This is Amendment A004 to solicitation 69056725B000001 for the Neck Lake Road Reconstruction project, modifying bid quantities across Schedules A, B, and C. The amendment revises quantities for several items including roadway aggregate, dump trucks, motor graders, temporary traffic control cones, and concrete barriers. It includes updates to plan sheets showing soft ground embankment construction details and revised summary of quantities tables.
Specific changes include modifications to quantities for various line items such as roadway aggregate method 2 (detour repairs), 10 cubic yard dump trucks, 12-foot motor graders, 36-inch traffic control cones, and concrete barriers. The amendment contains detailed bid schedules and quantity summaries for all three project schedules, along with engineering drawings showing soft ground embankment construction types 1-3 and surcharge details. Plan sheets B.2 through B.11, C.7 through C.10, and L.1 are revised with updated quantities and construction details. The project is being administered by the Federal Highway Administration for road reconstruction work on Prince of Wales Island, Alaska.
View the file
Other files
Show 40 more
Latest 50 of 62 listed here. See the rest on GovTribe.
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT 1. CONTRACT ID CODE
N/A
PAGE
2. AMENDMENT/MODIFICATION NO. 3. EFFECTIVE DATE 4. REQUISITION/PURCHASE NO. 5. PROJECT NO. (If applicable)
A004 12/18/2024 N/A AK PFH 58(1), Neck Lake Road Reconstruction: NPOWI HWY. TO
MARINE ACCESS FACILITY JCT.
6. ISSUED BY CODE N/A 7. ADMINISTERED BY (If other than Item 6) CODE N/A
Department of Transportation Federal Highway Administration 610 East Fifth Street Vancouver WA 98661-3801
8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, State and Zip Code) 9A. AMENDMENT OF SOLICITATION NO.
X
69056725B000001
9B. DATED (SEE ITEM 11)
11/18/2024
10A. MODIFICATION OF CONTRACT/ORDER NO.
N/A
10B. DATED (SEE ITEM 13)
CODE: N/A FACILITY CODE: N/A N/A
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
| X | The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers (_X ) is extended, ( ) is not extended.
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:
(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted; or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
N/A
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS,
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A THIS CHANGE ORDER IS ISSUED PURSUANT TO (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER NO. IN
ITEM 10A.
N/A
B THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (Such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).
N/A
C THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
N/A
D OTHER (Specify type of modification and authority) N/A
E. IMPORTANT: Contractor n/a is not, n/a is required to sign this document and return n/a copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
AK PFH 58(1), Neck Lake Road Reconstruction: NPOWI HWY. TO MARINE ACCESS FACILITY JCT.
See page 2
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15a. NAME AND TITLE OF SIGNER (Type or print) 15a. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
N/A
15B. CONTRACTOR/OFFEROR 15C. DATE SIGNED 16B. UNITED STATES OF AMERICA 16C. DATE SIGNED
BY_________________________________________ BY N/A___________________________ N/A (Signature of person authorized to sign) (Signature of Contracting Officer)
NSN 7540-01-152-8070
PREVIOUS EDITION NOT USABLE
30-105 STANDARD FORM 30 (REV. 10-83)
Prescribed by GSA
FAR (48 CFR) 53.243
Project No AK PFH 58(1) Project Name: Neck Lake Road
Reconstruction: NPOWI HWY. TO MARINE
ACCESS FACILITY JCT.
Amendment No. A004, dated 12/18/2024 Solicitation No. 69056725B000001
REVISIONS ARE AS FOLLOWS:
BID SCHEDULE
Page A-7 through A-32. Revises bid quantities for the following:
Schedule A:
Line Item Bid item number Pay item Description A0880 30202-2000 roadway aggregate, method 2 (detour and waste site access repairs) A1300 62201-0250 Dump Truck, 10 cubic yard minimum capacity A1400 62201-2850 Motor Grader, 12 foot Minimum Blade A1600 63502-1000 Temporary Traffic Control, Cone, Type 36-inch A1660 63503-0400 Temporary Traffic Control, Concrete Barrier
Schedule B:
Line Item Bid item number Pay item Description B0880 30202-2000 roadway aggregate, method 2 (detour and waste site access repairs) B1320 62201-0250 Dump Truck, 10 cubic yard minimum capacity B1420 62201-2850 Motor Grader, 12 foot Minimum Blade B1620 63502-1000 Temporary Traffic Control, Cone, Type 36-inch B1680 63503-0400 Temporary Traffic Control, Concrete Barrier
Schedule C:
Line Item Bid item number Pay item Description C0920 30202-2000 roadway aggregate, method 2 (detour and waste site access repairs) C1240 62201-0250 Dump Truck, 10 cubic yard minimum capacity C1520 62201-2850 Motor Grader, 12 foot Minimum Blade C1720 63502-1000 Temporary Traffic Control, Cone, Type 36-inch
PLANS
Plan sheet B.2 Revises summary of Quantities.
A0880 30202-2000 roadway aggregate, method 2 (detour and waste site access repairs)
Plan sheet B.3 Revises summary of Quantities.
A1300 62201-0250 Dump Truck, 10 cubic yard minimum capacity A1400 62201-2850 Motor Grader, 12 foot Minimum Blade A1600 63502-1000 Temporary Traffic Control, Cone, Type 36-inch
Plan sheet B.4 Revises summary of Quantities.
A1660 63503-0400 Temporary Traffic Control, Concrete Barrier
Plan sheet B.6 Revises summary of Quantities.
B0880 30202-2000 roadway aggregate, method 2 (detour and waste site access repairs)
Project No AK PFH 58(1) Project Name: Neck Lake Road
Reconstruction: NPOWI HWY. TO MARINE
ACCESS FACILITY JCT.
Amendment No. A004, dated 12/18/2024 Solicitation No. 69056725B000001
Plan sheet B.7 Revises summary of Quantities.
B1320 62201-0250 Dump Truck, 10 cubic yard minimum capacity B1420 62201-2850 Motor Grader, 12 foot Minimum Blade
Plan sheet B.8 Revises summary of Quantities.
