af05801_SchedC_Earthwork.pdf
PDF 149 KB Posted
- Solicitation number
- 69056725B000001
About this file
This document appears to be an Earthwork Schedule C for the AK PFH 58(1), Neck Lake Road Reconstruction project. The schedule covers station ranges from 154+00 to 174+00 and includes details on earthwork quantities and volumes for roadway excavation, sub-excavation, topsoil, asphalt concrete pavement, aggregate base, sub-excavation backfill, and shoulder backfill. The quantities are provided in both unADJUsted and ADJUsted volumes. Mass ordinate values are also included.
The related federal contract opportunity is for the overall AK PFH 58(1), Neck Lake Road Reconstruction project, which consists of 3 bid schedules covering a total of 6 miles of road reconstruction work. The work includes roadway excavation, sub-excavation, soft ground embankment construction, grading, rock blasting, drainage, aggregate surface course, guardrail, erosion control, traffic control, and other related activities. The project is anticipated to be solicited in Winter 2024/2025 and has an estimated price range between $10-20 million. The contracting agency is the Department of Transportation Federal Highway Administration.
View the file
Other files
Show 40 more
Latest 50 of 62 listed here. See the rest on GovTribe.
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Earthwork
Schedule C
154+00 to 174+00
AK PFH 58(1),
Neck Lake Road Reconstruction: NPOWI Hwy. to Marine Access Facility Jct.
Material Name End Areas Unadjusted Adjusted Mult Mass Accum Station Volumes Volumes Factor Ordinate Unadj Vol
(sq. ft.) (cu. yd.) (cu. yd.) (cu. yd.)
SKIP STATION RANGE = 35+58.00 to 37+00.00
154+00.00 RDWYEXC
Excavation 5.54 0 0 0.85 0 Subsoil Exc 0.00 0 0 1.00 0 Fill 24.20 0 0 1.00 0 0
SUBEXCAVATION
Excavation 66.34 0 0 1.00 0 Subsoil Exc 0.00 0 0 1.00 0 Fill 0.00 0 0 1.00 0 0 Mass ordinate for SUBEXCAVATION = 0
TOPSOIL
Excavation 22.97 0 0 0.00 0 Subsoil Exc 5.74 0 0 0.00 0 Fill 0.00 0 0 0.00 0 0 Mass ordinate for TOPSOIL = 0
ACP
Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 5.11 0 0 0.00 0 0
AGG_BASE
Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 12.17 0 0 0.00 0 0
SUBEXBACKFILL
Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 55.94 0 0 0.00 0 0
SHOULDERBACKFILL
Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 0.16 0 0 0.00 0 0
154+50.00 RDWYEXC
Excavation 0.79 6 5 0.85 6 Subsoil Exc 0.00 0 0 1.00 0 Fill 32.76 53 53 1.00 ‐48 53
SUBEXCAVATION
Excavation 45.04 104 104 1.00 104 Subsoil Exc 0.02 0 0 1.00 0 Fill 0.00 0 0 1.00 ‐48 0 Mass ordinate for SUBEXCAVATION = 104
TOPSOIL
Excavation 19.31 40 0 0.00 40 Subsoil Exc 3.57 9 0 0.00 9 Fill 0.00 0 0 0.00 ‐48 0 Mass ordinate for TOPSOIL = 0
ACP
Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 5.11 9 0 0.00 ‐48 9
AGG_BASE
Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 12.17 23 0 0.00 ‐48 23
SUBEXBACKFILL
Excavation 0.00 0 0 0.00 0
Subsoil Exc 0.00 0 0 0.00 0 Fill 43.69 92 0 0.00 ‐48 92
SHOULDERBACKFILL
Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 0.16 0 0 0.00 ‐48 0
155+00.00 RDWYEXC
Excavation 0.00 1 1 0.85 7 Subsoil Exc 0.00 0 0 1.00 0 Fill 85.34 109 109 1.00 ‐156 162
SUBEXCAVATION
Excavation 24.57 64 64 1.00 168 Subsoil Exc 0.00 0 0 1.00 0 Fill 0.00 0 0 1.00 ‐156 0 Mass ordinate for SUBEXCAVATION = 168
TOPSOIL
Excavation 18.90 35 0 0.00 75 Subsoil Exc 3.45 7 0 0.00 16 Fill 0.00 0 0 0.00 ‐156 0 Mass ordinate for TOPSOIL = 0
ACP
Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 5.11 9 0 0.00 ‐156 18
AGG_BASE
Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 12.17 23 0 0.00 ‐156 46
SUBEXBACKFILL
Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 24.57 63 0 0.00 ‐156 155
SHOULDERBACKFILL
Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 0.16 0 0 0.00 ‐156 0
155+71.41 RDWYEXC
Excavation 0.00 0 0 0.85 7 Subsoil Exc 0.00 0 0 1.00 0 Fill 280.82 484 484 1.00 ‐640 646
SUBEXCAVATION
Excavation 33.65 77 77 1.00 245 Subsoil Exc 0.00 0 0 1.00 0 Fill 0.00 0 0 1.00 ‐640 0 Mass ordinate for SUBEXCAVATION = 245
TOPSOIL
Excavation 38.91 76 0 0.00 151 Subsoil Exc 3.84 10 0 0.00 26 Fill 0.00 0 0 0.00 ‐640 0 Mass ordinate for TOPSOIL = 0
ACP
Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 5.11 14 0 0.00 ‐640 32
AGG_BASE
Excavation 0.00 0 0 0.00 0
Fill 12.01 32 0 0.00 ‐640 78
Subsoil Exc 0.00 0 0 0.00 0 Fill 34.09 78 0 0.00 ‐640 233
SHOULDERBACKFILL
Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 0.14 0 0 0.00 ‐640 0
