BidTab Neck Lake Road Reconstruction.pdf

PDF 751 KB Posted

Attached to
AK PFH 58(1), Neck Lake Road Reconstruction: NPOWI Hwy. to Marine Access Facility Jct.
Solicitation number
69056725B000001
Issued by

About this file

This file is a bid tabulation report showing bid results for the Neck Lake Road Reconstruction project in Alaska. The project involves reconstructing the road from NPOWI Highway to Marine Access Facility Junction, with three alternate schedules (A, B, and C) covering different lengths of road reconstruction (1.6, 2.0, and 2.4 miles respectively).

The bids were opened on January 14, 2025, with three contractors submitting proposals: Glacier Construction Inc., ASRC Earthworks LLC, and Granite Construction Company. Glacier Construction Inc. submitted the lowest bids across all schedules: Schedule A at $18,751,434.00 (vs. Engineer's Estimate of $13,396,438.00), Schedule B at $20,503,340.50 (vs. Engineer's Estimate of $14,561,799.00), and Schedule C at $23,958,469.00 (vs. Engineer's Estimate of $17,459,239.00). The work includes major components such as mobilization, roadway excavation, drainage structures, erosion control, guardrail installation, and various types of construction activities. The project is managed by the Western Federal Lands Division of the Federal Highway Administration and is located in Prince of Wales County, Alaska.

View the file

Other files

File Type Posted
BidSum-AK PFH 58(1).pdf PDF
Amendment A008.pdf PDF
QA_01-08-2025.pdf PDF
QA_01-07-2025.pdf PDF
Amendment A007.pdf PDF
Amendment A006.pdf PDF
QA_12-30-2024.pdf PDF
Amendment A005.pdf PDF
Amendment A004.pdf PDF
Amendment A003.pdf PDF
QA_12-16-2024.pdf PDF
QA_12-13-2024.pdf PDF
Amendment A002.pdf PDF
QA_12-18-2024.pdf PDF
QA_12-06-2024.pdf PDF
Amendment A001.pdf PDF
QA_12-05-2024.pdf PDF
QA_11-26-2024.pdf PDF
af05801_SEGMENT1_proposed-alignment.pdf PDF
af05801_XS_Labeled_SchA.pdf PDF
af05801_SEGMENT1_proposed-profile.pdf PDF
af05801_XS_SchA.pdf PDF
af05801_TIE4_Earthwork.pdf PDF
af05801_SchedA_Earthwork.pdf PDF
af05801_SchedB_Earthwork.pdf PDF
ak pfh 58(1)_Neck Lake ARD Technical Memorandum.pdf PDF
af05801_TIE4_proposed-alignment.pdf PDF
af05801_TIE1_Earthwork.pdf PDF
ak pfh 58(1)_GR1516_pp385-973.pdf PDF
af05801_TIE2_superelevation.pdf PDF
af05801_TIE1_proposed-profile.pdf PDF
af05801_TIE2_proposed-alignment.pdf PDF
af05801_TIE4_proposed-profile.pdf PDF
af05801_TIE4_superelevation.pdf PDF
IFB AK PFH 58(1) Neck Lake Road Reconstruction.pdf PDF
af05801_SchedC_Earthwork.pdf PDF
af05801_BULK_proposed-alignment.pdf PDF
ak pfh 58(1)_FinalHydraulicReport.pdf PDF
ak pfh 58(1)_XS Approaches_SchC.pdf PDF
aka-pfh58-1_SWPPP for compilation_Final.pdf PDF
af05801_BULK_Earthwork.pdf PDF
af05801_Segment1_superelevation.pdf PDF
af05801_TIE2_Earthwork.pdf PDF
af05801_XS_SchB.pdf PDF
ak pfh 58(1)_NeckLakeRoad_Rockery_TM 1.21.2019.pdf PDF
af05801_TIE1_superelevation.pdf PDF
af05801_TIE3_Earthwork.pdf PDF
ak pfh 58(1)_GR1516_pp1-384.pdf PDF
af05801_XS_Labeled_SchC.pdf PDF
af05801_SEGMENT1_proposed-alignment.pdf PDF
Show 40 more

Latest 50 of 62 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Tabulation of Bids Report Date: 01/15/25

1 out of 53

Project No: AK PFH 58(1)

Project Name: Neck Lake Road Reconstruction: NPOWI Hwy. to Marine Access Facility Jct.

Contractor Responsive?

Engineer's Estimate

ASRC Earthworks, LLC

Glacier Construction Inc.

Granite Construction Company

Base Schedule A

$13,396,438.00

$21,715,751.00

$18,751,434.00

$21,828,935.00

Alternate Schedule B

$14,561,799.00

$22,689,830.00

$20,503,340.50

$23,750,215.00

Alternate Schedule C

$17,459,239.00

$25,127,702.00

$23,958,469.00

$27,385,235.00

2 out of 53

Project No: AK PFH 58(1)

Project Name: Neck Lake Road Reconstruction: NPOWI Hwy. to Marine Access Facility Jct.

Schedule: A

Schedule Type: Base

Solcitation No: 69056725B000001

Division: Western Federal Lands

State: AK County: PRINCE OF WALES

Federal Land: Tongass National Forest Opened at: Vancouver WA

Opened by: Robert Kolln

Date: 01/14/25

I certify that this Bid Tabulation accurately reflects the offers received for this solicitation.

Signed: _______________________________

Title: _______________________________

Date: _______________________________

Contract Awarded to: ____________________ Award Date: ____________________

Contractor Comment Bid Amount Responsive

Glacier Construction Inc. $18,751,434.00 PO Box 32159 Juneau, AK 99803

ASRC Earthworks, LLC $21,715,751.00 3900 C Street, Suite 309 Anchorage, AK 99503

Granite Construction Company $21,828,935.00 11471 Lang Street Anchorage, AK 99515

Engineer's Estimate $13,396,438.00

Contract Officer 01/15/2025

3 out of 53

Project No: AK PFH 58(1)

Project Name: Neck Lake Road Reconstruction: NPOWI Hwy. to Marine Access Facility Jct.

Schedule: A

Schedule Type: Base

Line Item Pay Item No. Description Quantity Unit Unit Price Amount

Number

A0020 15101-0000 MOBILIZATION

Glacier Construction Inc. Lump Sum $2,400,000.00 ASRC Earthworks, LLC Lump Sum $4,750,000.00 Granite Construction Company Lump Sum $3,000,000.00 Engineer's Estimate ALL LPSM Lump Sum $1,385,000.00

A0040 15201-0000 CONSTRUCTION SURVEY AND STAKING

Glacier Construction Inc. Lump Sum $677,000.00 ASRC Earthworks, LLC Lump Sum $500,000.00 Granite Construction Company Lump Sum $500,000.00 Engineer's Estimate ALL LPSM Lump Sum $346,000.00

A0060 15301-0010 CONTRACTOR QUALITY CONTROL AND ASSURANCE

Glacier Construction Inc. Lump Sum $559,000.00 ASRC Earthworks, LLC Lump Sum $900,000.00 Granite Construction Company Lump Sum $1,000,000.00 Engineer's Estimate ALL LPSM Lump Sum $346,000.00

A0080 15401-0000 CONTRACTOR TESTING

Glacier Construction Inc. Lump Sum $860,000.00 ASRC Earthworks, LLC Lump Sum $725,000.00 Granite Construction Company Lump Sum $500,000.00 Engineer's Estimate ALL LPSM Lump Sum $346,000.00

A0100 15501-0000 CONSTRUCTION SCHEDULE

Glacier Construction Inc. Lump Sum $54,000.00 ASRC Earthworks, LLC Lump Sum $40,000.00 Granite Construction Company Lump Sum $500,000.00 Engineer's Estimate ALL LPSM Lump Sum $58,000.00

A0120 15702-2000 SOIL EROSION CONTROL, TURBIDITY MONITORING

Glacier Construction Inc. Lump Sum $178,000.00 ASRC Earthworks, LLC Lump Sum $5,700.00 Granite Construction Company Lump Sum $10,000.00 Engineer's Estimate ALL LPSM Lump Sum $50,000.00

4 out of 53

Project No: AK PFH 58(1)

Project Name: Neck Lake Road Reconstruction: NPOWI Hwy. to Marine Access Facility Jct.

