af05801_TIE2_Earthwork.pdf
PDF 93 KB Posted
- Solicitation number
- 69056725B000001
About this file
This document contains a schedule of earthwork quantities for the AK PFH 58(1), Neck Lake Road Reconstruction project. The project involves approximately 5.6 miles of road reconstruction work, including roadway excavation, sub-excavation, soft ground embankment construction, grading, rock blasting, drainage, aggregate surface course placement, guardrail installation, erosion control, traffic control, and other related work. The project is being procured by the Department of Transportation Federal Highway Administration through a sealed bid, firm-fixed-price contract. The estimated price range is between $10,000,000 and $20,000,000, and the tentative completion date is Fall 2026. The earthwork schedule provides detailed breakdown of excavation, subsoil excavation, and fill quantities by station and material type.
View the file
Other files
Show 40 more
Latest 50 of 62 listed here. See the rest on GovTribe.
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Schedule A and B
Tie In
Earthwork
154+00 to 156+75
AK PFH 58(1),
Neck Lake Road Reconstruction: NPOWI Hwy. to Marine Access Facility Jct.
Material Name End Areas Unadjusted Adjusted Mult Mass Accum Station Volumes Volumes Factor Ordinate Unadj Vol
(sq. ft.) (cu. yd.) (cu. yd.) (cu. yd.)
154+00.00 RDWYEXC
Excavation 69.59 0 0 0.85 0 Subsoil Exc 0.00 0 0 1.00 0
Fill 20.79 0 0 1.00 0 0
TOPSOIL
Excavation 22.75 0 0 0.00 0 Subsoil Exc 5.03 0 0 0.00 0
Fill 0.00 0 0 0.00 0 0 Mass ordinate for TOPSOIL = 0
DELETE
Excavation 0.00 0 0 0.00 0
Subsoil Exc 0.00 0 0 0.00 0 Fill 5.11 0 0 0.00 0 0
AGG_BASE
Excavation 0.00 0 0 0.00 0
Subsoil Exc 0.00 0 0 0.00 0 Fill 12.08 0 0 0.00 0 0
SUBEXBACKFILL
Excavation 0.00 0 0 0.00 0
Subsoil Exc 0.00 0 0 0.00 0 Fill 61.03 0 0 0.00 0 0
SHOULDERBACKFILL
Excavation 0.00 0 0 0.00 0
Subsoil Exc 0.00 0 0 0.00 0 Fill 0.15 0 0 0.00 0 0
154+50.00 RDWYEXC
Excavation 48.03 109 93 0.85 109
Subsoil Exc 0.00 0 0 1.00 0 Fill 34.05 51 51 1.00 42 51
TOPSOIL
Excavation 19.84 40 0 0.00 40
Subsoil Exc 3.57 8 0 0.00 8 Fill 0.00 0 0 0.00 42 0
Mass ordinate for TOPSOIL = 0
DELETE
Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0
Fill 5.11 9 0 0.00 42 9
AGG_BASE
Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0
Fill 12.05 22 0 0.00 42 22
SUBEXBACKFILL
Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0
Fill 49.01 102 0 0.00 42 102
SHOULDERBACKFILL
Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0
Fill 0.15 0 0 0.00 42 0
155+00.00 RDWYEXC
Excavation 0.00 44 38 0.85 153
Subsoil Exc 0.00 0 0 1.00 0 Fill 44.98 73 73 1.00 7 124
SUBEXCAVATION
Excavation 36.82 34 34 1.00 34 Subsoil Exc 0.00 0 0 1.00 0 Fill 0.00 0 0 1.00 7 0 Mass ordinate for SUBEXCAVATION = 34
TOPSOIL
Excavation 19.07 36 0 0.00 76 Subsoil Exc 4.56 8 0 0.00 16 Fill 0.00 0 0 0.00 7 0 Mass ordinate for TOPSOIL = 0
DELETE
Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 5.11 9 0 0.00 7 18
AGG_BASE
Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 12.12 22 0 0.00 7 44
SUBEXBACKFILL
Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 37.86 80 0 0.00 7 182
SHOULDERBACKFILL
Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 0.16 0 0 0.00 7 0
155+50.00 RDWYEXC
Excavation 0.00 0 0 0.85 153 Subsoil Exc 0.00 0 0 1.00 0 Fill 77.22 113 113 1.00 ‐106 237
SUBEXCAVATION
Excavation 0.00 34 34 1.00 68 Subsoil Exc 0.00 0 0 1.00 0 Fill 0.00 0 0 1.00 ‐106 0 Mass ordinate for SUBEXCAVATION = 68
TOPSOIL
Excavation 0.00 18 0 0.00 94 Subsoil Exc 18.43 21 0 0.00 37 Fill 0.00 0 0 0.00 ‐106 0 Mass ordinate for TOPSOIL = 0
DELETE
Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 5.11 9 0 0.00 ‐106 27
AGG_BASE
Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 12.12 22 0 0.00 ‐106 66
SUBEXBACKFILL
Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 0.00 35 0 0.00 ‐106 217
SHOULDERBACKFILL
Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 0.16 0 0 0.00 ‐106 0
156+00.00 RDWYEXC
Excavation 0.00 0 0 0.85 153
Subsoil Exc 0.00 0 0 1.00 0 Fill 55.06 122 122 1.00 ‐228 359
TOPSOIL
Excavation 0.00 0 0 0.00 94
Subsoil Exc 14.58 31 0 0.00 68 Fill 0.00 0 0 0.00 ‐228 0
Mass ordinate for TOPSOIL = 0
DELETE
Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0
Fill 5.11 9 0 0.00 ‐228 36
AGG_BASE
Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0
Fill 12.06 22 0 0.00 ‐228 88
SHOULDERBACKFILL
Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0
Fill 0.15 0 0 0.00 ‐228 0
156+50.00 RDWYEXC
Excavation 0.27 0 0 0.85 153
Subsoil Exc 0.00 0 0 1.00 0 Fill 17.25 67 67 1.00 ‐295 426
TOPSOIL
Excavation 1.83 2 0 0.00 96
Subsoil Exc 7.68 21 0 0.00 89 Fill 0.00 0 0 0.00 ‐295 0
Mass ordinate for TOPSOIL = 0
DELETE
Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0
Fill 5.11 9 0 0.00 ‐295 45
AGG_BASE
Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0
Fill 12.07 22 0 0.00 ‐295 110
SHOULDERBACKFILL
Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0
Fill 0.15 0 0 0.00 ‐295 0
156+75.00 RDWYEXC
Excavation 12.03 6 5 0.85 159
Subsoil Exc 0.00 0 0 1.00 0 Fill 6.37 11 11 1.00 ‐301 437
TOPSOIL
Excavation 10.20 5 0 0.00 101
Subsoil Exc 6.01 6 0 0.00 95 Fill 0.00 0 0 0.00 ‐301 0
Mass ordinate for TOPSOIL = 0
DELETE
Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0
Fill 5.11 5 0 0.00 ‐301 50
AGG_BASE
Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0
Fill 12.15 11 0 0.00 ‐301 121
SHOULDERBACKFILL
Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0
Fill 0.16 0 0 0.00 ‐301 0 G R A N D S U M M A R Y T O T A L S
Material Name Unadjusted Adjusted Mult Volumes Volumes Factor
(cu. yd.) (cu. yd.)
RDWYEXC
Excavation 159 136 0.85 Subsoil Exc 0 0 1.00
Fill 437 437 1.00
SUBEXCAVATION
Excavation 68 68 1.00 Subsoil Exc 0 0 1.00
Fill 0 0 1.00
TOPSOIL
Excavation 101 0 0.00 Subsoil Exc 95 0 0.00
Fill 0 0 0.00
DELETE
Excavation 0 0 0.00 Subsoil Exc 0 0 0.00
Fill 50 0 0.00
AGG_BASE
Excavation 0 0 0.00 Subsoil Exc 0 0 0.00
Fill 121 0 0.00
SUBEXBACKFILL
Excavation 0 0 0.00 Subsoil Exc 0 0 0.00
Fill 217 0 0.00
SHOULDERBACKFILL
Excavation 0 0 0.00 Subsoil Exc 0 0 0.00
Fill 0 0 0.00
File details come from the government source that posted it. Updated .