01 10 9 0.85 44 Subsoil Exc 0.00 0 0 1.00 0 Fill 137.65 75 75 1.00 ‐396 432

ACP

Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 5.58 4 0 0.00 ‐396 34

AGG_BASE

Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 13.01 10 0 0.00 ‐396 82

SHOULDERBACKFILL

Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 0.15 0 0 0.00 ‐396 0

56+50.00 RDWYEXC

Excavation 0.00 1 1 0.85 45 Subsoil Exc 0.00 0 0 1.00 0 Fill 90.06 120 120 1.00 ‐515 552

ACP

Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 5.53 6 0 0.00 ‐515 40

AGG_BASE

Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 12.91 14 0 0.00 ‐515 96

SHOULDERBACKFILL

Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 0.15 0 0 0.00 ‐515 0

57+00.00 RDWYEXC

Excavation 0.00 0 0 0.85 45 Subsoil Exc 0.00 0 0 1.00 0 Fill 61.40 140 140 1.00 ‐655 692

ACP

Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 5.53 10 0 0.00 ‐655 50

AGG_BASE

Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 12.91 24 0 0.00 ‐655 120

SHOULDERBACKFILL

Subsoil Exc 0.00 0 0 0.00 0 Fill 0.15 0 0 0.00 ‐655 0

57+50.00 RDWYEXC

Excavation 0.00 0 0 0.85 45 Subsoil Exc 0.00 0 0 1.00 0 Fill 71.37 123 123 1.00 ‐778 815

ACP

Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 5.53 10 0 0.00 ‐778 60

AGG_BASE

Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 12.91 24 0 0.00 ‐778 144

SHOULDERBACKFILL

Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 0.15 0 0 0.00 ‐778 0

58+00.00 RDWYEXC

Excavation 0.00 0 0 0.85 45 Subsoil Exc 0.00 0 0 1.00 0 Fill 67.04 128 128 1.00 ‐906 943

ACP

Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 5.40 10 0 0.00 ‐906 70

AGG_BASE

Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 12.62 24 0 0.00 ‐906 168

SHOULDERBACKFILL

Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 0.15 0 0 0.00 ‐906 0

58+50.00 RDWYEXC

Excavation 0.00 0 0 0.85 45 Subsoil Exc 0.00 0 0 1.00 0 Fill 40.52 100 100 1.00 ‐1006 1043

ACP

Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 5.11 10 0 0.00 ‐1006 80

AGG_BASE

Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 12.08 23 0 0.00 ‐1006 191

SHOULDERBACKFILL

Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 0.15 0 0 0.00 ‐1006 0

59+00.00 RDWYEXC

Excavation 71.27 66 56 0.85 111 Subsoil Exc 0.00 0 0 1.00 0 Fill 23.69 59 59 1.00 ‐1009 1102

TOPSOIL

Excavation 14.41 13 0 0.00 13 Subsoil Exc 12.91 12 0 0.00 12 Fill 0.00 0 0 0.00 ‐1009 0 Mass ordinate for TOPSOIL = 0

ACP

Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 5.11 9 0 0.00 ‐1009 89

AGG_BASE

Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 12.17 22 0 0.00 ‐1009 213

SHOULDERBACKFILL

Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 0.16 0 0 0.00 ‐1009 0

59+50.00 RDWYEXC

Excavation 68.75 129 110 0.85 240 Subsoil Exc 0.00 0 0 1.00 0 Fill 13.13 34 34 1.00 ‐933 1136

TOPSOIL

Excavation 20.92 33 0 0.00 46 Subsoil Exc 5.38 17 0 0.00 29 Fill 0.00 0 0 0.00 ‐933 0 Mass ordinate for TOPSOIL = 0

ACP

Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 5.11 9 0 0.00 ‐933 98

AGG_BASE

Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 12.17 23 0 0.00 ‐933 236

SHOULDERBACKFILL

Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 0.16 0 0 0.00 ‐933 0

60+00.00 RDWYEXC

Excavation 22.84 85 72 0.85 325 Subsoil Exc 0.00 0 0 1.00 0 Fill 23.82 34 34 1.00 ‐895 1170

TOPSOIL

Excavation 12.66 31 0 0.00 77 Subsoil Exc 7.96 12 0 0.00 41 Fill 0.00 0 0 0.00 ‐895 0 Mass ordinate for TOPSOIL = 0

ACP

Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 5.11 9 0 0.00 ‐895 107

AGG_BASE

Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 12.17 23 0 0.00 ‐895 259

SHOULDERBACKFILL

Excavation 0.00 0 0 0.00 0

Fill 0.16 0 0 0.00 ‐895 0

60+50.00 RDWYEXC

Excavation 0.00 21 18 0.85 346 Subsoil Exc 0.00 0 0 1.00 0 Fill 56.68 75 75 1.00 ‐952 1245

