af05801_SchedB_Earthwork.pdf
PDF 115 KB Posted
- Solicitation number
- 69056725B000001
About this file
This document is a Earthwork Schedule B from 54+50 to 76+00 for the Neck Lake Road Reconstruction project. The project is located 45 miles northwest of Coffman Cove, Alaska and consists of 2.0 miles of road reconstruction work including roadway excavation, sub-excavation, embankment construction, grading, drainage, aggregate surface course, guardrail, erosion control, and other related construction activities. The work is part of a larger multi-schedule project solicited by the Department of Transportation Federal Highway Administration with an estimated price range between $10,000,000 and $20,000,000. The project is anticipated to be solicited in Winter 2024/2025 with a tentative completion date in Fall 2026.
View the file
Other files
Show 40 more
Latest 50 of 62 listed here. See the rest on GovTribe.
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Earthwork
Schedule B
54+50 to 76+00
AK PFH 58(1),
Neck Lake Road Reconstruction: NPOWI Hwy. to Marine Access Facility Jct.
Material Name End Areas Unadjusted Adjusted Mult Mass Accum Station Volumes Volumes Factor Ordinate Unadj Vol
(sq. ft.) (cu. yd.) (cu. yd.) (cu. yd.)
SKIP STATION RANGE = 35+58.00 to 37+00.00
54+50.00 RDWYEXC
Excavation 0.00 0 0 0.85 0 Subsoil Exc 0.00 0 0 1.00 0 Fill 45.52 0 0 1.00 0 0
ACP
Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 5.53 0 0 0.00 0 0
AGG_BASE
Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 12.91 0 0 0.00 0 0
SHOULDERBACKFILL
Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 0.15 0 0 0.00 0 0
55+00.00 RDWYEXC
Excavation 0.56 1 0 0.85 1 Subsoil Exc 0.00 0 0 1.00 0 Fill 77.71 114 114 1.00 ‐114 114
ACP
Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 5.53 10 0 0.00 ‐114 10
AGG_BASE
Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 12.91 24 0 0.00 ‐114 24
SHOULDERBACKFILL
Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 0.15 0 0 0.00 ‐114 0
55+50.00 RDWYEXC
Excavation 5.57 6 5 0.85 7 Subsoil Exc 0.00 0 0 1.00 0 Fill 66.95 134 134 1.00 ‐243 248
ACP
Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 5.53 10 0 0.00 ‐243 20
AGG_BASE
Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 12.91 24 0 0.00 ‐243 48
SHOULDERBACKFILL
Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 0.15 0 0 0.00 ‐243 0
56+00.00 RDWYEXC
Excavation 22.98 27 22 0.85 34 Subsoil Exc 0.00 0 0 1.00 0 Fill 50.95 109 109 1.00 ‐330 357
ACP
Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 5.53 10 0 0.00 ‐330 30
AGG_BASE
Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 12.91 24 0 0.00 ‐330 72
SHOULDERBACKFILL
Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 0.15 0 0 0.00 ‐330 0
56+21.46 RDWYEXC
Excavation 2.01 10 9 0.85 44 Subsoil Exc 0.00 0 0 1.00 0 Fill 137.65 75 75 1.00 ‐396 432
ACP
Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 5.58 4 0 0.00 ‐396 34
AGG_BASE
Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 13.01 10 0 0.00 ‐396 82
SHOULDERBACKFILL
Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 0.15 0 0 0.00 ‐396 0
56+50.00 RDWYEXC
Excavation 0.00 1 1 0.85 45 Subsoil Exc 0.00 0 0 1.00 0 Fill 90.06 120 120 1.00 ‐515 552
ACP
Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 5.53 6 0 0.00 ‐515 40
AGG_BASE
Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 12.91 14 0 0.00 ‐515 96
SHOULDERBACKFILL
Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 0.15 0 0 0.00 ‐515 0
57+00.00 RDWYEXC
Excavation 0.00 0 0 0.85 45 Subsoil Exc 0.00 0 0 1.00 0 Fill 61.40 140 140 1.00 ‐655 692
ACP
Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 5.53 10 0 0.00 ‐655 50
AGG_BASE
Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 12.91 24 0 0.00 ‐655 120
SHOULDERBACKFILL
Subsoil Exc 0.00 0 0 0.00 0 Fill 0.15 0 0 0.00 ‐655 0
57+50.00 RDWYEXC
Excavation 0.00 0 0 0.85 45 Subsoil Exc 0.00 0 0 1.00 0 Fill 71.37 123 123 1.00 ‐778 815
ACP
Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 5.53 10 0 0.00 ‐778 60
AGG_BASE
Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 12.91 24 0 0.00 ‐778 144
SHOULDERBACKFILL
Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 0.15 0 0 0.00 ‐778 0
58+00.00 RDWYEXC
Excavation 0.00 0 0 0.85 45 Subsoil Exc 0.00 0 0 1.00 0 Fill 67.04 128 128 1.00 ‐906 943
ACP
Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 5.40 10 0 0.00 ‐906 70
AGG_BASE
Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 12.62 24 0 0.00 ‐906 168
SHOULDERBACKFILL
Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 0.15 0 0 0.00 ‐906 0
58+50.00 RDWYEXC
Excavation 0.00 0 0 0.85 45 Subsoil Exc 0.00 0 0 1.00 0 Fill 40.52 100 100 1.00 ‐1006 1043
ACP
Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 5.11 10 0 0.00 ‐1006 80
AGG_BASE
Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 12.08 23 0 0.00 ‐1006 191
SHOULDERBACKFILL
Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 0.15 0 0 0.00 ‐1006 0
59+00.00 RDWYEXC
Excavation 71.27 66 56 0.85 111 Subsoil Exc 0.00 0 0 1.00 0 Fill 23.69 59 59 1.00 ‐1009 1102
TOPSOIL
Excavation 14.41 13 0 0.00 13 Subsoil Exc 12.91 12 0 0.00 12 Fill 0.00 0 0 0.00 ‐1009 0 Mass ordinate for TOPSOIL = 0
ACP
Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 5.11 9 0 0.00 ‐1009 89
AGG_BASE
Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 12.17 22 0 0.00 ‐1009 213
SHOULDERBACKFILL
Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 0.16 0 0 0.00 ‐1009 0
59+50.00 RDWYEXC
Excavation 68.75 129 110 0.85 240 Subsoil Exc 0.00 0 0 1.00 0 Fill 13.13 34 34 1.00 ‐933 1136
TOPSOIL
Excavation 20.92 33 0 0.00 46 Subsoil Exc 5.38 17 0 0.00 29 Fill 0.00 0 0 0.00 ‐933 0 Mass ordinate for TOPSOIL = 0
ACP
Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 5.11 9 0 0.00 ‐933 98
AGG_BASE
Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 12.17 23 0 0.00 ‐933 236
SHOULDERBACKFILL
Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 0.16 0 0 0.00 ‐933 0
60+00.00 RDWYEXC
Excavation 22.84 85 72 0.85 325 Subsoil Exc 0.00 0 0 1.00 0 Fill 23.82 34 34 1.00 ‐895 1170
TOPSOIL
Excavation 12.66 31 0 0.00 77 Subsoil Exc 7.96 12 0 0.00 41 Fill 0.00 0 0 0.00 ‐895 0 Mass ordinate for TOPSOIL = 0
ACP
Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 5.11 9 0 0.00 ‐895 107
AGG_BASE
Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 12.17 23 0 0.00 ‐895 259
SHOULDERBACKFILL
Excavation 0.00 0 0 0.00 0
Fill 0.16 0 0 0.00 ‐895 0
60+50.00 RDWYEXC
Excavation 0.00 21 18 0.85 346 Subsoil Exc 0.00 0 0 1.00 0 Fill 56.68 75 75 1.00 ‐952 1245
TOPSOIL
Excavation 0.00 12 0 0.00 89 Subsoil Exc 12.27 19 0 0.00 60 Fill 0.00 0 0 0.00 ‐952 0 Mass ordinate for TOPSOIL = 0
ACP
Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 5.11 9 0 0.00 ‐952 116
AGG_BASE
Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 12.11 22 0 0.00 ‐952 281
SHOULDERBACKFILL
Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 0.16 0 0 0.00 ‐952 0
61+00.00 RDWYEXC
Excavation 3.38 3 2 0.85 349 Subsoil Exc 0.00 0 0 1.00 0 Fill 74.45 121 121 1.00 ‐1071 1366
TOPSOIL
Excavation 9.94 9 0 0.00 98 Subsoil Exc 14.41 25 0 0.00 85 Fill 0.00 0 0 0.00 ‐1071 0 Mass ordinate for TOPSOIL = 0
ACP
Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 7.61 12 0 0.00 ‐1071 128
AGG_BASE
Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 17.21 27 0 0.00 ‐1071 308
SHOULDERBACKFILL
Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 0.16 0 0 0.00 ‐1071 0
61+50.00 RDWYEXC
Excavation 0.42 4 3 0.85 353 Subsoil Exc 0.00 0 0 1.00 0 Fill 82.75 146 146 1.00 ‐1214 1512
TOPSOIL
Excavation 2.86 12 0 0.00 110 Subsoil Exc 20.50 32 0 0.00 117 Fill 0.00 0 0 0.00 ‐1214 0 Mass ordinate for TOPSOIL = 0
ACP
Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 7.61 14 0 0.00 ‐1214 142
AGG_BASE
Fill 17.28 32 0 0.00 ‐1214 340
SHOULDERBACKFILL
Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 0.17 0 0 0.00 ‐1214 0
61+75.00 RDWYEXC