155+76.93 RDWYEXC
Excavation 0.00 0 0 0.85 7 Subsoil Exc 0.00 0 0 1.00 0 Fill 315.70 61 61 1.00 ‐701 707
SUBEXCAVATION
Excavation 36.97 7 7 1.00 252 Subsoil Exc 0.00 0 0 1.00 0 Fill 0.00 0 0 1.00 ‐701 0 Mass ordinate for SUBEXCAVATION = 252
TOPSOIL
Excavation 42.49 8 0 0.00 159 Subsoil Exc 4.57 1 0 0.00 27 Fill 0.00 0 0 0.00 ‐701 0 Mass ordinate for TOPSOIL = 0
ACP
Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 5.24 1 0 0.00 ‐701 33
AGG_BASE
Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 12.29 2 0 0.00 ‐701 80
SUBEXBACKFILL
Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 36.82 7 0 0.00 ‐701 240
SHOULDERBACKFILL
Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 0.14 0 0 0.00 ‐701 0
156+00.00 RDWYEXC
Excavation 30.02 13 11 0.85 20 Subsoil Exc 0.00 0 0 1.00 0 Fill 411.01 311 311 1.00 ‐1001 1018
SUBEXCAVATION
Excavation 70.50 46 46 1.00 298 Subsoil Exc 0.00 0 0 1.00 0 Fill 0.00 0 0 1.00 ‐1001 0 Mass ordinate for SUBEXCAVATION = 298
TOPSOIL
Excavation 74.76 50 0 0.00 209 Subsoil Exc 8.34 6 0 0.00 33 Fill 0.00 0 0 0.00 ‐1001 0 Mass ordinate for TOPSOIL = 0
ACP
Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 5.84 5 0 0.00 ‐1001 38
AGG_BASE
Fill 13.52 11 0 0.00 ‐1001 91
SUBEXBACKFILL
Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 67.44 45 0 0.00 ‐1001 285
SHOULDERBACKFILL
Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 0.15 0 0 0.00 ‐1001 0
156+32.07 RDWYEXC
Excavation 212.54 144 122 0.85 164 Subsoil Exc 0.00 0 0 1.00 0 Fill 391.52 477 477 1.00 ‐1356 1495
SUBEXCAVATION
Excavation 286.68 213 213 1.00 511 Subsoil Exc 0.00 0 0 1.00 0 Fill 0.00 0 0 1.00 ‐1356 0 Mass ordinate for SUBEXCAVATION = 511
TOPSOIL
Excavation 112.52 111 0 0.00 320 Subsoil Exc 5.74 8 0 0.00 41 Fill 0.00 0 0 0.00 ‐1356 0 Mass ordinate for TOPSOIL = 0
ACP
Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 6.53 7 0 0.00 ‐1356 45
AGG_BASE
Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 14.97 17 0 0.00 ‐1356 108
SUBEXBACKFILL
Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 204.98 162 0 0.00 ‐1356 447
SHOULDERBACKFILL
Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 0.16 0 0 0.00 ‐1356 0
156+50.00 RDWYEXC
Excavation 380.35 197 168 0.85 361 Subsoil Exc 0.00 0 0 1.00 0 Fill 72.16 154 154 1.00 ‐1342 1649
SUBEXCAVATION
Excavation 0.00 96 96 1.00 607 Subsoil Exc 0.00 0 0 1.00 0 Fill 0.00 0 0 1.00 ‐1342 0 Mass ordinate for SUBEXCAVATION = 607
TOPSOIL
Excavation 70.18 61 0 0.00 381 Subsoil Exc 28.27 11 0 0.00 52 Fill 0.00 0 0 0.00 ‐1342 0 Mass ordinate for TOPSOIL = 0
ACP
Excavation 0.00 0 0 0.00 0
Fill 6.53 4 0 0.00 ‐1342 49
Subsoil Exc 0.00 0 0 0.00 0 Fill 14.97 10 0 0.00 ‐1342 118
SUBEXBACKFILL
Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 0.00 68 0 0.00 ‐1342 515
SHOULDERBACKFILL
Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 0.16 0 0 0.00 ‐1342 0
156+75.00 RDWYEXC
Excavation 882.49 585 496 0.85 946 Subsoil Exc 0.00 0 0 1.00 0 Fill 4.22 35 35 1.00 ‐881 1684
TOPSOIL
Excavation 97.74 78 0 0.00 459 Subsoil Exc 4.22 15 0 0.00 67 Fill 0.00 0 0 0.00 ‐881 0 Mass ordinate for TOPSOIL = 0
ACP
Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 6.53 6 0 0.00 ‐881 55
AGG_BASE
Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 14.97 14 0 0.00 ‐881 132
SHOULDERBACKFILL
Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 0.16 0 0 0.00 ‐881 0
157+00.00 RDWYEXC
Excavation 1555.69 1129 959 0.85 2075 Subsoil Exc 0.00 0 0 1.00 0 Fill 1.94 3 3 1.00 75 1687
TOPSOIL
Excavation 109.44 96 0 0.00 555 Subsoil Exc 1.94 3 0 0.00 70 Fill 0.00 0 0 0.00 75 0 Mass ordinate for TOPSOIL = 0
ACP
Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 6.53 6 0 0.00 75 61
AGG_BASE
Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 14.97 14 0 0.00 75 146
SHOULDERBACKFILL
Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 0.16 0 0 0.00 75 0
157+30.00 RDWYEXC
Excavation 2205.90 2090 1776 0.85 4165 Subsoil Exc 0.00 0 0 1.00 0
Fill 1.53 2 2 1.00 1849 1689
TOPSOIL
Excavation 114.73 125 0 0.00 680 Subsoil Exc 1.53 2 0 0.00 72 Fill 0.00 0 0 0.00 1849 0 Mass ordinate for TOPSOIL = 0
ACP
Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 6.53 7 0 0.00 1849 68
AGG_BASE
Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 14.97 17 0 0.00 1849 163
SHOULDERBACKFILL
Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 0.16 0 0 0.00 1849 0
157+50.00 RDWYEXC
Excavation 2399.38 1706 1450 0.85 5871 Subsoil Exc 0.00 0 0 1.00 0 Fill 1.41 1 1 1.00 3298 1690