B1620 63502-1000 Temporary Traffic Control, Cone, Type 36-inch B1680 63503-0400 Temporary Traffic Control, Concrete Barrier
Plan sheet B.10 Revises summary of Quantities C0920 30202-2000 roadway aggregate, method 2 (detour and waste site access repairs)
Plan sheet B.11 Revises summary of Quantities C1240 62201-0250 Dump Truck, 10 cubic yard minimum capacity C1520 62201-2850 Motor Grader, 12 foot Minimum Blade
Plan sheet B.11 Revises summary of Quantities C1720 63502-1000 Temporary Traffic Control, Cone, Type 36-inch
Plan sheet C.7 Revises Soft Ground Embankment Construction, Type I Detail footnote: (1) and footnote: (10)
Plan sheet C.8 Revises Soft Ground Embankment Construction, Type 2 Detail footnote: (1) and footnote: (10)
Plan sheet C.9 Revises Soft Ground Embankment Construction, Type 3 Detail footnote: (1) and footnote: (10)
Plan sheet C.10 Revises footnote: (1) and footnote: (5)
Plan sheet L.1 Revises Summary of Temporary Traffic Control Quantities Schedules A&B and Summary of Temporary Traffic Control Quantities Schedules C
ENCLOSURES
Pages:
A-7 through A-32
Plan Sheets:
B.1 through B.12 C.7 through C.10 L.1
A - 7
Bidder/Offeror please note: Before preparing the bid, carefully read the Solicitation Provisions. Insert a unit bid price, in figures, for each pay item for which a quantity appears in the bid schedule. Multiply the unit price by the quantity for each pay item and show the amount bid. Should any mathematical check made by the Government show a mistake in the amount bid, the corrected unit price extension shall govern. When the word "LPSM" (Lump Sum) appears as a unit bid price, insert an amount for each lump sum pay item. When a sum based on a fixed rate appears for any pay item in the amount bid column, include the Government inserted amount bid for the item in the total bid amount. Total all of the amounts bid for each pay item and show the total bid amount.
Bid Schedule
Project No:AK PFH 58(1)
Project Name:Neck Lake Road Reconstruction: NPOWI Hwy. to Marine Access Facility Jct.
Revised by Amendment A004
A - 8
Contract Quantity Pay Items
20101-0000 CLEARING AND GRUBBING
20401-0000 ROADWAY EXCAVATION
20401-0000 ROADWAY EXCAVATION (SURCHARGE REMOVAL)
21101-2000 ROADWAY OBLITERATION, METHOD 2
62406-0400 PLACING CONSERVED TOPSOIL, 6-INCH DEPTH
Item No. Pay Item No. Description Quantity Unit Unit Price Amount
A0020 15101-0000 MOBILIZATION
ALL LPSM $___LPSM_____ $____________
A0040 15201-0000 CONSTRUCTION SURVEY AND STAKING
ALL LPSM $___LPSM_____ $____________
A0060 15301-0010 CONTRACTOR QUALITY CONTROL AND ASSURANCE
ALL LPSM $___LPSM_____ $____________
A0080 15401-0000 CONTRACTOR TESTING
ALL LPSM $___LPSM_____ $____________
A0100 15501-0000 CONSTRUCTION SCHEDULE
ALL LPSM $___LPSM_____ $____________
A0120 15702-2000 SOIL EROSION CONTROL, TURBIDITY MONITORING
ALL LPSM $___LPSM_____ $____________
A0140 15703-2000 SOIL EROSION CONTROL, TEMPORARY TURF ESTABLISHMENT
10.0 ACRE $____________ $____________
A0160 15705-0100 SOIL EROSION CONTROL, SILT FENCE
8,800 LNFT $____________ $____________
A0180 15705-0800 SOIL EROSION CONTROL, TEMPORARY 36-INCH CULVERT PIPE
1,725 LNFT $____________ $____________
A0200 15705-1300 SOIL EROSION CONTROL, TEMPORARY DIVERSION CHANNEL
350 LNFT $____________ $____________
A0220 15705-1400 SOIL EROSION CONTROL, FIBER ROLL
2,500 LNFT $____________ $____________
Bid Schedule Schedule:A Schedule Type:Base
Project No:AK PFH 58(1)
Project Name:Neck Lake Road Reconstruction: NPOWI Hwy. to Marine Access Facility Jct. Revised by Amendment A004
A - 9
A0240 15705-1700 SOIL EROSION CONTROL, FILTER BERM
325 LNFT $____________ $____________
A0260 15705-2000 SOIL EROSION CONTROL, FLOATING TURBIDITY CURTAIN
850 LNFT $____________ $____________
A0280 15801-0000 WATERING FOR DUST CONTROL
3,320 MGAL $____________ $____________
A0300 20101-0000 CLEARING AND GRUBBING
12.9 ACRE $____________ $____________
A0320 20301-1900 REMOVAL OF PIPE CULVERT
21 EACH $____________ $____________
A0340 20301-2800 REMOVAL OF STRUCTURES AND OBSTRUCTIONS (FISH HATCHERY
BULKHEAD)
1 EACH $____________ $____________
A0360 20401-0000 ROADWAY EXCAVATION
95,762 CUYD $____________ $____________
A0380 20401-0000 ROADWAY EXCAVATION (SURCHARGE REMOVAL)
8,126 CUYD $____________ $____________
A0400 20402-0000 SUBEXCAVATION
13,750 CUYD $____________ $____________
A0420 20411-0000 SELECT BORROW
27,000 TON $____________ $____________
A0440 20435-2500 BACKFILL, PERMEABLE (LIMESTONE)
5,100 CUYD $____________ $____________
A0460 20441-0000 WASTE (PAG ROCK)
18,000 CUYD $____________ $____________
A0480 20504-0000 BLASTING CONSULTANT
ALL LPSM $___LPSM_____ $____________
Bid Schedule Schedule:A Schedule Type:Base
Project Name:Neck Lake Road Reconstruction: NPOWI Hwy. to Marine Access Facility Jct. Revised by Amendment A004