Excavation 0.00 0 0 0.85 353 Subsoil Exc 0.00 0 0 1.00 0 Fill 127.46 97 97 1.00 ‐1311 1609
TOPSOIL
Excavation 0.00 1 0 0.00 111 Subsoil Exc 24.09 21 0 0.00 138 Fill 0.00 0 0 0.00 ‐1311 0 Mass ordinate for TOPSOIL = 0
ACP
Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 7.61 7 0 0.00 ‐1311 149
AGG_BASE
Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 17.28 16 0 0.00 ‐1311 356
SHOULDERBACKFILL
Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 0.17 0 0 0.00 ‐1311 0
61+91.00 RDWYEXC
Excavation 0.00 0 0 0.85 353 Subsoil Exc 0.00 0 0 1.00 0 Fill 156.27 84 84 1.00 ‐1395 1693
TOPSOIL
Excavation 0.00 0 0 0.00 111 Subsoil Exc 23.95 14 0 0.00 152 Fill 0.00 0 0 0.00 ‐1395 0 Mass ordinate for TOPSOIL = 0
ACP
Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 6.97 4 0 0.00 ‐1395 153
AGG_BASE
Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 17.32 10 0 0.00 ‐1395 366
SHOULDERBACKFILL
Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 1.10 0 0 0.00 ‐1395 0
62+00.00 RDWYEXC
Excavation 0.00 0 0 0.85 353 Subsoil Exc 0.00 0 0 1.00 0 Fill 170.83 55 55 1.00 ‐1450 1748
TOPSOIL
Excavation 0.00 0 0 0.00 111 Subsoil Exc 22.98 8 0 0.00 160 Fill 0.00 0 0 0.00 ‐1450 0 Mass ordinate for TOPSOIL = 0
Subsoil Exc 0.00 0 0 0.00 0 Fill 6.64 2 0 0.00 ‐1450 155
AGG_BASE
Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 16.59 6 0 0.00 ‐1450 372
SHOULDERBACKFILL
Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 1.07 0 0 0.00 ‐1450 0
62+20.00 RDWYEXC
Excavation 0.00 0 0 0.85 353 Subsoil Exc 0.00 0 0 1.00 0 Fill 197.23 136 136 1.00 ‐1586 1884
TOPSOIL
Excavation 0.00 0 0 0.00 111 Subsoil Exc 24.77 18 0 0.00 178 Fill 0.00 0 0 0.00 ‐1586 0 Mass ordinate for TOPSOIL = 0
ACP
Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 6.00 5 0 0.00 ‐1586 160
AGG_BASE
Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 15.16 12 0 0.00 ‐1586 384
SHOULDERBACKFILL
Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 1.00 1 0 0.00 ‐1586 1
62+25.00 RDWYEXC
Excavation 0.00 0 0 0.85 353 Subsoil Exc 0.00 0 0 1.00 0 Fill 202.12 37 37 1.00 ‐1623 1921
TOPSOIL
Excavation 0.00 0 0 0.00 111 Subsoil Exc 25.35 5 0 0.00 183 Fill 0.00 0 0 0.00 ‐1623 0 Mass ordinate for TOPSOIL = 0
ACP
Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 6.08 1 0 0.00 ‐1623 161
AGG_BASE
Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 14.74 3 0 0.00 ‐1623 387
SHOULDERBACKFILL
Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 0.71 0 0 0.00 ‐1623 1
62+50.00 RDWYEXC
Excavation 0.00 0 0 0.85 353
Fill 262.53 215 215 1.00 ‐1838 2136
Excavation 0.00 0 0 0.00 111 Subsoil Exc 29.50 25 0 0.00 208 Fill 0.00 0 0 0.00 ‐1838 0 Mass ordinate for TOPSOIL = 0
ACP
Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 6.08 6 0 0.00 ‐1838 167
AGG_BASE
Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 14.74 14 0 0.00 ‐1838 401
SHOULDERBACKFILL
Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 0.71 1 0 0.00 ‐1838 2
63+00.00 RDWYEXC
Excavation 0.00 0 0 0.85 353 Subsoil Exc 0.00 0 0 1.00 0 Fill 323.30 542 542 1.00 ‐2380 2678
SUBEXCAVATION
Excavation 18.88 17 17 1.00 17 Subsoil Exc 0.00 0 0 1.00 0 Fill 0.00 0 0 1.00 ‐2380 0 Mass ordinate for SUBEXCAVATION = 17
TOPSOIL
Excavation 9.56 9 0 0.00 120 Subsoil Exc 24.07 50 0 0.00 258 Fill 0.00 0 0 0.00 ‐2380 0 Mass ordinate for TOPSOIL = 0
ACP
Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 6.08 11 0 0.00 ‐2380 178
AGG_BASE
Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 14.74 27 0 0.00 ‐2380 428
SUBEXBACKFILL
Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 18.88 17 0 0.00 ‐2380 17
SHOULDERBACKFILL
Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 0.71 1 0 0.00 ‐2380 3
63+50.00 RDWYEXC
Excavation 0.00 0 0 0.85 353 Subsoil Exc 0.00 0 0 1.00 0 Fill 380.85 652 652 1.00 ‐3032 3330
SUBEXCAVATION
Excavation 23.41 39 39 1.00 56 Subsoil Exc 0.00 0 0 1.00 0 Fill 0.00 0 0 1.00 ‐3032 0 Mass ordinate for SUBEXCAVATION = 56
Excavation 11.12 19 0 0.00 139 Subsoil Exc 24.19 45 0 0.00 303 Fill 0.00 0 0 0.00 ‐3032 0 Mass ordinate for TOPSOIL = 0
