af05801_SchedC_Earthwork.pdf

PDF 149 KB Posted

Attached to
AK PFH 58(1), Neck Lake Road Reconstruction: NPOWI Hwy. to Marine Access Facility Jct.
Solicitation number
69056725B000001
Issued by

About this file

This document appears to be an Earthwork Schedule C for the AK PFH 58(1), Neck Lake Road Reconstruction project. The schedule covers station ranges from 154+00 to 174+00 and includes details on earthwork quantities and volumes for roadway excavation, sub-excavation, topsoil, asphalt concrete pavement, aggregate base, sub-excavation backfill, and shoulder backfill. The quantities are provided in both unADJUsted and ADJUsted volumes. Mass ordinate values are also included.

The related federal contract opportunity is for the overall AK PFH 58(1), Neck Lake Road Reconstruction project, which consists of 3 bid schedules covering a total of 6 miles of road reconstruction work. The work includes roadway excavation, sub-excavation, soft ground embankment construction, grading, rock blasting, drainage, aggregate surface course, guardrail, erosion control, traffic control, and other related activities. The project is anticipated to be solicited in Winter 2024/2025 and has an estimated price range between $10-20 million. The contracting agency is the Department of Transportation Federal Highway Administration.

View the file

Other files

File Type Posted
BidTab Neck Lake Road Reconstruction.pdf PDF
BidSum-AK PFH 58(1).pdf PDF
Amendment A008.pdf PDF
QA_01-08-2025.pdf PDF
QA_01-07-2025.pdf PDF
Amendment A007.pdf PDF
Amendment A006.pdf PDF
QA_12-30-2024.pdf PDF
Amendment A005.pdf PDF
Amendment A004.pdf PDF
Amendment A003.pdf PDF
QA_12-16-2024.pdf PDF
QA_12-13-2024.pdf PDF
Amendment A002.pdf PDF
QA_12-18-2024.pdf PDF
QA_12-06-2024.pdf PDF
Amendment A001.pdf PDF
QA_12-05-2024.pdf PDF
QA_11-26-2024.pdf PDF
af05801_SEGMENT1_proposed-alignment.pdf PDF
af05801_XS_Labeled_SchA.pdf PDF
af05801_SEGMENT1_proposed-profile.pdf PDF
af05801_XS_SchA.pdf PDF
af05801_TIE4_Earthwork.pdf PDF
af05801_SchedA_Earthwork.pdf PDF
af05801_SchedB_Earthwork.pdf PDF
ak pfh 58(1)_Neck Lake ARD Technical Memorandum.pdf PDF
af05801_TIE4_proposed-alignment.pdf PDF
af05801_TIE1_Earthwork.pdf PDF
ak pfh 58(1)_GR1516_pp385-973.pdf PDF
af05801_TIE2_superelevation.pdf PDF
af05801_TIE1_proposed-profile.pdf PDF
af05801_TIE2_proposed-alignment.pdf PDF
af05801_TIE4_proposed-profile.pdf PDF
af05801_TIE4_superelevation.pdf PDF
IFB AK PFH 58(1) Neck Lake Road Reconstruction.pdf PDF
af05801_BULK_proposed-alignment.pdf PDF
ak pfh 58(1)_FinalHydraulicReport.pdf PDF
ak pfh 58(1)_XS Approaches_SchC.pdf PDF
aka-pfh58-1_SWPPP for compilation_Final.pdf PDF
af05801_BULK_Earthwork.pdf PDF
af05801_Segment1_superelevation.pdf PDF
af05801_TIE2_Earthwork.pdf PDF
af05801_XS_SchB.pdf PDF
ak pfh 58(1)_NeckLakeRoad_Rockery_TM 1.21.2019.pdf PDF
af05801_TIE1_superelevation.pdf PDF
af05801_TIE3_Earthwork.pdf PDF
ak pfh 58(1)_GR1516_pp1-384.pdf PDF
af05801_XS_Labeled_SchC.pdf PDF
af05801_SEGMENT1_proposed-alignment.pdf PDF
Show 40 more

Latest 50 of 62 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Earthwork

Schedule C

154+00 to 174+00

AK PFH 58(1),

Neck Lake Road Reconstruction: NPOWI Hwy. to Marine Access Facility Jct.

Material Name End Areas Unadjusted Adjusted Mult Mass Accum Station Volumes Volumes Factor Ordinate Unadj Vol

(sq. ft.) (cu. yd.) (cu. yd.) (cu. yd.)

SKIP STATION RANGE = 35+58.00 to 37+00.00

154+00.00 RDWYEXC

Excavation 5.54 0 0 0.85 0 Subsoil Exc 0.00 0 0 1.00 0 Fill 24.20 0 0 1.00 0 0

SUBEXCAVATION

Excavation 66.34 0 0 1.00 0 Subsoil Exc 0.00 0 0 1.00 0 Fill 0.00 0 0 1.00 0 0 Mass ordinate for SUBEXCAVATION = 0

TOPSOIL

Excavation 22.97 0 0 0.00 0 Subsoil Exc 5.74 0 0 0.00 0 Fill 0.00 0 0 0.00 0 0 Mass ordinate for TOPSOIL = 0

ACP

Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 5.11 0 0 0.00 0 0

AGG_BASE

Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 12.17 0 0 0.00 0 0

SUBEXBACKFILL

Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 55.94 0 0 0.00 0 0

SHOULDERBACKFILL

Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 0.16 0 0 0.00 0 0

154+50.00 RDWYEXC

Excavation 0.79 6 5 0.85 6 Subsoil Exc 0.00 0 0 1.00 0 Fill 32.76 53 53 1.00 ‐48 53

SUBEXCAVATION

Excavation 45.04 104 104 1.00 104 Subsoil Exc 0.02 0 0 1.00 0 Fill 0.00 0 0 1.00 ‐48 0 Mass ordinate for SUBEXCAVATION = 104

TOPSOIL

Excavation 19.31 40 0 0.00 40 Subsoil Exc 3.57 9 0 0.00 9 Fill 0.00 0 0 0.00 ‐48 0 Mass ordinate for TOPSOIL = 0

