af05801_SchedA_Earthwork.pdf
PDF 275 KB Posted
- Solicitation number
- 69056725B000001
About this file
This document is a detailed earthwork schedule related to a federal contract opportunity for the AK PFH 58(1), Neck Lake Road Reconstruction project. The project involves approximately 6 miles of road reconstruction work in Prince of Wales Island, Alaska, including roadway excavation, sub-excavation, embankment construction, grading, drainage, aggregate surface course placement, and other related construction activities. The work is divided into 3 bid schedules, with only one schedule to be awarded. The anticipated solicitation period is Winter 2024/2025, and the estimated price range is between $10,000,000 and $20,000,000. The contract will be a sealed bid, firm-fixed-price type. The key federal agency involved is the Department of Transportation Federal Highway Administration.
View the file
Other files
Show 40 more
Latest 50 of 62 listed here. See the rest on GovTribe.
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Earthwork
Schedule A
76+00 to 154+00
AK PFH 58(1),
Neck Lake Road Reconstruction: NPOWI Hwy. to Marine Access Facility Jct.
Material Name End Areas Unadjusted Adjusted Mult Mass Accum Station Volumes Volumes Factor Ordinate Unadj Vol
(sq. ft.) (cu. yd.) (cu. yd.) (cu. yd.)
SKIP STATION RANGE = 35+58.00 to 37+00.00
76+00.00 RDWYEXC
Excavation 174.01 0 0 0.85 0 Subsoil Exc 0.00 0 0 1.00 0 Fill 61.24 0 0 1.00 0 0
TOPSOIL
Excavation 25.81 0 0 0.00 0 Subsoil Exc 7.22 0 0 0.00 0 Fill 0.00 0 0 0.00 0 0 Mass ordinate for TOPSOIL = 0
ACP
Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 5.11 0 0 0.00 0 0
AGG_BASE
Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 12.05 0 0 0.00 0 0
SHOULDERBACKFILL
Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 0.15 0 0 0.00 0 0
76+30.00 RDWYEXC
Excavation 295.66 260 222 0.85 260 Subsoil Exc 0.00 0 0 1.00 0 Fill 81.71 79 79 1.00 143 79
TOPSOIL
Excavation 45.70 40 0 0.00 40 Subsoil Exc 7.35 8 0 0.00 8 Fill 0.00 0 0 0.00 143 0 Mass ordinate for TOPSOIL = 0
ACP
Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 5.11 6 0 0.00 143 6
AGG_BASE
Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 12.11 13 0 0.00 143 13
SHOULDERBACKFILL
Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 0.16 0 0 0.00 143 0
76+50.00 RDWYEXC
Excavation 389.45 253 216 0.85 513 Subsoil Exc 0.00 0 0 1.00 0 Fill 106.72 70 70 1.00 289 149
TOPSOIL
Excavation 46.76 34 0 0.00 74 Subsoil Exc 8.06 6 0 0.00 14 Fill 0.00 0 0 0.00 289 0 Mass ordinate for TOPSOIL = 0
ACP
Excavation 0.00 0 0 0.00 0
Subsoil Exc 0.00 0 0 0.00 0 Fill 6.31 4 0 0.00 289 10
AGG_BASE
Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 14.60 10 0 0.00 289 23
SHOULDERBACKFILL
Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 0.16 0 0 0.00 289 0
76+80.00 RDWYEXC
Excavation 492.70 490 417 0.85 1003 Subsoil Exc 0.00 0 0 1.00 0 Fill 147.73 141 141 1.00 565 290
TOPSOIL
Excavation 47.14 52 0 0.00 126 Subsoil Exc 9.60 10 0 0.00 24 Fill 0.00 0 0 0.00 565 0 Mass ordinate for TOPSOIL = 0
ACP
Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 8.87 8 0 0.00 565 18
AGG_BASE
Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 19.89 19 0 0.00 565 42
SHOULDERBACKFILL
Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 0.18 0 0 0.00 565 0
77+00.00 RDWYEXC
Excavation 486.57 363 308 0.85 1366 Subsoil Exc 0.00 0 0 1.00 0 Fill 177.11 120 120 1.00 753 410
TOPSOIL
Excavation 44.05 33 0 0.00 159 Subsoil Exc 13.93 9 0 0.00 33 Fill 0.00 0 0 0.00 753 0 Mass ordinate for TOPSOIL = 0
ACP
Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 8.87 7 0 0.00 753 25
AGG_BASE
Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 19.89 15 0 0.00 753 57
SHOULDERBACKFILL
Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 0.18 0 0 0.00 753 0
77+50.00 RDWYEXC
Excavation 346.90 772 656 0.85 2138 Subsoil Exc 0.00 0 0 1.00 0 Fill 219.11 367 367 1.00 1042 777
TOPSOIL
Excavation 28.48 67 0 0.00 226 Subsoil Exc 14.59 26 0 0.00 59 Fill 0.00 0 0 0.00 1042 0 Mass ordinate for TOPSOIL = 0
ACP
Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 8.87 16 0 0.00 1042 41
AGG_BASE
Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 19.89 37 0 0.00 1042 94
SHOULDERBACKFILL
Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 0.18 0 0 0.00 1042 0
77+55.00 RDWYEXC
Excavation 344.89 64 55 0.85 2202 Subsoil Exc 0.00 0 0 1.00 0 Fill 218.46 41 41 1.00 1056 818