TOPSOIL

Excavation 0.00 12 0 0.00 89 Subsoil Exc 12.27 19 0 0.00 60 Fill 0.00 0 0 0.00 ‐952 0 Mass ordinate for TOPSOIL = 0

ACP

Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 5.11 9 0 0.00 ‐952 116

AGG_BASE

Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 12.11 22 0 0.00 ‐952 281

SHOULDERBACKFILL

Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 0.16 0 0 0.00 ‐952 0

61+00.00 RDWYEXC

Excavation 3.38 3 2 0.85 349 Subsoil Exc 0.00 0 0 1.00 0 Fill 74.45 121 121 1.00 ‐1071 1366

TOPSOIL

Excavation 9.94 9 0 0.00 98 Subsoil Exc 14.41 25 0 0.00 85 Fill 0.00 0 0 0.00 ‐1071 0 Mass ordinate for TOPSOIL = 0

ACP

Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 7.61 12 0 0.00 ‐1071 128

AGG_BASE

Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 17.21 27 0 0.00 ‐1071 308

SHOULDERBACKFILL

Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 0.16 0 0 0.00 ‐1071 0

61+50.00 RDWYEXC

Excavation 0.42 4 3 0.85 353 Subsoil Exc 0.00 0 0 1.00 0 Fill 82.75 146 146 1.00 ‐1214 1512

TOPSOIL

Excavation 2.86 12 0 0.00 110 Subsoil Exc 20.50 32 0 0.00 117 Fill 0.00 0 0 0.00 ‐1214 0 Mass ordinate for TOPSOIL = 0

ACP

Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 7.61 14 0 0.00 ‐1214 142

AGG_BASE

Fill 17.28 32 0 0.00 ‐1214 340

SHOULDERBACKFILL

Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 0.17 0 0 0.00 ‐1214 0

61+75.00 RDWYEXC

Excavation 0.00 0 0 0.85 353 Subsoil Exc 0.00 0 0 1.00 0 Fill 127.46 97 97 1.00 ‐1311 1609

TOPSOIL

Excavation 0.00 1 0 0.00 111 Subsoil Exc 24.09 21 0 0.00 138 Fill 0.00 0 0 0.00 ‐1311 0 Mass ordinate for TOPSOIL = 0

ACP

Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 7.61 7 0 0.00 ‐1311 149

AGG_BASE

Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 17.28 16 0 0.00 ‐1311 356

SHOULDERBACKFILL

Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 0.17 0 0 0.00 ‐1311 0

61+91.00 RDWYEXC

Excavation 0.00 0 0 0.85 353 Subsoil Exc 0.00 0 0 1.00 0 Fill 156.27 84 84 1.00 ‐1395 1693

TOPSOIL

Excavation 0.00 0 0 0.00 111 Subsoil Exc 23.95 14 0 0.00 152 Fill 0.00 0 0 0.00 ‐1395 0 Mass ordinate for TOPSOIL = 0

ACP

Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 6.97 4 0 0.00 ‐1395 153

AGG_BASE

Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 17.32 10 0 0.00 ‐1395 366

SHOULDERBACKFILL

Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 1.10 0 0 0.00 ‐1395 0

62+00.00 RDWYEXC

Excavation 0.00 0 0 0.85 353 Subsoil Exc 0.00 0 0 1.00 0 Fill 170.83 55 55 1.00 ‐1450 1748

TOPSOIL

Excavation 0.00 0 0 0.00 111 Subsoil Exc 22.98 8 0 0.00 160 Fill 0.00 0 0 0.00 ‐1450 0 Mass ordinate for TOPSOIL = 0

Subsoil Exc 0.00 0 0 0.00 0 Fill 6.64 2 0 0.00 ‐1450 155

AGG_BASE

Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 16.59 6 0 0.00 ‐1450 372

SHOULDERBACKFILL

Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 1.07 0 0 0.00 ‐1450 0

62+20.00 RDWYEXC

Excavation 0.00 0 0 0.85 353 Subsoil Exc 0.00 0 0 1.00 0 Fill 197.23 136 136 1.00 ‐1586 1884

TOPSOIL

Excavation 0.00 0 0 0.00 111 Subsoil Exc 24.77 18 0 0.00 178 Fill 0.00 0 0 0.00 ‐1586 0 Mass ordinate for TOPSOIL = 0

ACP

Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 6.00 5 0 0.00 ‐1586 160

AGG_BASE

Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 15.16 12 0 0.00 ‐1586 384

SHOULDERBACKFILL

Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 1.00 1 0 0.00 ‐1586 1

62+25.00 RDWYEXC

Excavation 0.00 0 0 0.85 353 Subsoil Exc 0.00 0 0 1.00 0 Fill 202.12 37 37 1.00 ‐1623 1921

TOPSOIL

Excavation 0.00 0 0 0.00 111 Subsoil Exc 25.35 5 0 0.00 183 Fill 0.00 0 0 0.00 ‐1623 0 Mass ordinate for TOPSOIL = 0