ACP

Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 5.11 9 0 0.00 ‐48 9

AGG_BASE

Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 12.17 23 0 0.00 ‐48 23

SUBEXBACKFILL

Excavation 0.00 0 0 0.00 0

Subsoil Exc 0.00 0 0 0.00 0 Fill 43.69 92 0 0.00 ‐48 92

SHOULDERBACKFILL

Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 0.16 0 0 0.00 ‐48 0

155+00.00 RDWYEXC

Excavation 0.00 1 1 0.85 7 Subsoil Exc 0.00 0 0 1.00 0 Fill 85.34 109 109 1.00 ‐156 162

SUBEXCAVATION

Excavation 24.57 64 64 1.00 168 Subsoil Exc 0.00 0 0 1.00 0 Fill 0.00 0 0 1.00 ‐156 0 Mass ordinate for SUBEXCAVATION = 168

TOPSOIL

Excavation 18.90 35 0 0.00 75 Subsoil Exc 3.45 7 0 0.00 16 Fill 0.00 0 0 0.00 ‐156 0 Mass ordinate for TOPSOIL = 0

ACP

Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 5.11 9 0 0.00 ‐156 18

AGG_BASE

Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 12.17 23 0 0.00 ‐156 46

SUBEXBACKFILL

Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 24.57 63 0 0.00 ‐156 155

SHOULDERBACKFILL

Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 0.16 0 0 0.00 ‐156 0

155+71.41 RDWYEXC

Excavation 0.00 0 0 0.85 7 Subsoil Exc 0.00 0 0 1.00 0 Fill 280.82 484 484 1.00 ‐640 646

SUBEXCAVATION

Excavation 33.65 77 77 1.00 245 Subsoil Exc 0.00 0 0 1.00 0 Fill 0.00 0 0 1.00 ‐640 0 Mass ordinate for SUBEXCAVATION = 245

TOPSOIL

Excavation 38.91 76 0 0.00 151 Subsoil Exc 3.84 10 0 0.00 26 Fill 0.00 0 0 0.00 ‐640 0 Mass ordinate for TOPSOIL = 0

ACP

Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 5.11 14 0 0.00 ‐640 32

AGG_BASE

Excavation 0.00 0 0 0.00 0

Fill 12.01 32 0 0.00 ‐640 78

Subsoil Exc 0.00 0 0 0.00 0 Fill 34.09 78 0 0.00 ‐640 233

SHOULDERBACKFILL

Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 0.14 0 0 0.00 ‐640 0

155+76.93 RDWYEXC

Excavation 0.00 0 0 0.85 7 Subsoil Exc 0.00 0 0 1.00 0 Fill 315.70 61 61 1.00 ‐701 707

SUBEXCAVATION

Excavation 36.97 7 7 1.00 252 Subsoil Exc 0.00 0 0 1.00 0 Fill 0.00 0 0 1.00 ‐701 0 Mass ordinate for SUBEXCAVATION = 252

TOPSOIL

Excavation 42.49 8 0 0.00 159 Subsoil Exc 4.57 1 0 0.00 27 Fill 0.00 0 0 0.00 ‐701 0 Mass ordinate for TOPSOIL = 0

ACP

Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 5.24 1 0 0.00 ‐701 33

AGG_BASE

Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 12.29 2 0 0.00 ‐701 80

SUBEXBACKFILL

Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 36.82 7 0 0.00 ‐701 240

SHOULDERBACKFILL

Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 0.14 0 0 0.00 ‐701 0

156+00.00 RDWYEXC

Excavation 30.02 13 11 0.85 20 Subsoil Exc 0.00 0 0 1.00 0 Fill 411.01 311 311 1.00 ‐1001 1018

SUBEXCAVATION

Excavation 70.50 46 46 1.00 298 Subsoil Exc 0.00 0 0 1.00 0 Fill 0.00 0 0 1.00 ‐1001 0 Mass ordinate for SUBEXCAVATION = 298

TOPSOIL

Excavation 74.76 50 0 0.00 209 Subsoil Exc 8.34 6 0 0.00 33 Fill 0.00 0 0 0.00 ‐1001 0 Mass ordinate for TOPSOIL = 0

ACP

Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 5.84 5 0 0.00 ‐1001 38

AGG_BASE

Fill 13.52 11 0 0.00 ‐1001 91

SUBEXBACKFILL

Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 67.44 45 0 0.00 ‐1001 285

SHOULDERBACKFILL

Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 0.15 0 0 0.00 ‐1001 0

156+32.07 RDWYEXC

Excavation 212.54 144 122 0.85 164 Subsoil Exc 0.00 0 0 1.00 0 Fill 391.52 477 477 1.00 ‐1356 1495

SUBEXCAVATION

Excavation 286.68 213 213 1.00 511 Subsoil Exc 0.00 0 0 1.00 0 Fill 0.00 0 0 1.00 ‐1356 0 Mass ordinate for SUBEXCAVATION = 511

TOPSOIL

Excavation 112.52 111 0 0.00 320 Subsoil Exc 5.74 8 0 0.00 41 Fill 0.00 0 0 0.00 ‐1356 0 Mass ordinate for TOPSOIL = 0

ACP

Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 6.53 7 0 0.00 ‐1356 45

AGG_BASE

Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 14.97 17 0 0.00 ‐1356 108

SUBEXBACKFILL

Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 204.98 162 0 0.00 ‐1356 447

SHOULDERBACKFILL

Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 0.16 0 0 0.00 ‐1356 0

156+50.00 RDWYEXC

Excavation 380.35 197 168 0.85 361 Subsoil Exc 0.00 0 0 1.00 0 Fill 72.16 154 154 1.00 ‐1342 1649

SUBEXCAVATION

Excavation 0.00 96 96 1.00 607 Subsoil Exc 0.00 0 0 1.00 0 Fill 0.00 0 0 1.00 ‐1342 0 Mass ordinate for SUBEXCAVATION = 607

TOPSOIL

Excavation 70.18 61 0 0.00 381 Subsoil Exc 28.27 11 0 0.00 52 Fill 0.00 0 0 0.00 ‐1342 0 Mass ordinate for TOPSOIL = 0