TOPSOIL
Excavation 28.58 5 0 0.00 231 Subsoil Exc 14.28 3 0 0.00 62 Fill 0.00 0 0 0.00 1056 0 Mass ordinate for TOPSOIL = 0
ACP
Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 8.87 2 0 0.00 1056 43
AGG_BASE
Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 19.89 4 0 0.00 1056 98
SHOULDERBACKFILL
Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 0.18 0 0 0.00 1056 0
77+79.00 RDWYEXC
Excavation 361.84 314 267 0.85 2516 Subsoil Exc 0.00 0 0 1.00 0 Fill 209.11 190 190 1.00 1133 1008
TOPSOIL
Excavation 26.31 24 0 0.00 255 Subsoil Exc 10.62 11 0 0.00 73 Fill 0.00 0 0 0.00 1133 0 Mass ordinate for TOPSOIL = 0
ACP
Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 7.45 7 0 0.00 1133 50
AGG_BASE
Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 18.09 17 0 0.00 1133 115
SHOULDERBACKFILL
Excavation 0.00 0 0 0.00 0
Fill 0.97 1 0 0.00 1133 1
78+00.00 RDWYEXC
Excavation 144.88 197 167 0.85 2713 Subsoil Exc 0.00 0 0 1.00 0 Fill 209.18 163 163 1.00 1137 1171
TOPSOIL
Excavation 25.66 20 0 0.00 275 Subsoil Exc 13.54 9 0 0.00 82 Fill 0.00 0 0 0.00 1137 0 Mass ordinate for TOPSOIL = 0
ACP
Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 6.66 5 0 0.00 1137 55
AGG_BASE
Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 16.44 13 0 0.00 1137 128
SHOULDERBACKFILL
Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 0.97 1 0 0.00 1137 2
78+25.00 RDWYEXC
Excavation 12.33 72 61 0.85 2785 Subsoil Exc 0.00 0 0 1.00 0 Fill 270.47 222 222 1.00 976 1393
SUBEXCAVATION
Excavation 78.51 37 37 1.00 37 Subsoil Exc 0.00 0 0 1.00 0 Fill 0.00 0 0 1.00 976 0 Mass ordinate for SUBEXCAVATION = 37
TOPSOIL
Excavation 28.13 24 0 0.00 299 Subsoil Exc 2.92 8 0 0.00 90 Fill 0.00 0 0 0.00 976 0 Mass ordinate for TOPSOIL = 0
ACP
Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 6.08 6 0 0.00 976 61
AGG_BASE
Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 14.68 14 0 0.00 976 142
SUBEXBACKFILL
Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 74.63 35 0 0.00 976 35
SHOULDERBACKFILL
Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 0.70 1 0 0.00 976 3
78+50.00 RDWYEXC
Excavation 0.00 6 5 0.85 2791 Subsoil Exc 0.00 0 0 1.00 0 Fill 324.75 276 276 1.00 705 1669
SUBEXCAVATION
Excavation 172.54 116 116 1.00 153
Subsoil Exc 0.00 0 0 1.00 0 Fill 0.00 0 0 1.00 705 0 Mass ordinate for SUBEXCAVATION = 153
TOPSOIL
Excavation 0.00 13 0 0.00 312 Subsoil Exc 0.00 1 0 0.00 91 Fill 0.00 0 0 0.00 705 0 Mass ordinate for TOPSOIL = 0
ACP
Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 6.08 6 0 0.00 705 67
AGG_BASE
Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 14.65 14 0 0.00 705 156
SUBEXBACKFILL
Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 170.69 114 0 0.00 705 149
SHOULDERBACKFILL
Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 0.70 1 0 0.00 705 4
78+83.02 RDWYEXC
Excavation 0.00 0 0 0.85 2791 Subsoil Exc 0.00 0 0 1.00 0 Fill 415.31 453 453 1.00 252 2122
SUBEXCAVATION
Excavation 263.32 267 267 1.00 420 Subsoil Exc 0.00 0 0 1.00 0 Fill 0.00 0 0 1.00 252 0 Mass ordinate for SUBEXCAVATION = 420
ACP
Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 6.19 8 0 0.00 252 75
AGG_BASE
Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 14.87 18 0 0.00 252 174
SUBEXBACKFILL
Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 263.02 265 0 0.00 252 414
SHOULDERBACKFILL
Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 0.70 1 0 0.00 252 5
79+00.00 RDWYEXC
Excavation 0.00 0 0 0.85 2791 Subsoil Exc 0.00 0 0 1.00 0 Fill 368.48 246 246 1.00 6 2368
SUBEXCAVATION
Excavation 283.89 172 172 1.00 592 Subsoil Exc 0.00 0 0 1.00 0 Fill 0.00 0 0 1.00 6 0 Mass ordinate for SUBEXCAVATION = 592
Excavation 19.34 6 0 0.00 318 Subsoil Exc 4.88 2 0 0.00 93 Fill 0.00 0 0 0.00 6 0 Mass ordinate for TOPSOIL = 0
ACP
Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 6.08 4 0 0.00 6 79
AGG_BASE
Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 14.67 9 0 0.00 6 183
SUBEXBACKFILL
Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 283.89 172 0 0.00 6 586
SHOULDERBACKFILL
Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 0.70 0 0 0.00 6 5
79+50.00 RDWYEXC
Excavation 0.00 0 0 0.85 2791 Subsoil Exc 0.00 0 0 1.00 0 Fill 295.19 615 615 1.00 ‐609 2983
SUBEXCAVATION
Excavation 0.00 263 263 1.00 855 Subsoil Exc 0.00 0 0 1.00 0 Fill 0.00 0 0 1.00 ‐609 0 Mass ordinate for SUBEXCAVATION = 855