ACP
Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 6.08 11 0 0.00 ‐3032 189
AGG_BASE
Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 14.74 27 0 0.00 ‐3032 455
SUBEXBACKFILL
Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 23.41 39 0 0.00 ‐3032 56
SHOULDERBACKFILL
Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 0.71 1 0 0.00 ‐3032 4
64+00.00 RDWYEXC
Excavation 0.00 0 0 0.85 353 Subsoil Exc 0.00 0 0 1.00 0 Fill 327.70 656 656 1.00 ‐3688 3986
SUBEXCAVATION
Excavation 22.60 43 43 1.00 99 Subsoil Exc 0.00 0 0 1.00 0 Fill 0.00 0 0 1.00 ‐3688 0 Mass ordinate for SUBEXCAVATION = 99
TOPSOIL
Excavation 10.94 20 0 0.00 159 Subsoil Exc 24.48 45 0 0.00 348 Fill 0.00 0 0 0.00 ‐3688 0 Mass ordinate for TOPSOIL = 0
ACP
Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 6.08 11 0 0.00 ‐3688 200
AGG_BASE
Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 14.74 27 0 0.00 ‐3688 482
SUBEXBACKFILL
Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 22.60 43 0 0.00 ‐3688 99
SHOULDERBACKFILL
Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 0.71 1 0 0.00 ‐3688 5
64+34.00 RDWYEXC
Excavation 0.00 0 0 0.85 353 Subsoil Exc 0.00 0 0 1.00 0 Fill 193.42 328 328 1.00 ‐4016 4314
SUBEXCAVATION
Excavation 0.00 14 14 1.00 113
Fill 0.00 0 0 1.00 ‐4016 0
Mass ordinate for SUBEXCAVATION = 113
Excavation 0.00 7 0 0.00 166 Subsoil Exc 26.85 32 0 0.00 380 Fill 0.00 0 0 0.00 ‐4016 0 Mass ordinate for TOPSOIL = 0
ACP
Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 6.09 8 0 0.00 ‐4016 208
AGG_BASE
Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 14.71 19 0 0.00 ‐4016 501
SUBEXBACKFILL
Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 0.00 14 0 0.00 ‐4016 113
SHOULDERBACKFILL
Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 0.70 1 0 0.00 ‐4016 6
64+50.00 RDWYEXC
Excavation 0.00 0 0 0.85 353 Subsoil Exc 0.00 0 0 1.00 0 Fill 155.48 103 103 1.00 ‐4119 4417
SUBEXCAVATION
Excavation 17.09 5 5 1.00 118 Subsoil Exc 0.00 0 0 1.00 0 Fill 0.00 0 0 1.00 ‐4119 0 Mass ordinate for SUBEXCAVATION = 118
TOPSOIL
Excavation 9.15 3 0 0.00 169 Subsoil Exc 20.10 14 0 0.00 394 Fill 0.00 0 0 0.00 ‐4119 0 Mass ordinate for TOPSOIL = 0
ACP
Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 6.08 4 0 0.00 ‐4119 212
AGG_BASE
Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 14.67 9 0 0.00 ‐4119 510
SUBEXBACKFILL
Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 17.09 5 0 0.00 ‐4119 118
SHOULDERBACKFILL
Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 0.70 0 0 0.00 ‐4119 6
64+75.00 RDWYEXC
Excavation 13.70 6 5 0.85 359 Subsoil Exc 0.00 0 0 1.00 0 Fill 165.36 149 149 1.00 ‐4263 4566
SUBEXCAVATION
Excavation 22.18 18 18 1.00 136
Fill 0.00 0 0 1.00 ‐4263 0 Mass ordinate for SUBEXCAVATION = 136
TOPSOIL
Excavation 22.51 14 0 0.00 183 Subsoil Exc 24.33 21 0 0.00 415 Fill 0.00 0 0 0.00 ‐4263 0 Mass ordinate for TOPSOIL = 0
ACP
Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 6.08 6 0 0.00 ‐4263 218
AGG_BASE
Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 14.64 14 0 0.00 ‐4263 524
SUBEXBACKFILL
Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 22.18 18 0 0.00 ‐4263 136
SHOULDERBACKFILL
Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 0.70 1 0 0.00 ‐4263 7
65+00.00 RDWYEXC
Excavation 55.23 32 27 0.85 391 Subsoil Exc 0.00 0 0 1.00 0 Fill 43.50 97 97 1.00 ‐4333 4663
SUBEXCAVATION
Excavation 0.00 10 10 1.00 146 Subsoil Exc 0.00 0 0 1.00 0 Fill 0.00 0 0 1.00 ‐4333 0 Mass ordinate for SUBEXCAVATION = 146
TOPSOIL
Excavation 16.67 19 0 0.00 202 Subsoil Exc 6.23 14 0 0.00 429 Fill 0.00 0 0 0.00 ‐4333 0 Mass ordinate for TOPSOIL = 0
ACP
Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 6.08 6 0 0.00 ‐4333 224
AGG_BASE
Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 14.58 14 0 0.00 ‐4333 538
SUBEXBACKFILL
Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 0.00 10 0 0.00 ‐4333 146
SHOULDERBACKFILL
Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 0.69 1 0 0.00 ‐4333 8
65+21.84 RDWYEXC
Excavation 64.39 49 41 0.85 440
Fill 35.24 32 32 1.00 ‐4324 4695
Excavation 20.50 15 0 0.00 217 Subsoil Exc 5.60 5 0 0.00 434 Fill 0.00 0 0 0.00 ‐4324 0 Mass ordinate for TOPSOIL = 0
ACP
Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 6.08 5 0 0.00 ‐4324 229
AGG_BASE
Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 14.54 12 0 0.00 ‐4324 550
SHOULDERBACKFILL
Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 0.68 1 0 0.00 ‐4324 9
65+50.00 RDWYEXC
Excavation 80.64 76 64 0.85 516 Subsoil Exc 0.00 0 0 1.00 0 Fill 35.83 37 37 1.00 ‐4297 4732
TOPSOIL
Excavation 22.58 23 0 0.00 240 Subsoil Exc 5.12 6 0 0.00 440 Fill 0.00 0 0 0.00 ‐4297 0 Mass ordinate for TOPSOIL = 0
ACP
Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 5.86 6 0 0.00 ‐4297 235
AGG_BASE
Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 15.57 16 0 0.00 ‐4297 566
SHOULDERBACKFILL
Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 1.44 1 0 0.00 ‐4297 10
65+71.90 RDWYEXC
Excavation 114.42 80 67 0.85 596 Subsoil Exc 0.00 0 0 1.00 0 Fill 39.95 31 31 1.00 ‐4261 4763
TOPSOIL
Excavation 25.54 19 0 0.00 259 Subsoil Exc 5.00 4 0 0.00 444 Fill 0.00 0 0 0.00 ‐4261 0 Mass ordinate for TOPSOIL = 0
ACP
Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 5.86 5 0 0.00 ‐4261 240
AGG_BASE
Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 16.30 13 0 0.00 ‐4261 579
SHOULDERBACKFILL
Fill 1.81 1 0 0.00 ‐4261 11
66+00.00 RDWYEXC
Excavation 236.29 183 155 0.85 779 Subsoil Exc 0.00 0 0 1.00 0 Fill 50.25 47 47 1.00 ‐4153 4810
TOPSOIL
Excavation 34.00 31 0 0.00 290 Subsoil Exc 6.16 6 0 0.00 450 Fill 0.00 0 0 0.00 ‐4153 0 Mass ordinate for TOPSOIL = 0
ACP
Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 5.51 6 0 0.00 ‐4153 246
AGG_BASE
Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 14.94 16 0 0.00 ‐4153 595
SHOULDERBACKFILL
Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 1.20 2 0 0.00 ‐4153 13
66+32.14 RDWYEXC
Excavation 119.75 212 180 0.85 991 Subsoil Exc 0.00 0 0 1.00 0 Fill 69.72 71 71 1.00 ‐4044 4881
TOPSOIL
Excavation 24.19 35 0 0.00 325 Subsoil Exc 11.47 10 0 0.00 460 Fill 0.00 0 0 0.00 ‐4044 0 Mass ordinate for TOPSOIL = 0
ACP
Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 5.11 6 0 0.00 ‐4044 252
AGG_BASE
Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 12.04 16 0 0.00 ‐4044 611
SHOULDERBACKFILL
Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 0.15 1 0 0.00 ‐4044 14
66+50.00 RDWYEXC
Excavation 194.44 104 88 0.85 1095 Subsoil Exc 0.00 0 0 1.00 0 Fill 85.16 51 51 1.00 ‐4007 4932
TOPSOIL
Excavation 32.96 18 0 0.00 343 Subsoil Exc 10.86 7 0 0.00 467 Fill 0.00 0 0 0.00 ‐4007 0 Mass ordinate for TOPSOIL = 0
ACP
Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 5.11 3 0 0.00 ‐4007 255
Fill 12.04 8 0 0.00 ‐4007 619
SHOULDERBACKFILL
Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 0.15 0 0 0.00 ‐4007 14
66+70.18 RDWYEXC
Excavation 157.49 132 112 0.85 1227 Subsoil Exc 0.00 0 0 1.00 0 Fill 107.76 72 72 1.00 ‐3967 5004
TOPSOIL
Excavation 29.02 23 0 0.00 366 Subsoil Exc 14.71 10 0 0.00 477 Fill 0.00 0 0 0.00 ‐3967 0 Mass ordinate for TOPSOIL = 0
ACP
Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 5.11 4 0 0.00 ‐3967 259
AGG_BASE
Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 12.04 9 0 0.00 ‐3967 628
SHOULDERBACKFILL
Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 0.15 0 0 0.00 ‐3967 14
66+75.20 RDWYEXC
Excavation 151.45 28 24 0.85 1255 Subsoil Exc 0.00 0 0 1.00 0 Fill 127.11 22 22 1.00 ‐3965 5026
TOPSOIL
Excavation 26.63 5 0 0.00 371 Subsoil Exc 16.20 3 0 0.00 480 Fill 0.00 0 0 0.00 ‐3965 0 Mass ordinate for TOPSOIL = 0
ACP
Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 5.11 1 0 0.00 ‐3965 260
AGG_BASE
Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 12.04 2 0 0.00 ‐3965 630
SHOULDERBACKFILL
Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 0.15 0 0 0.00 ‐3965 14
67+00.00 RDWYEXC