ACP

Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 6.08 1 0 0.00 ‐1623 161

AGG_BASE

Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 14.74 3 0 0.00 ‐1623 387

SHOULDERBACKFILL

Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 0.71 0 0 0.00 ‐1623 1

62+50.00 RDWYEXC

Excavation 0.00 0 0 0.85 353

Fill 262.53 215 215 1.00 ‐1838 2136

Excavation 0.00 0 0 0.00 111 Subsoil Exc 29.50 25 0 0.00 208 Fill 0.00 0 0 0.00 ‐1838 0 Mass ordinate for TOPSOIL = 0

ACP

Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 6.08 6 0 0.00 ‐1838 167

AGG_BASE

Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 14.74 14 0 0.00 ‐1838 401

SHOULDERBACKFILL

Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 0.71 1 0 0.00 ‐1838 2

63+00.00 RDWYEXC

Excavation 0.00 0 0 0.85 353 Subsoil Exc 0.00 0 0 1.00 0 Fill 323.30 542 542 1.00 ‐2380 2678

SUBEXCAVATION

Excavation 18.88 17 17 1.00 17 Subsoil Exc 0.00 0 0 1.00 0 Fill 0.00 0 0 1.00 ‐2380 0 Mass ordinate for SUBEXCAVATION = 17

TOPSOIL

Excavation 9.56 9 0 0.00 120 Subsoil Exc 24.07 50 0 0.00 258 Fill 0.00 0 0 0.00 ‐2380 0 Mass ordinate for TOPSOIL = 0

ACP

Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 6.08 11 0 0.00 ‐2380 178

AGG_BASE

Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 14.74 27 0 0.00 ‐2380 428

SUBEXBACKFILL

Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 18.88 17 0 0.00 ‐2380 17

SHOULDERBACKFILL

Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 0.71 1 0 0.00 ‐2380 3

63+50.00 RDWYEXC

Excavation 0.00 0 0 0.85 353 Subsoil Exc 0.00 0 0 1.00 0 Fill 380.85 652 652 1.00 ‐3032 3330

SUBEXCAVATION

Excavation 23.41 39 39 1.00 56 Subsoil Exc 0.00 0 0 1.00 0 Fill 0.00 0 0 1.00 ‐3032 0 Mass ordinate for SUBEXCAVATION = 56

Excavation 11.12 19 0 0.00 139 Subsoil Exc 24.19 45 0 0.00 303 Fill 0.00 0 0 0.00 ‐3032 0 Mass ordinate for TOPSOIL = 0

ACP

Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 6.08 11 0 0.00 ‐3032 189

AGG_BASE

Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 14.74 27 0 0.00 ‐3032 455

SUBEXBACKFILL

Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 23.41 39 0 0.00 ‐3032 56

SHOULDERBACKFILL

Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 0.71 1 0 0.00 ‐3032 4

64+00.00 RDWYEXC

Excavation 0.00 0 0 0.85 353 Subsoil Exc 0.00 0 0 1.00 0 Fill 327.70 656 656 1.00 ‐3688 3986

SUBEXCAVATION

Excavation 22.60 43 43 1.00 99 Subsoil Exc 0.00 0 0 1.00 0 Fill 0.00 0 0 1.00 ‐3688 0 Mass ordinate for SUBEXCAVATION = 99

TOPSOIL

Excavation 10.94 20 0 0.00 159 Subsoil Exc 24.48 45 0 0.00 348 Fill 0.00 0 0 0.00 ‐3688 0 Mass ordinate for TOPSOIL = 0

ACP

Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 6.08 11 0 0.00 ‐3688 200

AGG_BASE

Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 14.74 27 0 0.00 ‐3688 482

SUBEXBACKFILL

Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 22.60 43 0 0.00 ‐3688 99

SHOULDERBACKFILL

Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 0.71 1 0 0.00 ‐3688 5

64+34.00 RDWYEXC

Excavation 0.00 0 0 0.85 353 Subsoil Exc 0.00 0 0 1.00 0 Fill 193.42 328 328 1.00 ‐4016 4314

SUBEXCAVATION

Excavation 0.00 14 14 1.00 113

Fill 0.00 0 0 1.00 ‐4016 0

Mass ordinate for SUBEXCAVATION = 113

Excavation 0.00 7 0 0.00 166 Subsoil Exc 26.85 32 0 0.00 380 Fill 0.00 0 0 0.00 ‐4016 0 Mass ordinate for TOPSOIL = 0

ACP

Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 6.09 8 0 0.00 ‐4016 208

AGG_BASE

Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 14.71 19 0 0.00 ‐4016 501

SUBEXBACKFILL

Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 0.00 14 0 0.00 ‐4016 113

SHOULDERBACKFILL

Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 0.70 1 0 0.00 ‐4016 6

64+50.00 RDWYEXC

Excavation 0.00 0 0 0.85 353 Subsoil Exc 0.00 0 0 1.00 0 Fill 155.48 103 103 1.00 ‐4119 4417