TOPSOIL
Excavation 0.00 18 0 0.00 336 Subsoil Exc 16.71 20 0 0.00 113 Fill 0.00 0 0 0.00 ‐609 0 Mass ordinate for TOPSOIL = 0
ACP
Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 6.08 11 0 0.00 ‐609 90
AGG_BASE
Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 14.67 27 0 0.00 ‐609 210
SUBEXBACKFILL
Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 0.00 263 0 0.00 ‐609 849
SHOULDERBACKFILL
Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 0.70 1 0 0.00 ‐609 6
80+00.00 RDWYEXC
Excavation 0.00 0 0 0.85 2791 Subsoil Exc 0.00 0 0 1.00 0 Fill 232.94 489 489 1.00 ‐1098 3472
TOPSOIL
Excavation 0.00 0 0 0.00 336 Subsoil Exc 16.50 31 0 0.00 144
Fill 0.00 0 0 0.00 ‐1098 0 Mass ordinate for TOPSOIL = 0
ACP
Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 6.08 11 0 0.00 ‐1098 101
AGG_BASE
Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 14.67 27 0 0.00 ‐1098 237
SHOULDERBACKFILL
Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 0.70 1 0 0.00 ‐1098 7
80+50.00 RDWYEXC
Excavation 0.00 0 0 0.85 2791 Subsoil Exc 0.00 0 0 1.00 0 Fill 228.43 427 427 1.00 ‐1525 3899
TOPSOIL
Excavation 0.00 0 0 0.00 336 Subsoil Exc 17.73 32 0 0.00 176 Fill 0.00 0 0 0.00 ‐1525 0 Mass ordinate for TOPSOIL = 0
ACP
Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 6.08 11 0 0.00 ‐1525 112
AGG_BASE
Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 14.67 27 0 0.00 ‐1525 264
SHOULDERBACKFILL
Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 0.70 1 0 0.00 ‐1525 8
80+60.00 RDWYEXC
Excavation 0.00 0 0 0.85 2791 Subsoil Exc 0.00 0 0 1.00 0 Fill 236.32 86 86 1.00 ‐1611 3985
TOPSOIL
Excavation 0.00 0 0 0.00 336 Subsoil Exc 17.82 7 0 0.00 183 Fill 0.00 0 0 0.00 ‐1611 0 Mass ordinate for TOPSOIL = 0
ACP
Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 6.08 2 0 0.00 ‐1611 114
AGG_BASE
Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 14.67 5 0 0.00 ‐1611 269
SHOULDERBACKFILL
Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 0.70 0 0 0.00 ‐1611 8
81+00.00 RDWYEXC
Excavation 0.00 0 0 0.85 2791
Fill 226.55 343 343 1.00 ‐1954 4328
TOPSOIL
Excavation 0.00 0 0 0.00 336 Subsoil Exc 17.02 26 0 0.00 209 Fill 0.00 0 0 0.00 ‐1954 0 Mass ordinate for TOPSOIL = 0
ACP
Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 6.08 9 0 0.00 ‐1954 123
AGG_BASE
Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 14.67 22 0 0.00 ‐1954 291
SHOULDERBACKFILL
Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 0.70 1 0 0.00 ‐1954 9
81+50.00 RDWYEXC
Excavation 0.00 0 0 0.85 2791 Subsoil Exc 0.00 0 0 1.00 0 Fill 237.07 429 429 1.00 ‐2383 4757
TOPSOIL
Excavation 0.00 0 0 0.00 336 Subsoil Exc 14.52 29 0 0.00 238 Fill 0.00 0 0 0.00 ‐2383 0 Mass ordinate for TOPSOIL = 0
ACP
Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 6.08 11 0 0.00 ‐2383 134
AGG_BASE
Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 14.67 27 0 0.00 ‐2383 318
SHOULDERBACKFILL
Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 0.70 1 0 0.00 ‐2383 10
82+00.00 RDWYEXC
Excavation 18.24 17 14 0.85 2808 Subsoil Exc 0.00 0 0 1.00 0 Fill 139.31 348 348 1.00 ‐2717 5105
TOPSOIL
Excavation 6.01 6 0 0.00 342 Subsoil Exc 10.94 24 0 0.00 262 Fill 0.00 0 0 0.00 ‐2717 0 Mass ordinate for TOPSOIL = 0
ACP
Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 6.08 11 0 0.00 ‐2717 145
AGG_BASE
Excavation 0.00 0 0 0.00 0
Fill 14.67 27 0 0.00 ‐2717 345
SHOULDERBACKFILL
Subsoil Exc 0.00 0 0 0.00 0 Fill 0.70 1 0 0.00 ‐2717 11
82+25.00 RDWYEXC
Excavation 52.67 33 28 0.85 2841 Subsoil Exc 0.00 0 0 1.00 0 Fill 115.91 118 118 1.00 ‐2807 5223
TOPSOIL
Excavation 15.82 10 0 0.00 352 Subsoil Exc 9.05 9 0 0.00 271 Fill 0.00 0 0 0.00 ‐2807 0 Mass ordinate for TOPSOIL = 0
ACP
Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 6.08 6 0 0.00 ‐2807 151
AGG_BASE
Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 14.67 14 0 0.00 ‐2807 359
SHOULDERBACKFILL
Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 0.70 1 0 0.00 ‐2807 12
82+50.00 RDWYEXC
Excavation 228.66 130 110 0.85 2971 Subsoil Exc 0.00 0 0 1.00 0 Fill 112.38 106 106 1.00 ‐2803 5329
TOPSOIL
Excavation 23.98 19 0 0.00 371 Subsoil Exc 9.21 8 0 0.00 279 Fill 0.00 0 0 0.00 ‐2803 0 Mass ordinate for TOPSOIL = 0
ACP
Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 6.08 6 0 0.00 ‐2803 157
AGG_BASE
Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 14.67 14 0 0.00 ‐2803 373
SHOULDERBACKFILL
Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 0.70 1 0 0.00 ‐2803 13
83+00.00 RDWYEXC
Excavation 375.54 559 476 0.85 3530 Subsoil Exc 0.00 0 0 1.00 0 Fill 86.15 184 184 1.00 ‐2511 5513
TOPSOIL
Excavation 24.31 45 0 0.00 416 Subsoil Exc 4.60 13 0 0.00 292 Fill 0.00 0 0 0.00 ‐2511 0 Mass ordinate for TOPSOIL = 0
Fill 6.08 11 0 0.00 ‐2511 168
AGG_BASE
Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 14.64 27 0 0.00 ‐2511 400
SHOULDERBACKFILL
Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 0.70 1 0 0.00 ‐2511 14
83+25.00 RDWYEXC
Excavation 261.50 295 251 0.85 3825 Subsoil Exc 0.00 0 0 1.00 0 Fill 103.79 88 88 1.00 ‐2348 5601
TOPSOIL
Excavation 24.60 22 0 0.00 438 Subsoil Exc 5.80 5 0 0.00 297 Fill 0.00 0 0 0.00 ‐2348 0 Mass ordinate for TOPSOIL = 0
ACP
Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 6.08 6 0 0.00 ‐2348 174
AGG_BASE
Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 14.57 14 0 0.00 ‐2348 414
SHOULDERBACKFILL
Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 0.69 1 0 0.00 ‐2348 15
83+50.00 RDWYEXC
Excavation 137.50 185 157 0.85 4010 Subsoil Exc 0.00 0 0 1.00 0 Fill 131.28 109 109 1.00 ‐2300 5710
TOPSOIL
Excavation 20.82 21 0 0.00 459 Subsoil Exc 8.12 6 0 0.00 303 Fill 0.00 0 0 0.00 ‐2300 0 Mass ordinate for TOPSOIL = 0
ACP
Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 6.08 6 0 0.00 ‐2300 180
AGG_BASE
Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 14.51 13 0 0.00 ‐2300 427
SHOULDERBACKFILL
Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 0.68 1 0 0.00 ‐2300 16
84+00.00 RDWYEXC
Excavation 0.00 127 108 0.85 4137 Subsoil Exc 0.00 0 0 1.00 0 Fill 231.12 336 336 1.00 ‐2528 6046
Excavation 0.00 20 0 0.00 479 Subsoil Exc 13.31 20 0 0.00 323 Fill 0.00 0 0 0.00 ‐2528 0 Mass ordinate for TOPSOIL = 0
ACP
Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 6.08 11 0 0.00 ‐2528 191
AGG_BASE
Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 14.43 27 0 0.00 ‐2528 454
SHOULDERBACKFILL
Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 0.67 1 0 0.00 ‐2528 17
84+33.48 RDWYEXC
Excavation 0.00 0 0 0.85 4137 Subsoil Exc 0.00 0 0 1.00 0 Fill 314.43 338 338 1.00 ‐2866 6384
TOPSOIL
Excavation 0.00 0 0 0.00 479 Subsoil Exc 15.11 18 0 0.00 341 Fill 0.00 0 0 0.00 ‐2866 0 Mass ordinate for TOPSOIL = 0
ACP
Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 6.11 8 0 0.00 ‐2866 199
AGG_BASE
Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 14.47 18 0 0.00 ‐2866 472
SHOULDERBACKFILL
Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 0.67 1 0 0.00 ‐2866 18
84+50.00 RDWYEXC
Excavation 0.00 0 0 0.85 4137 Subsoil Exc 0.00 0 0 1.00 0 Fill 334.44 198 198 1.00 ‐3064 6582
TOPSOIL
Excavation 0.00 0 0 0.00 479 Subsoil Exc 16.43 10 0 0.00 351 Fill 0.00 0 0 0.00 ‐3064 0 Mass ordinate for TOPSOIL = 0
ACP
Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 6.08 4 0 0.00 ‐3064 203
AGG_BASE
Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 14.42 9 0 0.00 ‐3064 481
SHOULDERBACKFILL
Excavation 0.00 0 0 0.00 0
Fill 0.67 0 0 0.00 ‐3064 18
85+00.00 RDWYEXC
Excavation 0.00 0 0 0.85 4137 Subsoil Exc 0.00 0 0 1.00 0 Fill 279.10 568 568 1.00 ‐3632 7150
TOPSOIL
Excavation 0.00 0 0 0.00 479 Subsoil Exc 13.89 28 0 0.00 379 Fill 0.00 0 0 0.00 ‐3632 0 Mass ordinate for TOPSOIL = 0
ACP
Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 6.08 11 0 0.00 ‐3632 214
AGG_BASE
Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 14.42 27 0 0.00 ‐3632 508
SHOULDERBACKFILL
Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 0.67 1 0 0.00 ‐3632 19
85+50.00 RDWYEXC
Excavation 253.60 235 200 0.85 4372 Subsoil Exc 0.00 0 0 1.00 0 Fill 229.14 471 471 1.00 ‐3903 7621
TOPSOIL
Excavation 23.21 21 0 0.00 500 Subsoil Exc 10.21 22 0 0.00 401 Fill 0.00 0 0 0.00 ‐3903 0 Mass ordinate for TOPSOIL = 0
ACP
Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 6.08 11 0 0.00 ‐3903 225
AGG_BASE
Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 14.42 27 0 0.00 ‐3903 535
SHOULDERBACKFILL
Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 0.67 1 0 0.00 ‐3903 20
85+77.12 RDWYEXC
Excavation 185.62 221 188 0.85 4593 Subsoil Exc 0.00 0 0 1.00 0 Fill 229.05 230 230 1.00 ‐3945 7851
TOPSOIL
Excavation 23.11 23 0 0.00 523 Subsoil Exc 9.33 10 0 0.00 411 Fill 0.00 0 0 0.00 ‐3945 0 Mass ordinate for TOPSOIL = 0
ACP
Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 6.08 6 0 0.00 ‐3945 231
AGG_BASE