ACP

Excavation 0.00 0 0 0.00 0

Fill 6.53 4 0 0.00 ‐1342 49

Subsoil Exc 0.00 0 0 0.00 0 Fill 14.97 10 0 0.00 ‐1342 118

SUBEXBACKFILL

Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 0.00 68 0 0.00 ‐1342 515

SHOULDERBACKFILL

Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 0.16 0 0 0.00 ‐1342 0

156+75.00 RDWYEXC

Excavation 882.49 585 496 0.85 946 Subsoil Exc 0.00 0 0 1.00 0 Fill 4.22 35 35 1.00 ‐881 1684

TOPSOIL

Excavation 97.74 78 0 0.00 459 Subsoil Exc 4.22 15 0 0.00 67 Fill 0.00 0 0 0.00 ‐881 0 Mass ordinate for TOPSOIL = 0

ACP

Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 6.53 6 0 0.00 ‐881 55

AGG_BASE

Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 14.97 14 0 0.00 ‐881 132

SHOULDERBACKFILL

Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 0.16 0 0 0.00 ‐881 0

157+00.00 RDWYEXC

Excavation 1555.69 1129 959 0.85 2075 Subsoil Exc 0.00 0 0 1.00 0 Fill 1.94 3 3 1.00 75 1687

TOPSOIL

Excavation 109.44 96 0 0.00 555 Subsoil Exc 1.94 3 0 0.00 70 Fill 0.00 0 0 0.00 75 0 Mass ordinate for TOPSOIL = 0

ACP

Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 6.53 6 0 0.00 75 61

AGG_BASE

Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 14.97 14 0 0.00 75 146

SHOULDERBACKFILL

Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 0.16 0 0 0.00 75 0

157+30.00 RDWYEXC

Excavation 2205.90 2090 1776 0.85 4165 Subsoil Exc 0.00 0 0 1.00 0

Fill 1.53 2 2 1.00 1849 1689

TOPSOIL

Excavation 114.73 125 0 0.00 680 Subsoil Exc 1.53 2 0 0.00 72 Fill 0.00 0 0 0.00 1849 0 Mass ordinate for TOPSOIL = 0

ACP

Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 6.53 7 0 0.00 1849 68

AGG_BASE

Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 14.97 17 0 0.00 1849 163

SHOULDERBACKFILL

Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 0.16 0 0 0.00 1849 0

157+50.00 RDWYEXC

Excavation 2399.38 1706 1450 0.85 5871 Subsoil Exc 0.00 0 0 1.00 0 Fill 1.41 1 1 1.00 3298 1690

TOPSOIL

Excavation 115.99 85 0 0.00 765 Subsoil Exc 1.41 1 0 0.00 73 Fill 0.00 0 0 0.00 3298 0 Mass ordinate for TOPSOIL = 0

ACP

Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 7.18 5 0 0.00 3298 73

AGG_BASE

Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 16.34 12 0 0.00 3298 175

SHOULDERBACKFILL

Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 0.17 0 0 0.00 3298 0

157+80.00 RDWYEXC

Excavation 1153.35 1974 1678 0.85 7845 Subsoil Exc 0.00 0 0 1.00 0 Fill 294.25 164 164 1.00 4812 1854

TOPSOIL

Excavation 61.51 99 0 0.00 864 Subsoil Exc 44.72 26 0 0.00 99 Fill 0.00 0 0 0.00 4812 0 Mass ordinate for TOPSOIL = 0

ACP

Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 9.04 9 0 0.00 4812 82

AGG_BASE

Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 20.25 20 0 0.00 4812 195

SHOULDERBACKFILL

Fill 0.18 0 0 0.00 4812 0

158+00.00 RDWYEXC

Excavation 988.31 794 674 0.85 8639 Subsoil Exc 0.00 0 0 1.00 0 Fill 603.95 333 333 1.00 5153 2187

SUBEXCAVATION

Excavation 17.83 7 7 1.00 614 Subsoil Exc 0.00 0 0 1.00 0 Fill 0.00 0 0 1.00 5153 0 Mass ordinate for SUBEXCAVATION = 614

TOPSOIL

Excavation 69.48 49 0 0.00 913 Subsoil Exc 55.26 37 0 0.00 136 Fill 0.00 0 0 0.00 5153 0 Mass ordinate for TOPSOIL = 0

ACP

Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 9.04 7 0 0.00 5153 89

AGG_BASE

Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 20.25 15 0 0.00 5153 210

SUBEXBACKFILL

Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 17.83 7 0 0.00 5153 522

SHOULDERBACKFILL

Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 0.18 0 0 0.00 5153 0

158+05.00 RDWYEXC

Excavation 963.69 181 154 0.85 8820 Subsoil Exc 0.00 0 0 1.00 0 Fill 594.36 111 111 1.00 5196 2298

SUBEXCAVATION

Excavation 15.54 3 3 1.00 617 Subsoil Exc 0.00 0 0 1.00 0 Fill 0.00 0 0 1.00 5196 0 Mass ordinate for SUBEXCAVATION = 617

TOPSOIL

Excavation 70.92 13 0 0.00 926 Subsoil Exc 54.33 10 0 0.00 146 Fill 0.00 0 0 0.00 5196 0 Mass ordinate for TOPSOIL = 0

ACP

Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 9.04 2 0 0.00 5196 91

AGG_BASE

Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 20.25 4 0 0.00 5196 214

SUBEXBACKFILL

Excavation 0.00 0 0 0.00 0

Fill 15.53 3 0 0.00 5196 525

Subsoil Exc 0.00 0 0 0.00 0 Fill 0.18 0 0 0.00 5196 0

158+10.00 RDWYEXC

Excavation 968.02 179 152 0.85 8999 Subsoil Exc 0.00 0 0 1.00 0 Fill 569.59 108 108 1.00 5240 2406

SUBEXCAVATION

Excavation 18.21 3 3 1.00 620 Subsoil Exc 0.00 0 0 1.00 0 Fill 0.00 0 0 1.00 5240 0 Mass ordinate for SUBEXCAVATION = 620

TOPSOIL

Excavation 74.10 14 0 0.00 940 Subsoil Exc 52.30 10 0 0.00 156 Fill 0.00 0 0 0.00 5240 0 Mass ordinate for TOPSOIL = 0

ACP

Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 9.04 2 0 0.00 5240 93

AGG_BASE

Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 20.25 4 0 0.00 5240 218

SUBEXBACKFILL

Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 18.29 3 0 0.00 5240 528

SHOULDERBACKFILL

Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 0.18 0 0 0.00 5240 0

158+25.00 RDWYEXC

Excavation 1327.10 638 541 0.85 9637 Subsoil Exc 0.00 0 0 1.00 0 Fill 2.54 159 159 1.00 5622 2565