SUBEXCAVATION

Excavation 17.09 5 5 1.00 118 Subsoil Exc 0.00 0 0 1.00 0 Fill 0.00 0 0 1.00 ‐4119 0 Mass ordinate for SUBEXCAVATION = 118

TOPSOIL

Excavation 9.15 3 0 0.00 169 Subsoil Exc 20.10 14 0 0.00 394 Fill 0.00 0 0 0.00 ‐4119 0 Mass ordinate for TOPSOIL = 0

ACP

Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 6.08 4 0 0.00 ‐4119 212

AGG_BASE

Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 14.67 9 0 0.00 ‐4119 510

SUBEXBACKFILL

Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 17.09 5 0 0.00 ‐4119 118

SHOULDERBACKFILL

Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 0.70 0 0 0.00 ‐4119 6

64+75.00 RDWYEXC

Excavation 13.70 6 5 0.85 359 Subsoil Exc 0.00 0 0 1.00 0 Fill 165.36 149 149 1.00 ‐4263 4566

SUBEXCAVATION

Excavation 22.18 18 18 1.00 136

Fill 0.00 0 0 1.00 ‐4263 0 Mass ordinate for SUBEXCAVATION = 136

TOPSOIL

Excavation 22.51 14 0 0.00 183 Subsoil Exc 24.33 21 0 0.00 415 Fill 0.00 0 0 0.00 ‐4263 0 Mass ordinate for TOPSOIL = 0

ACP

Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 6.08 6 0 0.00 ‐4263 218

AGG_BASE

Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 14.64 14 0 0.00 ‐4263 524

SUBEXBACKFILL

Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 22.18 18 0 0.00 ‐4263 136

SHOULDERBACKFILL

Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 0.70 1 0 0.00 ‐4263 7

65+00.00 RDWYEXC

Excavation 55.23 32 27 0.85 391 Subsoil Exc 0.00 0 0 1.00 0 Fill 43.50 97 97 1.00 ‐4333 4663

SUBEXCAVATION

Excavation 0.00 10 10 1.00 146 Subsoil Exc 0.00 0 0 1.00 0 Fill 0.00 0 0 1.00 ‐4333 0 Mass ordinate for SUBEXCAVATION = 146

TOPSOIL

Excavation 16.67 19 0 0.00 202 Subsoil Exc 6.23 14 0 0.00 429 Fill 0.00 0 0 0.00 ‐4333 0 Mass ordinate for TOPSOIL = 0

ACP

Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 6.08 6 0 0.00 ‐4333 224

AGG_BASE

Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 14.58 14 0 0.00 ‐4333 538

SUBEXBACKFILL

Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 0.00 10 0 0.00 ‐4333 146

SHOULDERBACKFILL

Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 0.69 1 0 0.00 ‐4333 8

65+21.84 RDWYEXC

Excavation 64.39 49 41 0.85 440

Fill 35.24 32 32 1.00 ‐4324 4695

Excavation 20.50 15 0 0.00 217 Subsoil Exc 5.60 5 0 0.00 434 Fill 0.00 0 0 0.00 ‐4324 0 Mass ordinate for TOPSOIL = 0

ACP

Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 6.08 5 0 0.00 ‐4324 229

AGG_BASE

Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 14.54 12 0 0.00 ‐4324 550

SHOULDERBACKFILL

Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 0.68 1 0 0.00 ‐4324 9

65+50.00 RDWYEXC

Excavation 80.64 76 64 0.85 516 Subsoil Exc 0.00 0 0 1.00 0 Fill 35.83 37 37 1.00 ‐4297 4732

TOPSOIL

Excavation 22.58 23 0 0.00 240 Subsoil Exc 5.12 6 0 0.00 440 Fill 0.00 0 0 0.00 ‐4297 0 Mass ordinate for TOPSOIL = 0

ACP

Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 5.86 6 0 0.00 ‐4297 235

AGG_BASE

Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 15.57 16 0 0.00 ‐4297 566

SHOULDERBACKFILL

Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 1.44 1 0 0.00 ‐4297 10

65+71.90 RDWYEXC

Excavation 114.42 80 67 0.85 596 Subsoil Exc 0.00 0 0 1.00 0 Fill 39.95 31 31 1.00 ‐4261 4763

TOPSOIL

Excavation 25.54 19 0 0.00 259 Subsoil Exc 5.00 4 0 0.00 444 Fill 0.00 0 0 0.00 ‐4261 0 Mass ordinate for TOPSOIL = 0

ACP

Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 5.86 5 0 0.00 ‐4261 240

AGG_BASE

Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 16.30 13 0 0.00 ‐4261 579

SHOULDERBACKFILL

Fill 1.81 1 0 0.00 ‐4261 11

66+00.00 RDWYEXC

Excavation 236.29 183 155 0.85 779 Subsoil Exc 0.00 0 0 1.00 0 Fill 50.25 47 47 1.00 ‐4153 4810

