This document appears to be a Schedule C for the earthwork portion of a federal contract opportunity for the AK PFH 58(1), Neck Lake Road Reconstruction project. The project consists of approximately 6 miles of roadway reconstruction work including excavation, embankment, grading, drainage, and other civil infrastructure. The work is broken into three bid schedules, with Schedule C covering the 2.4 mile segment from stations 174+50 to 177+50. The document provides detailed quantity estimates for various earthwork-related pay items along this portion of the project, including roadway excavation, subsoil excavation, various types of fill, and other related work. The overall federal contract opportunity is estimated to be between $10-20 million and is anticipated to be solicited in Winter 2024/2025 by the Department of Transportation Federal Highway Administration.

View the file

Other files

File Type Posted
BidTab Neck Lake Road Reconstruction.pdf PDF
BidSum-AK PFH 58(1).pdf PDF
Amendment A008.pdf PDF
QA_01-08-2025.pdf PDF
QA_01-07-2025.pdf PDF
Amendment A007.pdf PDF
Amendment A006.pdf PDF
QA_12-30-2024.pdf PDF
Amendment A005.pdf PDF
Amendment A004.pdf PDF
Amendment A003.pdf PDF
QA_12-16-2024.pdf PDF
QA_12-13-2024.pdf PDF
Amendment A002.pdf PDF
QA_12-18-2024.pdf PDF
QA_12-06-2024.pdf PDF
Amendment A001.pdf PDF
QA_12-05-2024.pdf PDF
QA_11-26-2024.pdf PDF
af05801_SEGMENT1_proposed-alignment.pdf PDF
af05801_XS_Labeled_SchA.pdf PDF
af05801_SEGMENT1_proposed-profile.pdf PDF
af05801_XS_SchA.pdf PDF
af05801_SchedA_Earthwork.pdf PDF
af05801_SchedB_Earthwork.pdf PDF
ak pfh 58(1)_Neck Lake ARD Technical Memorandum.pdf PDF
af05801_TIE4_proposed-alignment.pdf PDF
af05801_TIE1_Earthwork.pdf PDF
ak pfh 58(1)_GR1516_pp385-973.pdf PDF
af05801_TIE2_superelevation.pdf PDF
af05801_TIE1_proposed-profile.pdf PDF
af05801_TIE2_proposed-alignment.pdf PDF
af05801_TIE4_proposed-profile.pdf PDF
af05801_TIE4_superelevation.pdf PDF
IFB AK PFH 58(1) Neck Lake Road Reconstruction.pdf PDF
af05801_SchedC_Earthwork.pdf PDF
af05801_BULK_proposed-alignment.pdf PDF
ak pfh 58(1)_FinalHydraulicReport.pdf PDF
ak pfh 58(1)_XS Approaches_SchC.pdf PDF
aka-pfh58-1_SWPPP for compilation_Final.pdf PDF
af05801_BULK_Earthwork.pdf PDF
af05801_Segment1_superelevation.pdf PDF
af05801_TIE2_Earthwork.pdf PDF
af05801_XS_SchB.pdf PDF
ak pfh 58(1)_NeckLakeRoad_Rockery_TM 1.21.2019.pdf PDF
af05801_TIE1_superelevation.pdf PDF
af05801_TIE3_Earthwork.pdf PDF
ak pfh 58(1)_GR1516_pp1-384.pdf PDF
af05801_XS_Labeled_SchC.pdf PDF
af05801_SEGMENT1_proposed-alignment.pdf PDF
Show 40 more

Latest 50 of 62 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Schedule C Earthwork tie in stations 174+50 to 177+50

AK PFH 58(1),

Neck Lake Road Reconstruction: NPOWI Hwy. to Marine Access Facility Jct.

Material Name End Areas Unadjusted Adjusted Mult Mass Accum Station Volumes Volumes Factor Ordinate Unadj Vol

(sq. ft.) (cu. yd.) (cu. yd.) (cu. yd.)

174+50.00 RDWYEXC

Excavation 204.53 0 0 0.85 0 Subsoil Exc 0.00 0 0 1.00 0 Fill 1.18 0 0 1.00 0 0

TOPSOIL

Excavation 55.81 0 0 0.00 0 Subsoil Exc 1.18 0 0 0.00 0 Fill 0.00 0 0 0.00 0 0 Mass ordinate for TOPSOIL = 0

DELETE

Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 6.03 0 0 0.00 0 0

AGG_BASE

Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 13.95 0 0 0.00 0 0

SUBEXBACKFILL

Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 203.33 0 0 0.00 0 0

SHOULDERBACKFILL

Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 0.15 0 0 0.00 0 0

175+00.00 RDWYEXC

Excavation 197.08 371 316 0.85 371 Subsoil Exc 0.00 0 0 1.00 0 Fill 1.24 2 2 1.00 314 2