SUBEXCAVATION

Excavation 0.00 5 5 1.00 625 Subsoil Exc 0.00 0 0 1.00 0 Fill 0.00 0 0 1.00 5622 0 Mass ordinate for SUBEXCAVATION = 625

TOPSOIL

Excavation 108.46 51 0 0.00 991 Subsoil Exc 2.54 15 0 0.00 171 Fill 0.00 0 0 0.00 5622 0 Mass ordinate for TOPSOIL = 0

ACP

Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 9.04 5 0 0.00 5622 98

AGG_BASE

Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 20.25 11 0 0.00 5622 229

Fill 0.00 5 0 0.00 5622 533

SHOULDERBACKFILL

Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 0.18 0 0 0.00 5622 0

158+50.00 RDWYEXC

Excavation 1632.85 1370 1165 0.85 11007 Subsoil Exc 0.00 0 0 1.00 0 Fill 1.64 2 2 1.00 6785 2567

TOPSOIL

Excavation 115.41 104 0 0.00 1095 Subsoil Exc 1.64 2 0 0.00 173 Fill 0.00 0 0 0.00 6785 0 Mass ordinate for TOPSOIL = 0

ACP

Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 9.04 8 0 0.00 6785 106

AGG_BASE

Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 20.25 19 0 0.00 6785 248

SHOULDERBACKFILL

Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 0.18 0 0 0.00 6785 0

158+75.00 RDWYEXC

Excavation 1384.48 1397 1187 0.85 12404 Subsoil Exc 0.00 0 0 1.00 0 Fill 1.44 1 1 1.00 7971 2568

TOPSOIL

Excavation 110.79 105 0 0.00 1200 Subsoil Exc 1.44 1 0 0.00 174 Fill 0.00 0 0 0.00 7971 0 Mass ordinate for TOPSOIL = 0

ACP

Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 9.04 8 0 0.00 7971 114

AGG_BASE

Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 20.25 19 0 0.00 7971 267

SHOULDERBACKFILL

Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 0.18 0 0 0.00 7971 0

158+90.00 RDWYEXC

Excavation 978.69 657 558 0.85 13061 Subsoil Exc 0.00 0 0 1.00 0 Fill 1.31 1 1 1.00 8528 2569

TOPSOIL

Excavation 109.87 61 0 0.00 1261 Subsoil Exc 1.31 1 0 0.00 175 Fill 0.00 0 0 0.00 8528 0 Mass ordinate for TOPSOIL = 0

ACP

Subsoil Exc 0.00 0 0 0.00 0 Fill 9.04 5 0 0.00 8528 119

AGG_BASE

Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 21.35 12 0 0.00 8528 279

SHOULDERBACKFILL

Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 1.00 0 0 0.00 8528 0

159+00.00 RDWYEXC

Excavation 759.31 322 274 0.85 13383 Subsoil Exc 0.00 0 0 1.00 0 Fill 1.80 1 1 1.00 8801 2570

TOPSOIL

Excavation 106.05 40 0 0.00 1301 Subsoil Exc 1.80 1 0 0.00 176 Fill 0.00 0 0 0.00 8801 0 Mass ordinate for TOPSOIL = 0

ACP

Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 8.45 3 0 0.00 8801 122

AGG_BASE

Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 20.16 8 0 0.00 8801 287

SHOULDERBACKFILL

Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 0.99 0 0 0.00 8801 0

159+25.00 RDWYEXC

Excavation 238.20 462 393 0.85 13845 Subsoil Exc 0.00 0 0 1.00 0 Fill 10.57 6 6 1.00 9188 2576

SUBEXCAVATION

Excavation 407.92 188 188 1.00 813 Subsoil Exc 0.00 0 0 1.00 0 Fill 0.00 0 0 1.00 9188 0 Mass ordinate for SUBEXCAVATION = 813

TOPSOIL

Excavation 94.17 92 0 0.00 1393 Subsoil Exc 1.49 2 0 0.00 178 Fill 0.00 0 0 0.00 9188 0 Mass ordinate for TOPSOIL = 0

ACP

Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 7.51 7 0 0.00 9188 129

AGG_BASE

Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 18.26 18 0 0.00 9188 305

SUBEXBACKFILL

Fill 177.40 82 0 0.00 9188 615

Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 0.99 1 0 0.00 9188 1

159+41.85 RDWYEXC

Excavation 145.48 120 102 0.85 13965 Subsoil Exc 0.00 0 0 1.00 0 Fill 67.57 24 24 1.00 9266 2600

SUBEXCAVATION

Excavation 331.56 230 230 1.00 1043 Subsoil Exc 0.00 0 0 1.00 0 Fill 0.00 0 0 1.00 9266 0 Mass ordinate for SUBEXCAVATION = 1043

TOPSOIL

Excavation 89.09 57 0 0.00 1450 Subsoil Exc 1.63 1 0 0.00 179 Fill 0.00 0 0 0.00 9266 0 Mass ordinate for TOPSOIL = 0

ACP

Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 7.51 5 0 0.00 9266 134

AGG_BASE

Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 17.71 11 0 0.00 9266 316

SUBEXBACKFILL

Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 216.22 123 0 0.00 9266 738

SHOULDERBACKFILL

Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 0.72 1 0 0.00 9266 2

159+50.00 RDWYEXC

Excavation 109.78 39 33 0.85 14004 Subsoil Exc 0.00 0 0 1.00 0 Fill 113.44 27 27 1.00 9272 2627

SUBEXCAVATION

Excavation 294.96 94 94 1.00 1137 Subsoil Exc 0.00 0 0 1.00 0 Fill 0.00 0 0 1.00 9272 0 Mass ordinate for SUBEXCAVATION = 1137

TOPSOIL

Excavation 89.73 27 0 0.00 1477 Subsoil Exc 1.84 1 0 0.00 180 Fill 0.00 0 0 0.00 9272 0 Mass ordinate for TOPSOIL = 0