TOPSOIL

Excavation 34.00 31 0 0.00 290 Subsoil Exc 6.16 6 0 0.00 450 Fill 0.00 0 0 0.00 ‐4153 0 Mass ordinate for TOPSOIL = 0

ACP

Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 5.51 6 0 0.00 ‐4153 246

AGG_BASE

Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 14.94 16 0 0.00 ‐4153 595

SHOULDERBACKFILL

Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 1.20 2 0 0.00 ‐4153 13

66+32.14 RDWYEXC

Excavation 119.75 212 180 0.85 991 Subsoil Exc 0.00 0 0 1.00 0 Fill 69.72 71 71 1.00 ‐4044 4881

TOPSOIL

Excavation 24.19 35 0 0.00 325 Subsoil Exc 11.47 10 0 0.00 460 Fill 0.00 0 0 0.00 ‐4044 0 Mass ordinate for TOPSOIL = 0

ACP

Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 5.11 6 0 0.00 ‐4044 252

AGG_BASE

Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 12.04 16 0 0.00 ‐4044 611

SHOULDERBACKFILL

Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 0.15 1 0 0.00 ‐4044 14

66+50.00 RDWYEXC

Excavation 194.44 104 88 0.85 1095 Subsoil Exc 0.00 0 0 1.00 0 Fill 85.16 51 51 1.00 ‐4007 4932

TOPSOIL

Excavation 32.96 18 0 0.00 343 Subsoil Exc 10.86 7 0 0.00 467 Fill 0.00 0 0 0.00 ‐4007 0 Mass ordinate for TOPSOIL = 0

ACP

Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 5.11 3 0 0.00 ‐4007 255

Fill 12.04 8 0 0.00 ‐4007 619

SHOULDERBACKFILL

Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 0.15 0 0 0.00 ‐4007 14

66+70.18 RDWYEXC

Excavation 157.49 132 112 0.85 1227 Subsoil Exc 0.00 0 0 1.00 0 Fill 107.76 72 72 1.00 ‐3967 5004

TOPSOIL

Excavation 29.02 23 0 0.00 366 Subsoil Exc 14.71 10 0 0.00 477 Fill 0.00 0 0 0.00 ‐3967 0 Mass ordinate for TOPSOIL = 0

ACP

Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 5.11 4 0 0.00 ‐3967 259

AGG_BASE

Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 12.04 9 0 0.00 ‐3967 628

SHOULDERBACKFILL

Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 0.15 0 0 0.00 ‐3967 14

66+75.20 RDWYEXC

Excavation 151.45 28 24 0.85 1255 Subsoil Exc 0.00 0 0 1.00 0 Fill 127.11 22 22 1.00 ‐3965 5026

TOPSOIL

Excavation 26.63 5 0 0.00 371 Subsoil Exc 16.20 3 0 0.00 480 Fill 0.00 0 0 0.00 ‐3965 0 Mass ordinate for TOPSOIL = 0

ACP

Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 5.11 1 0 0.00 ‐3965 260

AGG_BASE

Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 12.04 2 0 0.00 ‐3965 630

SHOULDERBACKFILL

Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 0.15 0 0 0.00 ‐3965 14

67+00.00 RDWYEXC

Excavation 141.70 134 114 0.85 1389 Subsoil Exc 0.00 0 0 1.00 0 Fill 170.48 137 137 1.00 ‐3988 5163

TOPSOIL

Excavation 23.97 23 0 0.00 394 Subsoil Exc 16.08 15 0 0.00 495 Fill 0.00 0 0 0.00 ‐3988 0

Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 5.11 5 0 0.00 ‐3988 265

AGG_BASE

Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 12.04 11 0 0.00 ‐3988 641

SHOULDERBACKFILL

Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 0.15 0 0 0.00 ‐3988 14

67+25.00 RDWYEXC

Excavation 221.72 168 143 0.85 1557 Subsoil Exc 0.00 0 0 1.00 0 Fill 111.49 131 131 1.00 ‐3976 5294

TOPSOIL

Excavation 31.28 25 0 0.00 419 Subsoil Exc 9.54 12 0 0.00 507 Fill 0.00 0 0 0.00 ‐3976 0 Mass ordinate for TOPSOIL = 0

ACP

Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 5.11 5 0 0.00 ‐3976 270

AGG_BASE

Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 12.04 11 0 0.00 ‐3976 652

SHOULDERBACKFILL

Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 0.15 0 0 0.00 ‐3976 14

67+50.00 RDWYEXC

Excavation 296.64 240 204 0.85 1797 Subsoil Exc 0.00 0 0 1.00 0 Fill 89.42 93 93 1.00 ‐3865 5387

TOPSOIL

Excavation 32.32 29 0 0.00 448 Subsoil Exc 8.31 8 0 0.00 515 Fill 0.00 0 0 0.00 ‐3865 0 Mass ordinate for TOPSOIL = 0

