This document appears to be a profile plan for tie-in stations as part of a larger federal contract opportunity for the AK PFH 58(1), Neck Lake Road Reconstruction project. The project involves approximately 6 miles of road reconstruction work, including roadway excavation, embankment construction, grading, blasting, drainage, guardrail installation, and other associated civil works. The contract is being offered by the Department of Transportation Federal Highway Administration as a sealed bid, firm-fixed-price opportunity with an estimated value between $10 - $20 million. The project is anticipated to be solicited in Winter 2024/2025, with a tentative completion date in Fall 2026. The profile plan provides technical details on the vertical alignment and grade changes for a 3.5-mile segment of the roadway reconstruction.

View the file

Other files

File Type Posted
BidTab Neck Lake Road Reconstruction.pdf PDF
BidSum-AK PFH 58(1).pdf PDF
Amendment A008.pdf PDF
QA_01-08-2025.pdf PDF
QA_01-07-2025.pdf PDF
Amendment A007.pdf PDF
Amendment A006.pdf PDF
QA_12-30-2024.pdf PDF
Amendment A005.pdf PDF
Amendment A004.pdf PDF
Amendment A003.pdf PDF
QA_12-16-2024.pdf PDF
QA_12-13-2024.pdf PDF
Amendment A002.pdf PDF
QA_12-18-2024.pdf PDF
QA_12-06-2024.pdf PDF
Amendment A001.pdf PDF
QA_12-05-2024.pdf PDF
QA_11-26-2024.pdf PDF
af05801_SEGMENT1_proposed-alignment.pdf PDF
af05801_XS_Labeled_SchA.pdf PDF
af05801_SEGMENT1_proposed-profile.pdf PDF
af05801_XS_SchA.pdf PDF
af05801_TIE4_Earthwork.pdf PDF
af05801_SchedA_Earthwork.pdf PDF
af05801_SchedB_Earthwork.pdf PDF
ak pfh 58(1)_Neck Lake ARD Technical Memorandum.pdf PDF
af05801_TIE4_proposed-alignment.pdf PDF
af05801_TIE1_Earthwork.pdf PDF
ak pfh 58(1)_GR1516_pp385-973.pdf PDF
af05801_TIE2_superelevation.pdf PDF
af05801_TIE1_proposed-profile.pdf PDF
af05801_TIE2_proposed-alignment.pdf PDF
af05801_TIE4_superelevation.pdf PDF
IFB AK PFH 58(1) Neck Lake Road Reconstruction.pdf PDF
af05801_SchedC_Earthwork.pdf PDF
af05801_BULK_proposed-alignment.pdf PDF
ak pfh 58(1)_FinalHydraulicReport.pdf PDF
ak pfh 58(1)_XS Approaches_SchC.pdf PDF
aka-pfh58-1_SWPPP for compilation_Final.pdf PDF
af05801_BULK_Earthwork.pdf PDF
af05801_Segment1_superelevation.pdf PDF
af05801_TIE2_Earthwork.pdf PDF
af05801_XS_SchB.pdf PDF
ak pfh 58(1)_NeckLakeRoad_Rockery_TM 1.21.2019.pdf PDF
af05801_TIE1_superelevation.pdf PDF
af05801_TIE3_Earthwork.pdf PDF
ak pfh 58(1)_GR1516_pp1-384.pdf PDF
af05801_XS_Labeled_SchC.pdf PDF
af05801_SEGMENT1_proposed-alignment.pdf PDF
Show 40 more

Latest 50 of 62 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Schedule C Profile tie in stations 174+25 to 177+75

AK PFH 58(1),

Neck Lake Road Reconstruction: NPOWI Hwy. to Marine Access Facility Jct.

Copyright: (c) 2009 Bentley Systems, Incorporated. All rights reserved.

Project: NeckLake2017 Subject:

Job No. 581 Operator: OC Date: Tuesday August 20, 2024 9:12 am

SYSTEM FIX 3 ASEC 2 AZIM PRI 0 NOR NE STA 2 FILE: 'TIE4_P'

* 1 Print Profile TIE4_P

Beginning profile TIE4_P description:

STATION ELEV GRADE TOTAL L BACK L AHEAD L

VPI 1 174+25.00 111.610

VPC 174+30.00 111.515 ‐1.909 K = 40.3

VPI 2 174+80.00 110.560 100.000 50.000 50.000

Low Point 175+06.85 110.781

VPT 175+30.00 110.848 0.575

VPC 175+30.00 110.848 0.575 K = 20.9 SSD = 231.3

High Point 175+42.03 110.882

VPI 3 176+00.00 111.250 140.000 70.000 70.000

VPT 176+70.00 106.970 ‐6.114

VPI 4 177+75.00 100.550 ‐6.114