Fill 14.45 14 0 0.00 ‐3945 549
SHOULDERBACKFILL
Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 0.67 1 0 0.00 ‐3945 21
86+00.00 RDWYEXC
Excavation 216.68 171 144 0.85 4764 Subsoil Exc 0.00 0 0 1.00 0 Fill 246.49 201 201 1.00 ‐4002 8052
TOPSOIL
Excavation 26.49 21 0 0.00 544 Subsoil Exc 10.87 9 0 0.00 420 Fill 0.00 0 0 0.00 ‐4002 0 Mass ordinate for TOPSOIL = 0
ACP
Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 6.25 5 0 0.00 ‐4002 236
AGG_BASE
Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 14.80 12 0 0.00 ‐4002 561
SHOULDERBACKFILL
Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 0.67 1 0 0.00 ‐4002 22
86+50.00 RDWYEXC
Excavation 267.54 449 381 0.85 5213 Subsoil Exc 0.00 0 0 1.00 0 Fill 153.08 370 370 1.00 ‐3991 8422
TOPSOIL
Excavation 26.17 49 0 0.00 593 Subsoil Exc 7.75 17 0 0.00 437 Fill 0.00 0 0 0.00 ‐3991 0 Mass ordinate for TOPSOIL = 0
ACP
Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 6.60 12 0 0.00 ‐3991 248
AGG_BASE
Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 15.60 28 0 0.00 ‐3991 589
SHOULDERBACKFILL
Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 0.69 1 0 0.00 ‐3991 23
87+00.00 RDWYEXC
Excavation 547.68 754 641 0.85 5967 Subsoil Exc 0.00 0 0 1.00 0 Fill 164.34 294 294 1.00 ‐3644 8716
TOPSOIL
Excavation 28.96 51 0 0.00 644 Subsoil Exc 9.00 16 0 0.00 453 Fill 0.00 0 0 0.00 ‐3644 0
Subsoil Exc 0.00 0 0 0.00 0 Fill 6.95 13 0 0.00 ‐3644 261
AGG_BASE
Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 16.44 30 0 0.00 ‐3644 619
SHOULDERBACKFILL
Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 0.70 1 0 0.00 ‐3644 24
87+37.63 RDWYEXC
Excavation 502.04 731 622 0.85 6698 Subsoil Exc 0.00 0 0 1.00 0 Fill 121.97 200 200 1.00 ‐3222 8916
TOPSOIL
Excavation 23.37 37 0 0.00 681 Subsoil Exc 4.38 9 0 0.00 462 Fill 0.00 0 0 0.00 ‐3222 0 Mass ordinate for TOPSOIL = 0
ACP
Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 7.11 10 0 0.00 ‐3222 271
AGG_BASE
Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 16.88 23 0 0.00 ‐3222 642
SHOULDERBACKFILL
Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 0.72 1 0 0.00 ‐3222 25
87+50.00 RDWYEXC
Excavation 544.47 240 204 0.85 6938 Subsoil Exc 0.00 0 0 1.00 0 Fill 122.44 56 56 1.00 ‐3074 8972
TOPSOIL
Excavation 21.56 10 0 0.00 691 Subsoil Exc 4.10 2 0 0.00 464 Fill 0.00 0 0 0.00 ‐3074 0 Mass ordinate for TOPSOIL = 0
ACP
Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 7.11 3 0 0.00 ‐3074 274
AGG_BASE
Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 16.88 8 0 0.00 ‐3074 650
SHOULDERBACKFILL
Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 0.72 0 0 0.00 ‐3074 25
88+00.00 RDWYEXC
Excavation 556.69 1020 867 0.85 7958
Fill 188.32 288 288 1.00 ‐2495 9260
Excavation 30.44 48 0 0.00 739 Subsoil Exc 7.32 11 0 0.00 475 Fill 0.00 0 0 0.00 ‐2495 0 Mass ordinate for TOPSOIL = 0
ACP
Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 7.11 13 0 0.00 ‐2495 287
AGG_BASE
Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 16.88 31 0 0.00 ‐2495 681
SHOULDERBACKFILL
Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 0.72 1 0 0.00 ‐2495 26
88+50.00 RDWYEXC
Excavation 793.72 1251 1063 0.85 9209 Subsoil Exc 0.00 0 0 1.00 0 Fill 207.04 366 366 1.00 ‐1798 9626
TOPSOIL
Excavation 20.20 47 0 0.00 786 Subsoil Exc 8.08 14 0 0.00 489 Fill 0.00 0 0 0.00 ‐1798 0 Mass ordinate for TOPSOIL = 0
ACP
Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 7.11 13 0 0.00 ‐1798 300
AGG_BASE
Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 16.88 31 0 0.00 ‐1798 712
SHOULDERBACKFILL
Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 0.72 1 0 0.00 ‐1798 27
89+00.00 RDWYEXC
Excavation 979.08 1641 1395 0.85 10850 Subsoil Exc 0.00 0 0 1.00 0 Fill 173.72 353 353 1.00 ‐756 9979
TOPSOIL
Excavation 20.93 38 0 0.00 824 Subsoil Exc 6.92 14 0 0.00 503 Fill 0.00 0 0 0.00 ‐756 0 Mass ordinate for TOPSOIL = 0
ACP
Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 7.10 13 0 0.00 ‐756 313
AGG_BASE
Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 16.86 31 0 0.00 ‐756 743
Fill 0.72 1 0 0.00 ‐756 28
89+50.00 RDWYEXC
Excavation 1077.87 1904 1619 0.85 12754 Subsoil Exc 0.00 0 0 1.00 0 Fill 95.52 249 249 1.00 614 10228
TOPSOIL
Excavation 26.07 43 0 0.00 867 Subsoil Exc 3.98 10 0 0.00 513 Fill 0.00 0 0 0.00 614 0 Mass ordinate for TOPSOIL = 0
ACP
Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 7.11 13 0 0.00 614 326