ACP

Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 5.11 5 0 0.00 ‐3865 275

AGG_BASE

Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 12.04 11 0 0.00 ‐3865 663

SHOULDERBACKFILL

Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 0.15 0 0 0.00 ‐3865 14

68+00.00 RDWYEXC

Excavation 219.95 478 406 0.85 2275

Fill 62.61 141 141 1.00 ‐3600 5528

TOPSOIL

Excavation 34.57 62 0 0.00 510 Subsoil Exc 6.83 14 0 0.00 529 Fill 0.00 0 0 0.00 ‐3600 0 Mass ordinate for TOPSOIL = 0

ACP

Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 5.11 9 0 0.00 ‐3600 284

AGG_BASE

Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 12.04 22 0 0.00 ‐3600 685

SHOULDERBACKFILL

Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 0.15 0 0 0.00 ‐3600 14

68+50.00 RDWYEXC

Excavation 268.23 452 385 0.85 2727 Subsoil Exc 0.00 0 0 1.00 0 Fill 64.04 117 117 1.00 ‐3332 5645

TOPSOIL

Excavation 33.35 63 0 0.00 573 Subsoil Exc 9.08 15 0 0.00 544 Fill 0.00 0 0 0.00 ‐3332 0 Mass ordinate for TOPSOIL = 0

ACP

Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 5.11 9 0 0.00 ‐3332 293

AGG_BASE

Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 12.04 22 0 0.00 ‐3332 707

SHOULDERBACKFILL

Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 0.15 0 0 0.00 ‐3332 14

69+00.00 RDWYEXC

Excavation 245.29 475 404 0.85 3202 Subsoil Exc 0.00 0 0 1.00 0 Fill 62.83 117 117 1.00 ‐3045 5762

TOPSOIL

Excavation 35.91 64 0 0.00 637 Subsoil Exc 7.07 15 0 0.00 559 Fill 0.00 0 0 0.00 ‐3045 0 Mass ordinate for TOPSOIL = 0

ACP

Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 5.11 9 0 0.00 ‐3045 302

AGG_BASE

Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 12.04 22 0 0.00 ‐3045 729

Fill 0.15 0 0 0.00 ‐3045 14

69+50.00 RDWYEXC

Excavation 258.73 467 397 0.85 3669 Subsoil Exc 0.00 0 0 1.00 0 Fill 69.18 122 122 1.00 ‐2770 5884

TOPSOIL

Excavation 29.92 61 0 0.00 698 Subsoil Exc 9.97 16 0 0.00 575 Fill 0.00 0 0 0.00 ‐2770 0 Mass ordinate for TOPSOIL = 0

ACP

Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 5.11 9 0 0.00 ‐2770 311

AGG_BASE

Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 12.04 22 0 0.00 ‐2770 751

SHOULDERBACKFILL

Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 0.15 0 0 0.00 ‐2770 14

70+00.00 RDWYEXC

Excavation 109.10 340 290 0.85 4009 Subsoil Exc 0.00 0 0 1.00 0 Fill 60.18 120 120 1.00 ‐2600 6004

TOPSOIL

Excavation 27.10 52 0 0.00 750 Subsoil Exc 8.56 17 0 0.00 592 Fill 0.00 0 0 0.00 ‐2600 0 Mass ordinate for TOPSOIL = 0

ACP

Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 5.11 9 0 0.00 ‐2600 320

AGG_BASE

Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 12.06 22 0 0.00 ‐2600 773

SHOULDERBACKFILL

Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 0.14 0 0 0.00 ‐2600 14

70+50.00 RDWYEXC

Excavation 22.06 121 104 0.85 4130 Subsoil Exc 0.00 0 0 1.00 0 Fill 75.98 126 126 1.00 ‐2622 6130

TOPSOIL

Excavation 11.99 36 0 0.00 786 Subsoil Exc 11.20 18 0 0.00 610 Fill 0.00 0 0 0.00 ‐2622 0 Mass ordinate for TOPSOIL = 0

ACP

Fill 5.11 9 0 0.00 ‐2622 329

Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 12.11 22 0 0.00 ‐2622 795

SHOULDERBACKFILL

Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 0.16 0 0 0.00 ‐2622 14

71+00.00 RDWYEXC

Excavation 69.53 85 72 0.85 4215 Subsoil Exc 0.00 0 0 1.00 0 Fill 68.73 134 134 1.00 ‐2684 6264

TOPSOIL

Excavation 18.04 27 0 0.00 813 Subsoil Exc 7.96 18 0 0.00 628 Fill 0.00 0 0 0.00 ‐2684 0 Mass ordinate for TOPSOIL = 0

ACP

Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 5.11 9 0 0.00 ‐2684 338

AGG_BASE

Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 12.17 22 0 0.00 ‐2684 817

SHOULDERBACKFILL

Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 0.16 0 0 0.00 ‐2684 14

71+50.00 RDWYEXC

Excavation 47.08 108 92 0.85 4323 Subsoil Exc 0.00 0 0 1.00 0 Fill 72.67 131 131 1.00 ‐2723 6395

