QA_12-05-2024.pdf

PDF 59 KB Posted

Attached to
AK PFH 58(1), Neck Lake Road Reconstruction: NPOWI Hwy. to Marine Access Facility Jct.
Solicitation number
69056725B000001
Issued by

About this file

This is a Questions and Answers document for solicitation number 69056725B000001 regarding the Neck Lake Road Reconstruction project from NPOWI Highway to Marine Access Facility Junction. The document contains five technical and general questions submitted by potential bidders with responses from the contracting office.

The Q&A addresses inquiries about the correct email for submitting questions (wfl.contracts@dot.gov), specifications regarding fertilizer types (10-20-10 and 46-0-0), application rates for fertilizer and mulch (referencing Subsection 625.08A table 625-1), and clarification about weed-free straw wattles as fiber rolls (referencing FP-14 section subsection 713.12(b)). The questions were answered between November 26, 2024, and December 5, 2024, with one item being addressed in Amendment A001.

View the file

Other files

File Type Posted
BidTab Neck Lake Road Reconstruction.pdf PDF
BidSum-AK PFH 58(1).pdf PDF
Amendment A008.pdf PDF
QA_01-08-2025.pdf PDF
QA_01-07-2025.pdf PDF
Amendment A007.pdf PDF
Amendment A006.pdf PDF
QA_12-30-2024.pdf PDF
Amendment A005.pdf PDF
Amendment A004.pdf PDF
Amendment A003.pdf PDF
QA_12-16-2024.pdf PDF
QA_12-13-2024.pdf PDF
Amendment A002.pdf PDF
QA_12-18-2024.pdf PDF
QA_12-06-2024.pdf PDF
Amendment A001.pdf PDF
QA_11-26-2024.pdf PDF
af05801_SEGMENT1_proposed-alignment.pdf PDF
af05801_XS_Labeled_SchA.pdf PDF
af05801_SEGMENT1_proposed-profile.pdf PDF
af05801_XS_SchA.pdf PDF
af05801_TIE4_Earthwork.pdf PDF
af05801_SchedA_Earthwork.pdf PDF
af05801_SchedB_Earthwork.pdf PDF
ak pfh 58(1)_Neck Lake ARD Technical Memorandum.pdf PDF
af05801_TIE4_proposed-alignment.pdf PDF
af05801_TIE1_Earthwork.pdf PDF
ak pfh 58(1)_GR1516_pp385-973.pdf PDF
af05801_TIE2_superelevation.pdf PDF
af05801_TIE1_proposed-profile.pdf PDF
af05801_TIE2_proposed-alignment.pdf PDF
af05801_TIE4_proposed-profile.pdf PDF
af05801_TIE4_superelevation.pdf PDF
IFB AK PFH 58(1) Neck Lake Road Reconstruction.pdf PDF
af05801_SchedC_Earthwork.pdf PDF
af05801_BULK_proposed-alignment.pdf PDF
ak pfh 58(1)_FinalHydraulicReport.pdf PDF
ak pfh 58(1)_XS Approaches_SchC.pdf PDF
aka-pfh58-1_SWPPP for compilation_Final.pdf PDF
af05801_BULK_Earthwork.pdf PDF
af05801_Segment1_superelevation.pdf PDF
af05801_TIE2_Earthwork.pdf PDF
af05801_XS_SchB.pdf PDF
ak pfh 58(1)_NeckLakeRoad_Rockery_TM 1.21.2019.pdf PDF
af05801_TIE1_superelevation.pdf PDF
af05801_TIE3_Earthwork.pdf PDF
ak pfh 58(1)_GR1516_pp1-384.pdf PDF
af05801_XS_Labeled_SchC.pdf PDF
af05801_SEGMENT1_proposed-alignment.pdf PDF
Show 40 more

Latest 50 of 62 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

AK PFH 58(1)

Neck Lake Road Reconstruction NPOWI Hwy. to Marine Access Facility Jct

# General Technical Question Answer Date

1 X Is wfl.contracts@dot.gov the correct email to submit questions to for solicitation number 69056725B000001?

See Block 9 on Page A-5. 11/26/2024

2 X Why is there 10-20-10 and 46-0-0 fertilizer in the specifications? will be addressed undeer Amendment A001. 12/5/2024

3 X What is the application rate on fertilizer?

Please see Subsection 625.08A table 625-1. Bid according to solicitation documents.

12/5/2024

4 X What is the application rate on the 713.05 mulch?

Please see Subsection 625.08A table 625-1. Bid according to solicitation documents.

12/5/2024

5 X Are weed free straw wattles considered fiber rolls for section

713.12?

Please see FP-14 section subsection 713.12(b). Bid accroding to solicatitaion documents.

12/5/2024

Check General or Technical

File details come from the government source that posted it. Updated .