This document appears to be a Schedule A Earthwork for the Neck Lake Road Reconstruction project, which is a federal contract opportunity with the Department of Transportation Federal Highway Administration. The project involves roadway excavation, sub-excavation, soft ground embankment construction, grading, rock blasting, riprap placement, rockery, drainage, embankment, placement of aggregate surface course, guardrail installation, erosion control, temporary traffic control, permanent signage, and turf establishment along 1.6 miles of road reconstruction. The contract is a Sealed Bid, Firm-Fixed-Price type, with an estimated price range between $10,000,000 and $20,000,000. The project is anticipated to be solicited in Winter 2024/2025 and the tentative completion date is Fall 2026.
View the file
Other files
Show 40 more
Latest 50 of 62 listed here. See the rest on GovTribe.
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Schedule A
Earthwork stations 73+70 to 76+00
AK PFH 58(1),
Neck Lake Road Reconstruction: NPOWI Hwy. to Marine Access Facility Jct.
Material Name End Areas Unadjusted Adjusted Mult Mass Accum Station Volumes Volumes Factor Ordinate Unadj Vol
(sq. ft.) (cu. yd.) (cu. yd.) (cu. yd.)
73+70.00 RDWYEXC
Excavation 15.05 0 0 0.85 0 Subsoil Exc 0.00 0 0 1.00 0 Fill 36.72 0 0 1.00 0 0
TOPSOIL
Excavation 7.56 0 0 0.00 0 Subsoil Exc 19.10 0 0 0.00 0 Fill 0.00 0 0 0.00 0 0 Mass ordinate for TOPSOIL = 0
DELETE
Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 5.19 0 0 0.00 0 0
AGG_BASE
Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 12.17 0 0 0.00 0 0
SHOULDERBACKFILL
Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 0.16 0 0 0.00 0 0
74+00.00 RDWYEXC
Excavation 27.58 23 20 0.85 23 Subsoil Exc 0.00 0 0 1.00 0 Fill 28.32 36 36 1.00 ‐16 36
TOPSOIL
Excavation 13.42 12 0 0.00 12 Subsoil Exc 14.66 19 0 0.00 19 Fill 0.00 0 0 0.00 ‐16 0 Mass ordinate for TOPSOIL = 0
DELETE
Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 5.37 6 0 0.00 ‐16 6
AGG_BASE
Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 11.91 13 0 0.00 ‐16 13
SHOULDERBACKFILL
Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 0.16 0 0 0.00 ‐16 0
74+50.00 RDWYEXC
Excavation 13.35 37 32 0.85 60 Subsoil Exc 0.00 0 0 1.00 0 Fill 77.30 98 98 1.00 ‐82 134
TOPSOIL
Excavation 10.22 22 0 0.00 34 Subsoil Exc 20.48 33 0 0.00 52 Fill 0.00 0 0 0.00 ‐82 0 Mass ordinate for TOPSOIL = 0
DELETE
Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0
Fill 5.11 10 0 0.00 ‐82 16
AGG_BASE
Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 12.17 22 0 0.00 ‐82 35
SHOULDERBACKFILL
Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 0.16 0 0 0.00 ‐82 0
75+00.00 RDWYEXC
Excavation 5.47 17 15 0.85 77 Subsoil Exc 0.00 0 0 1.00 0 Fill 97.02 161 161 1.00 ‐228 295
TOPSOIL
Excavation 5.69 15 0 0.00 49 Subsoil Exc 18.64 36 0 0.00 88 Fill 0.00 0 0 0.00 ‐228 0 Mass ordinate for TOPSOIL = 0
DELETE
Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 5.11 9 0 0.00 ‐228 25
AGG_BASE
Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 12.17 23 0 0.00 ‐228 58
SHOULDERBACKFILL
Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 0.16 0 0 0.00 ‐228 0
75+50.00 RDWYEXC
Excavation 154.43 149 126 0.85 226 Subsoil Exc 0.00 0 0 1.00 0 Fill 31.81 119 119 1.00 ‐221 414
TOPSOIL
Excavation 23.41 27 0 0.00 76 Subsoil Exc 6.37 23 0 0.00 111 Fill 0.00 0 0 0.00 ‐221 0 Mass ordinate for TOPSOIL = 0
DELETE
Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 5.11 9 0 0.00 ‐221 34
AGG_BASE
Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 12.17 23 0 0.00 ‐221 81
SHOULDERBACKFILL
Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 0.16 0 0 0.00 ‐221 0
76+00.00 RDWYEXC
Excavation 151.82 284 241 0.85 510 Subsoil Exc 0.00 0 0 1.00 0 Fill 72.14 96 96 1.00 ‐76 510
TOPSOIL
Excavation 17.44 37 0 0.00 113
Subsoil Exc 9.64 15 0 0.00 126 Fill 0.00 0 0 0.00 ‐76 0 Mass ordinate for TOPSOIL = 0
DELETE
Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 5.11 9 0 0.00 ‐76 43
AGG_BASE
Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 12.03 22 0 0.00 ‐76 103
SHOULDERBACKFILL
Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 0.15 0 0 0.00 ‐76 0 � G R A N D S U M M A R Y T O T A L S Material Name Unadjusted Adjusted Mult Volumes Volumes Factor
(cu. yd.) (cu. yd.)
RDWYEXC
Excavation 510 434 0.85 Subsoil Exc 0 0 1.00 Fill 510 510 1.00
TOPSOIL
Excavation 113 0 0.00 Subsoil Exc 126 0 0.00 Fill 0 0 0.00
DELETE
Excavation 0 0 0.00 Subsoil Exc 0 0 0.00 Fill 43 0 0.00
AGG_BASE
Excavation 0 0 0.00 Subsoil Exc 0 0 0.00 Fill 103 0 0.00
SHOULDERBACKFILL
Excavation 0 0 0.00 Subsoil Exc 0 0 0.00 Fill 0 0 0.00
File details come from the government source that posted it. Updated .