af05801_TIE3_Earthwork.pdf
PDF 68 KB Posted
- Solicitation number
- 69056725B000001
About this file
This document appears to be a spreadsheet containing detailed earthwork volume calculations related to a federal contract opportunity.
The key details of the related federal contract opportunity are:
Solicitation Number: 69056725B000001
Name: AK PFH 58(1), Neck Lake Road Reconstruction: NPOWI Hwy. to Marine Access Facility Jct.
Opportunity Type: Solicitation
Description: The work consists of roadway excavation, sub-excavation, soft ground embankment construction, grading, rock blasting, drainage, embankment, aggregate surface course, guardrail, erosion control, traffic control, and turf establishment. The project is divided into 3 bid schedules, with only one schedule to be awarded. The estimated price range is between $10,000,000 and $20,000,000. The project is anticipated to be solicited in Winter 2024/2025 and have a tentative completion date of Fall 2026. The contracting agency is the Department of Transportation Federal Highway Administration.
View the file
Other files
Show 40 more
Latest 50 of 62 listed here. See the rest on GovTribe.
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Schedule B and C Earthwork tie in station 52+75 to 54+50
AK PFH 58(1),
Neck Lake Road Reconstruction: NPOWI Hwy. to Marine Access Facility Jct.
Material Name End Areas Unadjusted Adjusted Mult Mass Accum Station Volumes Volumes Factor Ordinate Unadj Vol
(sq. ft.) (cu. yd.) (cu. yd.) (cu. yd.)
52+75.00 RDWYEXC
Excavation 51.52 0 0 0.85 0 Subsoil Exc 0.00 0 0 1.00 0 Fill 0.56 0 0 1.00 0 0
DELETE
Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 5.03 0 0 0.00 0 0
AGG_BASE
Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 12.36 0 0 0.00 0 0
SHOULDERBACKFILL
Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 0.14 0 0 0.00 0 0
53+00.00 RDWYEXC
Excavation 59.80 52 44 0.85 52 Subsoil Exc 0.00 0 0 1.00 0 Fill 0.69 1 1 1.00 43 1
DELETE
Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 5.33 5 0 0.00 43 5
AGG_BASE
Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 12.45 11 0 0.00 43 11
SHOULDERBACKFILL
Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 0.14 0 0 0.00 43 0
53+50.00 RDWYEXC
Excavation 0.00 55 47 0.85 107 Subsoil Exc 0.00 0 0 1.00 0 Fill 31.16 29 29 1.00 61 30
DELETE
Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 5.43 10 0 0.00 61 15
AGG_BASE
Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 12.65 23 0 0.00 61 34
SHOULDERBACKFILL
Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 0.14 0 0 0.00 61 0
54+00.00 RDWYEXC
Excavation 0.00 0 0 0.85 107 Subsoil Exc 0.00 0 0 1.00 0 Fill 48.47 74 74 1.00 ‐13 104
DELETE
Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 5.52 10 0 0.00 ‐13 25
AGG_BASE
Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 12.87 24 0 0.00 ‐13 58
SHOULDERBACKFILL
Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 0.15 0 0 0.00 ‐13 0
54+50.00 RDWYEXC
Excavation 0.00 0 0 0.85 107 Subsoil Exc 0.00 0 0 1.00 0 Fill 45.51 87 87 1.00 ‐100 191
DELETE
Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 5.53 10 0 0.00 ‐100 35
AGG_BASE
Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 12.91 24 0 0.00 ‐100 82
SHOULDERBACKFILL
Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 0.15 0 0 0.00 ‐100 0 � G R A N D S U M M A R Y T O T A L S Material Name Unadjusted Adjusted Mult Volumes Volumes Factor
(cu. yd.) (cu. yd.)
RDWYEXC
Excavation 107 91 0.85 Subsoil Exc 0 0 1.00 Fill 191 191 1.00
DELETE
Excavation 0 0 0.00 Subsoil Exc 0 0 0.00 Fill 35 0 0.00
AGG_BASE
Excavation 0 0 0.00 Subsoil Exc 0 0 0.00 Fill 82 0 0.00
SHOULDERBACKFILL
Excavation 0 0 0.00 Subsoil Exc 0 0 0.00 Fill 0 0 0.00