ACP

Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 7.51 2 0 0.00 9272 136

AGG_BASE

Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 17.71 5 0 0.00 9272 321

Fill 216.99 65 0 0.00 9272 803

SHOULDERBACKFILL

Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 0.72 0 0 0.00 9272 2

159+75.00 RDWYEXC

Excavation 26.71 63 54 0.85 14067 Subsoil Exc 0.00 0 0 1.00 0 Fill 283.43 184 184 1.00 9142 2811

SUBEXCAVATION

Excavation 183.49 221 221 1.00 1358 Subsoil Exc 0.00 0 0 1.00 0 Fill 0.00 0 0 1.00 9142 0 Mass ordinate for SUBEXCAVATION = 1358

TOPSOIL

Excavation 78.07 78 0 0.00 1555 Subsoil Exc 1.45 2 0 0.00 182 Fill 0.00 0 0 0.00 9142 0 Mass ordinate for TOPSOIL = 0

ACP

Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 7.51 7 0 0.00 9142 143

AGG_BASE

Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 17.71 16 0 0.00 9142 337

SUBEXBACKFILL

Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 163.25 176 0 0.00 9142 979

SHOULDERBACKFILL

Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 0.72 1 0 0.00 9142 3

160+00.00 RDWYEXC

Excavation 16.62 20 17 0.85 14087 Subsoil Exc 0.00 0 0 1.00 0 Fill 343.83 290 290 1.00 8869 3101

SUBEXCAVATION

Excavation 165.28 161 161 1.00 1519 Subsoil Exc 0.00 0 0 1.00 0 Fill 0.00 0 0 1.00 8869 0 Mass ordinate for SUBEXCAVATION = 1519

TOPSOIL

Excavation 77.89 72 0 0.00 1627 Subsoil Exc 2.34 2 0 0.00 184 Fill 0.00 0 0 0.00 8869 0 Mass ordinate for TOPSOIL = 0

ACP

Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 7.51 7 0 0.00 8869 150

AGG_BASE

Fill 17.71 16 0 0.00 8869 353

Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 157.37 148 0 0.00 8869 1127

SHOULDERBACKFILL

Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 0.72 1 0 0.00 8869 4

160+30.79 RDWYEXC

Excavation 2.82 11 9 0.85 14098 Subsoil Exc 0.00 0 0 1.00 0 Fill 425.12 438 438 1.00 8440 3539

SUBEXCAVATION

Excavation 137.81 173 173 1.00 1692 Subsoil Exc 0.00 0 0 1.00 0 Fill 0.00 0 0 1.00 8440 0 Mass ordinate for SUBEXCAVATION = 1692

TOPSOIL

Excavation 72.77 86 0 0.00 1713 Subsoil Exc 2.51 3 0 0.00 187 Fill 0.00 0 0 0.00 8440 0 Mass ordinate for TOPSOIL = 0

ACP

Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 7.51 9 0 0.00 8440 159

AGG_BASE

Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 17.71 20 0 0.00 8440 373

SUBEXBACKFILL

Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 136.15 167 0 0.00 8440 1294

SHOULDERBACKFILL

Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 0.72 1 0 0.00 8440 5

160+50.00 RDWYEXC

Excavation 0.21 1 1 0.85 14099 Subsoil Exc 0.00 0 0 1.00 0 Fill 377.36 285 285 1.00 8156 3824

SUBEXCAVATION

Excavation 113.05 90 90 1.00 1782 Subsoil Exc 0.00 0 0 1.00 0 Fill 0.00 0 0 1.00 8156 0 Mass ordinate for SUBEXCAVATION = 1782

TOPSOIL

Excavation 67.82 50 0 0.00 1763 Subsoil Exc 2.85 2 0 0.00 189 Fill 0.00 0 0 0.00 8156 0 Mass ordinate for TOPSOIL = 0

ACP

Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 7.17 5 0 0.00 8156 164

Fill 16.96 12 0 0.00 8156 385

SUBEXBACKFILL

Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 112.92 89 0 0.00 8156 1383

SHOULDERBACKFILL

Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 0.71 1 0 0.00 8156 6

160+73.51 RDWYEXC

Excavation 0.00 0 0 0.85 14099 Subsoil Exc 0.00 0 0 1.00 0 Fill 369.34 325 325 1.00 7831 4149

SUBEXCAVATION

Excavation 68.65 79 79 1.00 1861 Subsoil Exc 0.00 0 0 1.00 0 Fill 0.00 0 0 1.00 7831 0 Mass ordinate for SUBEXCAVATION = 1861

TOPSOIL

Excavation 58.07 55 0 0.00 1818 Subsoil Exc 6.22 4 0 0.00 193 Fill 0.00 0 0 0.00 7831 0 Mass ordinate for TOPSOIL = 0

ACP

Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 6.54 6 0 0.00 7831 170

AGG_BASE

Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 15.61 14 0 0.00 7831 399

SUBEXBACKFILL

Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 68.59 79 0 0.00 7831 1462

SHOULDERBACKFILL

Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 0.70 1 0 0.00 7831 7

160+91.46 RDWYEXC

Excavation 0.04 0 0 0.85 14099 Subsoil Exc 0.00 0 0 1.00 0 Fill 344.38 237 237 1.00 7594 4386

SUBEXCAVATION

Excavation 72.57 47 47 1.00 1908 Subsoil Exc 0.00 0 0 1.00 0 Fill 0.00 0 0 1.00 7594 0 Mass ordinate for SUBEXCAVATION = 1908

TOPSOIL

Excavation 56.93 38 0 0.00 1856 Subsoil Exc 6.61 4 0 0.00 197 Fill 0.00 0 0 0.00 7594 0 Mass ordinate for TOPSOIL = 0

ACP

Fill 5.86 4 0 0.00 7594 174

Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 15.36 10 0 0.00 7594 409

SUBEXBACKFILL

Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 73.66 47 0 0.00 7594 1509

SHOULDERBACKFILL

Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 1.28 1 0 0.00 7594 8

161+00.00 RDWYEXC

Excavation 4.34 1 1 0.85 14100 Subsoil Exc 0.00 0 0 1.00 0 Fill 286.07 100 100 1.00 7495 4486

SUBEXCAVATION

Excavation 125.15 31 31 1.00 1939 Subsoil Exc 0.00 0 0 1.00 0 Fill 0.00 0 0 1.00 7495 0 Mass ordinate for SUBEXCAVATION = 1939