Excavation 141.70 134 114 0.85 1389 Subsoil Exc 0.00 0 0 1.00 0 Fill 170.48 137 137 1.00 ‐3988 5163
TOPSOIL
Excavation 23.97 23 0 0.00 394 Subsoil Exc 16.08 15 0 0.00 495 Fill 0.00 0 0 0.00 ‐3988 0
Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 5.11 5 0 0.00 ‐3988 265
AGG_BASE
Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 12.04 11 0 0.00 ‐3988 641
SHOULDERBACKFILL
Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 0.15 0 0 0.00 ‐3988 14
67+25.00 RDWYEXC
Excavation 221.72 168 143 0.85 1557 Subsoil Exc 0.00 0 0 1.00 0 Fill 111.49 131 131 1.00 ‐3976 5294
TOPSOIL
Excavation 31.28 25 0 0.00 419 Subsoil Exc 9.54 12 0 0.00 507 Fill 0.00 0 0 0.00 ‐3976 0 Mass ordinate for TOPSOIL = 0
ACP
Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 5.11 5 0 0.00 ‐3976 270
AGG_BASE
Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 12.04 11 0 0.00 ‐3976 652
SHOULDERBACKFILL
Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 0.15 0 0 0.00 ‐3976 14
67+50.00 RDWYEXC
Excavation 296.64 240 204 0.85 1797 Subsoil Exc 0.00 0 0 1.00 0 Fill 89.42 93 93 1.00 ‐3865 5387
TOPSOIL
Excavation 32.32 29 0 0.00 448 Subsoil Exc 8.31 8 0 0.00 515 Fill 0.00 0 0 0.00 ‐3865 0 Mass ordinate for TOPSOIL = 0
ACP
Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 5.11 5 0 0.00 ‐3865 275
AGG_BASE
Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 12.04 11 0 0.00 ‐3865 663
SHOULDERBACKFILL
Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 0.15 0 0 0.00 ‐3865 14
68+00.00 RDWYEXC
Excavation 219.95 478 406 0.85 2275
Fill 62.61 141 141 1.00 ‐3600 5528
TOPSOIL
Excavation 34.57 62 0 0.00 510 Subsoil Exc 6.83 14 0 0.00 529 Fill 0.00 0 0 0.00 ‐3600 0 Mass ordinate for TOPSOIL = 0
ACP
Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 5.11 9 0 0.00 ‐3600 284
AGG_BASE
Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 12.04 22 0 0.00 ‐3600 685
SHOULDERBACKFILL
Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 0.15 0 0 0.00 ‐3600 14
68+50.00 RDWYEXC
Excavation 268.23 452 385 0.85 2727 Subsoil Exc 0.00 0 0 1.00 0 Fill 64.04 117 117 1.00 ‐3332 5645
TOPSOIL
Excavation 33.35 63 0 0.00 573 Subsoil Exc 9.08 15 0 0.00 544 Fill 0.00 0 0 0.00 ‐3332 0 Mass ordinate for TOPSOIL = 0
ACP
Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 5.11 9 0 0.00 ‐3332 293
AGG_BASE
Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 12.04 22 0 0.00 ‐3332 707
SHOULDERBACKFILL
Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 0.15 0 0 0.00 ‐3332 14
69+00.00 RDWYEXC
Excavation 245.29 475 404 0.85 3202 Subsoil Exc 0.00 0 0 1.00 0 Fill 62.83 117 117 1.00 ‐3045 5762
TOPSOIL
Excavation 35.91 64 0 0.00 637 Subsoil Exc 7.07 15 0 0.00 559 Fill 0.00 0 0 0.00 ‐3045 0 Mass ordinate for TOPSOIL = 0
ACP
Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 5.11 9 0 0.00 ‐3045 302
AGG_BASE
Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 12.04 22 0 0.00 ‐3045 729
Fill 0.15 0 0 0.00 ‐3045 14
69+50.00 RDWYEXC
Excavation 258.73 467 397 0.85 3669 Subsoil Exc 0.00 0 0 1.00 0 Fill 69.18 122 122 1.00 ‐2770 5884
TOPSOIL
Excavation 29.92 61 0 0.00 698 Subsoil Exc 9.97 16 0 0.00 575 Fill 0.00 0 0 0.00 ‐2770 0 Mass ordinate for TOPSOIL = 0
ACP
Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 5.11 9 0 0.00 ‐2770 311
AGG_BASE
Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 12.04 22 0 0.00 ‐2770 751
SHOULDERBACKFILL
Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 0.15 0 0 0.00 ‐2770 14
70+00.00 RDWYEXC
Excavation 109.10 340 290 0.85 4009 Subsoil Exc 0.00 0 0 1.00 0 Fill 60.18 120 120 1.00 ‐2600 6004
TOPSOIL
Excavation 27.10 52 0 0.00 750 Subsoil Exc 8.56 17 0 0.00 592 Fill 0.00 0 0 0.00 ‐2600 0 Mass ordinate for TOPSOIL = 0
ACP
Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 5.11 9 0 0.00 ‐2600 320
AGG_BASE
Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 12.06 22 0 0.00 ‐2600 773
SHOULDERBACKFILL
Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 0.14 0 0 0.00 ‐2600 14
70+50.00 RDWYEXC
