af05801_TIE4_Earthwork.pdf
PDF 72 KB Posted
- Solicitation number
- 69056725B000001
About this file
This document appears to be a Schedule C for the earthwork portion of a federal contract opportunity for the AK PFH 58(1), Neck Lake Road Reconstruction project. The project consists of approximately 6 miles of roadway reconstruction work including excavation, embankment, grading, drainage, and other civil infrastructure. The work is broken into three bid schedules, with Schedule C covering the 2.4 mile segment from stations 174+50 to 177+50. The document provides detailed quantity estimates for various earthwork-related pay items along this portion of the project, including roadway excavation, subsoil excavation, various types of fill, and other related work. The overall federal contract opportunity is estimated to be between $10-20 million and is anticipated to be solicited in Winter 2024/2025 by the Department of Transportation Federal Highway Administration.
View the file
Other files
Show 40 more
Latest 50 of 62 listed here. See the rest on GovTribe.
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Schedule C Earthwork tie in stations 174+50 to 177+50
AK PFH 58(1),
Neck Lake Road Reconstruction: NPOWI Hwy. to Marine Access Facility Jct.
Material Name End Areas Unadjusted Adjusted Mult Mass Accum Station Volumes Volumes Factor Ordinate Unadj Vol
(sq. ft.) (cu. yd.) (cu. yd.) (cu. yd.)
174+50.00 RDWYEXC
Excavation 204.53 0 0 0.85 0 Subsoil Exc 0.00 0 0 1.00 0 Fill 1.18 0 0 1.00 0 0
TOPSOIL
Excavation 55.81 0 0 0.00 0 Subsoil Exc 1.18 0 0 0.00 0 Fill 0.00 0 0 0.00 0 0 Mass ordinate for TOPSOIL = 0
DELETE
Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 6.03 0 0 0.00 0 0
AGG_BASE
Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 13.95 0 0 0.00 0 0
SUBEXBACKFILL
Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 203.33 0 0 0.00 0 0
SHOULDERBACKFILL
Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 0.15 0 0 0.00 0 0
175+00.00 RDWYEXC
Excavation 197.08 371 316 0.85 371 Subsoil Exc 0.00 0 0 1.00 0 Fill 1.24 2 2 1.00 314 2
TOPSOIL
Excavation 39.08 88 0 0.00 88 Subsoil Exc 1.24 2 0 0.00 2 Fill 0.00 0 0 0.00 314 0 Mass ordinate for TOPSOIL = 0
DELETE
Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 6.03 11 0 0.00 314 11
AGG_BASE
Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 13.95 26 0 0.00 314 26
SUBEXBACKFILL
Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 122.66 302 0 0.00 314 302
SHOULDERBACKFILL
Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 0.15 0 0 0.00 314 0
175+50.00 RDWYEXC
Excavation 221.47 387 329 0.85 758 Subsoil Exc 0.00 0 0 1.00 0 Fill 4.60 5 5 1.00 638 7
TOPSOIL
Excavation 37.46 71 0 0.00 159 Subsoil Exc 4.60 5 0 0.00 7 Fill 0.00 0 0 0.00 638 0 Mass ordinate for TOPSOIL = 0
DELETE
Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 6.06 11 0 0.00 638 22
AGG_BASE
Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 13.92 26 0 0.00 638 52
SUBEXBACKFILL
Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 137.87 241 0 0.00 638 543
SHOULDERBACKFILL
Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 0.15 0 0 0.00 638 0
176+00.00 RDWYEXC
Excavation 189.37 381 324 0.85 1139 Subsoil Exc 0.00 0 0 1.00 0 Fill 1.19 5 5 1.00 957 12
TOPSOIL
Excavation 25.70 59 0 0.00 218 Subsoil Exc 1.19 5 0 0.00 12 Fill 0.00 0 0 0.00 957 0 Mass ordinate for TOPSOIL = 0
DELETE
Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 6.03 11 0 0.00 957 33
AGG_BASE
Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 14.03 26 0 0.00 957 78
SUBEXBACKFILL
Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 142.41 260 0 0.00 957 803
SHOULDERBACKFILL
Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 0.15 0 0 0.00 957 0
176+50.00 RDWYEXC
Excavation 120.68 287 244 0.85 1426 Subsoil Exc 0.00 0 0 1.00 0 Fill 1.20 2 2 1.00 1199 14
TOPSOIL
Excavation 26.46 48 0 0.00 266 Subsoil Exc 1.20 2 0 0.00 14 Fill 0.00 0 0 0.00 1199 0 Mass ordinate for TOPSOIL = 0
DELETE
Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0
Fill 5.11 10 0 0.00 1199 43
AGG_BASE
Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 12.10 24 0 0.00 1199 102
SUBEXBACKFILL
Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 129.90 252 0 0.00 1199 1055
SHOULDERBACKFILL
Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 0.15 0 0 0.00 1199 0
177+00.00 RDWYEXC
Excavation 117.19 221 187 0.85 1647 Subsoil Exc 0.00 0 0 1.00 0 Fill 1.86 3 3 1.00 1383 17
TOPSOIL
Excavation 29.59 52 0 0.00 318 Subsoil Exc 1.86 3 0 0.00 17 Fill 0.00 0 0 0.00 1383 0 Mass ordinate for TOPSOIL = 0
DELETE
Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 5.11 9 0 0.00 1383 52
AGG_BASE
Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 12.02 22 0 0.00 1383 124
SUBEXBACKFILL
Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 144.93 254 0 0.00 1383 1309
SHOULDERBACKFILL
Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 0.14 0 0 0.00 1383 0
177+50.00 RDWYEXC
Excavation 4.22 112 95 0.85 1759 Subsoil Exc 0.00 0 0 1.00 0 Fill 30.07 30 30 1.00 1448 47
TOPSOIL
Excavation 0.00 28 0 0.00 346 Subsoil Exc 0.00 2 0 0.00 19 Fill 0.00 0 0 0.00 1448 0 Mass ordinate for TOPSOIL = 0
DELETE
Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 5.11 9 0 0.00 1448 61
AGG_BASE
Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 12.13 22 0 0.00 1448 146
SUBEXBACKFILL
Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0
Fill 0.00 134 0 0.00 1448 1443
SHOULDERBACKFILL
Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 0.16 0 0 0.00 1448 0 � G R A N D S U M M A R Y T O T A L S Material Name Unadjusted Adjusted Mult Volumes Volumes Factor
(cu. yd.) (cu. yd.)
RDWYEXC
Excavation 1759 1495 0.85 Subsoil Exc 0 0 1.00 Fill 47 47 1.00
TOPSOIL
Excavation 346 0 0.00 Subsoil Exc 19 0 0.00 Fill 0 0 0.00
DELETE
Excavation 0 0 0.00 Subsoil Exc 0 0 0.00 Fill 61 0 0.00
AGG_BASE
Excavation 0 0 0.00 Subsoil Exc 0 0 0.00 Fill 146 0 0.00
SUBEXBACKFILL
Excavation 0 0 0.00 Subsoil Exc 0 0 0.00 Fill 1443 0 0.00
SHOULDERBACKFILL
Excavation 0 0 0.00 Subsoil Exc 0 0 0.00 Fill 0 0 0.00
File details come from the government source that posted it. Updated .