A - 10
A0500 20701-0300 SEPARATION-STABILIZATION GEOTEXTILE, CLASS 1, TYPE C (NONWOVEN)
21,000 SQYD $____________ $____________
A0520 20703-2000 GEOGRID, STABILIZATION
3,750 SQYD $____________ $____________
A0540 20704-0000 GEOMEMBRANE
4,000 SQYD $____________ $____________
A0560 20820-0000 DEWATERING
ALL LPSM $___LPSM_____ $____________
A0580 21101-2000 ROADWAY OBLITERATION, METHOD 2
965 SQYD $____________ $____________
A0600 25101-0200 PLACED RIPRAP, METHOD A, CLASS 2 (RIPRAP BLANKET)
315 CUYD $____________ $____________
A0620 25101-0200 PLACED RIPRAP, METHOD A, CLASS 2 (ENERGY DISSIPATOR)
30 CUYD $____________ $____________
A0640 25101-0300 PLACED RIPRAP, METHOD A, CLASS 3 (RIPRAP HEADWALL)
335 CUYD $____________ $____________
A0660 25101-0400 PLACED RIPRAP, METHOD A, CLASS 4 (ROADWAY REVETMENT)
7,075 CUYD $____________ $____________
A0680 25120-0100 RIPRAP DITCH, METHOD A, CLASS 1
600 LNFT $____________ $____________
A0700 25205-0000 ROCK BUTTRESS (LIMESTONE)
500 CUYD $____________ $____________
A0720 25210-0000 ROCKERY
1,000 SQFT $____________ $____________
A0740 25403-0000 PRECAST CONCRETE BLOCK RETAINING WALL (FISH HATCHERY
BULKHEAD)
120 SQFT $____________ $____________
Bid Schedule Schedule:A Schedule Type:Base
Project Name:Neck Lake Road Reconstruction: NPOWI Hwy. to Marine Access Facility Jct. Revised by Amendment A004
A - 11
A0760 25701-0000 CONTRACTOR FURNISHED WALL DESIGN (FISH HATCHERY BULKHEAD)
ALL LPSM $___LPSM_____ $____________
A0780 26002-0000 ROCK DOWEL
1,085 LNFT $____________ $____________
A0800 27102-0100 GEOTECHNICAL INSTRUMENTATION, PIEZOMETER
8 EACH $____________ $____________
A0820 27102-0100 GEOTECHNICAL INSTRUMENTATION, PIEZOMETER (WITH DATA LOGGER)
2 EACH $____________ $____________
A0840 30110-0000 AGGREGATE SURFACE COURSE
9,900 TON $____________ $____________
A0880 30202-2000 ROADWAY AGGREGATE, METHOD 2 (DETOUR REPAIRS)
800 TON $____________ $____________
A0900 30202-2000 ROADWAY AGGREGATE, METHOD 2
675 TON $____________ $____________
A0920 30210-0000 BEDDING AND BACKFILL AGGREGATE (LIMESTONE)
900 CUYD $____________ $____________
A0940 60201-0800 24-INCH PIPE CULVERT
740 LNFT $____________ $____________
A0960 60201-0900 30-INCH PIPE CULVERT
166 LNFT $____________ $____________
A0980 60201-1000 36-INCH PIPE CULVERT
60 LNFT $____________ $____________
A1000 60201-1400 60-INCH PIPE CULVERT
74 LNFT $____________ $____________
A1020 60201-1600 72-INCH PIPE CULVERT
100 LNFT $____________ $____________
A1040 60201-1600 72-INCH PIPE CULVERT (SIMULATED STREAM)
66 LNFT $____________ $____________
Bid Schedule Schedule:A Schedule Type:Base
Project Name:Neck Lake Road Reconstruction: NPOWI Hwy. to Marine Access Facility Jct. Revised by Amendment A004
A - 12
A1060 60201-2000 96-INCH PIPE CULVERT
120 LNFT $____________ $____________
A1080 60202-0600 36-INCH EQUIVALENT DIAMETER ARCH OR ELLIPTICAL PIPE CULVERT
110 LNFT $____________ $____________
A1100 60210-0800 END SECTION FOR 24-INCH PIPE CULVERT
10 EACH $____________ $____________
A1120 60210-0900 END SECTION FOR 30-INCH PIPE CULVERT
3 EACH $____________ $____________
A1140 60210-1000 END SECTION FOR 36-INCH PIPE CULVERT
1 EACH $____________ $____________
A1160 60211-1000 END SECTION FOR 36-INCH EQUIVALENT DIAMETER ARCH OR ELLIPTICAL
PIPE CULVERT
2 EACH $____________ $____________
A1180 60302-0000 STRUCTURAL PLATE PIPE-ARCH (96-INCH EQUIVALENT, SIMULATED
STREAM)
64 LNFT $____________ $____________
A1200 61001-0000 HORIZONTAL DRAIN PIPE
2,100 LNFT $____________ $____________
A1220 61701-4500 GUARDRAIL SYSTEM MGS, TYPE 2, CLASS A STEEL POSTS
5,363 LNFT $____________ $____________
A1240 61702-0000 TERMINAL SECTION (ALASKA END TERMINAL)
15 EACH $____________ $____________
A1260 61702-1500 TERMINAL SECTION, TYPE MGS TANGENT
3 EACH $____________ $____________
A1280 62101-0000 MONUMENT (SETTLEMENT PLATE)
6 EACH $____________ $____________
A1300 62201-0250 DUMP TRUCK, 10 CUBIC YARD MINIMUM CAPACITY
100 HOUR $____________ $____________
Bid Schedule Schedule:A Schedule Type:Base
Project Name:Neck Lake Road Reconstruction: NPOWI Hwy. to Marine Access Facility Jct. Revised by Amendment A004
A - 13
A1320 62201-0650 BACKHOE LOADER, 10 CUBIC FOOT MINIMUM RATED CAPACITY BUCKET,
36-INCH WIDTH
80 HOUR $____________ $____________
A1340 62201-1000 WHEEL LOADER, 4 CUBIC YARD MINIMUM RATED CAPACITY
80 HOUR $____________ $____________
A1360 62201-1250 BULLDOZER, 120HP MINIMUM FLYWHEEL POWER
100 HOUR $____________ $____________
A1380 62201-2050 ROLLER
50 HOUR $____________ $____________
A1400 62201-2850 MOTOR GRADER, 12 FOOT MINIMUM BLADE
200 HOUR $____________ $____________
A1420 62201-3400 HYDRAULIC EXCAVATOR, 1 CUBIC YARD MINIMUM CAPACITY WITH
THUMB ATTACHMENT
100 HOUR $____________ $____________
A1440 62201-3750 CHAIN SAW (WITH OPERATOR)