TOPSOIL

Excavation 17.22 32 0 0.00 845 Subsoil Exc 8.02 15 0 0.00 643 Fill 0.00 0 0 0.00 ‐2723 0 Mass ordinate for TOPSOIL = 0

ACP

Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 5.11 9 0 0.00 ‐2723 347

AGG_BASE

Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 12.17 23 0 0.00 ‐2723 840

SHOULDERBACKFILL

Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 0.16 0 0 0.00 ‐2723 14

72+00.00 RDWYEXC

Excavation 21.37 63 53 0.85 4386 Subsoil Exc 0.00 0 0 1.00 0 Fill 63.70 126 126 1.00 ‐2796 6521

Excavation 12.26 27 0 0.00 872

Subsoil Exc 8.33 15 0 0.00 658 Fill 0.00 0 0 0.00 ‐2796 0 Mass ordinate for TOPSOIL = 0

ACP

Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 5.11 9 0 0.00 ‐2796 356

AGG_BASE

Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 12.17 23 0 0.00 ‐2796 863

SHOULDERBACKFILL

Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 0.16 0 0 0.00 ‐2796 14

72+50.00 RDWYEXC

Excavation 50.29 66 57 0.85 4452 Subsoil Exc 0.00 0 0 1.00 0 Fill 22.77 80 80 1.00 ‐2819 6601

TOPSOIL

Excavation 15.66 26 0 0.00 898 Subsoil Exc 6.38 14 0 0.00 672 Fill 0.00 0 0 0.00 ‐2819 0 Mass ordinate for TOPSOIL = 0

ACP

Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 5.11 9 0 0.00 ‐2819 365

AGG_BASE

Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 12.17 23 0 0.00 ‐2819 886

SHOULDERBACKFILL

Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 0.16 0 0 0.00 ‐2819 14

72+75.00 RDWYEXC

Excavation 60.46 51 44 0.85 4503 Subsoil Exc 0.00 0 0 1.00 0 Fill 19.46 20 20 1.00 ‐2795 6621

TOPSOIL

Excavation 16.18 15 0 0.00 913 Subsoil Exc 7.11 6 0 0.00 678 Fill 0.00 0 0 0.00 ‐2795 0 Mass ordinate for TOPSOIL = 0

ACP

Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 5.11 5 0 0.00 ‐2795 370

AGG_BASE

Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 12.17 11 0 0.00 ‐2795 897

SHOULDERBACKFILL

Excavation 0.00 0 0 0.00 0

Fill 0.16 0 0 0.00 ‐2795 14

73+00.00 RDWYEXC

Excavation 102.39 76 64 0.85 4579 Subsoil Exc 0.00 0 0 1.00 0 Fill 17.56 17 17 1.00 ‐2748 6638

TOPSOIL

Excavation 20.01 17 0 0.00 930 Subsoil Exc 6.53 6 0 0.00 684 Fill 0.00 0 0 0.00 ‐2748 0 Mass ordinate for TOPSOIL = 0

ACP

Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 5.11 5 0 0.00 ‐2748 375

AGG_BASE

Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 12.17 11 0 0.00 ‐2748 908

SHOULDERBACKFILL

Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 0.16 0 0 0.00 ‐2748 14

73+04.00 RDWYEXC

Excavation 106.13 15 13 0.85 4594 Subsoil Exc 0.00 0 0 1.00 0 Fill 17.31 3 3 1.00 ‐2738 6641

TOPSOIL

Excavation 20.04 3 0 0.00 933 Subsoil Exc 6.53 1 0 0.00 685 Fill 0.00 0 0 0.00 ‐2738 0 Mass ordinate for TOPSOIL = 0

ACP

Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 5.11 1 0 0.00 ‐2738 376

AGG_BASE

Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 12.17 2 0 0.00 ‐2738 910

SHOULDERBACKFILL

Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 0.16 0 0 0.00 ‐2738 14

73+25.00 RDWYEXC

Excavation 64.72 67 57 0.85 4661 Subsoil Exc 0.00 0 0 1.00 0 Fill 22.30 15 15 1.00 ‐2696 6656

TOPSOIL

Excavation 15.77 14 0 0.00 947 Subsoil Exc 7.60 5 0 0.00 690 Fill 0.00 0 0 0.00 ‐2696 0 Mass ordinate for TOPSOIL = 0

ACP

Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 5.11 4 0 0.00 ‐2696 380

AGG_BASE

Fill 12.17 9 0 0.00 ‐2696 919

Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 0.16 0 0 0.00 ‐2696 14

73+50.00 RDWYEXC

Excavation 44.87 51 43 0.85 4712 Subsoil Exc 0.00 0 0 1.00 0 Fill 32.95 26 26 1.00 ‐2679 6682