Schedule: A

Schedule Type: Base

Line Item Pay Item No. Description Quantity Unit Unit Price Amount

Number

A0140 15703-2000 SOIL EROSION CONTROL, TEMPORARY TURF ESTABLISHMENT

Glacier Construction Inc. $4,400.00 $44,000.00 ASRC Earthworks, LLC $6,000.00 $60,000.00 Granite Construction Company $5,000.00 $50,000.00 Engineer's Estimate 10.0 ACRE $10,000.00 $100,000.00

A0160 15705-0100 SOIL EROSION CONTROL, SILT FENCE

Glacier Construction Inc. $5.50 $48,400.00 ASRC Earthworks, LLC $7.50 $66,000.00 Granite Construction Company $20.00 $176,000.00 Engineer's Estimate 8,800 LNFT $17.50 $154,000.00

A0180 15705-0800 SOIL EROSION CONTROL, TEMPORARY 36-INCH CULVERT PIPE

Glacier Construction Inc. $260.00 $448,500.00 ASRC Earthworks, LLC $178.00 $307,050.00 Granite Construction Company $100.00 $172,500.00 Engineer's Estimate 1,725 LNFT $200.00 $345,000.00

A0200 15705-1300 SOIL EROSION CONTROL, TEMPORARY DIVERSION CHANNEL

Glacier Construction Inc. $55.00 $19,250.00 ASRC Earthworks, LLC $115.00 $40,250.00 Granite Construction Company $100.00 $35,000.00 Engineer's Estimate 350 LNFT $150.00 $52,500.00

A0220 15705-1400 SOIL EROSION CONTROL, FIBER ROLL

Glacier Construction Inc. $7.00 $17,500.00 ASRC Earthworks, LLC $7.50 $18,750.00 Granite Construction Company $20.00 $50,000.00 Engineer's Estimate 2,500 LNFT $11.00 $27,500.00

A0240 15705-1700 SOIL EROSION CONTROL, FILTER BERM

Glacier Construction Inc. $14.00 $4,550.00 ASRC Earthworks, LLC $20.00 $6,500.00 Granite Construction Company $20.00 $6,500.00 Engineer's Estimate 325 LNFT $25.00 $8,125.00

5 out of 53

Project No: AK PFH 58(1)

Project Name: Neck Lake Road Reconstruction: NPOWI Hwy. to Marine Access Facility Jct.

Schedule: A

Schedule Type: Base

Line Item Pay Item No. Description Quantity Unit Unit Price Amount

Number

A0260 15705-2000 SOIL EROSION CONTROL, FLOATING TURBIDITY CURTAIN

Glacier Construction Inc. $86.00 $73,100.00 ASRC Earthworks, LLC $65.00 $55,250.00 Granite Construction Company $100.00 $85,000.00 Engineer's Estimate 850 LNFT $75.00 $63,750.00

A0280 15801-0000 WATERING FOR DUST CONTROL

Glacier Construction Inc. $59.00 $195,880.00 ASRC Earthworks, LLC $35.00 $116,200.00 Granite Construction Company $50.00 $166,000.00 Engineer's Estimate 3,320 MGAL $85.00 $282,200.00

A0300 20101-0000 CLEARING AND GRUBBING

Glacier Construction Inc. $11,500.00 $148,350.00 ASRC Earthworks, LLC $30,000.00 $387,000.00 Granite Construction Company $100,000.00 $1,290,000.00 Engineer's Estimate 12.9 ACRE $22,000.00 $283,800.00

A0320 20301-1900 REMOVAL OF PIPE CULVERT

Glacier Construction Inc. $6,000.00 $126,000.00 ASRC Earthworks, LLC $3,500.00 $73,500.00 Granite Construction Company $5,000.00 $105,000.00 Engineer's Estimate 21 EACH $2,400.00 $50,400.00

A0340 20301-2800 REMOVAL OF STRUCTURES AND OBSTRUCTIONS (FISH HATCHERY BULKHEAD)

Glacier Construction Inc. $3,500.00 $3,500.00 ASRC Earthworks, LLC $1,800.00 $1,800.00 Granite Construction Company $50,000.00 $50,000.00 Engineer's Estimate 1 EACH $5,000.00 $5,000.00

A0360 20401-0000 ROADWAY EXCAVATION

Glacier Construction Inc. $39.00 $3,734,718.00 ASRC Earthworks, LLC $48.00 $4,596,576.00 Granite Construction Company $50.00 $4,788,100.00 Engineer's Estimate 95,762 CUYD $24.00 $2,298,288.00

6 out of 53

Project No: AK PFH 58(1)

Project Name: Neck Lake Road Reconstruction: NPOWI Hwy. to Marine Access Facility Jct.

Schedule: A

Schedule Type: Base

Line Item Pay Item No. Description Quantity Unit Unit Price Amount

Number

A0380 20401-0000 ROADWAY EXCAVATION (SURCHARGE REMOVAL)

Glacier Construction Inc. $15.50 $125,953.00 ASRC Earthworks, LLC $25.00 $203,150.00 Granite Construction Company $10.00 $81,260.00 Engineer's Estimate 8,126 CUYD $10.00 $81,260.00

A0400 20402-0000 SUBEXCAVATION

Glacier Construction Inc. $15.50 $213,125.00 ASRC Earthworks, LLC $30.00 $412,500.00 Granite Construction Company $50.00 $687,500.00 Engineer's Estimate 13,750 CUYD $38.00 $522,500.00

A0420 20411-0000 SELECT BORROW

Glacier Construction Inc. $37.00 $999,000.00 ASRC Earthworks, LLC $27.00 $729,000.00 Granite Construction Company $25.00 $675,000.00 Engineer's Estimate 27,000 TON $24.00 $648,000.00

A0440 20435-2500 BACKFILL, PERMEABLE (LIMESTONE)

Glacier Construction Inc. $85.00 $433,500.00 ASRC Earthworks, LLC $100.00 $510,000.00 Granite Construction Company $50.00 $255,000.00 Engineer's Estimate 5,100 CUYD $45.00 $229,500.00

A0460 20441-0000 WASTE (PAG ROCK)

Glacier Construction Inc. $30.00 $540,000.00 ASRC Earthworks, LLC $10.00 $180,000.00 Granite Construction Company $10.00 $180,000.00 Engineer's Estimate 18,000 CUYD $30.00 $540,000.00

A0480 20504-0000 BLASTING CONSULTANT

Glacier Construction Inc. Lump Sum $420,000.00 ASRC Earthworks, LLC Lump Sum $225,000.00 Granite Construction Company Lump Sum $200,000.00 Engineer's Estimate ALL LPSM Lump Sum $60,000.00

7 out of 53

Project No: AK PFH 58(1)

Project Name: Neck Lake Road Reconstruction: NPOWI Hwy. to Marine Access Facility Jct.

Schedule: A

Schedule Type: Base

Line Item Pay Item No. Description Quantity Unit Unit Price Amount

Number

A0500 20701-0300 SEPARATION-STABILIZATION GEOTEXTILE, CLASS 1, TYPE C (NONWOVEN)

Glacier Construction Inc. $4.00 $84,000.00 ASRC Earthworks, LLC $3.15 $66,150.00 Granite Construction Company $5.00 $105,000.00 Engineer's Estimate 21,000 SQYD $5.00 $105,000.00

A0520 20703-2000 GEOGRID, STABILIZATION

Glacier Construction Inc. $3.00 $11,250.00 ASRC Earthworks, LLC $3.50 $13,125.00 Granite Construction Company $5.00 $18,750.00 Engineer's Estimate 3,750 SQYD $5.00 $18,750.00

A0540 20704-0000 GEOMEMBRANE

Glacier Construction Inc. $23.00 $92,000.00 ASRC Earthworks, LLC $40.00 $160,000.00 Granite Construction Company $15.00 $60,000.00 Engineer's Estimate 4,000 SQYD $20.00 $80,000.00

A0560 20820-0000 DEWATERING

Glacier Construction Inc. Lump Sum $875,000.00 ASRC Earthworks, LLC Lump Sum $200,000.00 Granite Construction Company Lump Sum $500,000.00 Engineer's Estimate ALL LPSM Lump Sum $100,000.00

A0580 21101-2000 ROADWAY OBLITERATION, METHOD 2

Glacier Construction Inc. $4.00 $3,860.00 ASRC Earthworks, LLC $5.00 $4,825.00 Granite Construction Company $5.00 $4,825.00 Engineer's Estimate 965 SQYD $10.00 $9,650.00

A0600 25101-0200 PLACED RIPRAP, METHOD A, CLASS 2 (RIPRAP BLANKET)

Glacier Construction Inc. $90.00 $28,350.00 ASRC Earthworks, LLC $115.00 $36,225.00 Granite Construction Company $150.00 $47,250.00 Engineer's Estimate 315 CUYD $125.00 $39,375.00

8 out of 53

Project No: AK PFH 58(1)

Project Name: Neck Lake Road Reconstruction: NPOWI Hwy. to Marine Access Facility Jct.

Schedule: A

Schedule Type: Base

Line Item Pay Item No. Description Quantity Unit Unit Price Amount

Number

A0620 25101-0200 PLACED RIPRAP, METHOD A, CLASS 2 (ENERGY DISSIPATOR)

Glacier Construction Inc. $220.00 $6,600.00 ASRC Earthworks, LLC $120.00 $3,600.00 Granite Construction Company $150.00 $4,500.00 Engineer's Estimate 30 CUYD $175.00 $5,250.00

A0640 25101-0300 PLACED RIPRAP, METHOD A, CLASS 3 (RIPRAP HEADWALL)

Glacier Construction Inc. $47.00 $15,745.00 ASRC Earthworks, LLC $125.00 $41,875.00 Granite Construction Company $150.00 $50,250.00 Engineer's Estimate 335 CUYD $130.00 $43,550.00

A0660 25101-0400 PLACED RIPRAP, METHOD A, CLASS 4 (ROADWAY REVETMENT)

Glacier Construction Inc. $75.00 $530,625.00 ASRC Earthworks, LLC $135.00 $955,125.00 Granite Construction Company $150.00 $1,061,250.00 Engineer's Estimate 7,075 CUYD $150.00 $1,061,250.00

A0680 25120-0100 RIPRAP DITCH, METHOD A, CLASS 1

Glacier Construction Inc. $30.00 $18,000.00 ASRC Earthworks, LLC $35.00 $21,000.00 Granite Construction Company $25.00 $15,000.00 Engineer's Estimate 600 LNFT $40.00 $24,000.00

A0700 25205-0000 ROCK BUTTRESS (LIMESTONE)

Glacier Construction Inc. $57.00 $28,500.00 ASRC Earthworks, LLC $145.00 $72,500.00 Granite Construction Company $50.00 $25,000.00 Engineer's Estimate 500 CUYD $150.00 $75,000.00

A0720 25210-0000 ROCKERY

Glacier Construction Inc. $65.00 $65,000.00 ASRC Earthworks, LLC $225.00 $225,000.00 Granite Construction Company $100.00 $100,000.00 Engineer's Estimate 1,000 SQFT $115.00 $115,000.00

9 out of 53

Project No: AK PFH 58(1)

Project Name: Neck Lake Road Reconstruction: NPOWI Hwy. to Marine Access Facility Jct.