40 HOUR $____________ $____________
A1460 62301-0000 GENERAL LABOR
80 HOUR $____________ $____________
A1480 62303-1000 SPECIAL LABOR, HIRED TECHNICAL SERVICES (PAG ROCK MONITORING)
ALL LPSM $___LPSM_____ $____________
A1500 62406-0400 PLACING CONSERVED TOPSOIL, 6-INCH DEPTH
9.0 ACRE $____________ $____________
A1520 62503-0000 TURF ESTABLISHMENT (HYDRAULIC METHOD, TYPE 1)
46.0 SLRY $____________ $____________
A1540 62503-0000 TURF ESTABLISHMENT (HYDRAULIC METHOD, TYPE 2)
1.0 SLRY $____________ $____________
A1560 63302-0000 SIGN SYSTEM
3 SQFT $____________ $____________
Bid Schedule Schedule:A Schedule Type:Base
Project Name:Neck Lake Road Reconstruction: NPOWI Hwy. to Marine Access Facility Jct. Revised by Amendment A004
A - 14
A1580 63502-0600 TEMPORARY TRAFFIC CONTROL, BARRICADE TYPE 3
6 EACH $____________ $____________
A1600 63502-1000 TEMPORARY TRAFFIC CONTROL, CONE, TYPE 36-INCH
120 EACH $____________ $____________
A1620 63502-1300 TEMPORARY TRAFFIC CONTROL, DRUM
60 EACH $____________ $____________
A1640 63502-1400 TEMPORARY TRAFFIC CONTROL, VERTICAL PANEL
60 EACH $____________ $____________
A1660 63503-0400 TEMPORARY TRAFFIC CONTROL, CONCRETE BARRIER
1,200 LNFT $____________ $____________
A1680 63503-1000 TEMPORARY TRAFFIC CONTROL, PLASTIC FENCE
1,650 LNFT $____________ $____________
A1700 63504-1000 TEMPORARY TRAFFIC CONTROL, CONSTRUCTION SIGN
445 SQFT $____________ $____________
A1720 63506-0500 TEMPORARY TRAFFIC CONTROL, FLAGGER
100 HOUR $____________ $____________
A1740 63701-0000 FIELD OFFICE
1 EACH $____________ $____________
A1760 63701-0000 FIELD OFFICE (STORAGE CONTAINER)
1 EACH $____________ $____________
A1780 63704-0000 VEHICLE
3 EACH $____________ $____________
A1800 64703-3010 MITIGATION, ROCK WEIR
2 EACH $____________ $____________
A1820 64703-3010 MITIGATION, ROCK WEIR (BEDROCK)
3 EACH $____________ $____________
A1840 64704-1500 MITIGATION, STREAMBED CHANNEL REALIGNMENT
160 CUYD $____________ $____________
Bid Schedule Schedule:A Schedule Type:Base
Project Name:Neck Lake Road Reconstruction: NPOWI Hwy. to Marine Access Facility Jct. Revised by Amendment A004
A - 15
A1860 64704-1600 MITIGATION, STREAMBED CHANNEL RECONSTRUCTION (BEDROCK)
45 CUYD $____________ $____________
Submitted by:____________________________________ Schedule A Base Total:____________________
Bid Schedule Schedule:A Schedule Type:Base
Project Name:Neck Lake Road Reconstruction: NPOWI Hwy. to Marine Access Facility Jct. Revised by Amendment A004
A - 16
20101-0000 CLEARING AND GRUBBING
20401-0000 ROADWAY EXCAVATION
20401-0000 ROADWAY EXCAVATION (SURCHARGE REMOVAL)
21101-2000 ROADWAY OBLITERATION, METHOD 2
62406-0400 PLACING CONSERVED TOPSOIL, 6-INCH DEPTH
Item No. Pay Item No. Description Quantity Unit Unit Price Amount
B0020 15101-0000 MOBILIZATION
ALL LPSM $___LPSM_____ $____________
B0040 15201-0000 CONSTRUCTION SURVEY AND STAKING
ALL LPSM $___LPSM_____ $____________
B0060 15301-0010 CONTRACTOR QUALITY CONTROL AND ASSURANCE
ALL LPSM $___LPSM_____ $____________
B0080 15401-0000 CONTRACTOR TESTING
ALL LPSM $___LPSM_____ $____________
B0100 15501-0000 CONSTRUCTION SCHEDULE
ALL LPSM $___LPSM_____ $____________
B0120 15702-2000 SOIL EROSION CONTROL, TURBIDITY MONITORING
ALL LPSM $___LPSM_____ $____________
B0140 15703-2000 SOIL EROSION CONTROL, TEMPORARY TURF ESTABLISHMENT
12.0 ACRE $____________ $____________
B0160 15705-0100 SOIL EROSION CONTROL, SILT FENCE
8,800 LNFT $____________ $____________
B0180 15705-0800 SOIL EROSION CONTROL, TEMPORARY 36-INCH CULVERT PIPE
2,050 LNFT $____________ $____________
B0200 15705-1300 SOIL EROSION CONTROL, TEMPORARY DIVERSION CHANNEL
450 LNFT $____________ $____________
B0220 15705-1400 SOIL EROSION CONTROL, FIBER ROLL
3,750 LNFT $____________ $____________
Bid Schedule Schedule:B Schedule Type:Alternate
Project Name:Neck Lake Road Reconstruction: NPOWI Hwy. to Marine Access Facility Jct. Revised by Amendment A004
A - 17
B0240 15705-1700 SOIL EROSION CONTROL, FILTER BERM
925 LNFT $____________ $____________
B0260 15705-2000 SOIL EROSION CONTROL, FLOATING TURBIDITY CURTAIN
850 LNFT $____________ $____________
B0280 15801-0000 WATERING FOR DUST CONTROL
3,600 MGAL $____________ $____________
B0300 20101-0000 CLEARING AND GRUBBING
15.1 ACRE $____________ $____________
B0320 20301-1900 REMOVAL OF PIPE CULVERT
25 EACH $____________ $____________
B0340 20301-2800 REMOVAL OF STRUCTURES AND OBSTRUCTIONS (FISH HATCHERY
BULKHEAD)
1 EACH $____________ $____________
B0360 20401-0000 ROADWAY EXCAVATION
103,591 CUYD $____________ $____________
B0380 20401-0000 ROADWAY EXCAVATION (SURCHARGE REMOVAL)
11,194 CUYD $____________ $____________
B0400 20402-0000 SUBEXCAVATION
14,000 CUYD $____________ $____________
B0420 20411-0000 SELECT BORROW