TOPSOIL
Excavation 115.99 85 0 0.00 765 Subsoil Exc 1.41 1 0 0.00 73 Fill 0.00 0 0 0.00 3298 0 Mass ordinate for TOPSOIL = 0
ACP
Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 7.18 5 0 0.00 3298 73
AGG_BASE
Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 16.34 12 0 0.00 3298 175
SHOULDERBACKFILL
Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 0.17 0 0 0.00 3298 0
157+80.00 RDWYEXC
Excavation 1153.35 1974 1678 0.85 7845 Subsoil Exc 0.00 0 0 1.00 0 Fill 294.25 164 164 1.00 4812 1854
TOPSOIL
Excavation 61.51 99 0 0.00 864 Subsoil Exc 44.72 26 0 0.00 99 Fill 0.00 0 0 0.00 4812 0 Mass ordinate for TOPSOIL = 0
ACP
Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 9.04 9 0 0.00 4812 82
AGG_BASE
Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 20.25 20 0 0.00 4812 195
SHOULDERBACKFILL
Fill 0.18 0 0 0.00 4812 0
158+00.00 RDWYEXC
Excavation 988.31 794 674 0.85 8639 Subsoil Exc 0.00 0 0 1.00 0 Fill 603.95 333 333 1.00 5153 2187
SUBEXCAVATION
Excavation 17.83 7 7 1.00 614 Subsoil Exc 0.00 0 0 1.00 0 Fill 0.00 0 0 1.00 5153 0 Mass ordinate for SUBEXCAVATION = 614
TOPSOIL
Excavation 69.48 49 0 0.00 913 Subsoil Exc 55.26 37 0 0.00 136 Fill 0.00 0 0 0.00 5153 0 Mass ordinate for TOPSOIL = 0
ACP
Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 9.04 7 0 0.00 5153 89
AGG_BASE
Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 20.25 15 0 0.00 5153 210
SUBEXBACKFILL
Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 17.83 7 0 0.00 5153 522
SHOULDERBACKFILL
Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 0.18 0 0 0.00 5153 0
158+05.00 RDWYEXC
Excavation 963.69 181 154 0.85 8820 Subsoil Exc 0.00 0 0 1.00 0 Fill 594.36 111 111 1.00 5196 2298
SUBEXCAVATION
Excavation 15.54 3 3 1.00 617 Subsoil Exc 0.00 0 0 1.00 0 Fill 0.00 0 0 1.00 5196 0 Mass ordinate for SUBEXCAVATION = 617
TOPSOIL
Excavation 70.92 13 0 0.00 926 Subsoil Exc 54.33 10 0 0.00 146 Fill 0.00 0 0 0.00 5196 0 Mass ordinate for TOPSOIL = 0
ACP
Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 9.04 2 0 0.00 5196 91
AGG_BASE
Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 20.25 4 0 0.00 5196 214
SUBEXBACKFILL
Excavation 0.00 0 0 0.00 0
Fill 15.53 3 0 0.00 5196 525
Subsoil Exc 0.00 0 0 0.00 0 Fill 0.18 0 0 0.00 5196 0
158+10.00 RDWYEXC
Excavation 968.02 179 152 0.85 8999 Subsoil Exc 0.00 0 0 1.00 0 Fill 569.59 108 108 1.00 5240 2406
SUBEXCAVATION
Excavation 18.21 3 3 1.00 620 Subsoil Exc 0.00 0 0 1.00 0 Fill 0.00 0 0 1.00 5240 0 Mass ordinate for SUBEXCAVATION = 620
TOPSOIL
Excavation 74.10 14 0 0.00 940 Subsoil Exc 52.30 10 0 0.00 156 Fill 0.00 0 0 0.00 5240 0 Mass ordinate for TOPSOIL = 0
ACP
Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 9.04 2 0 0.00 5240 93
AGG_BASE
Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 20.25 4 0 0.00 5240 218
SUBEXBACKFILL
Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 18.29 3 0 0.00 5240 528
SHOULDERBACKFILL
Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 0.18 0 0 0.00 5240 0
158+25.00 RDWYEXC
Excavation 1327.10 638 541 0.85 9637 Subsoil Exc 0.00 0 0 1.00 0 Fill 2.54 159 159 1.00 5622 2565
SUBEXCAVATION
Excavation 0.00 5 5 1.00 625 Subsoil Exc 0.00 0 0 1.00 0 Fill 0.00 0 0 1.00 5622 0 Mass ordinate for SUBEXCAVATION = 625
TOPSOIL
Excavation 108.46 51 0 0.00 991 Subsoil Exc 2.54 15 0 0.00 171 Fill 0.00 0 0 0.00 5622 0 Mass ordinate for TOPSOIL = 0
ACP
Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 9.04 5 0 0.00 5622 98
AGG_BASE
Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 20.25 11 0 0.00 5622 229
Fill 0.00 5 0 0.00 5622 533
SHOULDERBACKFILL
Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 0.18 0 0 0.00 5622 0
158+50.00 RDWYEXC
Excavation 1632.85 1370 1165 0.85 11007 Subsoil Exc 0.00 0 0 1.00 0 Fill 1.64 2 2 1.00 6785 2567
TOPSOIL
Excavation 115.41 104 0 0.00 1095 Subsoil Exc 1.64 2 0 0.00 173 Fill 0.00 0 0 0.00 6785 0 Mass ordinate for TOPSOIL = 0
ACP
Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 9.04 8 0 0.00 6785 106
AGG_BASE
Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 20.25 19 0 0.00 6785 248
SHOULDERBACKFILL
Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 0.18 0 0 0.00 6785 0
158+75.00 RDWYEXC
Excavation 1384.48 1397 1187 0.85 12404 Subsoil Exc 0.00 0 0 1.00 0 Fill 1.44 1 1 1.00 7971 2568
TOPSOIL
Excavation 110.79 105 0 0.00 1200 Subsoil Exc 1.44 1 0 0.00 174 Fill 0.00 0 0 0.00 7971 0 Mass ordinate for TOPSOIL = 0
ACP
Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 9.04 8 0 0.00 7971 114
AGG_BASE
Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 20.25 19 0 0.00 7971 267
SHOULDERBACKFILL
Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 0.18 0 0 0.00 7971 0
158+90.00 RDWYEXC
Excavation 978.69 657 558 0.85 13061 Subsoil Exc 0.00 0 0 1.00 0 Fill 1.31 1 1 1.00 8528 2569
TOPSOIL
Excavation 109.87 61 0 0.00 1261 Subsoil Exc 1.31 1 0 0.00 175 Fill 0.00 0 0 0.00 8528 0 Mass ordinate for TOPSOIL = 0
ACP
Subsoil Exc 0.00 0 0 0.00 0 Fill 9.04 5 0 0.00 8528 119
AGG_BASE
Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 21.35 12 0 0.00 8528 279
SHOULDERBACKFILL
Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 1.00 0 0 0.00 8528 0
159+00.00 RDWYEXC
Excavation 759.31 322 274 0.85 13383 Subsoil Exc 0.00 0 0 1.00 0 Fill 1.80 1 1 1.00 8801 2570
TOPSOIL
Excavation 106.05 40 0 0.00 1301 Subsoil Exc 1.80 1 0 0.00 176 Fill 0.00 0 0 0.00 8801 0 Mass ordinate for TOPSOIL = 0
ACP
Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 8.45 3 0 0.00 8801 122
AGG_BASE
Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 20.16 8 0 0.00 8801 287
SHOULDERBACKFILL
Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 0.99 0 0 0.00 8801 0
159+25.00 RDWYEXC
Excavation 238.20 462 393 0.85 13845 Subsoil Exc 0.00 0 0 1.00 0 Fill 10.57 6 6 1.00 9188 2576
SUBEXCAVATION
Excavation 407.92 188 188 1.00 813 Subsoil Exc 0.00 0 0 1.00 0 Fill 0.00 0 0 1.00 9188 0 Mass ordinate for SUBEXCAVATION = 813
TOPSOIL
Excavation 94.17 92 0 0.00 1393 Subsoil Exc 1.49 2 0 0.00 178 Fill 0.00 0 0 0.00 9188 0 Mass ordinate for TOPSOIL = 0
ACP
Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 7.51 7 0 0.00 9188 129
AGG_BASE
Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 18.26 18 0 0.00 9188 305
SUBEXBACKFILL
Fill 177.40 82 0 0.00 9188 615
Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 0.99 1 0 0.00 9188 1
159+41.85 RDWYEXC
Excavation 145.48 120 102 0.85 13965 Subsoil Exc 0.00 0 0 1.00 0 Fill 67.57 24 24 1.00 9266 2600
SUBEXCAVATION
Excavation 331.56 230 230 1.00 1043 Subsoil Exc 0.00 0 0 1.00 0 Fill 0.00 0 0 1.00 9266 0 Mass ordinate for SUBEXCAVATION = 1043
TOPSOIL
Excavation 89.09 57 0 0.00 1450 Subsoil Exc 1.63 1 0 0.00 179 Fill 0.00 0 0 0.00 9266 0 Mass ordinate for TOPSOIL = 0
ACP
Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 7.51 5 0 0.00 9266 134
AGG_BASE
Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 17.71 11 0 0.00 9266 316
SUBEXBACKFILL
Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 216.22 123 0 0.00 9266 738
SHOULDERBACKFILL
Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 0.72 1 0 0.00 9266 2
159+50.00 RDWYEXC
Excavation 109.78 39 33 0.85 14004 Subsoil Exc 0.00 0 0 1.00 0 Fill 113.44 27 27 1.00 9272 2627
SUBEXCAVATION
Excavation 294.96 94 94 1.00 1137 Subsoil Exc 0.00 0 0 1.00 0 Fill 0.00 0 0 1.00 9272 0 Mass ordinate for SUBEXCAVATION = 1137
TOPSOIL
Excavation 89.73 27 0 0.00 1477 Subsoil Exc 1.84 1 0 0.00 180 Fill 0.00 0 0 0.00 9272 0 Mass ordinate for TOPSOIL = 0
ACP
Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 7.51 2 0 0.00 9272 136
AGG_BASE
Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 17.71 5 0 0.00 9272 321
Fill 216.99 65 0 0.00 9272 803
SHOULDERBACKFILL
Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 0.72 0 0 0.00 9272 2
159+75.00 RDWYEXC
Excavation 26.71 63 54 0.85 14067 Subsoil Exc 0.00 0 0 1.00 0 Fill 283.43 184 184 1.00 9142 2811
SUBEXCAVATION
Excavation 183.49 221 221 1.00 1358 Subsoil Exc 0.00 0 0 1.00 0 Fill 0.00 0 0 1.00 9142 0 Mass ordinate for SUBEXCAVATION = 1358
TOPSOIL
Excavation 78.07 78 0 0.00 1555 Subsoil Exc 1.45 2 0 0.00 182 Fill 0.00 0 0 0.00 9142 0 Mass ordinate for TOPSOIL = 0
ACP
Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 7.51 7 0 0.00 9142 143
AGG_BASE
Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 17.71 16 0 0.00 9142 337
SUBEXBACKFILL
Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 163.25 176 0 0.00 9142 979
SHOULDERBACKFILL
Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 0.72 1 0 0.00 9142 3
160+00.00 RDWYEXC
Excavation 16.62 20 17 0.85 14087 Subsoil Exc 0.00 0 0 1.00 0 Fill 343.83 290 290 1.00 8869 3101
SUBEXCAVATION
Excavation 165.28 161 161 1.00 1519 Subsoil Exc 0.00 0 0 1.00 0 Fill 0.00 0 0 1.00 8869 0 Mass ordinate for SUBEXCAVATION = 1519
TOPSOIL
Excavation 77.89 72 0 0.00 1627 Subsoil Exc 2.34 2 0 0.00 184 Fill 0.00 0 0 0.00 8869 0 Mass ordinate for TOPSOIL = 0
ACP
Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 7.51 7 0 0.00 8869 150
AGG_BASE
Fill 17.71 16 0 0.00 8869 353
Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 157.37 148 0 0.00 8869 1127
SHOULDERBACKFILL
Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 0.72 1 0 0.00 8869 4
160+30.79 RDWYEXC
Excavation 2.82 11 9 0.85 14098 Subsoil Exc 0.00 0 0 1.00 0 Fill 425.12 438 438 1.00 8440 3539
SUBEXCAVATION
Excavation 137.81 173 173 1.00 1692 Subsoil Exc 0.00 0 0 1.00 0 Fill 0.00 0 0 1.00 8440 0 Mass ordinate for SUBEXCAVATION = 1692
TOPSOIL
Excavation 72.77 86 0 0.00 1713 Subsoil Exc 2.51 3 0 0.00 187 Fill 0.00 0 0 0.00 8440 0 Mass ordinate for TOPSOIL = 0
ACP
Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 7.51 9 0 0.00 8440 159
AGG_BASE
Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 17.71 20 0 0.00 8440 373
SUBEXBACKFILL
Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 136.15 167 0 0.00 8440 1294
SHOULDERBACKFILL
Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 0.72 1 0 0.00 8440 5
160+50.00 RDWYEXC
Excavation 0.21 1 1 0.85 14099 Subsoil Exc 0.00 0 0 1.00 0 Fill 377.36 285 285 1.00 8156 3824
SUBEXCAVATION
Excavation 113.05 90 90 1.00 1782 Subsoil Exc 0.00 0 0 1.00 0 Fill 0.00 0 0 1.00 8156 0 Mass ordinate for SUBEXCAVATION = 1782
TOPSOIL
Excavation 67.82 50 0 0.00 1763 Subsoil Exc 2.85 2 0 0.00 189 Fill 0.00 0 0 0.00 8156 0 Mass ordinate for TOPSOIL = 0
ACP
Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 7.17 5 0 0.00 8156 164
Fill 16.96 12 0 0.00 8156 385
SUBEXBACKFILL
Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 112.92 89 0 0.00 8156 1383
SHOULDERBACKFILL
Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 0.71 1 0 0.00 8156 6
160+73.51 RDWYEXC
Excavation 0.00 0 0 0.85 14099 Subsoil Exc 0.00 0 0 1.00 0 Fill 369.34 325 325 1.00 7831 4149
SUBEXCAVATION
Excavation 68.65 79 79 1.00 1861 Subsoil Exc 0.00 0 0 1.00 0 Fill 0.00 0 0 1.00 7831 0 Mass ordinate for SUBEXCAVATION = 1861
TOPSOIL
Excavation 58.07 55 0 0.00 1818 Subsoil Exc 6.22 4 0 0.00 193 Fill 0.00 0 0 0.00 7831 0 Mass ordinate for TOPSOIL = 0
ACP
Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 6.54 6 0 0.00 7831 170
AGG_BASE
Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 15.61 14 0 0.00 7831 399
SUBEXBACKFILL
Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 68.59 79 0 0.00 7831 1462
SHOULDERBACKFILL
Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 0.70 1 0 0.00 7831 7
160+91.46 RDWYEXC
Excavation 0.04 0 0 0.85 14099 Subsoil Exc 0.00 0 0 1.00 0 Fill 344.38 237 237 1.00 7594 4386
SUBEXCAVATION
Excavation 72.57 47 47 1.00 1908 Subsoil Exc 0.00 0 0 1.00 0 Fill 0.00 0 0 1.00 7594 0 Mass ordinate for SUBEXCAVATION = 1908
TOPSOIL
Excavation 56.93 38 0 0.00 1856 Subsoil Exc 6.61 4 0 0.00 197 Fill 0.00 0 0 0.00 7594 0 Mass ordinate for TOPSOIL = 0
ACP
Fill 5.86 4 0 0.00 7594 174
Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 15.36 10 0 0.00 7594 409
SUBEXBACKFILL
Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 73.66 47 0 0.00 7594 1509
SHOULDERBACKFILL
Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 1.28 1 0 0.00 7594 8
161+00.00 RDWYEXC
Excavation 4.34 1 1 0.85 14100 Subsoil Exc 0.00 0 0 1.00 0 Fill 286.07 100 100 1.00 7495 4486
SUBEXCAVATION
Excavation 125.15 31 31 1.00 1939 Subsoil Exc 0.00 0 0 1.00 0 Fill 0.00 0 0 1.00 7495 0 Mass ordinate for SUBEXCAVATION = 1939
TOPSOIL
Excavation 55.28 18 0 0.00 1874 Subsoil Exc 4.50 2 0 0.00 199 Fill 0.00 0 0 0.00 7495 0 Mass ordinate for TOPSOIL = 0
ACP
Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 5.86 2 0 0.00 7495 176
AGG_BASE
Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 15.66 5 0 0.00 7495 414
SUBEXBACKFILL
Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 122.97 31 0 0.00 7495 1540
SHOULDERBACKFILL
Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 1.43 0 0 0.00 7495 8
161+23.80 RDWYEXC
Excavation 6.08 5 4 0.85 14105 Subsoil Exc 0.00 0 0 1.00 0 Fill 216.31 221 221 1.00 7278 4707
SUBEXCAVATION
Excavation 171.31 130 130 1.00 2069 Subsoil Exc 0.00 0 0 1.00 0 Fill 0.00 0 0 1.00 7278 0 Mass ordinate for SUBEXCAVATION = 2069
TOPSOIL
Excavation 53.38 48 0 0.00 1922 Subsoil Exc 5.42 4 0 0.00 203 Fill 0.00 0 0 0.00 7278 0
Fill 5.86 5 0 0.00 7278 181
AGG_BASE
Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 16.48 14 0 0.00 7278 428
SUBEXBACKFILL
Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 166.56 128 0 0.00 7278 1668
SHOULDERBACKFILL
Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 1.84 1 0 0.00 7278 9