Schedule: A

Schedule Type: Base

Line Item Pay Item No. Description Quantity Unit Unit Price Amount

Number

A0740 25403-0000 PRECAST CONCRETE BLOCK RETAINING WALL (FISH HATCHERY BULKHEAD)

Glacier Construction Inc. $140.00 $16,800.00 ASRC Earthworks, LLC $735.00 $88,200.00 Granite Construction Company $500.00 $60,000.00 Engineer's Estimate 120 SQFT $100.00 $12,000.00

A0760 25701-0000 CONTRACTOR FURNISHED WALL DESIGN (FISH HATCHERY BULKHEAD)

Glacier Construction Inc. Lump Sum $2,000.00 ASRC Earthworks, LLC Lump Sum $26,000.00 Granite Construction Company Lump Sum $10,000.00 Engineer's Estimate ALL LPSM Lump Sum $15,000.00

A0780 26002-0000 ROCK DOWEL

Glacier Construction Inc. $155.00 $168,175.00 ASRC Earthworks, LLC $300.00 $325,500.00 Granite Construction Company $350.00 $379,750.00 Engineer's Estimate 1,085 LNFT $165.00 $179,025.00

A0800 27102-0100 GEOTECHNICAL INSTRUMENTATION, PIEZOMETER

Glacier Construction Inc. $2,850.00 $22,800.00 ASRC Earthworks, LLC $3,500.00 $28,000.00 Granite Construction Company $3,000.00 $24,000.00 Engineer's Estimate 8 EACH $1,000.00 $8,000.00

A0820 27102-0100 GEOTECHNICAL INSTRUMENTATION, PIEZOMETER (WITH DATA LOGGER)

Glacier Construction Inc. $2,350.00 $4,700.00 ASRC Earthworks, LLC $4,300.00 $8,600.00 Granite Construction Company $5,000.00 $10,000.00 Engineer's Estimate 2 EACH $2,000.00 $4,000.00

A0840 30110-0000 AGGREGATE SURFACE COURSE

Glacier Construction Inc. $40.00 $396,000.00 ASRC Earthworks, LLC $80.00 $792,000.00 Granite Construction Company $50.00 $495,000.00 Engineer's Estimate 9,900 TON $30.00 $297,000.00

10 out of 53

Project No: AK PFH 58(1)

Project Name: Neck Lake Road Reconstruction: NPOWI Hwy. to Marine Access Facility Jct.

Schedule: A

Schedule Type: Base

Line Item Pay Item No. Description Quantity Unit Unit Price Amount

Number

A0880 30202-2000 ROADWAY AGGREGATE, METHOD 2 (DETOUR AND WASTE SITE ACCESS REPAIRS)

Glacier Construction Inc. $75.00 $90,000.00 ASRC Earthworks, LLC $60.00 $72,000.00 Granite Construction Company $50.00 $60,000.00 Engineer's Estimate 1,200 TON $35.00 $42,000.00

A0900 30202-2000 ROADWAY AGGREGATE, METHOD 2

Glacier Construction Inc. $40.00 $27,000.00 ASRC Earthworks, LLC $60.00 $40,500.00 Granite Construction Company $50.00 $33,750.00 Engineer's Estimate 675 TON $35.00 $23,625.00

A0920 30210-0000 BEDDING AND BACKFILL AGGREGATE (LIMESTONE)

Glacier Construction Inc. $96.00 $86,400.00 ASRC Earthworks, LLC $60.00 $54,000.00 Granite Construction Company $50.00 $45,000.00 Engineer's Estimate 900 CUYD $50.00 $45,000.00

A0940 60201-0800 24-INCH PIPE CULVERT

Glacier Construction Inc. $235.00 $173,900.00 ASRC Earthworks, LLC $195.00 $144,300.00 Granite Construction Company $350.00 $259,000.00 Engineer's Estimate 740 LNFT $170.00 $125,800.00

A0960 60201-0900 30-INCH PIPE CULVERT

Glacier Construction Inc. $286.00 $47,476.00 ASRC Earthworks, LLC $235.00 $39,010.00 Granite Construction Company $450.00 $74,700.00 Engineer's Estimate 166 LNFT $190.00 $31,540.00

A0980 60201-1000 36-INCH PIPE CULVERT

Glacier Construction Inc. $340.00 $20,400.00 ASRC Earthworks, LLC $280.00 $16,800.00 Granite Construction Company $500.00 $30,000.00 Engineer's Estimate 60 LNFT $280.00 $16,800.00

11 out of 53

Project No: AK PFH 58(1)

Project Name: Neck Lake Road Reconstruction: NPOWI Hwy. to Marine Access Facility Jct.

Schedule: A

Schedule Type: Base

Line Item Pay Item No. Description Quantity Unit Unit Price Amount

Number

A1000 60201-1400 60-INCH PIPE CULVERT

Glacier Construction Inc. $803.00 $59,422.00 ASRC Earthworks, LLC $785.00 $58,090.00 Granite Construction Company $1,400.00 $103,600.00 Engineer's Estimate 74 LNFT $700.00 $51,800.00

A1020 60201-1600 72-INCH PIPE CULVERT

Glacier Construction Inc. $820.00 $82,000.00 ASRC Earthworks, LLC $865.00 $86,500.00 Granite Construction Company $1,500.00 $150,000.00 Engineer's Estimate 100 LNFT $800.00 $80,000.00

A1040 60201-1600 72-INCH PIPE CULVERT (SIMULATED STREAM)

Glacier Construction Inc. $4,200.00 $277,200.00 ASRC Earthworks, LLC $3,070.00 $202,620.00 Granite Construction Company $6,000.00 $396,000.00 Engineer's Estimate 66 LNFT $1,000.00 $66,000.00

A1060 60201-2000 96-INCH PIPE CULVERT

Glacier Construction Inc. $1,170.00 $140,400.00 ASRC Earthworks, LLC $975.00 $117,000.00 Granite Construction Company $2,500.00 $300,000.00 Engineer's Estimate 120 LNFT $1,100.00 $132,000.00

A1080 60202-0600 36-INCH EQUIVALENT DIAMETER ARCH OR ELLIPTICAL PIPE CULVERT

Glacier Construction Inc. $381.00 $41,910.00 ASRC Earthworks, LLC $385.00 $42,350.00 Granite Construction Company $600.00 $66,000.00 Engineer's Estimate 110 LNFT $300.00 $33,000.00

A1100 60210-0800 END SECTION FOR 24-INCH PIPE CULVERT

Glacier Construction Inc. $835.00 $8,350.00 ASRC Earthworks, LLC $1,165.00 $11,650.00 Granite Construction Company $1,500.00 $15,000.00 Engineer's Estimate 10 EACH $1,250.00 $12,500.00

12 out of 53

Project No: AK PFH 58(1)

Project Name: Neck Lake Road Reconstruction: NPOWI Hwy. to Marine Access Facility Jct.

Schedule: A

Schedule Type: Base

Line Item Pay Item No. Description Quantity Unit Unit Price Amount

Number

A1120 60210-0900 END SECTION FOR 30-INCH PIPE CULVERT

Glacier Construction Inc. $1,450.00 $4,350.00 ASRC Earthworks, LLC $1,960.00 $5,880.00 Granite Construction Company $2,500.00 $7,500.00 Engineer's Estimate 3 EACH $800.00 $2,400.00

A1140 60210-1000 END SECTION FOR 36-INCH PIPE CULVERT

Glacier Construction Inc. $1,900.00 $1,900.00 ASRC Earthworks, LLC $2,585.00 $2,585.00 Granite Construction Company $3,000.00 $3,000.00 Engineer's Estimate 1 EACH $1,800.00 $1,800.00

A1160 60211-1000 END SECTION FOR 36-INCH EQUIVALENT DIAMETER ARCH OR ELLIPTICAL PIPE CULVERT

Glacier Construction Inc. $1,930.00 $3,860.00 ASRC Earthworks, LLC $2,585.00 $5,170.00 Granite Construction Company $3,000.00 $6,000.00 Engineer's Estimate 2 EACH $2,000.00 $4,000.00

A1180 60302-0000 STRUCTURAL PLATE PIPE-ARCH (96-INCH EQUIVALENT, SIMULATED STREAM)

Glacier Construction Inc. $4,210.00 $269,440.00 ASRC Earthworks, LLC $3,330.00 $213,120.00 Granite Construction Company $9,500.00 $608,000.00 Engineer's Estimate 64 LNFT $2,750.00 $176,000.00

A1200 61001-0000 HORIZONTAL DRAIN PIPE

Glacier Construction Inc. $23.00 $48,300.00 ASRC Earthworks, LLC $25.00 $52,500.00 Granite Construction Company $20.00 $42,000.00 Engineer's Estimate 2,100 LNFT $200.00 $420,000.00

A1220 61701-4500 GUARDRAIL SYSTEM MGS, TYPE 2, CLASS A STEEL POSTS

Glacier Construction Inc. $105.00 $563,115.00 ASRC Earthworks, LLC $125.00 $670,375.00 Granite Construction Company $100.00 $536,300.00 Engineer's Estimate 5,363 LNFT $75.00 $402,225.00

13 out of 53

Project No: AK PFH 58(1)

Project Name: Neck Lake Road Reconstruction: NPOWI Hwy. to Marine Access Facility Jct.

