af05801_BULK_Earthwork.pdf

PDF 84 KB Posted

Attached to
AK PFH 58(1), Neck Lake Road Reconstruction: NPOWI Hwy. to Marine Access Facility Jct.
Solicitation number
69056725B000001
Issued by

About this file

This document appears to be a detailed computation of earthwork quantities for a federal construction project. The project involves road reconstruction and infrastructure work for 6 miles of Neck Lake Road in Alaska, including roadway excavation, embankment construction, drainage, aggregate surfacing, and other related work. The estimated price range for the project is between $10,000,000 and $20,000,000, with a tentative completion date of Fall 2026. The project will be solicited through a sealed bid, firm-fixed-price procurement, and will be offered for full and open competition. The federal agency responsible is the Department of Transportation Federal Highway Administration.

View the file

Other files

File Type Posted
BidTab Neck Lake Road Reconstruction.pdf PDF
BidSum-AK PFH 58(1).pdf PDF
Amendment A008.pdf PDF
QA_01-08-2025.pdf PDF
QA_01-07-2025.pdf PDF
Amendment A007.pdf PDF
Amendment A006.pdf PDF
QA_12-30-2024.pdf PDF
Amendment A005.pdf PDF
Amendment A004.pdf PDF
Amendment A003.pdf PDF
QA_12-16-2024.pdf PDF
QA_12-13-2024.pdf PDF
Amendment A002.pdf PDF
QA_12-18-2024.pdf PDF
QA_12-06-2024.pdf PDF
Amendment A001.pdf PDF
QA_12-05-2024.pdf PDF
QA_11-26-2024.pdf PDF
af05801_SEGMENT1_proposed-alignment.pdf PDF
af05801_XS_Labeled_SchA.pdf PDF
af05801_SEGMENT1_proposed-profile.pdf PDF
af05801_XS_SchA.pdf PDF
af05801_TIE4_Earthwork.pdf PDF
af05801_SchedA_Earthwork.pdf PDF
af05801_SchedB_Earthwork.pdf PDF
ak pfh 58(1)_Neck Lake ARD Technical Memorandum.pdf PDF
af05801_TIE4_proposed-alignment.pdf PDF
af05801_TIE1_Earthwork.pdf PDF
ak pfh 58(1)_GR1516_pp385-973.pdf PDF
af05801_TIE2_superelevation.pdf PDF
af05801_TIE1_proposed-profile.pdf PDF
af05801_TIE2_proposed-alignment.pdf PDF
af05801_TIE4_proposed-profile.pdf PDF
af05801_TIE4_superelevation.pdf PDF
IFB AK PFH 58(1) Neck Lake Road Reconstruction.pdf PDF
af05801_SchedC_Earthwork.pdf PDF
af05801_BULK_proposed-alignment.pdf PDF
ak pfh 58(1)_FinalHydraulicReport.pdf PDF
ak pfh 58(1)_XS Approaches_SchC.pdf PDF
aka-pfh58-1_SWPPP for compilation_Final.pdf PDF
af05801_Segment1_superelevation.pdf PDF
af05801_TIE2_Earthwork.pdf PDF
af05801_XS_SchB.pdf PDF
ak pfh 58(1)_NeckLakeRoad_Rockery_TM 1.21.2019.pdf PDF
af05801_TIE1_superelevation.pdf PDF
af05801_TIE3_Earthwork.pdf PDF
ak pfh 58(1)_GR1516_pp1-384.pdf PDF
af05801_XS_Labeled_SchC.pdf PDF
af05801_SEGMENT1_proposed-alignment.pdf PDF
Show 40 more

Latest 50 of 62 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Earthwork

Approach Road 3000+02.98 to 3001+86.97

Fish Hatchery Bulkhead 107+93.79 Mainline Left

AK PFH 58(1),

Neck Lake Road Reconstruction: NPOWI Hwy. to Marine Access Facility Jct.

COMPUTING EARTHWORKS FOR BASELINE = BULK

COMPUTING EARTHWORKS FOR JOB = 582

FORMING LIST OF XSCELLS

BEGINNING EARTHWORKS COMPUTATION

Material Name End Areas Unadjusted Adjusted Mult Mass Accum Station Volumes Volumes Factor Ordinate Unadj Vol

(sq. ft.) (cu. yd.) (cu. yd.) (cu. yd.)