161+50.00 RDWYEXC
Excavation 0.82 3 3 0.85 14108 Subsoil Exc 0.00 0 0 1.00 0 Fill 235.81 219 219 1.00 7062 4926
SUBEXCAVATION
Excavation 108.46 136 136 1.00 2205 Subsoil Exc 0.00 0 0 1.00 0 Fill 0.00 0 0 1.00 7062 0 Mass ordinate for SUBEXCAVATION = 2205
TOPSOIL
Excavation 42.18 47 0 0.00 1969 Subsoil Exc 5.27 5 0 0.00 208 Fill 0.00 0 0 0.00 7062 0 Mass ordinate for TOPSOIL = 0
ACP
Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 5.53 6 0 0.00 7062 187
AGG_BASE
Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 15.08 15 0 0.00 7062 443
SUBEXBACKFILL
Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 107.65 133 0 0.00 7062 1801
SHOULDERBACKFILL
Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 1.19 1 0 0.00 7062 10
161+84.04 RDWYEXC
Excavation 0.00 1 0 0.85 14109 Subsoil Exc 0.00 0 0 1.00 0 Fill 208.77 280 280 1.00 6782 5206
SUBEXCAVATION
Excavation 56.26 104 104 1.00 2309 Subsoil Exc 0.00 0 0 1.00 0 Fill 0.00 0 0 1.00 6782 0 Mass ordinate for SUBEXCAVATION = 2309
TOPSOIL
Excavation 30.64 46 0 0.00 2015 Subsoil Exc 4.49 6 0 0.00 214 Fill 0.00 0 0 0.00 6782 0
Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 5.11 7 0 0.00 6782 194
AGG_BASE
Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 12.17 17 0 0.00 6782 460
SUBEXBACKFILL
Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 56.38 103 0 0.00 6782 1904
SHOULDERBACKFILL
Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 0.16 1 0 0.00 6782 11
162+00.00 RDWYEXC
Excavation 0.00 0 0 0.85 14109 Subsoil Exc 0.00 0 0 1.00 0 Fill 201.64 121 121 1.00 6661 5327
SUBEXCAVATION
Excavation 37.06 28 28 1.00 2337 Subsoil Exc 0.00 0 0 1.00 0 Fill 0.00 0 0 1.00 6661 0 Mass ordinate for SUBEXCAVATION = 2337
TOPSOIL
Excavation 25.58 17 0 0.00 2032 Subsoil Exc 4.32 3 0 0.00 217 Fill 0.00 0 0 0.00 6661 0 Mass ordinate for TOPSOIL = 0
ACP
Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 5.11 3 0 0.00 6661 197
AGG_BASE
Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 12.17 7 0 0.00 6661 467
SUBEXBACKFILL
Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 37.06 28 0 0.00 6661 1932
SHOULDERBACKFILL
Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 0.16 0 0 0.00 6661 11
162+21.93 RDWYEXC
Excavation 0.00 0 0 0.85 14109 Subsoil Exc 0.00 0 0 1.00 0 Fill 205.32 165 165 1.00 6496 5492
SUBEXCAVATION
Excavation 41.08 32 32 1.00 2369 Subsoil Exc 0.00 0 0 1.00 0 Fill 0.00 0 0 1.00 6496 0 Mass ordinate for SUBEXCAVATION = 2369
Excavation 21.95 19 0 0.00 2051
Subsoil Exc 13.90 7 0 0.00 224 Fill 0.00 0 0 0.00 6496 0 Mass ordinate for TOPSOIL = 0
ACP
Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 5.11 4 0 0.00 6496 201
AGG_BASE
Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 12.17 10 0 0.00 6496 477
SUBEXBACKFILL
Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 41.08 32 0 0.00 6496 1964
SHOULDERBACKFILL
Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 0.16 0 0 0.00 6496 11
162+50.00 RDWYEXC
Excavation 0.00 0 0 0.85 14109 Subsoil Exc 0.00 0 0 1.00 0 Fill 192.33 207 207 1.00 6289 5699
SUBEXCAVATION
Excavation 37.67 41 41 1.00 2410 Subsoil Exc 0.00 0 0 1.00 0 Fill 0.00 0 0 1.00 6289 0 Mass ordinate for SUBEXCAVATION = 2410
TOPSOIL
Excavation 31.31 28 0 0.00 2079 Subsoil Exc 10.79 13 0 0.00 237 Fill 0.00 0 0 0.00 6289 0 Mass ordinate for TOPSOIL = 0
ACP
Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 5.11 5 0 0.00 6289 206
AGG_BASE
Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 12.17 13 0 0.00 6289 490
SUBEXBACKFILL
Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 37.67 41 0 0.00 6289 2005
SHOULDERBACKFILL
Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 0.16 0 0 0.00 6289 11
163+00.00 RDWYEXC
Excavation 0.00 0 0 0.85 14109 Subsoil Exc 0.00 0 0 1.00 0 Fill 61.17 235 235 1.00 6054 5934
SUBEXCAVATION
Excavation 20.67 54 54 1.00 2464 Subsoil Exc 0.00 0 0 1.00 0 Fill 0.00 0 0 1.00 6054 0 Mass ordinate for SUBEXCAVATION = 2464
Excavation 19.37 47 0 0.00 2126 Subsoil Exc 3.58 13 0 0.00 250 Fill 0.00 0 0 0.00 6054 0 Mass ordinate for TOPSOIL = 0
ACP
Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 5.11 9 0 0.00 6054 215
AGG_BASE
Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 12.17 23 0 0.00 6054 513
SUBEXBACKFILL
Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 20.67 54 0 0.00 6054 2059
SHOULDERBACKFILL
Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 0.16 0 0 0.00 6054 11
163+50.00 RDWYEXC
