af05801_TIE1_Earthwork.pdf

PDF 71 KB Posted

Attached to
AK PFH 58(1), Neck Lake Road Reconstruction: NPOWI Hwy. to Marine Access Facility Jct.
Solicitation number
69056725B000001
Issued by

About this file

This document appears to be a Schedule A Earthwork for the Neck Lake Road Reconstruction project, which is a federal contract opportunity with the Department of Transportation Federal Highway Administration. The project involves roadway excavation, sub-excavation, soft ground embankment construction, grading, rock blasting, riprap placement, rockery, drainage, embankment, placement of aggregate surface course, guardrail installation, erosion control, temporary traffic control, permanent signage, and turf establishment along 1.6 miles of road reconstruction. The contract is a Sealed Bid, Firm-Fixed-Price type, with an estimated price range between $10,000,000 and $20,000,000. The project is anticipated to be solicited in Winter 2024/2025 and the tentative completion date is Fall 2026.

View the file

Other files

File Type Posted
BidTab Neck Lake Road Reconstruction.pdf PDF
BidSum-AK PFH 58(1).pdf PDF
Amendment A008.pdf PDF
QA_01-08-2025.pdf PDF
QA_01-07-2025.pdf PDF
Amendment A007.pdf PDF
Amendment A006.pdf PDF
QA_12-30-2024.pdf PDF
Amendment A005.pdf PDF
Amendment A004.pdf PDF
Amendment A003.pdf PDF
QA_12-16-2024.pdf PDF
QA_12-13-2024.pdf PDF
Amendment A002.pdf PDF
QA_12-18-2024.pdf PDF
QA_12-06-2024.pdf PDF
Amendment A001.pdf PDF
QA_12-05-2024.pdf PDF
QA_11-26-2024.pdf PDF
af05801_SEGMENT1_proposed-alignment.pdf PDF
af05801_XS_Labeled_SchA.pdf PDF
af05801_SEGMENT1_proposed-profile.pdf PDF
af05801_XS_SchA.pdf PDF
af05801_TIE4_Earthwork.pdf PDF
af05801_SchedA_Earthwork.pdf PDF
af05801_SchedB_Earthwork.pdf PDF
ak pfh 58(1)_Neck Lake ARD Technical Memorandum.pdf PDF
af05801_TIE4_proposed-alignment.pdf PDF
ak pfh 58(1)_GR1516_pp385-973.pdf PDF
af05801_TIE2_superelevation.pdf PDF
af05801_TIE1_proposed-profile.pdf PDF
af05801_TIE2_proposed-alignment.pdf PDF
af05801_TIE4_proposed-profile.pdf PDF
af05801_TIE4_superelevation.pdf PDF
IFB AK PFH 58(1) Neck Lake Road Reconstruction.pdf PDF
af05801_SchedC_Earthwork.pdf PDF
af05801_BULK_proposed-alignment.pdf PDF
ak pfh 58(1)_FinalHydraulicReport.pdf PDF
ak pfh 58(1)_XS Approaches_SchC.pdf PDF
aka-pfh58-1_SWPPP for compilation_Final.pdf PDF
af05801_BULK_Earthwork.pdf PDF
af05801_Segment1_superelevation.pdf PDF
af05801_TIE2_Earthwork.pdf PDF
af05801_XS_SchB.pdf PDF
ak pfh 58(1)_NeckLakeRoad_Rockery_TM 1.21.2019.pdf PDF
af05801_TIE1_superelevation.pdf PDF
af05801_TIE3_Earthwork.pdf PDF
ak pfh 58(1)_GR1516_pp1-384.pdf PDF
af05801_XS_Labeled_SchC.pdf PDF
af05801_SEGMENT1_proposed-alignment.pdf PDF
Show 40 more

Latest 50 of 62 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Schedule A

Earthwork stations 73+70 to 76+00

AK PFH 58(1),

Neck Lake Road Reconstruction: NPOWI Hwy. to Marine Access Facility Jct.

Material Name End Areas Unadjusted Adjusted Mult Mass Accum Station Volumes Volumes Factor Ordinate Unadj Vol

(sq. ft.) (cu. yd.) (cu. yd.) (cu. yd.)