Schedule: A

Schedule Type: Base

Line Item Pay Item No. Description Quantity Unit Unit Price Amount

Number

A1240 61702-0000 TERMINAL SECTION (ALASKA END TERMINAL)

Glacier Construction Inc. $4,075.00 $61,125.00 ASRC Earthworks, LLC $6,800.00 $102,000.00 Granite Construction Company $5,000.00 $75,000.00 Engineer's Estimate 15 EACH $3,000.00 $45,000.00

A1260 61702-1500 TERMINAL SECTION, TYPE MGS TANGENT

Glacier Construction Inc. $6,600.00 $19,800.00 ASRC Earthworks, LLC $11,000.00 $33,000.00 Granite Construction Company $10,000.00 $30,000.00 Engineer's Estimate 3 EACH $5,600.00 $16,800.00

A1280 62101-0000 MONUMENT (SETTLEMENT PLATE)

Glacier Construction Inc. $3,150.00 $18,900.00 ASRC Earthworks, LLC $4,725.00 $28,350.00 Granite Construction Company $5,000.00 $30,000.00 Engineer's Estimate 6 EACH $2,000.00 $12,000.00

A1300 62201-0250 DUMP TRUCK, 10 CUBIC YARD MINIMUM CAPACITY

Glacier Construction Inc. $240.00 $36,000.00 ASRC Earthworks, LLC $300.00 $45,000.00 Granite Construction Company $300.00 $45,000.00 Engineer's Estimate 150 HOUR $210.00 $31,500.00

A1320 62201-0650 BACKHOE LOADER, 10 CUBIC FOOT MINIMUM RATED CAPACITY BUCKET, 36-INCH WIDTH

Glacier Construction Inc. $225.00 $18,000.00 ASRC Earthworks, LLC $350.00 $28,000.00 Granite Construction Company $300.00 $24,000.00 Engineer's Estimate 80 HOUR $150.00 $12,000.00

A1340 62201-1000 WHEEL LOADER, 4 CUBIC YARD MINIMUM RATED CAPACITY

Glacier Construction Inc. $250.00 $20,000.00 ASRC Earthworks, LLC $350.00 $28,000.00 Granite Construction Company $350.00 $28,000.00 Engineer's Estimate 80 HOUR $260.00 $20,800.00

14 out of 53

Project No: AK PFH 58(1)

Project Name: Neck Lake Road Reconstruction: NPOWI Hwy. to Marine Access Facility Jct.

Schedule: A

Schedule Type: Base

Line Item Pay Item No. Description Quantity Unit Unit Price Amount

Number

A1360 62201-1250 BULLDOZER, 120HP MINIMUM FLYWHEEL POWER

Glacier Construction Inc. $465.00 $46,500.00 ASRC Earthworks, LLC $400.00 $40,000.00 Granite Construction Company $400.00 $40,000.00 Engineer's Estimate 100 HOUR $305.00 $30,500.00

A1380 62201-2050 ROLLER

Glacier Construction Inc. $275.00 $13,750.00 ASRC Earthworks, LLC $300.00 $15,000.00 Granite Construction Company $300.00 $15,000.00 Engineer's Estimate 50 HOUR $250.00 $12,500.00

A1400 62201-2850 MOTOR GRADER, 12 FOOT MINIMUM BLADE

Glacier Construction Inc. $315.00 $78,750.00 ASRC Earthworks, LLC $300.00 $75,000.00 Granite Construction Company $400.00 $100,000.00 Engineer's Estimate 250 HOUR $300.00 $75,000.00

A1420 62201-3400 HYDRAULIC EXCAVATOR, 1 CUBIC YARD MINIMUM CAPACITY WITH THUMB ATTACHMENT

Glacier Construction Inc. $310.00 $31,000.00 ASRC Earthworks, LLC $500.00 $50,000.00 Granite Construction Company $450.00 $45,000.00 Engineer's Estimate 100 HOUR $280.00 $28,000.00

A1440 62201-3750 CHAIN SAW (WITH OPERATOR)

Glacier Construction Inc. $190.00 $7,600.00 ASRC Earthworks, LLC $300.00 $12,000.00 Granite Construction Company $200.00 $8,000.00 Engineer's Estimate 40 HOUR $160.00 $6,400.00

A1460 62301-0000 GENERAL LABOR

Glacier Construction Inc. $160.00 $12,800.00 ASRC Earthworks, LLC $140.00 $11,200.00 Granite Construction Company $200.00 $16,000.00 Engineer's Estimate 80 HOUR $150.00 $12,000.00

15 out of 53

Project No: AK PFH 58(1)

Project Name: Neck Lake Road Reconstruction: NPOWI Hwy. to Marine Access Facility Jct.

Schedule: A

Schedule Type: Base

Line Item Pay Item No. Description Quantity Unit Unit Price Amount

Number

A1480 62303-1000 SPECIAL LABOR, HIRED TECHNICAL SERVICES (PAG ROCK MONITORING)

Glacier Construction Inc. Lump Sum $111,000.00 ASRC Earthworks, LLC Lump Sum $110,000.00 Granite Construction Company Lump Sum $100,000.00 Engineer's Estimate ALL LPSM Lump Sum $85,000.00

A1500 62406-0400 PLACING CONSERVED TOPSOIL, 6-INCH DEPTH

Glacier Construction Inc. $35,000.00 $315,000.00 ASRC Earthworks, LLC $18,000.00 $162,000.00 Granite Construction Company $20,000.00 $180,000.00 Engineer's Estimate 9.0 ACRE $13,500.00 $121,500.00

A1520 62503-0000 TURF ESTABLISHMENT (HYDRAULIC METHOD, TYPE 1)

Glacier Construction Inc. $1,715.00 $78,890.00 ASRC Earthworks, LLC $2,500.00 $115,000.00 Granite Construction Company $2,500.00 $115,000.00 Engineer's Estimate 46.0 SLRY $2,050.00 $94,300.00

A1540 62503-0000 TURF ESTABLISHMENT (HYDRAULIC METHOD, TYPE 2)

Glacier Construction Inc. $2,075.00 $2,075.00 ASRC Earthworks, LLC $2,400.00 $2,400.00 Granite Construction Company $2,500.00 $2,500.00 Engineer's Estimate 1.0 SLRY $2,600.00 $2,600.00

A1560 63302-0000 SIGN SYSTEM

Glacier Construction Inc. $300.00 $900.00 ASRC Earthworks, LLC $250.00 $750.00 Granite Construction Company $300.00 $900.00 Engineer's Estimate 3 SQFT $250.00 $750.00

A1580 63502-0600 TEMPORARY TRAFFIC CONTROL, BARRICADE TYPE 3

Glacier Construction Inc. $380.00 $2,280.00 ASRC Earthworks, LLC $450.00 $2,700.00 Granite Construction Company $500.00 $3,000.00 Engineer's Estimate 6 EACH $600.00 $3,600.00

16 out of 53

Project No: AK PFH 58(1)

Project Name: Neck Lake Road Reconstruction: NPOWI Hwy. to Marine Access Facility Jct.