AGG_BASE
Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 16.88 31 0 0.00 614 774
SHOULDERBACKFILL
Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 0.72 1 0 0.00 614 29
90+00.00 RDWYEXC
Excavation 574.87 1530 1301 0.85 14284 Subsoil Exc 0.00 0 0 1.00 0 Fill 86.72 169 169 1.00 1746 10397
TOPSOIL
Excavation 35.86 58 0 0.00 925 Subsoil Exc 4.36 8 0 0.00 521 Fill 0.00 0 0 0.00 1746 0 Mass ordinate for TOPSOIL = 0
ACP
Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 7.11 13 0 0.00 1746 339
AGG_BASE
Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 16.88 31 0 0.00 1746 805
SHOULDERBACKFILL
Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 0.72 1 0 0.00 1746 30
90+28.73 RDWYEXC
Excavation 413.20 525 446 0.85 14809 Subsoil Exc 0.00 0 0 1.00 0 Fill 160.73 132 132 1.00 2060 10529
TOPSOIL
Excavation 28.85 35 0 0.00 960 Subsoil Exc 8.65 7 0 0.00 528 Fill 0.00 0 0 0.00 2060 0 Mass ordinate for TOPSOIL = 0
ACP
Excavation 0.00 0 0 0.00 0
Fill 7.11 8 0 0.00 2060 347
Subsoil Exc 0.00 0 0 0.00 0 Fill 16.88 18 0 0.00 2060 823
SHOULDERBACKFILL
Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 0.72 1 0 0.00 2060 31
90+50.00 RDWYEXC
Excavation 309.98 285 242 0.85 15094 Subsoil Exc 0.00 0 0 1.00 0 Fill 187.44 137 137 1.00 2165 10666
TOPSOIL
Excavation 24.66 21 0 0.00 981 Subsoil Exc 9.46 7 0 0.00 535 Fill 0.00 0 0 0.00 2165 0 Mass ordinate for TOPSOIL = 0
ACP
Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 6.78 5 0 0.00 2165 352
AGG_BASE
Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 16.15 13 0 0.00 2165 836
SHOULDERBACKFILL
Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 0.71 1 0 0.00 2165 32
90+83.37 RDWYEXC
Excavation 166.07 294 250 0.85 15388 Subsoil Exc 0.00 0 0 1.00 0 Fill 231.98 259 259 1.00 2156 10925
TOPSOIL
Excavation 22.76 29 0 0.00 1010 Subsoil Exc 11.56 13 0 0.00 548 Fill 0.00 0 0 0.00 2156 0 Mass ordinate for TOPSOIL = 0
ACP
Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 6.08 8 0 0.00 2156 360
AGG_BASE
Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 14.65 19 0 0.00 2156 855
SHOULDERBACKFILL
Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 0.70 1 0 0.00 2156 33
91+00.00 RDWYEXC
Excavation 66.34 72 61 0.85 15460 Subsoil Exc 0.00 0 0 1.00 0 Fill 240.45 145 145 1.00 2072 11070
TOPSOIL
Excavation 13.16 11 0 0.00 1021 Subsoil Exc 11.12 7 0 0.00 555
Fill 0.00 0 0 0.00 2072 0
ACP
Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 6.08 4 0 0.00 2072 364
AGG_BASE
Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 14.65 9 0 0.00 2072 864
SHOULDERBACKFILL
Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 0.70 0 0 0.00 2072 33
91+04.00 RDWYEXC
Excavation 69.76 10 9 0.85 15470 Subsoil Exc 0.00 0 0 1.00 0 Fill 237.01 35 35 1.00 2046 11105
TOPSOIL
Excavation 13.46 2 0 0.00 1023 Subsoil Exc 10.98 2 0 0.00 557 Fill 0.00 0 0 0.00 2046 0 Mass ordinate for TOPSOIL = 0
ACP
Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 6.08 1 0 0.00 2046 365
AGG_BASE
Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 14.65 2 0 0.00 2046 866
SHOULDERBACKFILL
Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 0.70 0 0 0.00 2046 33
91+50.00 RDWYEXC
Excavation 128.03 168 143 0.85 15638 Subsoil Exc 0.00 0 0 1.00 0 Fill 195.23 368 368 1.00 1821 11473
TOPSOIL
Excavation 16.29 25 0 0.00 1048 Subsoil Exc 8.21 16 0 0.00 573 Fill 0.00 0 0 0.00 1821 0 Mass ordinate for TOPSOIL = 0
ACP
Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 6.08 10 0 0.00 1821 375
AGG_BASE
Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 14.65 25 0 0.00 1821 891
SHOULDERBACKFILL
Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 0.70 1 0 0.00 1821 34
92+00.00 RDWYEXC
Excavation 191.94 296 252 0.85 15934
Fill 197.32 363 363 1.00 1710 11836
TOPSOIL
Excavation 18.04 32 0 0.00 1080 Subsoil Exc 8.18 15 0 0.00 588 Fill 0.00 0 0 0.00 1710 0 Mass ordinate for TOPSOIL = 0
ACP
Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 6.08 11 0 0.00 1710 386
AGG_BASE
Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 14.65 27 0 0.00 1710 918
SHOULDERBACKFILL
Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 0.70 1 0 0.00 1710 35
92+50.00 RDWYEXC
Excavation 345.72 498 424 0.85 16432 Subsoil Exc 0.00 0 0 1.00 0 Fill 173.97 344 344 1.00 1790 12180
TOPSOIL
Excavation 17.52 33 0 0.00 1113 Subsoil Exc 6.94 14 0 0.00 602 Fill 0.00 0 0 0.00 1790 0 Mass ordinate for TOPSOIL = 0
ACP
Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 6.08 11 0 0.00 1790 397
AGG_BASE
Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 14.70 27 0 0.00 1790 945
SHOULDERBACKFILL
Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 0.70 1 0 0.00 1790 36
92+70.67 RDWYEXC
Excavation 476.52 314 268 0.85 16746 Subsoil Exc 0.00 0 0 1.00 0 Fill 150.03 124 124 1.00 1934 12304
TOPSOIL
Excavation 20.57 14 0 0.00 1127 Subsoil Exc 6.95 5 0 0.00 607 Fill 0.00 0 0 0.00 1934 0 Mass ordinate for TOPSOIL = 0
ACP
Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 6.08 5 0 0.00 1934 402
AGG_BASE
Excavation 0.00 0 0 0.00 0
Fill 14.76 11 0 0.00 1934 956
Subsoil Exc 0.00 0 0 0.00 0 Fill 0.71 1 0 0.00 1934 37
93+00.00 RDWYEXC
Excavation 1546.32 1098 934 0.85 17844 Subsoil Exc 0.00 0 0 1.00 0 Fill 126.18 150 150 1.00 2718 12454
TOPSOIL
Excavation 32.87 29 0 0.00 1156 Subsoil Exc 2.77 5 0 0.00 612 Fill 0.00 0 0 0.00 2718 0 Mass ordinate for TOPSOIL = 0
ACP
Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 6.66 7 0 0.00 2718 409
AGG_BASE
Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 16.70 17 0 0.00 2718 973
SHOULDERBACKFILL
Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 1.10 1 0 0.00 2718 38
93+16.45 RDWYEXC
Excavation 2270.74 1163 988 0.85 19007 Subsoil Exc 0.00 0 0 1.00 0 Fill 129.14 78 78 1.00 3628 12532
TOPSOIL
Excavation 34.77 21 0 0.00 1177 Subsoil Exc 2.52 2 0 0.00 614 Fill 0.00 0 0 0.00 3628 0 Mass ordinate for TOPSOIL = 0
ACP
Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 7.26 4 0 0.00 3628 413
AGG_BASE
Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 18.04 11 0 0.00 3628 984
SHOULDERBACKFILL
Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 1.17 1 0 0.00 3628 39
93+25.00 RDWYEXC
Excavation 2352.70 732 622 0.85 19739 Subsoil Exc 0.00 0 0 1.00 0 Fill 116.37 39 39 1.00 4211 12571
TOPSOIL
Excavation 36.45 11 0 0.00 1188 Subsoil Exc 2.47 1 0 0.00 615 Fill 0.00 0 0 0.00 4211 0 Mass ordinate for TOPSOIL = 0
Fill 7.62 2 0 0.00 4211 415
AGG_BASE
Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 17.30 6 0 0.00 4211 990
SHOULDERBACKFILL
Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 0.17 0 0 0.00 4211 39
93+50.00 RDWYEXC
Excavation 2499.56 2246 1909 0.85 21985 Subsoil Exc 0.00 0 0 1.00 0 Fill 102.75 101 101 1.00 6019 12672
TOPSOIL
Excavation 39.69 35 0 0.00 1223 Subsoil Exc 2.76 2 0 0.00 617 Fill 0.00 0 0 0.00 6019 0 Mass ordinate for TOPSOIL = 0
ACP
Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 7.60 7 0 0.00 6019 422
AGG_BASE
Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 17.30 16 0 0.00 6019 1006
SHOULDERBACKFILL
Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 0.17 0 0 0.00 6019 39
93+66.32 RDWYEXC
Excavation 2360.57 1468 1248 0.85 23453 Subsoil Exc 0.00 0 0 1.00 0 Fill 96.13 60 60 1.00 7207 12732
TOPSOIL
Excavation 40.14 24 0 0.00 1247 Subsoil Exc 2.94 2 0 0.00 619 Fill 0.00 0 0 0.00 7207 0 Mass ordinate for TOPSOIL = 0
ACP
Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 7.62 5 0 0.00 7207 427
AGG_BASE
Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 17.30 10 0 0.00 7207 1016
SHOULDERBACKFILL
Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 0.17 0 0 0.00 7207 39
93+79.85 RDWYEXC
Excavation 2203.17 1143 971 0.85 24596 Subsoil Exc 0.00 0 0 1.00 0 Fill 94.83 48 48 1.00 8130 12780
Excavation 39.69 20 0 0.00 1267 Subsoil Exc 3.27 2 0 0.00 621 Fill 0.00 0 0 0.00 8130 0 Mass ordinate for TOPSOIL = 0
ACP
Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 7.62 4 0 0.00 8130 431
AGG_BASE
Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 17.30 9 0 0.00 8130 1025
SHOULDERBACKFILL
Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 0.17 0 0 0.00 8130 39
94+00.00 RDWYEXC
Excavation 1879.89 1524 1295 0.85 26120 Subsoil Exc 0.00 0 0 1.00 0 Fill 120.27 80 80 1.00 9345 12860
TOPSOIL
Excavation 34.84 28 0 0.00 1295 Subsoil Exc 4.19 3 0 0.00 624 Fill 0.00 0 0 0.00 9345 0 Mass ordinate for TOPSOIL = 0
ACP
Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 7.62 6 0 0.00 9345 437
AGG_BASE
Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 17.30 13 0 0.00 9345 1038
SHOULDERBACKFILL
Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 0.17 0 0 0.00 9345 39
94+05.00 RDWYEXC
Excavation 1753.89 337 286 0.85 26457 Subsoil Exc 0.00 0 0 1.00 0 Fill 141.32 24 24 1.00 9607 12884
TOPSOIL
Excavation 34.21 6 0 0.00 1301 Subsoil Exc 4.22 1 0 0.00 625 Fill 0.00 0 0 0.00 9607 0 Mass ordinate for TOPSOIL = 0