27,500 TON $____________ $____________
B0440 20435-2500 BACKFILL, PERMEABLE (LIMESTONE)
5,100 CUYD $____________ $____________
B0460 20441-0000 WASTE (PAG ROCK)
18,000 CUYD $____________ $____________
B0480 20504-0000 BLASTING CONSULTANT
ALL LPSM $___LPSM_____ $____________
Bid Schedule Schedule:B Schedule Type:Alternate
Project Name:Neck Lake Road Reconstruction: NPOWI Hwy. to Marine Access Facility Jct. Revised by Amendment A004
A - 18
B0500 20701-0300 SEPARATION-STABILIZATION GEOTEXTILE, CLASS 1, TYPE C (NONWOVEN)
22,500 SQYD $____________ $____________
B0520 20703-2000 GEOGRID, STABILIZATION
4,500 SQYD $____________ $____________
B0540 20704-0000 GEOMEMBRANE
4,000 SQYD $____________ $____________
B0560 20820-0000 DEWATERING
ALL LPSM $___LPSM_____ $____________
B0580 21101-2000 ROADWAY OBLITERATION, METHOD 2
965 SQYD $____________ $____________
B0600 25101-0200 PLACED RIPRAP, METHOD A, CLASS 2 (RIPRAP BLANKET)
315 CUYD $____________ $____________
B0620 25101-0200 PLACED RIPRAP, METHOD A, CLASS 2 (ENERGY DISSIPATOR)
35 CUYD $____________ $____________
B0640 25101-0300 PLACED RIPRAP, METHOD A, CLASS 3 (RIPRAP HEADWALL)
440 CUYD $____________ $____________
B0660 25101-0400 PLACED RIPRAP, METHOD A, CLASS 4 (ROADWAY REVETMENT)
7,075 CUYD $____________ $____________
B0680 25120-0100 RIPRAP DITCH, METHOD A, CLASS 1
1,050 LNFT $____________ $____________
B0700 25205-0000 ROCK BUTTRESS (LIMESTONE)
500 CUYD $____________ $____________
B0720 25210-0000 ROCKERY
1,000 SQFT $____________ $____________
B0740 25403-0000 PRECAST CONCRETE BLOCK RETAINING WALL (FISH HATCHERY
BULKHEAD)
120 SQFT $____________ $____________
Bid Schedule Schedule:B Schedule Type:Alternate
Project Name:Neck Lake Road Reconstruction: NPOWI Hwy. to Marine Access Facility Jct. Revised by Amendment A004
A - 19
B0760 25701-0000 CONTRACTOR FURNISHED WALL DESIGN (FISH HATCHERY BULKHEAD)
ALL LPSM $___LPSM_____ $____________
B0780 26002-0000 ROCK DOWEL
1,085 LNFT $____________ $____________
B0800 27102-0100 GEOTECHNICAL INSTRUMENTATION, PIEZOMETER
12 EACH $____________ $____________
B0820 27102-0100 GEOTECHNICAL INSTRUMENTATION, PIEZOMETER (WITH DATA LOGGER)
2 EACH $____________ $____________
B0840 30110-0000 AGGREGATE SURFACE COURSE
12,000 TON $____________ $____________
B0880 30202-2000 ROADWAY AGGREGATE, METHOD 2 (DETOUR REPAIRS)
800 TON $____________ $____________
B0900 30202-2000 ROADWAY AGGREGATE, METHOD 2
900 TON $____________ $____________
B0920 30210-0000 BEDDING AND BACKFILL AGGREGATE (LIMESTONE)
900 CUYD $____________ $____________
B0940 60201-0800 24-INCH PIPE CULVERT
875 LNFT $____________ $____________
B0960 60201-0900 30-INCH PIPE CULVERT
210 LNFT $____________ $____________
B0980 60201-1000 36-INCH PIPE CULVERT
60 LNFT $____________ $____________
B1000 60201-1400 60-INCH PIPE CULVERT
74 LNFT $____________ $____________
B1020 60201-1600 72-INCH PIPE CULVERT
100 LNFT $____________ $____________
B1040 60201-1600 72-INCH PIPE CULVERT (SIMULATED STREAM)
132 LNFT $____________ $____________
Bid Schedule Schedule:B Schedule Type:Alternate
Project Name:Neck Lake Road Reconstruction: NPOWI Hwy. to Marine Access Facility Jct. Revised by Amendment A004
A - 20
B1060 60201-2000 96-INCH PIPE CULVERT
120 LNFT $____________ $____________
B1080 60201-2200 108-INCH PIPE CULVERT (SIMULATED STREAM)
74 LNFT $____________ $____________
B1100 60202-0600 36-INCH EQUIVALENT DIAMETER ARCH OR ELLIPTICAL PIPE CULVERT
110 LNFT $____________ $____________
B1120 60210-0800 END SECTION FOR 24-INCH PIPE CULVERT
11 EACH $____________ $____________
B1140 60210-0900 END SECTION FOR 30-INCH PIPE CULVERT
4 EACH $____________ $____________
B1160 60210-1000 END SECTION FOR 36-INCH PIPE CULVERT
1 EACH $____________ $____________
B1180 60211-1000 END SECTION FOR 36-INCH EQUIVALENT DIAMETER ARCH OR ELLIPTICAL
PIPE CULVERT
2 EACH $____________ $____________
B1200 60302-0000 STRUCTURAL PLATE PIPE-ARCH (96-INCH EQUIVALENT, SIMULATED
STREAM)
64 LNFT $____________ $____________
B1220 61001-0000 HORIZONTAL DRAIN PIPE
2,100 LNFT $____________ $____________
B1240 61701-4500 GUARDRAIL SYSTEM MGS, TYPE 2, CLASS A STEEL POSTS
5,688 LNFT $____________ $____________
B1260 61702-0000 TERMINAL SECTION (ALASKA END TERMINAL)
16 EACH $____________ $____________
B1280 61702-1500 TERMINAL SECTION, TYPE MGS TANGENT
4 EACH $____________ $____________
B1300 62101-0000 MONUMENT (SETTLEMENT PLATE)
10 EACH $____________ $____________
Bid Schedule Schedule:B Schedule Type:Alternate
Project Name:Neck Lake Road Reconstruction: NPOWI Hwy. to Marine Access Facility Jct. Revised by Amendment A004
A - 21
B1320 62201-0250 DUMP TRUCK, 10 CUBIC YARD MINIMUM CAPACITY
100 HOUR $____________ $____________
B1340 62201-0650 BACKHOE LOADER, 10 CUBIC FOOT MINIMUM RATED CAPACITY BUCKET,
36-INCH WIDTH