TOPSOIL

Excavation 55.28 18 0 0.00 1874 Subsoil Exc 4.50 2 0 0.00 199 Fill 0.00 0 0 0.00 7495 0 Mass ordinate for TOPSOIL = 0

ACP

Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 5.86 2 0 0.00 7495 176

AGG_BASE

Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 15.66 5 0 0.00 7495 414

SUBEXBACKFILL

Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 122.97 31 0 0.00 7495 1540

SHOULDERBACKFILL

Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 1.43 0 0 0.00 7495 8

161+23.80 RDWYEXC

Excavation 6.08 5 4 0.85 14105 Subsoil Exc 0.00 0 0 1.00 0 Fill 216.31 221 221 1.00 7278 4707

SUBEXCAVATION

Excavation 171.31 130 130 1.00 2069 Subsoil Exc 0.00 0 0 1.00 0 Fill 0.00 0 0 1.00 7278 0 Mass ordinate for SUBEXCAVATION = 2069

TOPSOIL

Excavation 53.38 48 0 0.00 1922 Subsoil Exc 5.42 4 0 0.00 203 Fill 0.00 0 0 0.00 7278 0

Fill 5.86 5 0 0.00 7278 181

AGG_BASE

Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 16.48 14 0 0.00 7278 428

SUBEXBACKFILL

Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 166.56 128 0 0.00 7278 1668

SHOULDERBACKFILL

Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 1.84 1 0 0.00 7278 9

161+50.00 RDWYEXC

Excavation 0.82 3 3 0.85 14108 Subsoil Exc 0.00 0 0 1.00 0 Fill 235.81 219 219 1.00 7062 4926

SUBEXCAVATION

Excavation 108.46 136 136 1.00 2205 Subsoil Exc 0.00 0 0 1.00 0 Fill 0.00 0 0 1.00 7062 0 Mass ordinate for SUBEXCAVATION = 2205

TOPSOIL

Excavation 42.18 47 0 0.00 1969 Subsoil Exc 5.27 5 0 0.00 208 Fill 0.00 0 0 0.00 7062 0 Mass ordinate for TOPSOIL = 0

ACP

Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 5.53 6 0 0.00 7062 187

AGG_BASE

Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 15.08 15 0 0.00 7062 443

SUBEXBACKFILL

Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 107.65 133 0 0.00 7062 1801

SHOULDERBACKFILL

Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 1.19 1 0 0.00 7062 10

161+84.04 RDWYEXC

Excavation 0.00 1 0 0.85 14109 Subsoil Exc 0.00 0 0 1.00 0 Fill 208.77 280 280 1.00 6782 5206

SUBEXCAVATION

Excavation 56.26 104 104 1.00 2309 Subsoil Exc 0.00 0 0 1.00 0 Fill 0.00 0 0 1.00 6782 0 Mass ordinate for SUBEXCAVATION = 2309

TOPSOIL

Excavation 30.64 46 0 0.00 2015 Subsoil Exc 4.49 6 0 0.00 214 Fill 0.00 0 0 0.00 6782 0

Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 5.11 7 0 0.00 6782 194

AGG_BASE

Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 12.17 17 0 0.00 6782 460

SUBEXBACKFILL

Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 56.38 103 0 0.00 6782 1904

SHOULDERBACKFILL

Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 0.16 1 0 0.00 6782 11

162+00.00 RDWYEXC

Excavation 0.00 0 0 0.85 14109 Subsoil Exc 0.00 0 0 1.00 0 Fill 201.64 121 121 1.00 6661 5327

SUBEXCAVATION

Excavation 37.06 28 28 1.00 2337 Subsoil Exc 0.00 0 0 1.00 0 Fill 0.00 0 0 1.00 6661 0 Mass ordinate for SUBEXCAVATION = 2337

TOPSOIL

Excavation 25.58 17 0 0.00 2032 Subsoil Exc 4.32 3 0 0.00 217 Fill 0.00 0 0 0.00 6661 0 Mass ordinate for TOPSOIL = 0

ACP

Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 5.11 3 0 0.00 6661 197

AGG_BASE

Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 12.17 7 0 0.00 6661 467

SUBEXBACKFILL

Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 37.06 28 0 0.00 6661 1932

SHOULDERBACKFILL

Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 0.16 0 0 0.00 6661 11

162+21.93 RDWYEXC

Excavation 0.00 0 0 0.85 14109 Subsoil Exc 0.00 0 0 1.00 0 Fill 205.32 165 165 1.00 6496 5492

SUBEXCAVATION

Excavation 41.08 32 32 1.00 2369 Subsoil Exc 0.00 0 0 1.00 0 Fill 0.00 0 0 1.00 6496 0 Mass ordinate for SUBEXCAVATION = 2369

Excavation 21.95 19 0 0.00 2051

Subsoil Exc 13.90 7 0 0.00 224 Fill 0.00 0 0 0.00 6496 0 Mass ordinate for TOPSOIL = 0

ACP

Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 5.11 4 0 0.00 6496 201

AGG_BASE

Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 12.17 10 0 0.00 6496 477

SUBEXBACKFILL

Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 41.08 32 0 0.00 6496 1964

SHOULDERBACKFILL

Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 0.16 0 0 0.00 6496 11

162+50.00 RDWYEXC

Excavation 0.00 0 0 0.85 14109 Subsoil Exc 0.00 0 0 1.00 0 Fill 192.33 207 207 1.00 6289 5699

SUBEXCAVATION

Excavation 37.67 41 41 1.00 2410 Subsoil Exc 0.00 0 0 1.00 0 Fill 0.00 0 0 1.00 6289 0 Mass ordinate for SUBEXCAVATION = 2410

TOPSOIL

Excavation 31.31 28 0 0.00 2079 Subsoil Exc 10.79 13 0 0.00 237 Fill 0.00 0 0 0.00 6289 0 Mass ordinate for TOPSOIL = 0

ACP

Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 5.11 5 0 0.00 6289 206

AGG_BASE

Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 12.17 13 0 0.00 6289 490

SUBEXBACKFILL

Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 37.67 41 0 0.00 6289 2005

SHOULDERBACKFILL

Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 0.16 0 0 0.00 6289 11

163+00.00 RDWYEXC

Excavation 0.00 0 0 0.85 14109 Subsoil Exc 0.00 0 0 1.00 0 Fill 61.17 235 235 1.00 6054 5934