Schedule: A

Schedule Type: Base

Line Item Pay Item No. Description Quantity Unit Unit Price Amount

Number

A1600 63502-1000 TEMPORARY TRAFFIC CONTROL, CONE, TYPE 36-INCH

Glacier Construction Inc. $35.00 $8,400.00 ASRC Earthworks, LLC $60.00 $14,400.00 Granite Construction Company $50.00 $12,000.00 Engineer's Estimate 240 EACH $35.00 $8,400.00

A1620 63502-1300 TEMPORARY TRAFFIC CONTROL, DRUM

Glacier Construction Inc. $100.00 $6,000.00 ASRC Earthworks, LLC $100.00 $6,000.00 Granite Construction Company $100.00 $6,000.00 Engineer's Estimate 60 EACH $110.00 $6,600.00

A1640 63502-1400 TEMPORARY TRAFFIC CONTROL, VERTICAL PANEL

Glacier Construction Inc. $115.00 $6,900.00 ASRC Earthworks, LLC $140.00 $8,400.00 Granite Construction Company $100.00 $6,000.00 Engineer's Estimate 60 EACH $75.00 $4,500.00

A1660 63503-0400 TEMPORARY TRAFFIC CONTROL, CONCRETE BARRIER

Glacier Construction Inc. $538.00 $441,160.00 ASRC Earthworks, LLC $355.00 $291,100.00 Granite Construction Company $100.00 $82,000.00 Engineer's Estimate 820 LNFT $260.00 $213,200.00

A1680 63503-1000 TEMPORARY TRAFFIC CONTROL, PLASTIC FENCE

Glacier Construction Inc. $12.00 $19,800.00 ASRC Earthworks, LLC $5.00 $8,250.00 Granite Construction Company $5.00 $8,250.00 Engineer's Estimate 1,650 LNFT $5.00 $8,250.00

A1700 63504-1000 TEMPORARY TRAFFIC CONTROL, CONSTRUCTION SIGN

Glacier Construction Inc. $120.00 $53,400.00 ASRC Earthworks, LLC $100.00 $44,500.00 Granite Construction Company $100.00 $44,500.00 Engineer's Estimate 445 SQFT $75.00 $33,375.00

17 out of 53

Project No: AK PFH 58(1)

Project Name: Neck Lake Road Reconstruction: NPOWI Hwy. to Marine Access Facility Jct.

Schedule: A

Schedule Type: Base

Line Item Pay Item No. Description Quantity Unit Unit Price Amount

Number

A1720 63506-0500 TEMPORARY TRAFFIC CONTROL, FLAGGER

Glacier Construction Inc. $115.00 $11,500.00 ASRC Earthworks, LLC $120.00 $12,000.00 Granite Construction Company $200.00 $20,000.00 Engineer's Estimate 100 HOUR $120.00 $12,000.00

A1740 63701-0000 FIELD OFFICE

Glacier Construction Inc. $353,000.00 $353,000.00 ASRC Earthworks, LLC $300,000.00 $300,000.00 Granite Construction Company $200,000.00 $200,000.00 Engineer's Estimate 1 EACH $80,000.00 $80,000.00

A1760 63701-0000 FIELD OFFICE (STORAGE CONTAINER)

Glacier Construction Inc. $10,000.00 $10,000.00 ASRC Earthworks, LLC $8,000.00 $8,000.00 Granite Construction Company $20,000.00 $20,000.00 Engineer's Estimate 1 EACH $10,000.00 $10,000.00

A1780 63704-0000 VEHICLE

Glacier Construction Inc. $79,000.00 $237,000.00 ASRC Earthworks, LLC $80,000.00 $240,000.00 Granite Construction Company $75,000.00 $225,000.00 Engineer's Estimate 3 EACH $65,000.00 $195,000.00

A1800 64703-3010 MITIGATION, ROCK WEIR

Glacier Construction Inc. $3,500.00 $7,000.00 ASRC Earthworks, LLC $2,500.00 $5,000.00 Granite Construction Company $5,000.00 $10,000.00 Engineer's Estimate 2 EACH $3,000.00 $6,000.00

A1820 64703-3010 MITIGATION, ROCK WEIR (BEDROCK)

Glacier Construction Inc. $6,700.00 $20,100.00 ASRC Earthworks, LLC $7,400.00 $22,200.00 Granite Construction Company $10,000.00 $30,000.00 Engineer's Estimate 3 EACH $10,000.00 $30,000.00

18 out of 53

Project No: AK PFH 58(1)

Project Name: Neck Lake Road Reconstruction: NPOWI Hwy. to Marine Access Facility Jct.

Schedule: A

Schedule Type: Base

Line Item Pay Item No. Description Quantity Unit Unit Price Amount

Number

A1840 64704-1500 MITIGATION, STREAMBED CHANNEL REALIGNMENT

Glacier Construction Inc. $165.00 $26,400.00 ASRC Earthworks, LLC $385.00 $61,600.00 Granite Construction Company $100.00 $16,000.00 Engineer's Estimate 160 CUYD $95.00 $15,200.00

A1860 64704-1600 MITIGATION, STREAMBED CHANNEL RECONSTRUCTION (BEDROCK)

Glacier Construction Inc. $850.00 $38,250.00 ASRC Earthworks, LLC $500.00 $22,500.00 Granite Construction Company $500.00 $22,500.00 Engineer's Estimate 45 CUYD $500.00 $22,500.00

Total Schedule - All Items

Glacier Construction Inc. $18,751,434.00 ASRC Earthworks, LLC $21,715,751.00 Granite Construction Company $21,828,935.00 Engineer's Estimate $13,396,438.00

19 out of 53

Project No: AK PFH 58(1)

Project Name: Neck Lake Road Reconstruction: NPOWI Hwy. to Marine Access Facility Jct.

Schedule: B

Schedule Type: Alternate

Solcitation No: 69056725B000001

Division: Western Federal Lands

State: AK County: PRINCE OF WALES

Federal Land: Tongass National Forest Opened at: Vancouver WA

Opened by: Robert Kolln

Date: 01/14/25

I certify that this Bid Tabulation accurately reflects the offers received for this solicitation.

Signed: _______________________________

Title: _______________________________

Date: _______________________________

Contract Awarded to: ____________________ Award Date: ____________________

Contractor Comment Bid Amount Responsive

Glacier Construction Inc. $20,503,340.50 PO Box 32159 Juneau, AK 99803

ASRC Earthworks, LLC $22,689,830.00 3900 C Street, Suite 309 Anchorage, AK 99503

Granite Construction Company $23,750,215.00 11471 Lang Street Anchorage, AK 99515

Engineer's Estimate $14,561,799.00

20 out of 53

Project No: AK PFH 58(1)

Project Name: Neck Lake Road Reconstruction: NPOWI Hwy. to Marine Access Facility Jct.

Schedule: B

Schedule Type: Alternate

Line Item Pay Item No. Description Quantity Unit Unit Price Amount

Number

B0020 15101-0000 MOBILIZATION

Glacier Construction Inc. Lump Sum $2,417,000.00 ASRC Earthworks, LLC Lump Sum $4,700,000.00 Granite Construction Company Lump Sum $2,800,000.00 Engineer's Estimate ALL LPSM Lump Sum $1,505,000.00

B0040 15201-0000 CONSTRUCTION SURVEY AND STAKING

Glacier Construction Inc. Lump Sum $742,000.00 ASRC Earthworks, LLC Lump Sum $500,000.00 Granite Construction Company Lump Sum $500,000.00 Engineer's Estimate ALL LPSM Lump Sum $376,000.00

B0060 15301-0010 CONTRACTOR QUALITY CONTROL AND ASSURANCE

Glacier Construction Inc. Lump Sum $587,000.00 ASRC Earthworks, LLC Lump Sum $900,000.00 Granite Construction Company Lump Sum $1,000,000.00 Engineer's Estimate ALL LPSM Lump Sum $376,000.00

B0080 15401-0000 CONTRACTOR TESTING

Glacier Construction Inc. Lump Sum $916,000.00 ASRC Earthworks, LLC Lump Sum $725,000.00 Granite Construction Company Lump Sum $500,000.00 Engineer's Estimate ALL LPSM Lump Sum $376,000.00

B0100 15501-0000 CONSTRUCTION SCHEDULE

Glacier Construction Inc. Lump Sum $55,000.00 ASRC Earthworks, LLC Lump Sum $40,000.00 Granite Construction Company Lump Sum $500,000.00 Engineer's Estimate ALL LPSM Lump Sum $63,000.00

B0120 15702-2000 SOIL EROSION CONTROL, TURBIDITY MONITORING

Glacier Construction Inc. Lump Sum $175,000.00 ASRC Earthworks, LLC Lump Sum $5,700.00

Engineer's Estimate ALL LPSM Lump Sum $50,000.00

21 out of 53

Project No: AK PFH 58(1)

Project Name: Neck Lake Road Reconstruction: NPOWI Hwy. to Marine Access Facility Jct.

Schedule: B

Schedule Type: Alternate

Line Item Pay Item No. Description Quantity Unit Unit Price Amount

Number

B0140 15703-2000 SOIL EROSION CONTROL, TEMPORARY TURF ESTABLISHMENT

Glacier Construction Inc. $4,400.00 $52,800.00 ASRC Earthworks, LLC $6,000.00 $72,000.00 Granite Construction Company $5,000.00 $60,000.00 Engineer's Estimate 12.0 ACRE $10,000.00 $120,000.00

B0160 15705-0100 SOIL EROSION CONTROL, SILT FENCE

Glacier Construction Inc. $5.50 $48,400.00 ASRC Earthworks, LLC $7.50 $66,000.00 Granite Construction Company $20.00 $176,000.00 Engineer's Estimate 8,800 LNFT $17.50 $154,000.00

B0180 15705-0800 SOIL EROSION CONTROL, TEMPORARY 36-INCH CULVERT PIPE

Glacier Construction Inc. $260.00 $533,000.00 ASRC Earthworks, LLC $180.00 $369,000.00 Granite Construction Company $100.00 $205,000.00 Engineer's Estimate 2,050 LNFT $200.00 $410,000.00

B0200 15705-1300 SOIL EROSION CONTROL, TEMPORARY DIVERSION CHANNEL

Glacier Construction Inc. $55.00 $24,750.00 ASRC Earthworks, LLC $115.00 $51,750.00 Granite Construction Company $100.00 $45,000.00 Engineer's Estimate 450 LNFT $150.00 $67,500.00

B0220 15705-1400 SOIL EROSION CONTROL, FIBER ROLL

Glacier Construction Inc. $7.00 $26,250.00 ASRC Earthworks, LLC $7.50 $28,125.00 Granite Construction Company $20.00 $75,000.00 Engineer's Estimate 3,750 LNFT $11.00 $41,250.00

B0240 15705-1700 SOIL EROSION CONTROL, FILTER BERM

Glacier Construction Inc. $14.00 $12,950.00 ASRC Earthworks, LLC $20.00 $18,500.00 Granite Construction Company $20.00 $18,500.00 Engineer's Estimate 925 LNFT $25.00 $23,125.00

22 out of 53

Project No: AK PFH 58(1)

Project Name: Neck Lake Road Reconstruction: NPOWI Hwy. to Marine Access Facility Jct.

Schedule: B

Schedule Type: Alternate

Line Item Pay Item No. Description Quantity Unit Unit Price Amount

Number

B0260 15705-2000 SOIL EROSION CONTROL, FLOATING TURBIDITY CURTAIN

Glacier Construction Inc. $86.00 $73,100.00 ASRC Earthworks, LLC $65.00 $55,250.00 Granite Construction Company $100.00 $85,000.00 Engineer's Estimate 850 LNFT $75.00 $63,750.00

B0280 15801-0000 WATERING FOR DUST CONTROL

Glacier Construction Inc. $59.00 $212,400.00 ASRC Earthworks, LLC $35.00 $126,000.00 Granite Construction Company $50.00 $180,000.00 Engineer's Estimate 3,600 MGAL $85.00 $306,000.00

B0300 20101-0000 CLEARING AND GRUBBING

Glacier Construction Inc. $11,500.00 $173,650.00 ASRC Earthworks, LLC $30,000.00 $453,000.00 Granite Construction Company $100,000.00 $1,510,000.00 Engineer's Estimate 15.1 ACRE $22,000.00 $332,200.00

B0320 20301-1900 REMOVAL OF PIPE CULVERT

Glacier Construction Inc. $6,000.00 $150,000.00 ASRC Earthworks, LLC $3,500.00 $87,500.00 Granite Construction Company $5,000.00 $125,000.00 Engineer's Estimate 25 EACH $2,400.00 $60,000.00

B0340 20301-2800 REMOVAL OF STRUCTURES AND OBSTRUCTIONS (FISH HATCHERY BULKHEAD)

Glacier Construction Inc. $3,500.00 $3,500.00 ASRC Earthworks, LLC $1,800.00 $1,800.00 Granite Construction Company $50,000.00 $50,000.00 Engineer's Estimate 1 EACH $5,000.00 $5,000.00

B0360 20401-0000 ROADWAY EXCAVATION

Glacier Construction Inc. $40.50 $4,195,435.50 ASRC Earthworks, LLC $45.00 $4,661,595.00 Granite Construction Company $50.00 $5,179,550.00 Engineer's Estimate 103,591 CUYD $24.00 $2,486,184.00

23 out of 53

Project No: AK PFH 58(1)

Project Name: Neck Lake Road Reconstruction: NPOWI Hwy. to Marine Access Facility Jct.

Schedule: B

Schedule Type: Alternate

Line Item Pay Item No. Description Quantity Unit Unit Price Amount

Number

B0380 20401-0000 ROADWAY EXCAVATION (SURCHARGE REMOVAL)

Glacier Construction Inc. $15.00 $167,910.00 ASRC Earthworks, LLC $20.00 $223,880.00 Granite Construction Company $10.00 $111,940.00 Engineer's Estimate 11,194 CUYD $10.00 $111,940.00

B0400 20402-0000 SUBEXCAVATION

Glacier Construction Inc. $15.00 $210,000.00 ASRC Earthworks, LLC $30.00 $420,000.00 Granite Construction Company $50.00 $700,000.00 Engineer's Estimate 14,000 CUYD $38.00 $532,000.00

B0420 20411-0000 SELECT BORROW

Glacier Construction Inc. $37.00 $1,017,500.00 ASRC Earthworks, LLC $25.00 $687,500.00 Granite Construction Company $25.00 $687,500.00 Engineer's Estimate 27,500 TON $24.00 $660,000.00

B0440 20435-2500 BACKFILL, PERMEABLE (LIMESTONE)

Glacier Construction Inc. $85.00 $433,500.00 ASRC Earthworks, LLC $100.00 $510,000.00 Granite Construction Company $50.00 $255,000.00 Engineer's Estimate 5,100 CUYD $45.00 $229,500.00

B0460 20441-0000 WASTE (PAG ROCK)

Glacier Construction Inc. $30.00 $540,000.00 ASRC Earthworks, LLC $10.00 $180,000.00 Granite Construction Company $10.00 $180,000.00 Engineer's Estimate 18,000 CUYD $30.00 $540,000.00

B0480 20504-0000 BLASTING CONSULTANT

Glacier Construction Inc. Lump Sum $418,000.00 ASRC Earthworks, LLC Lump Sum $225,000.00 Granite Construction Company Lump Sum $200,000.00 Engineer's Estimate ALL LPSM Lump Sum $60,000.00

24 out of 53

Project No: AK PFH 58(1)

Project Name: Neck Lake Road Reconstruction: NPOWI Hwy. to Marine Access Facility Jct.

Schedule: B

Schedule Type: Alternate

Line Item Pay Item No. Description Quantity Unit Unit Price Amount

Number

B0500 20701-0300 SEPARATION-STABILIZATION GEOTEXTILE, CLASS 1, TYPE C (NONWOVEN)

Glacier Construction Inc. $4.00 $90,000.00 ASRC Earthworks, LLC $3.15 $70,875.00 Granite Construction Company $5.00 $112,500.00 Engineer's Estimate 22,500 SQYD $5.00 $112,500.00

B0520 20703-2000 GEOGRID, STABILIZATION

Glacier Construction Inc. $3.00 $13,500.00 ASRC Earthworks, LLC $3.50 $15,750.00 Granite Construction Company $5.00 $22,500.00 Engineer's Estimate 4,500 SQYD $5.00 $22,500.00

B0540 20704-0000 GEOMEMBRANE

Glacier Construction Inc. $23.00 $92,000.00 ASRC Earthworks, LLC $40.00 $160,000.00 Granite Construction Company $15.00 $60,000.00 Engineer's Estimate 4,000 SQYD $20.00 $80,000.00

B0560 20820-0000 DEWATERING

Glacier Construction Inc. Lump Sum $874,000.00 ASRC Earthworks, LLC Lump Sum $200,000.00 Granite Construction Company Lump Sum $500,000.00 Engineer's Estimate ALL LPSM Lump Sum $110,000.00

B0580 21101-2000 ROADWAY OBLITERATION, METHOD 2

Glacier Construction Inc. $4.00 $3,860.00 ASRC Earthworks, LLC $5.00 $4,825.00 Granite Construction Company $5.00 $4,825.00 Engineer's Estimate 965 SQYD $10.00 $9,650.00

B0600 25101-0200 PLACED RIPRAP, METHOD A, CLASS 2 (RIPRAP BLANKET)

Glacier Construction Inc. $90.00 $28,350.00 ASRC Earthworks, LLC $115.00 $36,225.00 Granite Construction Company $150.00 $47,250.00 Engineer's Estimate 315 CUYD $125.00 $39,375.00

25 out of 53

Project No: AK PFH 58(1)

Project Name: Neck Lake Road Reconstruction: NPOWI Hwy. to Marine Access Facility Jct.

Schedule: B

Schedule Type: Alternate

Line Item Pay Item No. Description Quantity Unit Unit Price Amount

Number

B0620 25101-0200 PLACED RIPRAP, METHOD A, CLASS 2 (ENERGY DISSIPATOR)

Glacier Construction Inc. $218.00 $7,630.00 ASRC Earthworks, LLC $120.00 $4,200.00 Granite Construction Company $150.00 $5,250.00 Engineer's Estimate 35 CUYD $175.00 $6,125.00

B0640 25101-0300 PLACED RIPRAP, METHOD A, CLASS 3 (RIPRAP HEADWALL)

Glacier Construction Inc. $47.00 $20,680.00 ASRC Earthworks, LLC $125.00 $55,000.00 Granite Construction Company $150.00 $66,000.00 Engineer's Estimate 440 CUYD $130.00 $57,200.00

B0660 25101-0400 PLACED RIPRAP, METHOD A, CLASS 4 (ROADWAY REVETMENT)

Glacier Construction Inc. $73.00 $516,475.00 ASRC Earthworks, LLC $135.00 $955,125.00 Granite Construction Company $150.00 $1,061,250.00 Engineer's Estimate 7,075 CUYD $150.00 $1,061,250.00

B0680 25120-0100 RIPRAP DITCH, METHOD A, CLASS 1

Glacier Construction Inc. $30.00 $31,500.00 ASRC Earthworks, LLC $35.00 $36,750.00 Granite Construction Company $25.00 $26,250.00 Engineer's Estimate 1,050 LNFT $40.00 $42,000.00

B0700 25205-0000 ROCK BUTTRESS (LIMESTONE)

Glacier Construction Inc. $57.00 $28,500.00 ASRC Earthworks, LLC $145.00 $72,500.00 Granite Construction Company $50.00 $25,000.00 Engineer's Estimate 500 CUYD $150.00 $75,000.00

B0720 25210-0000 ROCKERY

Glacier Construction Inc. $65.00 $65,000.00 ASRC Earthworks, LLC $225.00 $225,000.00 Granite Construction Company $100.00 $100,000.00 Engineer's Estimate 1,000 SQFT $115.00 $115,000.00

26 out of 53

Project No: AK PFH 58(1)

Project Name: Neck Lake Road Reconstruction: NPOWI Hwy. to Marine Access Facility Jct.