Excavation 31.12 29 25 0.85 14138 Subsoil Exc 0.00 0 0 1.00 0 Fill 1.83 58 58 1.00 6021 5992
SUBEXCAVATION
Excavation 110.32 122 122 1.00 2586 Subsoil Exc 0.00 0 0 1.00 0 Fill 0.00 0 0 1.00 6021 0 Mass ordinate for SUBEXCAVATION = 2586
TOPSOIL
Excavation 29.04 45 0 0.00 2171 Subsoil Exc 1.63 5 0 0.00 255 Fill 0.00 0 0 0.00 6021 0 Mass ordinate for TOPSOIL = 0
ACP
Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 5.11 9 0 0.00 6021 224
AGG_BASE
Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 12.17 23 0 0.00 6021 536
SUBEXBACKFILL
Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 47.52 63 0 0.00 6021 2122
SHOULDERBACKFILL
Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 0.16 0 0 0.00 6021 11
164+00.00 RDWYEXC
Excavation 7.02 35 30 0.85 14173 Subsoil Exc 0.00 0 0 1.00 0 Fill 48.38 46 46 1.00 6005 6038
SUBEXCAVATION
Excavation 42.28 142 142 1.00 2728
Fill 0.00 0 0 1.00 6005 0 Mass ordinate for SUBEXCAVATION = 2728
TOPSOIL
Excavation 24.71 50 0 0.00 2221 Subsoil Exc 5.49 7 0 0.00 262 Fill 0.00 0 0 0.00 6005 0 Mass ordinate for TOPSOIL = 0
ACP
Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 5.11 9 0 0.00 6005 233
AGG_BASE
Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 12.17 23 0 0.00 6005 559
SUBEXBACKFILL
Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 42.24 83 0 0.00 6005 2205
SHOULDERBACKFILL
Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 0.16 0 0 0.00 6005 11
164+50.00 RDWYEXC
Excavation 0.00 6 6 0.85 14179 Subsoil Exc 0.00 0 0 1.00 0 Fill 101.94 139 139 1.00 5872 6177
SUBEXCAVATION
Excavation 38.10 74 74 1.00 2802 Subsoil Exc 0.00 0 0 1.00 0 Fill 0.00 0 0 1.00 5872 0 Mass ordinate for SUBEXCAVATION = 2802
TOPSOIL
Excavation 33.52 54 0 0.00 2275 Subsoil Exc 1.64 7 0 0.00 269 Fill 0.00 0 0 0.00 5872 0 Mass ordinate for TOPSOIL = 0
ACP
Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 5.11 9 0 0.00 5872 242
AGG_BASE
Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 12.17 23 0 0.00 5872 582
SUBEXBACKFILL
Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 38.10 74 0 0.00 5872 2279
SHOULDERBACKFILL
Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 0.16 0 0 0.00 5872 11
165+00.00 RDWYEXC
Excavation 0.00 0 0 0.85 14179 Subsoil Exc 0.00 0 0 1.00 0 Fill 60.77 151 151 1.00 5721 6328
SUBEXCAVATION
Excavation 17.02 51 51 1.00 2853
Fill 0.00 0 0 1.00 5721 0 Mass ordinate for SUBEXCAVATION = 2853
TOPSOIL
Excavation 17.02 47 0 0.00 2322 Subsoil Exc 0.20 2 0 0.00 271 Fill 0.00 0 0 0.00 5721 0 Mass ordinate for TOPSOIL = 0
ACP
Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 5.11 9 0 0.00 5721 251
AGG_BASE
Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 12.17 23 0 0.00 5721 605
SUBEXBACKFILL
Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 17.02 51 0 0.00 5721 2330
SHOULDERBACKFILL
Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 0.16 0 0 0.00 5721 11
165+50.00 RDWYEXC
Excavation 3.19 2 2 0.85 14181 Subsoil Exc 0.00 0 0 1.00 0 Fill 63.34 115 115 1.00 5608 6443
SUBEXCAVATION
Excavation 31.89 45 45 1.00 2898 Subsoil Exc 0.00 0 0 1.00 0 Fill 0.00 0 0 1.00 5608 0 Mass ordinate for SUBEXCAVATION = 2898
TOPSOIL
Excavation 26.00 40 0 0.00 2362 Subsoil Exc 4.18 4 0 0.00 275 Fill 0.00 0 0 0.00 5608 0 Mass ordinate for TOPSOIL = 0
ACP
Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 5.11 9 0 0.00 5608 260
AGG_BASE
Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 12.17 23 0 0.00 5608 628
SUBEXBACKFILL
Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 32.37 46 0 0.00 5608 2376
SHOULDERBACKFILL
Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 0.16 0 0 0.00 5608 11
166+00.00 RDWYEXC
Excavation 7.00 9 8 0.85 14190
Fill 46.60 102 102 1.00 5514 6545
SUBEXCAVATION
Excavation 30.41 58 58 1.00 2956 Subsoil Exc 0.00 0 0 1.00 0 Fill 0.00 0 0 1.00 5514 0 Mass ordinate for SUBEXCAVATION = 2956
TOPSOIL
Excavation 23.12 45 0 0.00 2407 Subsoil Exc 4.47 8 0 0.00 283 Fill 0.00 0 0 0.00 5514 0 Mass ordinate for TOPSOIL = 0
ACP
Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 5.11 9 0 0.00 5514 269
AGG_BASE
Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 12.17 23 0 0.00 5514 651
SUBEXBACKFILL
Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 30.39 58 0 0.00 5514 2434
SHOULDERBACKFILL
Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 0.16 0 0 0.00 5514 11
166+05.00 RDWYEXC
Excavation 7.45 1 1 0.85 14191 Subsoil Exc 0.00 0 0 1.00 0 Fill 47.07 9 9 1.00 5506 6554
SUBEXCAVATION