ACP
Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 7.62 1 0 0.00 9607 438
AGG_BASE
Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 19.10 3 0 0.00 9607 1041
SHOULDERBACKFILL
Excavation 0.00 0 0 0.00 0
Fill 1.07 0 0 0.00 9607 39
94+08.90 RDWYEXC
Excavation 1660.32 247 209 0.85 26704 Subsoil Exc 0.00 0 0 1.00 0 Fill 117.75 19 19 1.00 9797 12903
TOPSOIL
Excavation 34.21 5 0 0.00 1306 Subsoil Exc 4.25 1 0 0.00 626 Fill 0.00 0 0 0.00 9797 0 Mass ordinate for TOPSOIL = 0
ACP
Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 7.44 1 0 0.00 9797 439
AGG_BASE
Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 18.05 3 0 0.00 9797 1044
SHOULDERBACKFILL
Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 0.98 0 0 0.00 9797 39
94+50.00 RDWYEXC
Excavation 615.79 1733 1473 0.85 28437 Subsoil Exc 0.00 0 0 1.00 0 Fill 102.34 168 168 1.00 11102 13071
TOPSOIL
Excavation 29.12 48 0 0.00 1354 Subsoil Exc 6.55 8 0 0.00 634 Fill 0.00 0 0 0.00 11102 0 Mass ordinate for TOPSOIL = 0
ACP
Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 6.00 10 0 0.00 11102 449
AGG_BASE
Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 15.11 25 0 0.00 11102 1069
SHOULDERBACKFILL
Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 0.98 1 0 0.00 11102 40
94+55.00 RDWYEXC
Excavation 441.26 98 83 0.85 28535 Subsoil Exc 0.00 0 0 1.00 0 Fill 107.69 19 19 1.00 11166 13090
TOPSOIL
Excavation 25.41 5 0 0.00 1359 Subsoil Exc 6.78 1 0 0.00 635 Fill 0.00 0 0 0.00 11166 0 Mass ordinate for TOPSOIL = 0
ACP
Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 6.08 1 0 0.00 11166 450
Fill 14.71 3 0 0.00 11166 1072
SHOULDERBACKFILL
Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 0.70 0 0 0.00 11166 40
94+71.00 RDWYEXC
Excavation 175.39 183 155 0.85 28718 Subsoil Exc 0.00 0 0 1.00 0 Fill 200.50 91 91 1.00 11230 13181
TOPSOIL
Excavation 14.30 11 0 0.00 1370 Subsoil Exc 11.29 5 0 0.00 640 Fill 0.00 0 0 0.00 11230 0 Mass ordinate for TOPSOIL = 0
ACP
Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 6.08 4 0 0.00 11230 454
AGG_BASE
Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 14.68 9 0 0.00 11230 1081
SHOULDERBACKFILL
Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 0.70 0 0 0.00 11230 40
94+75.00 RDWYEXC
Excavation 178.21 26 22 0.85 28744 Subsoil Exc 0.00 0 0 1.00 0 Fill 204.72 30 30 1.00 11222 13211
TOPSOIL
Excavation 14.46 2 0 0.00 1372 Subsoil Exc 10.98 2 0 0.00 642 Fill 0.00 0 0 0.00 11222 0 Mass ordinate for TOPSOIL = 0
ACP
Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 6.08 1 0 0.00 11222 455
AGG_BASE
Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 14.67 2 0 0.00 11222 1083
SHOULDERBACKFILL
Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 0.70 0 0 0.00 11222 40
95+00.00 RDWYEXC
Excavation 230.75 189 160 0.85 28933 Subsoil Exc 0.00 0 0 1.00 0 Fill 165.99 172 172 1.00 11210 13383
TOPSOIL
Excavation 15.74 14 0 0.00 1386 Subsoil Exc 8.11 9 0 0.00 651 Fill 0.00 0 0 0.00 11210 0
Subsoil Exc 0.00 0 0 0.00 0 Fill 6.08 6 0 0.00 11210 461
AGG_BASE
Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 14.63 14 0 0.00 11210 1097
SHOULDERBACKFILL
Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 0.69 1 0 0.00 11210 41
95+50.00 RDWYEXC
Excavation 238.81 434 369 0.85 29367 Subsoil Exc 0.00 0 0 1.00 0 Fill 182.21 322 322 1.00 11257 13705
TOPSOIL
Excavation 16.53 30 0 0.00 1416 Subsoil Exc 7.62 15 0 0.00 666 Fill 0.00 0 0 0.00 11257 0 Mass ordinate for TOPSOIL = 0
ACP
Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 6.08 11 0 0.00 11257 472
AGG_BASE
Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 14.55 27 0 0.00 11257 1124
SHOULDERBACKFILL
Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 0.68 1 0 0.00 11257 42
96+00.00 RDWYEXC
Excavation 198.97 405 344 0.85 29772 Subsoil Exc 0.00 0 0 1.00 0 Fill 157.70 315 315 1.00 11286 14020
TOPSOIL
Excavation 14.75 29 0 0.00 1445 Subsoil Exc 9.63 16 0 0.00 682 Fill 0.00 0 0 0.00 11286 0 Mass ordinate for TOPSOIL = 0
ACP
Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 6.08 11 0 0.00 11286 483
AGG_BASE
Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 14.49 27 0 0.00 11286 1151
SHOULDERBACKFILL
Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 0.68 1 0 0.00 11286 43
96+50.00 RDWYEXC
Excavation 130.14 305 259 0.85 30077
Fill 169.48 303 303 1.00 11242 14323
Excavation 12.16 25 0