80 HOUR $____________ $____________
B1360 62201-1000 WHEEL LOADER, 4 CUBIC YARD MINIMUM RATED CAPACITY
80 HOUR $____________ $____________
B1380 62201-1250 BULLDOZER, 120HP MINIMUM FLYWHEEL POWER
100 HOUR $____________ $____________
B1400 62201-2050 ROLLER
50 HOUR $____________ $____________
B1420 62201-2850 MOTOR GRADER, 12 FOOT MINIMUM BLADE
200 HOUR $____________ $____________
B1440 62201-3400 HYDRAULIC EXCAVATOR, 1 CUBIC YARD MINIMUM CAPACITY WITH
THUMB ATTACHMENT
100 HOUR $____________ $____________
B1460 62201-3750 CHAIN SAW (WITH OPERATOR)
40 HOUR $____________ $____________
B1480 62301-0000 GENERAL LABOR
80 HOUR $____________ $____________
B1500 62303-1000 SPECIAL LABOR, HIRED TECHNICAL SERVICES (PAG ROCK MONITORING)
ALL LPSM $___LPSM_____ $____________
B1520 62406-0400 PLACING CONSERVED TOPSOIL, 6-INCH DEPTH
11.0 ACRE $____________ $____________
B1540 62503-0000 TURF ESTABLISHMENT (HYDRAULIC METHOD, TYPE 1)
54.0 SLRY $____________ $____________
B1560 62503-0000 TURF ESTABLISHMENT (HYDRAULIC METHOD, TYPE 2)
1.0 SLRY $____________ $____________
Bid Schedule Schedule:B Schedule Type:Alternate
Project Name:Neck Lake Road Reconstruction: NPOWI Hwy. to Marine Access Facility Jct. Revised by Amendment A004
A - 22
B1580 63302-0000 SIGN SYSTEM
5 SQFT $____________ $____________
B1600 63502-0600 TEMPORARY TRAFFIC CONTROL, BARRICADE TYPE 3
6 EACH $____________ $____________
B1620 63502-1000 TEMPORARY TRAFFIC CONTROL, CONE, TYPE 36-INCH
120 EACH $____________ $____________
B1640 63502-1300 TEMPORARY TRAFFIC CONTROL, DRUM
60 EACH $____________ $____________
B1660 63502-1400 TEMPORARY TRAFFIC CONTROL, VERTICAL PANEL
60 EACH $____________ $____________
B1680 63503-0400 TEMPORARY TRAFFIC CONTROL, CONCRETE BARRIER
1,200 LNFT $____________ $____________
B1700 63503-1000 TEMPORARY TRAFFIC CONTROL, PLASTIC FENCE
3,300 LNFT $____________ $____________
B1720 63504-1000 TEMPORARY TRAFFIC CONTROL, CONSTRUCTION SIGN
445 SQFT $____________ $____________
B1740 63506-0500 TEMPORARY TRAFFIC CONTROL, FLAGGER
100 HOUR $____________ $____________
B1760 63701-0000 FIELD OFFICE
1 EACH $____________ $____________
B1780 63701-0000 FIELD OFFICE (STORAGE CONTAINER)
1 EACH $____________ $____________
B1800 63704-0000 VEHICLE
3 EACH $____________ $____________
B1820 64703-3010 MITIGATION, ROCK WEIR
2 EACH $____________ $____________
B1840 64703-3010 MITIGATION, ROCK WEIR (BEDROCK)
3 EACH $____________ $____________
Bid Schedule Schedule:B Schedule Type:Alternate
Project Name:Neck Lake Road Reconstruction: NPOWI Hwy. to Marine Access Facility Jct. Revised by Amendment A004
A - 23
B1860 64703-5000 MITIGATION, ROOT WAD
2 EACH $____________ $____________
B1880 64704-1500 MITIGATION, STREAMBED CHANNEL REALIGNMENT
160 CUYD $____________ $____________
B1900 64704-1600 MITIGATION, STREAMBED CHANNEL RECONSTRUCTION (BEDROCK)
45 CUYD $____________ $____________
Submitted by:____________________________________ Schedule B Alternate Total:___________________
Bid Schedule Schedule:B Schedule Type:Alternate
Project Name:Neck Lake Road Reconstruction: NPOWI Hwy. to Marine Access Facility Jct. Revised by Amendment A004
A - 24
20101-0000 CLEARING AND GRUBBING
20401-0000 ROADWAY EXCAVATION
20401-0000 ROADWAY EXCAVATION (SURCHARGE REMOVAL)
21101-2000 ROADWAY OBLITERATION, METHOD 2
62406-0400 PLACING CONSERVED TOPSOIL, 6-INCH DEPTH
Item No. Pay Item No. Description Quantity Unit Unit Price Amount
C0020 15101-0000 MOBILIZATION
ALL LPSM $___LPSM_____ $____________
C0040 15201-0000 CONSTRUCTION SURVEY AND STAKING
ALL LPSM $___LPSM_____ $____________
C0060 15301-0010 CONTRACTOR QUALITY CONTROL AND ASSURANCE
ALL LPSM $___LPSM_____ $____________
C0080 15401-0000 CONTRACTOR TESTING
ALL LPSM $___LPSM_____ $____________
C0100 15501-0000 CONSTRUCTION SCHEDULE
ALL LPSM $___LPSM_____ $____________
C0120 15702-2000 SOIL EROSION CONTROL, TURBIDITY MONITORING
ALL LPSM $___LPSM_____ $____________
C0140 15703-2000 SOIL EROSION CONTROL, TEMPORARY TURF ESTABLISHMENT
15.0 ACRE $____________ $____________
C0160 15705-0100 SOIL EROSION CONTROL, SILT FENCE
9,800 LNFT $____________ $____________
C0180 15705-0800 SOIL EROSION CONTROL, TEMPORARY 36-INCH CULVERT PIPE
2,050 LNFT $____________ $____________
C0200 15705-1200 SOIL EROSION CONTROL, TEMPORARY 72-INCH CULVERT PIPE
150 LNFT $____________ $____________
C0220 15705-1300 SOIL EROSION CONTROL, TEMPORARY DIVERSION CHANNEL
450 LNFT $____________ $____________
Bid Schedule Schedule:C Schedule Type:Alternate
Project Name:Neck Lake Road Reconstruction: NPOWI Hwy. to Marine Access Facility Jct. Revised by Amendment A004
A - 25
C0240 15705-1400 SOIL EROSION CONTROL, FIBER ROLL
7,150 LNFT $____________ $____________
C0260 15705-1700 SOIL EROSION CONTROL, FILTER BERM
925 LNFT $____________ $____________