SUBEXCAVATION

Excavation 20.67 54 54 1.00 2464 Subsoil Exc 0.00 0 0 1.00 0 Fill 0.00 0 0 1.00 6054 0 Mass ordinate for SUBEXCAVATION = 2464

Excavation 19.37 47 0 0.00 2126 Subsoil Exc 3.58 13 0 0.00 250 Fill 0.00 0 0 0.00 6054 0 Mass ordinate for TOPSOIL = 0

ACP

Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 5.11 9 0 0.00 6054 215

AGG_BASE

Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 12.17 23 0 0.00 6054 513

SUBEXBACKFILL

Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 20.67 54 0 0.00 6054 2059

SHOULDERBACKFILL

Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 0.16 0 0 0.00 6054 11

163+50.00 RDWYEXC

Excavation 31.12 29 25 0.85 14138 Subsoil Exc 0.00 0 0 1.00 0 Fill 1.83 58 58 1.00 6021 5992

SUBEXCAVATION

Excavation 110.32 122 122 1.00 2586 Subsoil Exc 0.00 0 0 1.00 0 Fill 0.00 0 0 1.00 6021 0 Mass ordinate for SUBEXCAVATION = 2586

TOPSOIL

Excavation 29.04 45 0 0.00 2171 Subsoil Exc 1.63 5 0 0.00 255 Fill 0.00 0 0 0.00 6021 0 Mass ordinate for TOPSOIL = 0

ACP

Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 5.11 9 0 0.00 6021 224

AGG_BASE

Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 12.17 23 0 0.00 6021 536

SUBEXBACKFILL

Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 47.52 63 0 0.00 6021 2122

SHOULDERBACKFILL

Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 0.16 0 0 0.00 6021 11

164+00.00 RDWYEXC

Excavation 7.02 35 30 0.85 14173 Subsoil Exc 0.00 0 0 1.00 0 Fill 48.38 46 46 1.00 6005 6038

SUBEXCAVATION

Excavation 42.28 142 142 1.00 2728

Fill 0.00 0 0 1.00 6005 0 Mass ordinate for SUBEXCAVATION = 2728

TOPSOIL

Excavation 24.71 50 0 0.00 2221 Subsoil Exc 5.49 7 0 0.00 262 Fill 0.00 0 0 0.00 6005 0 Mass ordinate for TOPSOIL = 0

ACP

Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 5.11 9 0 0.00 6005 233

AGG_BASE

Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 12.17 23 0 0.00 6005 559

SUBEXBACKFILL

Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 42.24 83 0 0.00 6005 2205

SHOULDERBACKFILL

Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 0.16 0 0 0.00 6005 11

164+50.00 RDWYEXC

Excavation 0.00 6 6 0.85 14179 Subsoil Exc 0.00 0 0 1.00 0 Fill 101.94 139 139 1.00 5872 6177

SUBEXCAVATION

Excavation 38.10 74 74 1.00 2802 Subsoil Exc 0.00 0 0 1.00 0 Fill 0.00 0 0 1.00 5872 0 Mass ordinate for SUBEXCAVATION = 2802

TOPSOIL

Excavation 33.52 54 0 0.00 2275 Subsoil Exc 1.64 7 0 0.00 269 Fill 0.00 0 0 0.00 5872 0 Mass ordinate for TOPSOIL = 0

ACP

Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 5.11 9 0 0.00 5872 242

AGG_BASE

Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 12.17 23 0 0.00 5872 582

SUBEXBACKFILL

Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 38.10 74 0 0.00 5872 2279

SHOULDERBACKFILL

Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 0.16 0 0 0.00 5872 11

165+00.00 RDWYEXC

Excavation 0.00 0 0 0.85 14179 Subsoil Exc 0.00 0 0 1.00 0 Fill 60.77 151 151 1.00 5721 6328

SUBEXCAVATION

Excavation 17.02 51 51 1.00 2853

Fill 0.00 0 0 1.00 5721 0 Mass ordinate for SUBEXCAVATION = 2853

TOPSOIL

Excavation 17.02 47 0 0.00 2322 Subsoil Exc 0.20 2 0 0.00 271 Fill 0.00 0 0 0.00 5721 0 Mass ordinate for TOPSOIL = 0

ACP

Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 5.11 9 0 0.00 5721 251

AGG_BASE

Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 12.17 23 0 0.00 5721 605

SUBEXBACKFILL

Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 17.02 51 0 0.00 5721 2330

SHOULDERBACKFILL

Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 0.16 0 0 0.00 5721 11

165+50.00 RDWYEXC

Excavation 3.19 2 2 0.85 14181 Subsoil Exc 0.00 0 0 1.00 0 Fill 63.34 115 115 1.00 5608 6443

SUBEXCAVATION

Excavation 31.89 45 45 1.00 2898 Subsoil Exc 0.00 0 0 1.00 0 Fill 0.00 0 0 1.00 5608 0 Mass ordinate for SUBEXCAVATION = 2898

TOPSOIL

Excavation 26.00 40 0 0.00 2362 Subsoil Exc 4.18 4 0 0.00 275 Fill 0.00 0 0 0.00 5608 0 Mass ordinate for TOPSOIL = 0

ACP

Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 5.11 9 0 0.00 5608 260

AGG_BASE

Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 12.17 23 0 0.00 5608 628

SUBEXBACKFILL

Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 32.37 46 0 0.00 5608 2376

SHOULDERBACKFILL

Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 0.16 0 0 0.00 5608 11

166+00.00 RDWYEXC

Excavation 7.00 9 8 0.85 14190

Fill 46.60 102 102 1.00 5514 6545

SUBEXCAVATION

Excavation 30.41 58 58 1.00 2956 Subsoil Exc 0.00 0 0 1.00 0 Fill 0.00 0 0 1.00 5514 0 Mass ordinate for SUBEXCAVATION = 2956

TOPSOIL

Excavation 23.12 45 0 0.00 2407 Subsoil Exc 4.47 8 0 0.00 283 Fill 0.00 0 0 0.00 5514 0 Mass ordinate for TOPSOIL = 0