TOPSOIL

Excavation 14.71 14 0 0.00 961 Subsoil Exc 9.16 8 0 0.00 698 Fill 0.00 0 0 0.00 ‐2679 0 Mass ordinate for TOPSOIL = 0

ACP

Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 5.11 5 0 0.00 ‐2679 385

AGG_BASE

Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 12.17 11 0 0.00 ‐2679 930

SHOULDERBACKFILL

Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 0.16 0 0 0.00 ‐2679 14

74+00.00 RDWYEXC

Excavation 44.09 82 70 0.85 4794 Subsoil Exc 0.00 0 0 1.00 0 Fill 36.84 65 65 1.00 ‐2674 6747

TOPSOIL

Excavation 14.34 27 0 0.00 988 Subsoil Exc 8.89 17 0 0.00 715 Fill 0.00 0 0 0.00 ‐2674 0 Mass ordinate for TOPSOIL = 0

ACP

Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 5.11 9 0 0.00 ‐2674 394

AGG_BASE

Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 12.17 23 0 0.00 ‐2674 953

SHOULDERBACKFILL

Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 0.16 0 0 0.00 ‐2674 14

74+50.00 RDWYEXC

Excavation 32.38 71 60 0.85 4865 Subsoil Exc 0.00 0 0 1.00 0 Fill 36.53 68 68 1.00 ‐2682 6815

TOPSOIL

Excavation 13.08 25 0 0.00 1013 Subsoil Exc 8.72 16 0 0.00 731 Fill 0.00 0 0 0.00 ‐2682 0

Fill 5.11 9 0 0.00 ‐2682 403

AGG_BASE

Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 12.17 23 0 0.00 ‐2682 976

SHOULDERBACKFILL

Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 0.16 0 0 0.00 ‐2682 14

75+00.00 RDWYEXC

Excavation 16.37 45 38 0.85 4910 Subsoil Exc 0.00 0 0 1.00 0 Fill 53.27 83 83 1.00 ‐2727 6898

TOPSOIL

Excavation 9.50 21 0 0.00 1034 Subsoil Exc 11.53 19 0 0.00 750 Fill 0.00 0 0 0.00 ‐2727 0 Mass ordinate for TOPSOIL = 0

ACP

Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 5.11 9 0 0.00 ‐2727 412

AGG_BASE

Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 12.17 23 0 0.00 ‐2727 999

SHOULDERBACKFILL

Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 0.16 0 0 0.00 ‐2727 14

75+50.00 RDWYEXC

Excavation 195.71 196 167 0.85 5106 Subsoil Exc 0.00 0 0 1.00 0 Fill 29.09 76 76 1.00 ‐2636 6974

TOPSOIL

Excavation 26.36 33 0 0.00 1067 Subsoil Exc 6.12 16 0 0.00 766 Fill 0.00 0 0 0.00 ‐2636 0 Mass ordinate for TOPSOIL = 0

ACP

Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 5.11 9 0 0.00 ‐2636 421

AGG_BASE

Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 12.06 22 0 0.00 ‐2636 1021

SHOULDERBACKFILL

Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 0.15 0 0 0.00 ‐2636 14

76+00.00 RDWYEXC

Excavation 174.01 342 291 0.85 5448

Fill 61.24 84 84 1.00 ‐2429 7058

Excavation 25.81 49 0 0.00 1116 Subsoil Exc 7.22 12 0 0.00 778 Fill 0.00 0 0 0.00 ‐2429 0 Mass ordinate for TOPSOIL = 0

ACP

Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 5.11 9 0 0.00 ‐2429 430

AGG_BASE

Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 12.05 22 0 0.00 ‐2429 1043

SHOULDERBACKFILL

Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 0.15 0 0 0.00 ‐2429 14 � G R A N D S U M M A R Y T O T A L S Material Name Unadjusted Adjusted Mult Volumes Volumes Factor

(cu. yd.) (cu. yd.)

RDWYEXC

Excavation 5448 4629 0.85 Subsoil Exc 0 0 1.00 Fill 7058 7058 1.00

SUBEXCAVATION

Excavation 146 146 1.00 Subsoil Exc 0 0 1.00 Fill 0 0 1.00

TOPSOIL

Excavation 1116 0 0.00 Subsoil Exc 778 0 0.00 Fill 0 0 0.00

ACP

Excavation 0 0 0.00 Subsoil Exc 0 0 0.00 Fill 430 0 0.00

AGG_BASE

Excavation 0 0 0.00 Subsoil Exc 0 0 0.00 Fill 1043 0 0.00

SUBEXBACKFILL

Excavation 0 0 0.00 Subsoil Exc 0 0 0.00 Fill 146 0 0.00

SHOULDERBACKFILL

Excavation 0 0 0.00 Subsoil Exc 0 0 0.00 Fill 14 0 0.00

File details come from the government source that posted it. Updated .