C0280 15705-2000 SOIL EROSION CONTROL, FLOATING TURBIDITY CURTAIN
1,150 LNFT $____________ $____________
C0300 15801-0000 WATERING FOR DUST CONTROL
3,780 MGAL $____________ $____________
C0320 20101-0000 CLEARING AND GRUBBING
18.7 ACRE $____________ $____________
C0340 20301-1900 REMOVAL OF PIPE CULVERT
28 EACH $____________ $____________
C0360 20301-1900 REMOVAL OF PIPE CULVERT (CAUSEWAY)
1 EACH $____________ $____________
C0380 20301-2800 REMOVAL OF STRUCTURES AND OBSTRUCTIONS (FISH HATCHERY
BULKHEAD)
1 EACH $____________ $____________
C0400 20401-0000 ROADWAY EXCAVATION
126,006 CUYD $____________ $____________
C0420 20401-0000 ROADWAY EXCAVATION (SURCHARGE REMOVAL)
13,720 CUYD $____________ $____________
C0440 20402-0000 SUBEXCAVATION
22,000 CUYD $____________ $____________
C0460 20411-0000 SELECT BORROW
43,350 TON $____________ $____________
C0480 20435-2500 BACKFILL, PERMEABLE (LIMESTONE)
5,100 CUYD $____________ $____________
Bid Schedule Schedule:C Schedule Type:Alternate
Project Name:Neck Lake Road Reconstruction: NPOWI Hwy. to Marine Access Facility Jct. Revised by Amendment A004
A - 26
C0500 20441-0000 WASTE (PAG ROCK)
18,000 CUYD $____________ $____________
C0520 20504-0000 BLASTING CONSULTANT
ALL LPSM $___LPSM_____ $____________
C0540 20701-0300 SEPARATION-STABILIZATION GEOTEXTILE, CLASS 1, TYPE C (NONWOVEN)
32,000 SQYD $____________ $____________
C0560 20703-2000 GEOGRID, STABILIZATION
5,050 SQYD $____________ $____________
C0580 20704-0000 GEOMEMBRANE
4,000 SQYD $____________ $____________
C0600 20820-0000 DEWATERING
ALL LPSM $___LPSM_____ $____________
C0620 21101-2000 ROADWAY OBLITERATION, METHOD 2
4,302 SQYD $____________ $____________
C0640 25101-0200 PLACED RIPRAP, METHOD A, CLASS 2 (RIPRAP BLANKET)
450 CUYD $____________ $____________
C0660 25101-0200 PLACED RIPRAP, METHOD A, CLASS 2 (ENERGY DISSIPATOR)
35 CUYD $____________ $____________
C0680 25101-0300 PLACED RIPRAP, METHOD A, CLASS 3 (RIPRAP HEADWALL)
515 CUYD $____________ $____________
C0700 25101-0400 PLACED RIPRAP, METHOD A, CLASS 4 (ROADWAY REVETMENT)
7,454 CUYD $____________ $____________
C0720 25120-0100 RIPRAP DITCH, METHOD A, CLASS 1
1,775 LNFT $____________ $____________
C0740 25205-0000 ROCK BUTTRESS (LIMESTONE)
500 CUYD $____________ $____________
C0760 25210-0000 ROCKERY
1,000 SQFT $____________ $____________
Bid Schedule Schedule:C Schedule Type:Alternate
Project Name:Neck Lake Road Reconstruction: NPOWI Hwy. to Marine Access Facility Jct. Revised by Amendment A004
A - 27
C0780 25403-0000 PRECAST CONCRETE BLOCK RETAINING WALL (FISH HATCHERY
BULKHEAD)
120 SQFT $____________ $____________
C0800 25701-0000 CONTRACTOR FURNISHED WALL DESIGN (FISH HATCHERY BULKHEAD)
ALL LPSM $___LPSM_____ $____________
C0820 26002-0000 ROCK DOWEL
1,200 LNFT $____________ $____________
C0840 27102-0100 GEOTECHNICAL INSTRUMENTATION, PIEZOMETER
13 EACH $____________ $____________
C0860 27102-0100 GEOTECHNICAL INSTRUMENTATION, PIEZOMETER (WITH DATA LOGGER)
2 EACH $____________ $____________
C0880 30110-0000 AGGREGATE SURFACE COURSE
14,450 TON $____________ $____________
C0920 30202-2000 ROADWAY AGGREGATE, METHOD 2 (DETOUR REPAIRS)
800 TON $____________ $____________
C0940 30202-2000 ROADWAY AGGREGATE, METHOD 2
1,150 TON $____________ $____________
C0960 30210-0000 BEDDING AND BACKFILL AGGREGATE (LIMESTONE)
900 CUYD $____________ $____________
C0980 60201-0600 18-INCH PIPE CULVERT
52 LNFT $____________ $____________
C1000 60201-0800 24-INCH PIPE CULVERT
930 LNFT $____________ $____________
C1020 60201-0900 30-INCH PIPE CULVERT
210 LNFT $____________ $____________
C1040 60201-1000 36-INCH PIPE CULVERT
60 LNFT $____________ $____________
Bid Schedule Schedule:C Schedule Type:Alternate
Project Name:Neck Lake Road Reconstruction: NPOWI Hwy. to Marine Access Facility Jct. Revised by Amendment A004
A - 28
C1060 60201-1400 60-INCH PIPE CULVERT
74 LNFT $____________ $____________
C1080 60201-1600 72-INCH PIPE CULVERT
100 LNFT $____________ $____________
C1100 60201-1600 72-INCH PIPE CULVERT (SIMULATED STREAM)
132 LNFT $____________ $____________
C1120 60201-2000 96-INCH PIPE CULVERT
120 LNFT $____________ $____________
C1140 60201-2200 108-INCH PIPE CULVERT (SIMULATED STREAM)
74 LNFT $____________ $____________
C1160 60201-2300 120-INCH PIPE CULVERT
110 LNFT $____________ $____________
C1180 60202-0600 36-INCH EQUIVALENT DIAMETER ARCH OR ELLIPTICAL PIPE CULVERT
110 LNFT $____________ $____________
C1200 60210-0600 END SECTION FOR 18-INCH PIPE CULVERT
2 EACH $____________ $____________
C1220 60210-0800 END SECTION FOR 24-INCH PIPE CULVERT
12 EACH $____________ $____________
C1240 60210-0900 END SECTION FOR 30-INCH PIPE CULVERT
4 EACH $____________ $____________
C1260 60210-1000 END SECTION FOR 36-INCH PIPE CULVERT
1 EACH $____________ $____________