Schedule: B

Schedule Type: Alternate

Line Item Pay Item No. Description Quantity Unit Unit Price Amount

Number

B0740 25403-0000 PRECAST CONCRETE BLOCK RETAINING WALL (FISH HATCHERY BULKHEAD)

Glacier Construction Inc. $140.00 $16,800.00 ASRC Earthworks, LLC $735.00 $88,200.00 Granite Construction Company $500.00 $60,000.00 Engineer's Estimate 120 SQFT $100.00 $12,000.00

B0760 25701-0000 CONTRACTOR FURNISHED WALL DESIGN (FISH HATCHERY BULKHEAD)

Glacier Construction Inc. Lump Sum $2,000.00 ASRC Earthworks, LLC Lump Sum $26,000.00 Granite Construction Company Lump Sum $10,000.00 Engineer's Estimate ALL LPSM Lump Sum $15,000.00

B0780 26002-0000 ROCK DOWEL

Glacier Construction Inc. $155.00 $168,175.00 ASRC Earthworks, LLC $400.00 $434,000.00 Granite Construction Company $350.00 $379,750.00 Engineer's Estimate 1,085 LNFT $165.00 $179,025.00

B0800 27102-0100 GEOTECHNICAL INSTRUMENTATION, PIEZOMETER

Glacier Construction Inc. $2,800.00 $33,600.00 ASRC Earthworks, LLC $3,500.00 $42,000.00 Granite Construction Company $3,000.00 $36,000.00 Engineer's Estimate 12 EACH $1,000.00 $12,000.00

B0820 27102-0100 GEOTECHNICAL INSTRUMENTATION, PIEZOMETER (WITH DATA LOGGER)

Glacier Construction Inc. $2,300.00 $4,600.00 ASRC Earthworks, LLC $4,300.00 $8,600.00 Granite Construction Company $5,000.00 $10,000.00 Engineer's Estimate 2 EACH $2,000.00 $4,000.00

B0840 30110-0000 AGGREGATE SURFACE COURSE

Glacier Construction Inc. $40.00 $480,000.00 ASRC Earthworks, LLC $70.00 $840,000.00 Granite Construction Company $50.00 $600,000.00 Engineer's Estimate 12,000 TON $30.00 $360,000.00

27 out of 53

Project No: AK PFH 58(1)

Project Name: Neck Lake Road Reconstruction: NPOWI Hwy. to Marine Access Facility Jct.

Schedule: B

Schedule Type: Alternate

Line Item Pay Item No. Description Quantity Unit Unit Price Amount

Number

B0880 30202-2000 ROADWAY AGGREGATE, METHOD 2 (DETOUR AND WASTE SITE ACCESS REPAIRS)

Glacier Construction Inc. $75.00 $90,000.00 ASRC Earthworks, LLC $55.00 $66,000.00 Granite Construction Company $50.00 $60,000.00 Engineer's Estimate 1,200 TON $35.00 $42,000.00

B0900 30202-2000 ROADWAY AGGREGATE, METHOD 2

Glacier Construction Inc. $40.00 $36,000.00 ASRC Earthworks, LLC $55.00 $49,500.00 Granite Construction Company $50.00 $45,000.00 Engineer's Estimate 900 TON $35.00 $31,500.00

B0920 30210-0000 BEDDING AND BACKFILL AGGREGATE (LIMESTONE)

Glacier Construction Inc. $96.00 $86,400.00 ASRC Earthworks, LLC $55.00 $49,500.00 Granite Construction Company $50.00 $45,000.00 Engineer's Estimate 900 CUYD $50.00 $45,000.00

B0940 60201-0800 24-INCH PIPE CULVERT

Glacier Construction Inc. $235.00 $205,625.00 ASRC Earthworks, LLC $190.00 $166,250.00 Granite Construction Company $350.00 $306,250.00 Engineer's Estimate 875 LNFT $170.00 $148,750.00

B0960 60201-0900 30-INCH PIPE CULVERT

Glacier Construction Inc. $280.00 $58,800.00 ASRC Earthworks, LLC $235.00 $49,350.00 Granite Construction Company $450.00 $94,500.00 Engineer's Estimate 210 LNFT $190.00 $39,900.00

B0980 60201-1000 36-INCH PIPE CULVERT

Glacier Construction Inc. $336.00 $20,160.00 ASRC Earthworks, LLC $280.00 $16,800.00 Granite Construction Company $500.00 $30,000.00 Engineer's Estimate 60 LNFT $280.00 $16,800.00

28 out of 53

Project No: AK PFH 58(1)

Project Name: Neck Lake Road Reconstruction: NPOWI Hwy. to Marine Access Facility Jct.

Schedule: B

Schedule Type: Alternate

Line Item Pay Item No. Description Quantity Unit Unit Price Amount

Number

B1000 60201-1400 60-INCH PIPE CULVERT

Glacier Construction Inc. $800.00 $59,200.00 ASRC Earthworks, LLC $785.00 $58,090.00 Granite Construction Company $1,400.00 $103,600.00 Engineer's Estimate 74 LNFT $700.00 $51,800.00

B1020 60201-1600 72-INCH PIPE CULVERT

Glacier Construction Inc. $817.00 $81,700.00 ASRC Earthworks, LLC $865.00 $86,500.00 Granite Construction Company $1,500.00 $150,000.00 Engineer's Estimate 100 LNFT $800.00 $80,000.00

B1040 60201-1600 72-INCH PIPE CULVERT (SIMULATED STREAM)

Glacier Construction Inc. $4,100.00 $541,200.00 ASRC Earthworks, LLC $3,000.00 $396,000.00 Granite Construction Company $6,000.00 $792,000.00 Engineer's Estimate 132 LNFT $1,000.00 $132,000.00

B1060 60201-2000 96-INCH PIPE CULVERT

Glacier Construction Inc. $1,165.00 $139,800.00 ASRC Earthworks, LLC $975.00 $117,000.00 Granite Construction Company $2,500.00 $300,000.00 Engineer's Estimate 120 LNFT $1,100.00 $132,000.00

B1080 60201-2200 108-INCH PIPE CULVERT (SIMULATED STREAM)

Glacier Construction Inc. $4,120.00 $304,880.00 ASRC Earthworks, LLC $3,150.00 $233,100.00 Granite Construction Company $7,500.00 $555,000.00 Engineer's Estimate 74 LNFT $2,400.00 $177,600.00

B1100 60202-0600 36-INCH EQUIVALENT DIAMETER ARCH OR ELLIPTICAL PIPE CULVERT

Glacier Construction Inc. $380.00 $41,800.00 ASRC Earthworks, LLC $385.00 $42,350.00 Granite Construction Company $600.00 $66,000.00 Engineer's Estimate 110 LNFT $300.00 $33,000.00

29 out of 53

Project No: AK PFH 58(1)

Project Name: Neck Lake Road Reconstruction: NPOWI Hwy. to Marine Access Facility Jct.

Schedule: B

Schedule Type: Alternate

Line Item Pay Item No. Description Quantity Unit Unit Price Amount

Number

B1120 60210-0800 END SECTION FOR 24-INCH PIPE CULVERT

Glacier Construction Inc. $835.00 $9,185.00 ASRC Earthworks, LLC $1,165.00 $12,815.00 Granite Construction Company $1,500.00 $16,500.00 Engineer's Estimate 11 EACH $1,250.00 $13,750.00

B1140 60210-0900 END SECTION FOR 30-INCH PIPE CULVERT

Glacier Construction Inc. $1,450.00 $5,800.00 ASRC Earthworks, LLC $1,960.00 $7,840.00 Granite Construction Company $2,500.00 $10,000.00 Engineer's Estimate 4 EACH $800.00 $3,200.00

B1160 60210-1000 END SECTION FOR 36-INCH PIPE CULVERT

Glacier Construction Inc. $1,900.00 $1,900.00 ASRC Earthworks, LLC $2,585.00 $2,585.00 Granite Construction Company $3,000.00 $3,000.00 Engineer's Estimate 1 EACH $1,800.00 $1,800.00

B1180 60211-1000 END SECTION FOR 36-INCH EQUIVALENT DIAMETER ARCH OR ELLIPTICAL PIPE CULVERT

Glacier Construction Inc. $1,925.00 $3,850.00 ASRC Earthworks, LLC $2,585.00 $5,170.00 Granite Construction Company $3,000.00 $6,000.00 Engineer's Estimate 2 EACH $2,000.00 $4,000.00

B1200 60302-0000 STRUCTURAL PLATE PIPE-ARCH (96-INCH EQUIVALENT, SIMULATED STREAM)

Glacier Construction Inc. $4,200.00 $268,800.00 ASRC Earthworks, LLC $3,330.00 $213,120.00 Granite Construction Company $9,500.00 $608,000.00 Engineer's Estimate 64 LNFT $2,750.00 $176,000.00

B1220 61001-0000 HORIZONTAL DRAIN PIPE

Glacier Construction Inc. $23.00 $48,300.00 ASRC Earthworks, LLC $25.00 $52,500.00 Granite Construction Company $20.00 $42,000.00 Engineer's Estimate 2,100 LNFT $200.00 $420,000.00

30 out of 53

Project No: AK PFH 58(1)

Project Name: Neck Lake Road Reconstruction: NPOWI Hwy. to Marine Access Facility Jct.

