af05801_TIE3_Earthwork.pdf

PDF 68 KB Posted

Attached to
AK PFH 58(1), Neck Lake Road Reconstruction: NPOWI Hwy. to Marine Access Facility Jct.
Solicitation number
69056725B000001
Issued by

About this file

This document appears to be a spreadsheet containing detailed earthwork volume calculations related to a federal contract opportunity.

The key details of the related federal contract opportunity are:

Solicitation Number: 69056725B000001

Name: AK PFH 58(1), Neck Lake Road Reconstruction: NPOWI Hwy. to Marine Access Facility Jct.

Opportunity Type: Solicitation

Description: The work consists of roadway excavation, sub-excavation, soft ground embankment construction, grading, rock blasting, drainage, embankment, aggregate surface course, guardrail, erosion control, traffic control, and turf establishment. The project is divided into 3 bid schedules, with only one schedule to be awarded. The estimated price range is between $10,000,000 and $20,000,000. The project is anticipated to be solicited in Winter 2024/2025 and have a tentative completion date of Fall 2026. The contracting agency is the Department of Transportation Federal Highway Administration.

View the file

Other files

File Type Posted
BidTab Neck Lake Road Reconstruction.pdf PDF
BidSum-AK PFH 58(1).pdf PDF
Amendment A008.pdf PDF
QA_01-08-2025.pdf PDF
QA_01-07-2025.pdf PDF
Amendment A007.pdf PDF
Amendment A006.pdf PDF
QA_12-30-2024.pdf PDF
Amendment A005.pdf PDF
Amendment A004.pdf PDF
Amendment A003.pdf PDF
QA_12-16-2024.pdf PDF
QA_12-13-2024.pdf PDF
Amendment A002.pdf PDF
QA_12-18-2024.pdf PDF
QA_12-06-2024.pdf PDF
Amendment A001.pdf PDF
QA_12-05-2024.pdf PDF
QA_11-26-2024.pdf PDF
af05801_SEGMENT1_proposed-alignment.pdf PDF
af05801_XS_Labeled_SchA.pdf PDF
af05801_SEGMENT1_proposed-profile.pdf PDF
af05801_XS_SchA.pdf PDF
af05801_TIE4_Earthwork.pdf PDF
af05801_SchedA_Earthwork.pdf PDF
af05801_SchedB_Earthwork.pdf PDF
ak pfh 58(1)_Neck Lake ARD Technical Memorandum.pdf PDF
af05801_TIE4_proposed-alignment.pdf PDF
af05801_TIE1_Earthwork.pdf PDF
ak pfh 58(1)_GR1516_pp385-973.pdf PDF
af05801_TIE2_superelevation.pdf PDF
af05801_TIE1_proposed-profile.pdf PDF
af05801_TIE2_proposed-alignment.pdf PDF
af05801_TIE4_proposed-profile.pdf PDF
af05801_TIE4_superelevation.pdf PDF
IFB AK PFH 58(1) Neck Lake Road Reconstruction.pdf PDF
af05801_SchedC_Earthwork.pdf PDF
af05801_BULK_proposed-alignment.pdf PDF
ak pfh 58(1)_FinalHydraulicReport.pdf PDF
ak pfh 58(1)_XS Approaches_SchC.pdf PDF
aka-pfh58-1_SWPPP for compilation_Final.pdf PDF
af05801_BULK_Earthwork.pdf PDF
af05801_Segment1_superelevation.pdf PDF
af05801_TIE2_Earthwork.pdf PDF
af05801_XS_SchB.pdf PDF
ak pfh 58(1)_NeckLakeRoad_Rockery_TM 1.21.2019.pdf PDF
af05801_TIE1_superelevation.pdf PDF
ak pfh 58(1)_GR1516_pp1-384.pdf PDF
af05801_XS_Labeled_SchC.pdf PDF
af05801_SEGMENT1_proposed-alignment.pdf PDF
Show 40 more

Latest 50 of 62 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Schedule B and C Earthwork tie in station 52+75 to 54+50

AK PFH 58(1),

Neck Lake Road Reconstruction: NPOWI Hwy. to Marine Access Facility Jct.

Material Name End Areas Unadjusted Adjusted Mult Mass Accum Station Volumes Volumes Factor Ordinate Unadj Vol

(sq. ft.) (cu. yd.) (cu. yd.) (cu. yd.)

52+75.00 RDWYEXC

Excavation 51.52 0 0 0.85 0 Subsoil Exc 0.00 0 0 1.00 0 Fill 0.56 0 0 1.00 0 0

DELETE

Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 5.03 0 0 0.00 0 0

AGG_BASE

Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 12.36 0 0 0.00 0 0

SHOULDERBACKFILL

Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 0.14 0 0 0.00 0 0

53+00.00 RDWYEXC

Excavation 59.80 52 44 0.85 52 Subsoil Exc 0.00 0 0 1.00 0 Fill 0.69 1 1 1.00 43 1

DELETE

Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 5.33 5 0 0.00 43 5

AGG_BASE

Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 12.45 11 0 0.00 43 11

SHOULDERBACKFILL

Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 0.14 0 0 0.00 43 0

53+50.00 RDWYEXC

Excavation 0.00 55 47 0.85 107 Subsoil Exc 0.00 0 0 1.00 0 Fill 31.16 29 29 1.00 61 30

DELETE

Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 5.43 10 0 0.00 61 15

AGG_BASE

Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 12.65 23 0 0.00 61 34

SHOULDERBACKFILL

Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 0.14 0 0 0.00 61 0

54+00.00 RDWYEXC

Excavation 0.00 0 0 0.85 107 Subsoil Exc 0.00 0 0 1.00 0 Fill 48.47 74 74 1.00 ‐13 104

DELETE

Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 5.52 10 0 0.00 ‐13 25

AGG_BASE

Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 12.87 24 0 0.00 ‐13 58

SHOULDERBACKFILL

Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 0.15 0 0 0.00 ‐13 0

54+50.00 RDWYEXC

Excavation 0.00 0 0 0.85 107 Subsoil Exc 0.00 0 0 1.00 0 Fill 45.51 87 87 1.00 ‐100 191

DELETE

Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 5.53 10 0 0.00 ‐100 35

AGG_BASE

Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 12.91 24 0 0.00 ‐100 82

SHOULDERBACKFILL

Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 0.15 0 0 0.00 ‐100 0 � G R A N D S U M M A R Y T O T A L S Material Name Unadjusted Adjusted Mult Volumes Volumes Factor

(cu. yd.) (cu. yd.)

RDWYEXC

Excavation 107 91 0.85 Subsoil Exc 0 0 1.00 Fill 191 191 1.00

DELETE

Excavation 0 0 0.00 Subsoil Exc 0 0 0.00 Fill 35 0 0.00

AGG_BASE

Excavation 0 0 0.00 Subsoil Exc 0 0 0.00 Fill 82 0 0.00

SHOULDERBACKFILL

Excavation 0 0 0.00 Subsoil Exc 0 0 0.00 Fill 0 0 0.00