ACP

Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 5.11 9 0 0.00 5514 269

AGG_BASE

Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 12.17 23 0 0.00 5514 651

SUBEXBACKFILL

Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 30.39 58 0 0.00 5514 2434

SHOULDERBACKFILL

Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 0.16 0 0 0.00 5514 11

166+05.00 RDWYEXC

Excavation 7.45 1 1 0.85 14191 Subsoil Exc 0.00 0 0 1.00 0 Fill 47.07 9 9 1.00 5506 6554

SUBEXCAVATION

Excavation 28.57 5 5 1.00 2961 Subsoil Exc 0.00 0 0 1.00 0 Fill 0.00 0 0 1.00 5506 0 Mass ordinate for SUBEXCAVATION = 2961

TOPSOIL

Excavation 22.43 4 0 0.00 2411 Subsoil Exc 4.34 1 0 0.00 284 Fill 0.00 0 0 0.00 5506 0 Mass ordinate for TOPSOIL = 0

ACP

Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 5.11 1 0 0.00 5506 270

AGG_BASE

Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 12.17 2 0 0.00 5506 653

SUBEXBACKFILL

Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 28.67 5 0 0.00 5506 2439

SHOULDERBACKFILL

Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 0.16 0 0 0.00 5506 11

166+50.00 RDWYEXC

Excavation 8.92 14 12 0.85 14205

Fill 80.91 107 107 1.00 5411 6661

SUBEXCAVATION

Excavation 27.65 47 47 1.00 3008 Subsoil Exc 0.00 0 0 1.00 0 Fill 0.00 0 0 1.00 5411 0 Mass ordinate for SUBEXCAVATION = 3008

TOPSOIL

Excavation 32.05 46 0 0.00 2457 Subsoil Exc 3.82 7 0 0.00 291 Fill 0.00 0 0 0.00 5411 0 Mass ordinate for TOPSOIL = 0

ACP

Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 7.36 10 0 0.00 5411 280

AGG_BASE

Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 16.67 24 0 0.00 5411 677

SUBEXBACKFILL

Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 27.65 47 0 0.00 5411 2486

SHOULDERBACKFILL

Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 0.16 0 0 0.00 5411 11

166+55.00 RDWYEXC

Excavation 9.09 1 1 0.85 14206 Subsoil Exc 0.00 0 0 1.00 0 Fill 84.35 15 15 1.00 5397 6676

SUBEXCAVATION

Excavation 23.99 5 5 1.00 3013 Subsoil Exc 0.00 0 0 1.00 0 Fill 0.00 0 0 1.00 5397 0 Mass ordinate for SUBEXCAVATION = 3013

TOPSOIL

Excavation 31.93 6 0 0.00 2463 Subsoil Exc 3.90 1 0 0.00 292 Fill 0.00 0 0 0.00 5397 0 Mass ordinate for TOPSOIL = 0

ACP

Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 7.61 1 0 0.00 5397 281

AGG_BASE

Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 17.17 3 0 0.00 5397 680

SUBEXBACKFILL

Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 23.99 5 0 0.00 5397 2491

SHOULDERBACKFILL

Excavation 0.00 0 0 0.00 0

Fill 0.16 0 0 0.00 5397 11

167+00.00 RDWYEXC

Excavation 1.99 9 8 0.85 14215 Subsoil Exc 0.00 0 0 1.00 0 Fill 78.18 135 135 1.00 5270 6811

SUBEXCAVATION

Excavation 18.73 36 36 1.00 3049 Subsoil Exc 0.00 0 0 1.00 0 Fill 0.00 0 0 1.00 5270 0 Mass ordinate for SUBEXCAVATION = 3049

TOPSOIL

Excavation 27.90 50 0 0.00 2513 Subsoil Exc 6.79 9 0 0.00 301 Fill 0.00 0 0 0.00 5270 0 Mass ordinate for TOPSOIL = 0

ACP

Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 7.61 13 0 0.00 5270 294

AGG_BASE

Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 17.17 29 0 0.00 5270 709

SUBEXBACKFILL

Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 18.73 36 0 0.00 5270 2527

SHOULDERBACKFILL

Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 0.16 0 0 0.00 5270 11

167+25.00 RDWYEXC

Excavation 0.00 1 0 0.85 14216 Subsoil Exc 0.00 0 0 1.00 0 Fill 88.38 77 77 1.00 5193 6888

SUBEXCAVATION

Excavation 26.73 21 21 1.00 3070 Subsoil Exc 0.00 0 0 1.00 0 Fill 0.00 0 0 1.00 5193 0 Mass ordinate for SUBEXCAVATION = 3070

TOPSOIL

Excavation 23.12 24 0 0.00 2537 Subsoil Exc 13.21 9 0 0.00 310 Fill 0.00 0 0 0.00 5193 0 Mass ordinate for TOPSOIL = 0

ACP

Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 7.61 7 0 0.00 5193 301

AGG_BASE

Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 17.09 16 0 0.00 5193 725

SUBEXBACKFILL

Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 26.73 21 0 0.00 5193 2548

Fill 0.15 0 0 0.00 5193 11

167+32.53 RDWYEXC

Excavation 0.00 0 0 0.85 14216 Subsoil Exc 0.00 0 0 1.00 0 Fill 101.18 26 26 1.00 5167 6914

SUBEXCAVATION

Excavation 28.12 8 8 1.00 3078 Subsoil Exc 0.00 0 0 1.00 0 Fill 0.00 0 0 1.00 5167 0 Mass ordinate for SUBEXCAVATION = 3078

TOPSOIL

Excavation 23.67 7 0 0.00 2544 Subsoil Exc 16.50 4 0 0.00 314 Fill 0.00 0 0 0.00 5167 0 Mass ordinate for TOPSOIL = 0

ACP

Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 7.35 2 0 0.00 5167 303

AGG_BASE

Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 17.81 5 0 0.00 5167 730

SUBEXBACKFILL

Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 28.12 8 0 0.00 5167 2556

SHOULDERBACKFILL

Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 0.99 0 0 0.00 5167 11

167+42.43 RDWYEXC

Excavation 0.00 0 0 0.85 14216 Subsoil Exc 0.00 0 0 1.00 0 Fill 74.86 32 32 1.00 5135 6946

SUBEXCAVATION

Excavation 23.65 9 9 1.00 3087 Subsoil Exc 0.00 0 0 1.00 0 Fill 0.00 0 0 1.00 5135 0 Mass ordinate for SUBEXCAVATION = 3087

Excavation 20.28 8 0 0.00 2552

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .