Amendment A008.pdf

PDF 1 MB Posted

Attached to
AK PFH 58(1), Neck Lake Road Reconstruction: NPOWI Hwy. to Marine Access Facility Jct.
Solicitation number
69056725B000001
Issued by

About this file

This is Amendment A008 to solicitation 69056725B000001 for the Neck Lake Road Reconstruction project in Alaska, issued by the Department of Transportation Federal Highway Administration. The amendment revises Special Contract Requirements related to blasting consultant qualifications and adds requirements for on-site inspections during drilling, loading, and blasting of controlled and production sections.

The amendment also updates Plan Sheet F.4 to add a note about lake water elevation levels, indicating that the ordinary low water surface elevation is 92.4 feet while the ordinary high water surface elevation is 97 feet. The amendment makes no changes to the proposal due date. The overall project involves road reconstruction across three schedules totaling 6 miles, with an estimated price range of $10-20 million and a completion date of Fall 2026.

View the file

Other files

File Type Posted
BidTab Neck Lake Road Reconstruction.pdf PDF
BidSum-AK PFH 58(1).pdf PDF
QA_01-08-2025.pdf PDF
QA_01-07-2025.pdf PDF
Amendment A007.pdf PDF
Amendment A006.pdf PDF
QA_12-30-2024.pdf PDF
Amendment A005.pdf PDF
Amendment A004.pdf PDF
Amendment A003.pdf PDF
QA_12-16-2024.pdf PDF
QA_12-13-2024.pdf PDF
Amendment A002.pdf PDF
QA_12-18-2024.pdf PDF
QA_12-06-2024.pdf PDF
Amendment A001.pdf PDF
QA_12-05-2024.pdf PDF
QA_11-26-2024.pdf PDF
af05801_SEGMENT1_proposed-alignment.pdf PDF
af05801_XS_Labeled_SchA.pdf PDF
af05801_SEGMENT1_proposed-profile.pdf PDF
af05801_XS_SchA.pdf PDF
af05801_TIE4_Earthwork.pdf PDF
af05801_SchedA_Earthwork.pdf PDF
af05801_SchedB_Earthwork.pdf PDF
ak pfh 58(1)_Neck Lake ARD Technical Memorandum.pdf PDF
af05801_TIE4_proposed-alignment.pdf PDF
af05801_TIE1_Earthwork.pdf PDF
ak pfh 58(1)_GR1516_pp385-973.pdf PDF
af05801_TIE2_superelevation.pdf PDF
af05801_TIE1_proposed-profile.pdf PDF
af05801_TIE2_proposed-alignment.pdf PDF
af05801_TIE4_proposed-profile.pdf PDF
af05801_TIE4_superelevation.pdf PDF
IFB AK PFH 58(1) Neck Lake Road Reconstruction.pdf PDF
af05801_SchedC_Earthwork.pdf PDF
af05801_BULK_proposed-alignment.pdf PDF
ak pfh 58(1)_FinalHydraulicReport.pdf PDF
ak pfh 58(1)_XS Approaches_SchC.pdf PDF
aka-pfh58-1_SWPPP for compilation_Final.pdf PDF
af05801_BULK_Earthwork.pdf PDF
af05801_Segment1_superelevation.pdf PDF
af05801_TIE2_Earthwork.pdf PDF
af05801_XS_SchB.pdf PDF
ak pfh 58(1)_NeckLakeRoad_Rockery_TM 1.21.2019.pdf PDF
af05801_TIE1_superelevation.pdf PDF
af05801_TIE3_Earthwork.pdf PDF
ak pfh 58(1)_GR1516_pp1-384.pdf PDF
af05801_XS_Labeled_SchC.pdf PDF
af05801_SEGMENT1_proposed-alignment.pdf PDF
Show 40 more

Latest 50 of 62 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT 1. CONTRACT ID CODE

N/A

PAGE

2. AMENDMENT/MODIFICATION NO. 3. EFFECTIVE DATE 4. REQUISITION/PURCHASE NO. 5. PROJECT NO. (If applicable)

A008 1/8/2025 N/A AK PFH 58(1), Neck Lake Road Reconstruction: NPOWI HWY. TO

MARINE ACCESS FACILITY JCT.

6. ISSUED BY CODE N/A 7. ADMINISTERED BY (If other than Item 6) CODE N/A

Department of Transportation Federal Highway Administration 610 East Fifth Street Vancouver WA 98661-3801

8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, State and Zip Code) 9A. AMENDMENT OF SOLICITATION NO.

X

69056725B000001

9B. DATED (SEE ITEM 11)

11/18/2024

10A. MODIFICATION OF CONTRACT/ORDER NO.

N/A

10B. DATED (SEE ITEM 13)

CODE: N/A FACILITY CODE: N/A N/A

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

| X | The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers (_ ) is extended, ( X ) is not extended.

Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:

(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted; or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

N/A

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS,

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

A THIS CHANGE ORDER IS ISSUED PURSUANT TO (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER NO. IN

ITEM 10A.

N/A

B THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (Such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).

N/A

C THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

N/A

D OTHER (Specify type of modification and authority) N/A

E. IMPORTANT: Contractor n/a is not, n/a is required to sign this document and return n/a copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

AK PFH 58(1), Neck Lake Road Reconstruction: Neck Lake Road Reconstruction: NPOWI Hwy. to Marine Access Facility Jct.

See page 2

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15a. NAME AND TITLE OF SIGNER (Type or print) 15a. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

N/A

15B. CONTRACTOR/OFFEROR 15C. DATE SIGNED 16B. UNITED STATES OF AMERICA 16C. DATE SIGNED

BY_________________________________________ BY N/A___________________________ N/A (Signature of person authorized to sign) (Signature of Contracting Officer)

NSN 7540-01-152-8070

PREVIOUS EDITION NOT USABLE

30-105 STANDARD FORM 30 (REV. 10-83)

Prescribed by GSA

FAR (48 CFR) 53.243

Amendment No. A008, dated 1/8/2025 AK PFH 58(1) Solicitation No. 69056725B000001 Neck Lake Road Reconstruction: NPOWI Hwy. to Page 2 Marine Access Facility Jct.

REVISIONS ARE AS FOLLOWS:

SPECIAL CONTRACT REQUIREMENTS

Page F-10, Subsection 205.04A, Blasting Consultant. Revises Subsection (a)(5).

PLANS

Plan Sheet F.4 Adds Note 3.

ENCLOSURES

Pages:

F-10

Plan Sheets:

F.4

F-10 DIVISION 200

Special Contract Requirements Project: AK PFH 58(1), Neck Lake Road Reconstruction: NPOWI Hwy. to Marine Access Facility Jct.

Section 205. — ROCK BLASTING

Construction Requirements

205.04 Qualifications. Delete Subsection (d).

205.04A Blasting Consultant. (Added Subsection.)

Provide a blasting consultant with at least 10 years experience in the field of rock blasting as a designer of blasts with controlled blasting techniques. Use a blasting consultant that is not an employee of the Contractor, an explosives manufacturer, or explosives distributor.

(a) Use a blast consultant to:

(1) Assist in the blast design.

(2) Attend the preconstruction conference.

(3) Make on-site inspections of the blast site before the submittal of each blast plan.

(4) Make on-site inspections during drilling, loading, and blasting of test sections.

(5) Make on-site inspections during drilling, loading, and blasting of controlled and production sections.

(6) Approve all blasting plans and modifications. Include with each blast plan submitted to the CO written evidence that the blasting consultant has reviewed and approved the blasting plan.

(b) Provide the following to the CO before the preconstruction conference:

(1) A resume of the proposed blasting consultant. Include educational background related to blasting and a detailed resume of experience in the blasting field.

(2) A list of at least five highway rock projects that demonstrate successfully completed work on which the blasting consultant has worked in the capacity of a consultant in blast design.

List a description of the projects, details of the blast plan, and modifications made during the project. List names and telephone numbers of project owners with sufficient knowledge of the project to verify the submitted information.

(3) A cost breakdown of the individual items included in the lump sum blasting consultant item for use in making progress payments.

Based on the documentation provided, the CO will notify the Contractor of the acceptability of the proposed blasting consultant under the terms of the contract within 14 days.

Revised by Amendment A008 Revised by Amendment A007 Revised by Amendment A002

3. The line delineating the lakewater reflects an ordinary low water surface elevation of 92.4 feet.

Whereas, the ordinary high water surface elevation of the lake is 97 feet.

(Revised by Amendment A008)

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
A008

File details come from the government source that posted it. Updated .