Excavation 28.57 5 5 1.00 2961 Subsoil Exc 0.00 0 0 1.00 0 Fill 0.00 0 0 1.00 5506 0 Mass ordinate for SUBEXCAVATION = 2961
TOPSOIL
Excavation 22.43 4 0 0.00 2411 Subsoil Exc 4.34 1 0 0.00 284 Fill 0.00 0 0 0.00 5506 0 Mass ordinate for TOPSOIL = 0
ACP
Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 5.11 1 0 0.00 5506 270
AGG_BASE
Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 12.17 2 0 0.00 5506 653
SUBEXBACKFILL
Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 28.67 5 0 0.00 5506 2439
SHOULDERBACKFILL
Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 0.16 0 0 0.00 5506 11
166+50.00 RDWYEXC
Excavation 8.92 14 12 0.85 14205
Fill 80.91 107 107 1.00 5411 6661
SUBEXCAVATION
Excavation 27.65 47 47 1.00 3008 Subsoil Exc 0.00 0 0 1.00 0 Fill 0.00 0 0 1.00 5411 0 Mass ordinate for SUBEXCAVATION = 3008
TOPSOIL
Excavation 32.05 46 0 0.00 2457 Subsoil Exc 3.82 7 0 0.00 291 Fill 0.00 0 0 0.00 5411 0 Mass ordinate for TOPSOIL = 0
ACP
Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 7.36 10 0 0.00 5411 280
AGG_BASE
Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 16.67 24 0 0.00 5411 677
SUBEXBACKFILL
Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 27.65 47 0 0.00 5411 2486
SHOULDERBACKFILL
Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 0.16 0 0 0.00 5411 11
166+55.00 RDWYEXC
Excavation 9.09 1 1 0.85 14206 Subsoil Exc 0.00 0 0 1.00 0 Fill 84.35 15 15 1.00 5397 6676
SUBEXCAVATION
Excavation 23.99 5 5 1.00 3013 Subsoil Exc 0.00 0 0 1.00 0 Fill 0.00 0 0 1.00 5397 0 Mass ordinate for SUBEXCAVATION = 3013
TOPSOIL
Excavation 31.93 6 0 0.00 2463 Subsoil Exc 3.90 1 0 0.00 292 Fill 0.00 0 0 0.00 5397 0 Mass ordinate for TOPSOIL = 0
ACP
Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 7.61 1 0 0.00 5397 281
AGG_BASE
Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 17.17 3 0 0.00 5397 680
SUBEXBACKFILL
Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 23.99 5 0 0.00 5397 2491
SHOULDERBACKFILL
Excavation 0.00 0 0 0.00 0
Fill 0.16 0 0 0.00 5397 11
167+00.00 RDWYEXC
Excavation 1.99 9 8 0.85 14215 Subsoil Exc 0.00 0 0 1.00 0 Fill 78.18 135 135 1.00 5270 6811
SUBEXCAVATION
Excavation 18.73 36 36 1.00 3049 Subsoil Exc 0.00 0 0 1.00 0 Fill 0.00 0 0 1.00 5270 0 Mass ordinate for SUBEXCAVATION = 3049
TOPSOIL
Excavation 27.90 50 0 0.00 2513 Subsoil Exc 6.79 9 0 0.00 301 Fill 0.00 0 0 0.00 5270 0 Mass ordinate for TOPSOIL = 0
ACP
Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 7.61 13 0 0.00 5270 294
AGG_BASE
Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 17.17 29 0 0.00 5270 709
SUBEXBACKFILL
Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 18.73 36 0 0.00 5270 2527
SHOULDERBACKFILL
Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 0.16 0 0 0.00 5270 11
167+25.00 RDWYEXC
Excavation 0.00 1 0 0.85 14216 Subsoil Exc 0.00 0 0 1.00 0 Fill 88.38 77 77 1.00 5193 6888
SUBEXCAVATION
Excavation 26.73 21 21 1.00 3070 Subsoil Exc 0.00 0 0 1.00 0 Fill 0.00 0 0 1.00 5193 0 Mass ordinate for SUBEXCAVATION = 3070
TOPSOIL
Excavation 23.12 24 0 0.00 2537 Subsoil Exc 13.21 9 0 0.00 310 Fill 0.00 0 0 0.00 5193 0 Mass ordinate for TOPSOIL = 0
ACP
Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 7.61 7 0 0.00 5193 301
AGG_BASE
Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 17.09 16 0 0.00 5193 725
SUBEXBACKFILL
Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 26.73 21 0 0.00 5193 2548
Fill 0.15 0 0 0.00 5193 11
167+32.53 RDWYEXC
Excavation 0.00 0 0 0.85 14216 Subsoil Exc 0.00 0 0 1.00 0 Fill 101.18 26 26 1.00 5167 6914
SUBEXCAVATION
Excavation 28.12 8 8 1.00 3078 Subsoil Exc 0.00 0 0 1.00 0 Fill 0.00 0 0 1.00 5167 0 Mass ordinate for SUBEXCAVATION = 3078
TOPSOIL
Excavation 23.67 7 0 0.00 2544 Subsoil Exc 16.50 4 0 0.00 314 Fill 0.00 0 0 0.00 5167 0 Mass ordinate for TOPSOIL = 0
ACP
Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 7.35 2 0 0.00 5167 303
AGG_BASE
Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 17.81 5 0 0.00 5167 730
SUBEXBACKFILL
Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 28.12 8 0 0.00 5167 2556
SHOULDERBACKFILL
Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 0.99 0 0 0.00 5167 11
167+42.43 RDWYEXC
Excavation 0.00 0 0 0.85 14216 Subsoil Exc 0.00 0 0 1.00 0 Fill 74.86 32 32 1.00 5135 6946
SUBEXCAVATION
Excavation 23.65 9 9 1.00 3087 Subsoil Exc 0.00 0 0 1.00 0 Fill 0.00 0 0 1.00 5135 0 Mass ordinate for SUBEXCAVATION = 3087
Excavation 20.28 8 0 0.00 2552
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .