af05801_BULK_proposed-alignment.pdf

PDF 81 KB Posted

Attached to
AK PFH 58(1), Neck Lake Road Reconstruction: NPOWI Hwy. to Marine Access Facility Jct.
Solicitation number
69056725B000001
Issued by

About this file

This document appears to be an alignment drawing for the AK PFH 58(1), Neck Lake Road Reconstruction project. The related federal contract opportunity solicitation outlines the work required, which includes roadway excavation, sub-excavation, embankment construction, grading, rock blasting, drainage, aggregate surface course, guardrail installation, erosion control, temporary traffic control, and permanent signage. The project consists of three bid schedules for 1.6, 2.0, and 2.4 miles of road reconstruction, with a tentative completion date of Fall 2026. The estimated price range is between $10,000,000 and $20,000,000, and the contract type is Sealed Bid, Firm-Fixed-Price. This unrestricted solicitation is anticipated to be offered by the Department of Transportation's Federal Highway Administration in Winter 2024/2025.

View the file

Other files

File Type Posted
BidTab Neck Lake Road Reconstruction.pdf PDF
BidSum-AK PFH 58(1).pdf PDF
Amendment A008.pdf PDF
QA_01-08-2025.pdf PDF
QA_01-07-2025.pdf PDF
Amendment A007.pdf PDF
Amendment A006.pdf PDF
QA_12-30-2024.pdf PDF
Amendment A005.pdf PDF
Amendment A004.pdf PDF
Amendment A003.pdf PDF
QA_12-16-2024.pdf PDF
QA_12-13-2024.pdf PDF
Amendment A002.pdf PDF
QA_12-18-2024.pdf PDF
QA_12-06-2024.pdf PDF
Amendment A001.pdf PDF
QA_12-05-2024.pdf PDF
QA_11-26-2024.pdf PDF
af05801_SEGMENT1_proposed-alignment.pdf PDF
af05801_XS_Labeled_SchA.pdf PDF
af05801_SEGMENT1_proposed-profile.pdf PDF
af05801_XS_SchA.pdf PDF
af05801_TIE4_Earthwork.pdf PDF
af05801_SchedA_Earthwork.pdf PDF
af05801_SchedB_Earthwork.pdf PDF
ak pfh 58(1)_Neck Lake ARD Technical Memorandum.pdf PDF
af05801_TIE4_proposed-alignment.pdf PDF
af05801_TIE1_Earthwork.pdf PDF
ak pfh 58(1)_GR1516_pp385-973.pdf PDF
af05801_TIE2_superelevation.pdf PDF
af05801_TIE1_proposed-profile.pdf PDF
af05801_TIE2_proposed-alignment.pdf PDF
af05801_TIE4_proposed-profile.pdf PDF
af05801_TIE4_superelevation.pdf PDF
IFB AK PFH 58(1) Neck Lake Road Reconstruction.pdf PDF
af05801_SchedC_Earthwork.pdf PDF
ak pfh 58(1)_FinalHydraulicReport.pdf PDF
ak pfh 58(1)_XS Approaches_SchC.pdf PDF
aka-pfh58-1_SWPPP for compilation_Final.pdf PDF
af05801_BULK_Earthwork.pdf PDF
af05801_Segment1_superelevation.pdf PDF
af05801_TIE2_Earthwork.pdf PDF
af05801_XS_SchB.pdf PDF
ak pfh 58(1)_NeckLakeRoad_Rockery_TM 1.21.2019.pdf PDF
af05801_TIE1_superelevation.pdf PDF
af05801_TIE3_Earthwork.pdf PDF
ak pfh 58(1)_GR1516_pp1-384.pdf PDF
af05801_XS_Labeled_SchC.pdf PDF
af05801_SEGMENT1_proposed-alignment.pdf PDF
Show 40 more

Latest 50 of 62 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Alignment

Approach Road 3000+00 Fish Hatchery Bulkhead 107+93.79 Mainline Left

AK PFH 58(1),

Neck Lake Road Reconstruction: NPOWI Hwy. to Marine Access Facility Jct.

Copyright: (c) 2009 Bentley Systems, Incorporated. All rights reserved.

Project: NeckLake2017 Subject:

Job No. 582 Operator: OC Date: Wednesday December 18, 2019 10:04 am

SYSTEM FIX 3 ASEC 2 AZIM PRI 0 RED NE STA 2 FILE: 'BULK'

* 1 DESCRIBE CHAIN BULK

Chain BULK contains:

CUR BULK‐1 507

Beginning chain BULK description

Curve Data

Curve BULK‐1 P.I. Station 3000+69.41 N 1,558,652.285 E 2,786,555.878 Delta = 108° 27' 49.03" (RT) Degree = 114° 35' 29.61" Tangent = 69.408 Length = 94.652 Radius = 50.000 External = 35.542 Long Chord = 81.139 Mid. Ord. = 20.775 P.C. Station 3000+00.00 N 1,558,630.061 E 2,786,490.125 P.T. Station 3000+94.65 N 1,558,582.878 E 2,786,556.134 C.C. N 1,558,582.693 E 2,786,506.134 Back = 71° 19' 30.53" Ahead = 179° 47' 19.56" Chord Bear = 125° 33' 25.05"

Course from PT BULK‐1 to 507 179° 47' 19.56" Dist 92.013

Point 507 N 1,558,490.866 E 2,786,556.473 Sta 3001+86.67

Ending chain BULK description

Blank Page

File details come from the government source that posted it. Updated .