Schedule: B

Schedule Type: Alternate

Line Item Pay Item No. Description Quantity Unit Unit Price Amount

Number

B1240 61701-4500 GUARDRAIL SYSTEM MGS, TYPE 2, CLASS A STEEL POSTS

Glacier Construction Inc. $105.00 $597,240.00 ASRC Earthworks, LLC $120.00 $682,560.00 Granite Construction Company $100.00 $568,800.00 Engineer's Estimate 5,688 LNFT $75.00 $426,600.00

B1260 61702-0000 TERMINAL SECTION (ALASKA END TERMINAL)

Glacier Construction Inc. $4,050.00 $64,800.00 ASRC Earthworks, LLC $6,400.00 $102,400.00 Granite Construction Company $5,000.00 $80,000.00 Engineer's Estimate 16 EACH $3,000.00 $48,000.00

B1280 61702-1500 TERMINAL SECTION, TYPE MGS TANGENT

Glacier Construction Inc. $6,600.00 $26,400.00 ASRC Earthworks, LLC $10,000.00 $40,000.00 Granite Construction Company $10,000.00 $40,000.00 Engineer's Estimate 4 EACH $5,600.00 $22,400.00

B1300 62101-0000 MONUMENT (SETTLEMENT PLATE)

Glacier Construction Inc. $3,150.00 $31,500.00 ASRC Earthworks, LLC $4,725.00 $47,250.00 Granite Construction Company $5,000.00 $50,000.00 Engineer's Estimate 10 EACH $2,000.00 $20,000.00

B1320 62201-0250 DUMP TRUCK, 10 CUBIC YARD MINIMUM CAPACITY

Glacier Construction Inc. $240.00 $36,000.00 ASRC Earthworks, LLC $300.00 $45,000.00 Granite Construction Company $300.00 $45,000.00 Engineer's Estimate 150 HOUR $210.00 $31,500.00

B1340 62201-0650 BACKHOE LOADER, 10 CUBIC FOOT MINIMUM RATED CAPACITY BUCKET, 36-INCH WIDTH

Glacier Construction Inc. $225.00 $18,000.00 ASRC Earthworks, LLC $350.00 $28,000.00 Granite Construction Company $300.00 $24,000.00

31 out of 53

Project No: AK PFH 58(1)

Project Name: Neck Lake Road Reconstruction: NPOWI Hwy. to Marine Access Facility Jct.

Schedule: B

Schedule Type: Alternate

Line Item Pay Item No. Description Quantity Unit Unit Price Amount

Number

B1360 62201-1000 WHEEL LOADER, 4 CUBIC YARD MINIMUM RATED CAPACITY

Glacier Construction Inc. $250.00 $20,000.00 ASRC Earthworks, LLC $350.00 $28,000.00 Granite Construction Company $350.00 $28,000.00 Engineer's Estimate 80 HOUR $260.00 $20,800.00

B1380 62201-1250 BULLDOZER, 120HP MINIMUM FLYWHEEL POWER

Glacier Construction Inc. $465.00 $46,500.00 ASRC Earthworks, LLC $400.00 $40,000.00 Granite Construction Company $400.00 $40,000.00 Engineer's Estimate 100 HOUR $305.00 $30,500.00

B1400 62201-2050 ROLLER

Glacier Construction Inc. $275.00 $13,750.00 ASRC Earthworks, LLC $300.00 $15,000.00 Granite Construction Company $300.00 $15,000.00 Engineer's Estimate 50 HOUR $250.00 $12,500.00

B1420 62201-2850 MOTOR GRADER, 12 FOOT MINIMUM BLADE

Glacier Construction Inc. $315.00 $78,750.00 ASRC Earthworks, LLC $300.00 $75,000.00 Granite Construction Company $400.00 $100,000.00 Engineer's Estimate 250 HOUR $300.00 $75,000.00

B1440 62201-3400 HYDRAULIC EXCAVATOR, 1 CUBIC YARD MINIMUM CAPACITY WITH THUMB ATTACHMENT

Glacier Construction Inc. $310.00 $31,000.00 ASRC Earthworks, LLC $500.00 $50,000.00 Granite Construction Company $450.00 $45,000.00 Engineer's Estimate 100 HOUR $280.00 $28,000.00

B1460 62201-3750 CHAIN SAW (WITH OPERATOR)

Glacier Construction Inc. $190.00 $7,600.00 ASRC Earthworks, LLC $300.00 $12,000.00 Granite Construction Company $200.00 $8,000.00 Engineer's Estimate 40 HOUR $160.00 $6,400.00

32 out of 53

Project No: AK PFH 58(1)

Project Name: Neck Lake Road Reconstruction: NPOWI Hwy. to Marine Access Facility Jct.

Schedule: B

Schedule Type: Alternate

Line Item Pay Item No. Description Quantity Unit Unit Price Amount

Number

B1480 62301-0000 GENERAL LABOR

Glacier Construction Inc. $160.00 $12,800.00 ASRC Earthworks, LLC $140.00 $11,200.00 Granite Construction Company $200.00 $16,000.00 Engineer's Estimate 80 HOUR $150.00 $12,000.00

B1500 62303-1000 SPECIAL LABOR, HIRED TECHNICAL SERVICES (PAG ROCK MONITORING)

Glacier Construction Inc. Lump Sum $111,000.00 ASRC Earthworks, LLC Lump Sum $110,000.00 Granite Construction Company Lump Sum $100,000.00 Engineer's Estimate ALL LPSM Lump Sum $85,000.00

B1520 62406-0400 PLACING CONSERVED TOPSOIL, 6-INCH DEPTH

Glacier Construction Inc. $35,000.00 $385,000.00 ASRC Earthworks, LLC $18,000.00 $198,000.00 Granite Construction Company $20,000.00 $220,000.00 Engineer's Estimate 11.0 ACRE $13,500.00 $148,500.00

B1540 62503-0000 TURF ESTABLISHMENT (HYDRAULIC METHOD, TYPE 1)

Glacier Construction Inc. $1,710.00 $92,340.00 ASRC Earthworks, LLC $2,500.00 $135,000.00 Granite Construction Company $2,500.00 $135,000.00 Engineer's Estimate 54.0 SLRY $2,050.00 $110,700.00

B1560 62503-0000 TURF ESTABLISHMENT (HYDRAULIC METHOD, TYPE 2)

Glacier Construction Inc. $2,075.00 $2,075.00 ASRC Earthworks, LLC $2,400.00 $2,400.00 Granite Construction Company $2,500.00 $2,500.00 Engineer's Estimate 1.0 SLRY $2,600.00 $2,600.00

B1580 63302-0000 SIGN SYSTEM

Glacier Construction Inc. $300.00 $1,500.00 ASRC Earthworks, LLC $250.00 $1,250.00 Granite Construction Company $300.00 $1,500.00 Engineer's Estimate 5 SQFT $250.00 $1,250.00

33 out of 53

Project No: AK PFH 58(1)

Project Name: Neck Lake Road Reconstruction: NPOWI Hwy. to Marine Access Facility Jct.

Schedule: B

Schedule Type: Alternate

Line Item Pay Item No. Description Quantity Unit Unit Price Amount

Number

B1600 63502-0600 TEMPORARY TRAFFIC CONTROL, BARRICADE TYPE 3

Glacier Construction Inc. $380.00 $2,280.00 ASRC Earthworks, LLC $450.00 $2,700.00 Granite Construction Company $500.00 $3,000.00 Engineer's Estimate 6 EACH $600.00 $3,600.00

B1620 63502-1000 TEMPORARY TRAFFIC CONTROL, CONE, TYPE 36-INCH

Glacier Construction Inc. $35.00 $8,400.00 ASRC Earthworks, LLC $60.00 $14,400.00 Granite Construction Company $50.00 $12,000.00 Engineer's Estimate 240 EACH $35.00 $8,400.00

B1640 63502-1300 TEMPORARY TRAFFIC CONTROL, DRUM

Glacier Construction Inc. $100.00 $6,000.00 ASRC Earthworks, LLC $100.00 $6,000.00 Granite Construction Company $100.00 $6,000.00 Engineer's Estimate 60 EACH $110.00 $6,600.00

B1660 63502-1400 TEMPORARY TRAFFIC CONTROL, VERTICAL PANEL

Glacier Construction Inc.