TOPSOIL

Excavation 39.08 88 0 0.00 88 Subsoil Exc 1.24 2 0 0.00 2 Fill 0.00 0 0 0.00 314 0 Mass ordinate for TOPSOIL = 0

DELETE

Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 6.03 11 0 0.00 314 11

AGG_BASE

Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 13.95 26 0 0.00 314 26

SUBEXBACKFILL

Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 122.66 302 0 0.00 314 302

SHOULDERBACKFILL

Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 0.15 0 0 0.00 314 0

175+50.00 RDWYEXC

Excavation 221.47 387 329 0.85 758 Subsoil Exc 0.00 0 0 1.00 0 Fill 4.60 5 5 1.00 638 7

TOPSOIL

Excavation 37.46 71 0 0.00 159 Subsoil Exc 4.60 5 0 0.00 7 Fill 0.00 0 0 0.00 638 0 Mass ordinate for TOPSOIL = 0

DELETE

Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 6.06 11 0 0.00 638 22

AGG_BASE

Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 13.92 26 0 0.00 638 52

SUBEXBACKFILL

Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 137.87 241 0 0.00 638 543

SHOULDERBACKFILL

Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 0.15 0 0 0.00 638 0

176+00.00 RDWYEXC

Excavation 189.37 381 324 0.85 1139 Subsoil Exc 0.00 0 0 1.00 0 Fill 1.19 5 5 1.00 957 12

TOPSOIL

Excavation 25.70 59 0 0.00 218 Subsoil Exc 1.19 5 0 0.00 12 Fill 0.00 0 0 0.00 957 0 Mass ordinate for TOPSOIL = 0

DELETE

Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 6.03 11 0 0.00 957 33

AGG_BASE

Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 14.03 26 0 0.00 957 78

SUBEXBACKFILL

Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 142.41 260 0 0.00 957 803

SHOULDERBACKFILL

Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 0.15 0 0 0.00 957 0

176+50.00 RDWYEXC

Excavation 120.68 287 244 0.85 1426 Subsoil Exc 0.00 0 0 1.00 0 Fill 1.20 2 2 1.00 1199 14

TOPSOIL

Excavation 26.46 48 0 0.00 266 Subsoil Exc 1.20 2 0 0.00 14 Fill 0.00 0 0 0.00 1199 0 Mass ordinate for TOPSOIL = 0

DELETE

Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0

Fill 5.11 10 0 0.00 1199 43

AGG_BASE

Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 12.10 24 0 0.00 1199 102

SUBEXBACKFILL

Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 129.90 252 0 0.00 1199 1055

SHOULDERBACKFILL

Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 0.15 0 0 0.00 1199 0

177+00.00 RDWYEXC

Excavation 117.19 221 187 0.85 1647 Subsoil Exc 0.00 0 0 1.00 0 Fill 1.86 3 3 1.00 1383 17

TOPSOIL

Excavation 29.59 52 0 0.00 318 Subsoil Exc 1.86 3 0 0.00 17 Fill 0.00 0 0 0.00 1383 0 Mass ordinate for TOPSOIL = 0

DELETE

Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 5.11 9 0 0.00 1383 52

AGG_BASE

Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 12.02 22 0 0.00 1383 124

SUBEXBACKFILL

Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 144.93 254 0 0.00 1383 1309

SHOULDERBACKFILL

Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 0.14 0 0 0.00 1383 0

177+50.00 RDWYEXC

Excavation 4.22 112 95 0.85 1759 Subsoil Exc 0.00 0 0 1.00 0 Fill 30.07 30 30 1.00 1448 47

TOPSOIL

Excavation 0.00 28 0 0.00 346 Subsoil Exc 0.00 2 0 0.00 19 Fill 0.00 0 0 0.00 1448 0 Mass ordinate for TOPSOIL = 0

DELETE

Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 5.11 9 0 0.00 1448 61

AGG_BASE

Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 12.13 22 0 0.00 1448 146

SUBEXBACKFILL

Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0

Fill 0.00 134 0 0.00 1448 1443

SHOULDERBACKFILL

Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 0.16 0 0 0.00 1448 0 � G R A N D S U M M A R Y T O T A L S Material Name Unadjusted Adjusted Mult Volumes Volumes Factor

(cu. yd.) (cu. yd.)

RDWYEXC

Excavation 1759 1495 0.85 Subsoil Exc 0 0 1.00 Fill 47 47 1.00

TOPSOIL

Excavation 346 0 0.00 Subsoil Exc 19 0 0.00 Fill 0 0 0.00

DELETE

Excavation 0 0 0.00 Subsoil Exc 0 0 0.00 Fill 61 0 0.00

AGG_BASE

Excavation 0 0 0.00 Subsoil Exc 0 0 0.00 Fill 146 0 0.00

SUBEXBACKFILL

Excavation 0 0 0.00 Subsoil Exc 0 0 0.00 Fill 1443 0 0.00

SHOULDERBACKFILL

Excavation 0 0 0.00 Subsoil Exc 0 0 0.00 Fill 0 0 0.00