73+70.00 RDWYEXC

Excavation 15.05 0 0 0.85 0 Subsoil Exc 0.00 0 0 1.00 0 Fill 36.72 0 0 1.00 0 0

TOPSOIL

Excavation 7.56 0 0 0.00 0 Subsoil Exc 19.10 0 0 0.00 0 Fill 0.00 0 0 0.00 0 0 Mass ordinate for TOPSOIL = 0

DELETE

Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 5.19 0 0 0.00 0 0

AGG_BASE

Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 12.17 0 0 0.00 0 0

SHOULDERBACKFILL

Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 0.16 0 0 0.00 0 0

74+00.00 RDWYEXC

Excavation 27.58 23 20 0.85 23 Subsoil Exc 0.00 0 0 1.00 0 Fill 28.32 36 36 1.00 ‐16 36

TOPSOIL

Excavation 13.42 12 0 0.00 12 Subsoil Exc 14.66 19 0 0.00 19 Fill 0.00 0 0 0.00 ‐16 0 Mass ordinate for TOPSOIL = 0

DELETE

Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 5.37 6 0 0.00 ‐16 6

AGG_BASE

Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 11.91 13 0 0.00 ‐16 13

SHOULDERBACKFILL

Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 0.16 0 0 0.00 ‐16 0

74+50.00 RDWYEXC

Excavation 13.35 37 32 0.85 60 Subsoil Exc 0.00 0 0 1.00 0 Fill 77.30 98 98 1.00 ‐82 134

TOPSOIL

Excavation 10.22 22 0 0.00 34 Subsoil Exc 20.48 33 0 0.00 52 Fill 0.00 0 0 0.00 ‐82 0 Mass ordinate for TOPSOIL = 0

DELETE

Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0

Fill 5.11 10 0 0.00 ‐82 16

AGG_BASE

Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 12.17 22 0 0.00 ‐82 35

SHOULDERBACKFILL

Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 0.16 0 0 0.00 ‐82 0

75+00.00 RDWYEXC

Excavation 5.47 17 15 0.85 77 Subsoil Exc 0.00 0 0 1.00 0 Fill 97.02 161 161 1.00 ‐228 295

TOPSOIL

Excavation 5.69 15 0 0.00 49 Subsoil Exc 18.64 36 0 0.00 88 Fill 0.00 0 0 0.00 ‐228 0 Mass ordinate for TOPSOIL = 0

DELETE

Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 5.11 9 0 0.00 ‐228 25

AGG_BASE

Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 12.17 23 0 0.00 ‐228 58

SHOULDERBACKFILL

Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 0.16 0 0 0.00 ‐228 0

75+50.00 RDWYEXC

Excavation 154.43 149 126 0.85 226 Subsoil Exc 0.00 0 0 1.00 0 Fill 31.81 119 119 1.00 ‐221 414

TOPSOIL

Excavation 23.41 27 0 0.00 76 Subsoil Exc 6.37 23 0 0.00 111 Fill 0.00 0 0 0.00 ‐221 0 Mass ordinate for TOPSOIL = 0

DELETE

Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 5.11 9 0 0.00 ‐221 34

AGG_BASE

Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 12.17 23 0 0.00 ‐221 81

SHOULDERBACKFILL

Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 0.16 0 0 0.00 ‐221 0

76+00.00 RDWYEXC

Excavation 151.82 284 241 0.85 510 Subsoil Exc 0.00 0 0 1.00 0 Fill 72.14 96 96 1.00 ‐76 510

TOPSOIL

Excavation 17.44 37 0 0.00 113

Subsoil Exc 9.64 15 0 0.00 126 Fill 0.00 0 0 0.00 ‐76 0 Mass ordinate for TOPSOIL = 0

DELETE

Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 5.11 9 0 0.00 ‐76 43

AGG_BASE

Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 12.03 22 0 0.00 ‐76 103

SHOULDERBACKFILL

Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 0.15 0 0 0.00 ‐76 0 � G R A N D S U M M A R Y T O T A L S Material Name Unadjusted Adjusted Mult Volumes Volumes Factor

(cu. yd.) (cu. yd.)

RDWYEXC

Excavation 510 434 0.85 Subsoil Exc 0 0 1.00 Fill 510 510 1.00

TOPSOIL

Excavation 113 0 0.00 Subsoil Exc 126 0 0.00 Fill 0 0 0.00

DELETE

Excavation 0 0 0.00 Subsoil Exc 0 0 0.00 Fill 43 0 0.00

AGG_BASE

Excavation 0 0 0.00 Subsoil Exc 0 0 0.00 Fill 103 0 0.00

SHOULDERBACKFILL

Excavation 0 0 0.00 Subsoil Exc 0 0 0.00 Fill 0 0 0.00

File details come from the government source that posted it. Updated .