Excavation 22.06 121 104 0.85 4130 Subsoil Exc 0.00 0 0 1.00 0 Fill 75.98 126 126 1.00 ‐2622 6130
TOPSOIL
Excavation 11.99 36 0 0.00 786 Subsoil Exc 11.20 18 0 0.00 610 Fill 0.00 0 0 0.00 ‐2622 0 Mass ordinate for TOPSOIL = 0
ACP
Fill 5.11 9 0 0.00 ‐2622 329
Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 12.11 22 0 0.00 ‐2622 795
SHOULDERBACKFILL
Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 0.16 0 0 0.00 ‐2622 14
71+00.00 RDWYEXC
Excavation 69.53 85 72 0.85 4215 Subsoil Exc 0.00 0 0 1.00 0 Fill 68.73 134 134 1.00 ‐2684 6264
TOPSOIL
Excavation 18.04 27 0 0.00 813 Subsoil Exc 7.96 18 0 0.00 628 Fill 0.00 0 0 0.00 ‐2684 0 Mass ordinate for TOPSOIL = 0
ACP
Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 5.11 9 0 0.00 ‐2684 338
AGG_BASE
Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 12.17 22 0 0.00 ‐2684 817
SHOULDERBACKFILL
Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 0.16 0 0 0.00 ‐2684 14
71+50.00 RDWYEXC
Excavation 47.08 108 92 0.85 4323 Subsoil Exc 0.00 0 0 1.00 0 Fill 72.67 131 131 1.00 ‐2723 6395
TOPSOIL
Excavation 17.22 32 0 0.00 845 Subsoil Exc 8.02 15 0 0.00 643 Fill 0.00 0 0 0.00 ‐2723 0 Mass ordinate for TOPSOIL = 0
ACP
Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 5.11 9 0 0.00 ‐2723 347
AGG_BASE
Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 12.17 23 0 0.00 ‐2723 840
SHOULDERBACKFILL
Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 0.16 0 0 0.00 ‐2723 14
72+00.00 RDWYEXC
Excavation 21.37 63 53 0.85 4386 Subsoil Exc 0.00 0 0 1.00 0 Fill 63.70 126 126 1.00 ‐2796 6521
Excavation 12.26 27 0 0.00 872
Subsoil Exc 8.33 15 0 0.00 658 Fill 0.00 0 0 0.00 ‐2796 0 Mass ordinate for TOPSOIL = 0
ACP
Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 5.11 9 0 0.00 ‐2796 356
AGG_BASE
Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 12.17 23 0 0.00 ‐2796 863
SHOULDERBACKFILL
Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 0.16 0 0 0.00 ‐2796 14
72+50.00 RDWYEXC
Excavation 50.29 66 57 0.85 4452 Subsoil Exc 0.00 0 0 1.00 0 Fill 22.77 80 80 1.00 ‐2819 6601
TOPSOIL
Excavation 15.66 26 0 0.00 898 Subsoil Exc 6.38 14 0 0.00 672 Fill 0.00 0 0 0.00 ‐2819 0 Mass ordinate for TOPSOIL = 0
ACP
Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 5.11 9 0 0.00 ‐2819 365
AGG_BASE
Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 12.17 23 0 0.00 ‐2819 886
SHOULDERBACKFILL
Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 0.16 0 0 0.00 ‐2819 14
72+75.00 RDWYEXC
Excavation 60.46 51 44 0.85 4503 Subsoil Exc 0.00 0 0 1.00 0 Fill 19.46 20 20 1.00 ‐2795 6621
TOPSOIL
Excavation 16.18 15 0 0.00 913 Subsoil Exc 7.11 6 0 0.00 678 Fill 0.00 0 0 0.00 ‐2795 0 Mass ordinate for TOPSOIL = 0
ACP
Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 5.11 5 0 0.00 ‐2795 370
AGG_BASE
Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 12.17 11 0 0.00 ‐2795 897
SHOULDERBACKFILL
Excavation 0.00 0 0 0.00 0
Fill 0.16 0 0 0.00 ‐2795 14
73+00.00 RDWYEXC
Excavation 102.39 76 64 0.85 4579 Subsoil Exc 0.00 0 0 1.00 0 Fill 17.56 17 17 1.00 ‐2748 6638
TOPSOIL
Excavation 20.01 17 0 0.00 930 Subsoil Exc 6.53 6 0 0.00 684 Fill 0.00 0 0 0.00 ‐2748 0 Mass ordinate for TOPSOIL = 0
ACP
Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 5.11 5 0 0.00 ‐2748 375
AGG_BASE
Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 12.17 11 0 0.00 ‐2748 908
SHOULDERBACKFILL
Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 0.16 0 0 0.00 ‐2748 14
73+04.00 RDWYEXC
Excavation 106.13 15 13 0.85 4594 Subsoil Exc 0.00 0 0 1.00 0 Fill 17.31 3 3 1.00 ‐2738 6641
TOPSOIL
Excavation 20.04 3 0 0.00 933 Subsoil Exc 6.53 1 0 0.00 685 Fill 0.00 0 0 0.00 ‐2738 0 Mass ordinate for TOPSOIL = 0
ACP
Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 5.11 1 0 0.00 ‐2738 376
AGG_BASE
Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 12.17 2 0 0.00 ‐2738 910
SHOULDERBACKFILL
Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 0.16 0 0 0.00 ‐2738 14
73+25.00 RDWYEXC