C1280 60211-1000 END SECTION FOR 36-INCH EQUIVALENT DIAMETER ARCH OR ELLIPTICAL
PIPE CULVERT
2 EACH $____________ $____________
C1300 60302-0000 STRUCTURAL PLATE PIPE-ARCH (96-INCH EQUIVALENT, SIMULATED
STREAM)
64 LNFT $____________ $____________
Bid Schedule Schedule:C Schedule Type:Alternate
Project Name:Neck Lake Road Reconstruction: NPOWI Hwy. to Marine Access Facility Jct. Revised by Amendment A004
A - 29
C1320 61001-0000 HORIZONTAL DRAIN PIPE
2,320 LNFT $____________ $____________
C1340 61701-4500 GUARDRAIL SYSTEM MGS, TYPE 2, CLASS A STEEL POSTS
6,150 LNFT $____________ $____________
C1360 61702-0000 TERMINAL SECTION (ALASKA END TERMINAL)
19 EACH $____________ $____________
C1380 61702-1500 TERMINAL SECTION, TYPE MGS TANGENT
7 EACH $____________ $____________
C1400 62101-0000 MONUMENT (SETTLEMENT PLATE)
11 EACH $____________ $____________
C1420 62201-0250 DUMP TRUCK, 10 CUBIC YARD MINIMUM CAPACITY
100 HOUR $____________ $____________
C1440 62201-0650 BACKHOE LOADER, 10 CUBIC FOOT MINIMUM RATED CAPACITY BUCKET,
36-INCH WIDTH
80 HOUR $____________ $____________
C1460 62201-1000 WHEEL LOADER, 4 CUBIC YARD MINIMUM RATED CAPACITY
80 HOUR $____________ $____________
C1480 62201-1250 BULLDOZER, 120HP MINIMUM FLYWHEEL POWER
100 HOUR $____________ $____________
C1500 62201-2050 ROLLER
50 HOUR $____________ $____________
C1520 62201-2850 MOTOR GRADER, 12 FOOT MINIMUM BLADE
200 HOUR $____________ $____________
C1540 62201-3400 HYDRAULIC EXCAVATOR, 1 CUBIC YARD MINIMUM CAPACITY WITH
THUMB ATTACHMENT
100 HOUR $____________ $____________
Bid Schedule Schedule:C Schedule Type:Alternate
Project Name:Neck Lake Road Reconstruction: NPOWI Hwy. to Marine Access Facility Jct. Revised by Amendment A004
A - 30
C1560 62201-3750 CHAIN SAW (WITH OPERATOR)
40 HOUR $____________ $____________
C1580 62301-0000 GENERAL LABOR
80 HOUR $____________ $____________
C1600 62303-1000 SPECIAL LABOR, HIRED TECHNICAL SERVICES (PAG ROCK MONITORING)
ALL LPSM $___LPSM_____ $____________
C1620 62406-0400 PLACING CONSERVED TOPSOIL, 6-INCH DEPTH
14.1 ACRE $____________ $____________
C1640 62503-0000 TURF ESTABLISHMENT (HYDRAULIC METHOD, TYPE 1)
64.0 SLRY $____________ $____________
C1660 62503-0000 TURF ESTABLISHMENT (HYDRAULIC METHOD, TYPE 2)
4.0 SLRY $____________ $____________
C1680 63302-0000 SIGN SYSTEM
68 SQFT $____________ $____________
C1700 63502-0600 TEMPORARY TRAFFIC CONTROL, BARRICADE TYPE 3
6 EACH $____________ $____________
C1720 63502-1000 TEMPORARY TRAFFIC CONTROL, CONE, TYPE 36-INCH
120 EACH $____________ $____________
C1740 63502-1300 TEMPORARY TRAFFIC CONTROL, DRUM
60 EACH $____________ $____________
C1760 63502-1400 TEMPORARY TRAFFIC CONTROL, VERTICAL PANEL
60 EACH $____________ $____________
C1780 63503-0400 TEMPORARY TRAFFIC CONTROL, CONCRETE BARRIER
1,200 LNFT $____________ $____________
C1800 63503-1000 TEMPORARY TRAFFIC CONTROL, PLASTIC FENCE
5,450 LNFT $____________ $____________
C1820 63504-1000 TEMPORARY TRAFFIC CONTROL, CONSTRUCTION SIGN
445 SQFT $____________ $____________
Bid Schedule Schedule:C Schedule Type:Alternate
Project Name:Neck Lake Road Reconstruction: NPOWI Hwy. to Marine Access Facility Jct. Revised by Amendment A004
A - 31
C1840 63506-0500 TEMPORARY TRAFFIC CONTROL, FLAGGER
400 HOUR $____________ $____________
C1860 63701-0000 FIELD OFFICE
1 EACH $____________ $____________
C1880 63701-0000 FIELD OFFICE (STORAGE CONTAINER)
1 EACH $____________ $____________
C1900 63704-0000 VEHICLE
3 EACH $____________ $____________
C1920 64703-3010 MITIGATION, ROCK WEIR
2 EACH $____________ $____________
C1940 64703-3010 MITIGATION, ROCK WEIR (BEDROCK)
3 EACH $____________ $____________
C1960 64703-5000 MITIGATION, ROOT WAD
2 EACH $____________ $____________
C1980 64704-1500 MITIGATION, STREAMBED CHANNEL REALIGNMENT
160 CUYD $____________ $____________
C2000 64704-1600 MITIGATION, STREAMBED CHANNEL RECONSTRUCTION (BEDROCK)
45 CUYD $____________ $____________
Submitted by:____________________________________ Schedule C Alternate Total:____________________
Bid Schedule Schedule:C Schedule Type:Alternate
Project Name:Neck Lake Road Reconstruction: NPOWI Hwy. to Marine Access Facility Jct. Revised by Amendment A004
A-32
Bid Schedule Schedule A, B and C summary Project No: AK PFH 58(1) Project Name: Neck Lake Road Reconstruction: NPOWI Hwy. to Marine Access Facility Jct.
BID SCHEDULE SUMMARY
SCHEDULE SCHEDULE AMOUNT
Schedule A Base (Pages A-8 through A-15) $ _________________________
Schedule B Alternante (Pages A-16 through A-23) $ _________________________
Schedule C Alternante (Pages A-24 through A-31) $ _________________________
Submitted by: __________________________________
Revised by Amendment A004
| AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT |
| A004 |
| Amd_Page_2_Master.pdf |
| BID SCHEDULE |