3000+02.98 RDWYEXC

Excavation 3.11 0 0 0.85 0 Subsoil Exc 0.00 0 0 1.00 0 Fill 34.77 0 0 1.00 0 0

ACP

Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 4.59 0 0 0.00 0 0

AGG_BASE

Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 9.96 0 0 0.00 0 0

3000+25.00 RDWYEXC

Excavation 0.00 1 1 0.85 1 Subsoil Exc 0.00 0 0 1.00 0 Fill 119.12 63 63 1.00 ‐62 63

ACP

Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 3.78 3 0 0.00 ‐62 3

AGG_BASE

Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 9.06 8 0 0.00 ‐62 8

3000+50.00 RDWYEXC

Excavation 0.00 0 0 0.85 1 Subsoil Exc 0.00 0 0 1.00 0 Fill 58.92 82 82 1.00 ‐144 145

ACP

Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 3.75 3 0 0.00 ‐144 6

AGG_BASE

Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 9.01 8 0 0.00 ‐144 16

3000+75.00 RDWYEXC

Excavation 0.00 0 0 0.85 1 Subsoil Exc 0.00 0 0 1.00 0 Fill 10.86 32 32 1.00 ‐176 177

ACP

Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 3.75 3 0 0.00 ‐176 9

AGG_BASE

Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 9.01 8 0 0.00 ‐176 24

3001+00.00 RDWYEXC

Excavation 12.96 6 5 0.85 7 Subsoil Exc 0.00 0 0 1.00 0 Fill 0.00 5 5 1.00 ‐176 182

ACP

Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 3.95 4 0 0.00 ‐176 13

AGG_BASE

Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 9.41 9 0 0.00 ‐176 33

3001+25.00 RDWYEXC

Excavation 36.52 23 19 0.85 30 Subsoil Exc 0.00 0 0 1.00 0 Fill 0.00 0 0 1.00 ‐157 182

ACP

Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 6.21 5 0 0.00 ‐157 18

AGG_BASE

Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 13.92 11 0 0.00 ‐157 44

3001+50.00 RDWYEXC

Excavation 26.55 29 25 0.85 59 Subsoil Exc 0.00 0 0 1.00 0 Fill 0.00 0 0 1.00 ‐132 182

ACP

Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 5.07 5 0 0.00 ‐132 23

AGG_BASE

Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 11.66 12 0 0.00 ‐132 56

3001+68.77 RDWYEXC

Excavation 29.47 20 16 0.85 79 Subsoil Exc 0.00 0 0 1.00 0 Fill 3.36 1 1 1.00 ‐117 183

ACP

Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 6.04 4 0 0.00 ‐117 27

AGG_BASE

Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 11.93 8 0 0.00 ‐117 64

3001+75.00 RDWYEXC

Excavation 28.86 7 6 0.85 86

Subsoil Exc 0.00 0 0 1.00 0 Fill 2.55 1 1 1.00 ‐112 184

ACP

Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 5.48 1 0 0.00 ‐112 28

AGG_BASE

Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 10.89 3 0 0.00 ‐112 67

3001+83.97 RDWYEXC

Excavation 27.14 9 8 0.85 95 Subsoil Exc 0.00 0 0 1.00 0 Fill 1.56 1 1 1.00 ‐105 185

ACP

Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 4.67 2 0 0.00 ‐105 30

AGG_BASE

Excavation 0.00 0 0 0.00 0 Subsoil Exc 0.00 0 0 0.00 0 Fill 9.46 3 0 0.00 ‐105 70 � G R A N D S U M M A R Y T O T A L S Material Name Unadjusted Adjusted Mult Volumes Volumes Factor

(cu. yd.) (cu. yd.)

RDWYEXC

Excavation 95 80 0.85 Subsoil Exc 0 0 1.00 Fill 185 185 1.00

ACP

Excavation 0 0 0.00 Subsoil Exc 0 0 0.00 Fill 30 0 0.00

AGG_BASE

Excavation 0 0 0.00 Subsoil Exc 0 0 0.00 Fill 70 0 0.00 � S P L I T S U M M A R Y T O T A L S XS Quant XS Quant Add/Sub Quant Add/Sub Quant Material Name Unadjusted Adjusted Unadjusted Adjusted Mult Volume Volume Volume Volume Factor

(cu. yd.) (cu. yd.) (cu. yd.) (cu. yd.)

RDWYEXC

Excavation 95 80 0 0 0.85 Subsoil Exc 0 0 0 0 1.00 Fill 185 185 0 0 1.00

ACP

Excavation 0 0 0 0 0.00 Subsoil Exc 0 0 0 0 0.00 Fill 30 0 0 0 0.00

AGG_BASE

Excavation 0 0 0 0 0.00 Subsoil Exc 0 0 0 0 0.00 Fill 70 0 0 0 0.00

File details come from the government source that posted it. Updated .