Excavation 64.72 67 57 0.85 4661 Subsoil Exc 0.00 0 0 1.00 0 Fill 22.30 15 15 1.00 ‐2696 6656
TOPSOIL
Excavation 15.77 14 0 0.00 947 Subsoil Exc 7.60 5 0 0.00 690 Fill 0.00 0 0 0.00 ‐2696 0 Mass ordinate for TOPSOIL = 0
ACP
Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 5.11 4 0 0.00 ‐2696 380
AGG_BASE
Fill 12.17 9 0 0.00 ‐2696 919
Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 0.16 0 0 0.00 ‐2696 14
73+50.00 RDWYEXC
Excavation 44.87 51 43 0.85 4712 Subsoil Exc 0.00 0 0 1.00 0 Fill 32.95 26 26 1.00 ‐2679 6682
TOPSOIL
Excavation 14.71 14 0 0.00 961 Subsoil Exc 9.16 8 0 0.00 698 Fill 0.00 0 0 0.00 ‐2679 0 Mass ordinate for TOPSOIL = 0
ACP
Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 5.11 5 0 0.00 ‐2679 385
AGG_BASE
Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 12.17 11 0 0.00 ‐2679 930
SHOULDERBACKFILL
Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 0.16 0 0 0.00 ‐2679 14
74+00.00 RDWYEXC
Excavation 44.09 82 70 0.85 4794 Subsoil Exc 0.00 0 0 1.00 0 Fill 36.84 65 65 1.00 ‐2674 6747
TOPSOIL
Excavation 14.34 27 0 0.00 988 Subsoil Exc 8.89 17 0 0.00 715 Fill 0.00 0 0 0.00 ‐2674 0 Mass ordinate for TOPSOIL = 0
ACP
Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 5.11 9 0 0.00 ‐2674 394
AGG_BASE
Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 12.17 23 0 0.00 ‐2674 953
SHOULDERBACKFILL
Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 0.16 0 0 0.00 ‐2674 14
74+50.00 RDWYEXC
Excavation 32.38 71 60 0.85 4865 Subsoil Exc 0.00 0 0 1.00 0 Fill 36.53 68 68 1.00 ‐2682 6815
TOPSOIL
Excavation 13.08 25 0 0.00 1013 Subsoil Exc 8.72 16 0 0.00 731 Fill 0.00 0 0 0.00 ‐2682 0
Fill 5.11 9 0 0.00 ‐2682 403
AGG_BASE
Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 12.17 23 0 0.00 ‐2682 976
SHOULDERBACKFILL
Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 0.16 0 0 0.00 ‐2682 14
75+00.00 RDWYEXC
Excavation 16.37 45 38 0.85 4910 Subsoil Exc 0.00 0 0 1.00 0 Fill 53.27 83 83 1.00 ‐2727 6898
TOPSOIL
Excavation 9.50 21 0 0.00 1034 Subsoil Exc 11.53 19 0 0.00 750 Fill 0.00 0 0 0.00 ‐2727 0 Mass ordinate for TOPSOIL = 0
ACP
Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 5.11 9 0 0.00 ‐2727 412
AGG_BASE
Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 12.17 23 0 0.00 ‐2727 999
SHOULDERBACKFILL
Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 0.16 0 0 0.00 ‐2727 14
75+50.00 RDWYEXC
Excavation 195.71 196 167 0.85 5106 Subsoil Exc 0.00 0 0 1.00 0 Fill 29.09 76 76 1.00 ‐2636 6974
TOPSOIL
Excavation 26.36 33 0 0.00 1067 Subsoil Exc 6.12 16 0 0.00 766 Fill 0.00 0 0 0.00 ‐2636 0 Mass ordinate for TOPSOIL = 0
ACP
Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 5.11 9 0 0.00 ‐2636 421
AGG_BASE
Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 12.06 22 0 0.00 ‐2636 1021
SHOULDERBACKFILL
Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 0.15 0 0 0.00 ‐2636 14
76+00.00 RDWYEXC
Excavation 174.01 342 291 0.85 5448
Fill 61.24 84 84 1.00 ‐2429 7058
Excavation 25.81 49 0 0.00 1116 Subsoil Exc 7.22 12 0 0.00 778 Fill 0.00 0 0 0.00 ‐2429 0 Mass ordinate for TOPSOIL = 0
ACP
Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 5.11 9 0 0.00 ‐2429 430
AGG_BASE
Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 12.05 22 0 0.00 ‐2429 1043
SHOULDERBACKFILL
Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 0.15 0 0 0.00 ‐2429 14 � G R A N D S U M M A R Y T O T A L S Material Name Unadjusted Adjusted Mult Volumes Volumes Factor
(cu. yd.) (cu. yd.)
RDWYEXC
Excavation 5448 4629 0.85 Subsoil Exc 0 0 1.00 Fill 7058 7058 1.00
SUBEXCAVATION
Excavation 146 146 1.00 Subsoil Exc 0 0 1.00 Fill 0 0 1.00
TOPSOIL
Excavation 1116 0 0.00 Subsoil Exc 778 0 0.00 Fill 0 0 0.00
ACP
Excavation 0 0 0.00 Subsoil Exc 0 0 0.00 Fill 430 0 0.00
AGG_BASE
Excavation 0 0 0.00 Subsoil Exc 0 0 0.00 Fill 1043 0 0.00
SUBEXBACKFILL
Excavation 0 0 0.00 Subsoil Exc 0 0 0.00 Fill 146 0 0.00
SHOULDERBACKFILL
Excavation 0 0 0.00 Subsoil Exc 0 0 0.00 Fill 14 0 0.00