af05801_TIE2_superelevation.pdf

PDF 49 KB Posted

Attached to
AK PFH 58(1), Neck Lake Road Reconstruction: NPOWI Hwy. to Marine Access Facility Jct.
Solicitation number
69056725B000001
Issued by

About this file

This document appears to be an attachment related to a federal contract opportunity for the AK PFH 58(1), Neck Lake Road Reconstruction project. The attachment contains information about the superelevation settings and parameters for the project, including details on the station locations, slopes, and curve information.

The related federal contract opportunity is for the Neck Lake Road Reconstruction project, which consists of approximately 6 miles of roadway work including excavation, embankment construction, drainage, paving, and other related civil infrastructure. The project is anticipated to be solicited in Winter 2024/2025, with a tentative completion date in Fall 2026. The estimated price range is between $10,000,000 and $20,000,000, and it will be a sealed bid, firm-fixed-price contract offered for full and open competition.

View the file

Other files

File Type Posted
BidTab Neck Lake Road Reconstruction.pdf PDF
BidSum-AK PFH 58(1).pdf PDF
Amendment A008.pdf PDF
QA_01-08-2025.pdf PDF
QA_01-07-2025.pdf PDF
Amendment A007.pdf PDF
Amendment A006.pdf PDF
QA_12-30-2024.pdf PDF
Amendment A005.pdf PDF
Amendment A004.pdf PDF
Amendment A003.pdf PDF
QA_12-16-2024.pdf PDF
QA_12-13-2024.pdf PDF
Amendment A002.pdf PDF
QA_12-18-2024.pdf PDF
QA_12-06-2024.pdf PDF
Amendment A001.pdf PDF
QA_12-05-2024.pdf PDF
QA_11-26-2024.pdf PDF
af05801_SEGMENT1_proposed-alignment.pdf PDF
af05801_XS_Labeled_SchA.pdf PDF
af05801_SEGMENT1_proposed-profile.pdf PDF
af05801_XS_SchA.pdf PDF
af05801_TIE4_Earthwork.pdf PDF
af05801_SchedA_Earthwork.pdf PDF
af05801_SchedB_Earthwork.pdf PDF
ak pfh 58(1)_Neck Lake ARD Technical Memorandum.pdf PDF
af05801_TIE4_proposed-alignment.pdf PDF
af05801_TIE1_Earthwork.pdf PDF
ak pfh 58(1)_GR1516_pp385-973.pdf PDF
af05801_TIE1_proposed-profile.pdf PDF
af05801_TIE2_proposed-alignment.pdf PDF
af05801_TIE4_proposed-profile.pdf PDF
af05801_TIE4_superelevation.pdf PDF
IFB AK PFH 58(1) Neck Lake Road Reconstruction.pdf PDF
af05801_SchedC_Earthwork.pdf PDF
af05801_BULK_proposed-alignment.pdf PDF
ak pfh 58(1)_FinalHydraulicReport.pdf PDF
ak pfh 58(1)_XS Approaches_SchC.pdf PDF
aka-pfh58-1_SWPPP for compilation_Final.pdf PDF
af05801_BULK_Earthwork.pdf PDF
af05801_Segment1_superelevation.pdf PDF
af05801_TIE2_Earthwork.pdf PDF
af05801_XS_SchB.pdf PDF
ak pfh 58(1)_NeckLakeRoad_Rockery_TM 1.21.2019.pdf PDF
af05801_TIE1_superelevation.pdf PDF
af05801_TIE3_Earthwork.pdf PDF
ak pfh 58(1)_GR1516_pp1-384.pdf PDF
af05801_XS_Labeled_SchC.pdf PDF
af05801_SEGMENT1_proposed-alignment.pdf PDF
Show 40 more

Latest 50 of 62 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Schedule A and B

Super elevations stations 153+52.47 to 156+78.48

AK PFH 58(1),

Neck Lake Road Reconstruction: NPOWI Hwy. to Marine Access Facility Jct.

/* Superelevation Settings and Parameters:

Project Name:

F:\HIGHWAYS\FHWA\24500048_af05801_NeckLakeRoad\Design\geopm\NeckLake2017.prj User:

F:\HIGHWAYS\FHWA\24500048_af05801_NeckLakeRoad\Design\geopm\projdbs\oc Run Name: TIE2 Unit System is english.

Created input file "Superelevation_TIE2.inp".

Created activity log file "Superelevation_TIE2.log".

Created on Mon, Jul 22, 2024 at 09:15.

Using Preference File "FHWA_US_2004_80_20" Using e Selection of "6%‐30mph".

Using Length Selection of "AASHTO English" Using Design Speed of 30.000000.

auto shape job number = 581 auto shape set shape cluster baseline = TIE2 shape cluster profile = TIE2_P shape cluster tie = 0.0000 independent shape chain / offset

TIE2 ‐10.0000

TIE2 0.0000

filler line station / slope 153+52.470000 ‐2.0000 153+70.372056 ‐2.0000 154+77.038723 6.0000 /* Curve TIE2‐2 */ 155+76.173224 6.0000 /* Curve TIE2‐2 */ 156+78.480000 ‐1.6730 auto shape set shape cluster baseline = TIE2 shape cluster profile = TIE2_P shape cluster tie = 0.0000 dependent shape chain / offset

TIE2 0.0000

TIE2 10.0000

filler line station / slope 153+52.470000 ‐2.0000 154+23.705390 ‐2.0000 154+77.038723 ‐6.0000 /* Curve TIE2‐2 */ 155+76.173224 ‐6.0000 /* Curve TIE2‐2 */ 156+29.506557 ‐2.0000 156+78.480000 ‐2.0000

Plot Parameters Dependent Shape lvname = X_Geopak_Cell co = 6 lc = 0 wt = 2 Dependent Text lvname = X_Geopak_Cell co = 6 Independent Shape lvname = X_Geopak_Cell co = 1 lc = 0 wt = 2 Independent Text lvname = X_Geopak_Cell co = 1

Write shapes into dgn = F:\highways\FHWA\24500048_af05801_NeckLakeRoad\Design\af05801Sa02.dgn

File details come from the government source that posted it. Updated .