af05801_TIE1_superelevation.pdf

PDF 51 KB Posted

Attached to
AK PFH 58(1), Neck Lake Road Reconstruction: NPOWI Hwy. to Marine Access Facility Jct.
Solicitation number
69056725B000001
Issued by

About this file

This document appears to be a Schedule A related to the superelevation settings and parameters for the AK PFH 58(1), Neck Lake Road Reconstruction project. The project involves approximately 6 miles of road reconstruction work, including roadway excavation, sub-excavation, soft ground embankment construction, grading, rock blasting, drainage, embankment, aggregate surface course, guardrail installation, erosion control, and other related work. The project is located 45 miles northwest of Coffman Cove, Alaska and is anticipated to be solicited in Winter 2024/2025 as a sealed bid, firm-fixed-price contract with an estimated price range between $10,000,000 and $20,000,000. The project will include 3 bid schedules, with only one schedule to be awarded. The solicitation is offered for full and open competition on an unrestricted basis and is being managed by the Department of Transportation Federal Highway Administration.

View the file

Other files

File Type Posted
BidTab Neck Lake Road Reconstruction.pdf PDF
BidSum-AK PFH 58(1).pdf PDF
Amendment A008.pdf PDF
QA_01-08-2025.pdf PDF
QA_01-07-2025.pdf PDF
Amendment A007.pdf PDF
Amendment A006.pdf PDF
QA_12-30-2024.pdf PDF
Amendment A005.pdf PDF
Amendment A004.pdf PDF
Amendment A003.pdf PDF
QA_12-16-2024.pdf PDF
QA_12-13-2024.pdf PDF
Amendment A002.pdf PDF
QA_12-18-2024.pdf PDF
QA_12-06-2024.pdf PDF
Amendment A001.pdf PDF
QA_12-05-2024.pdf PDF
QA_11-26-2024.pdf PDF
af05801_SEGMENT1_proposed-alignment.pdf PDF
af05801_XS_Labeled_SchA.pdf PDF
af05801_SEGMENT1_proposed-profile.pdf PDF
af05801_XS_SchA.pdf PDF
af05801_TIE4_Earthwork.pdf PDF
af05801_SchedA_Earthwork.pdf PDF
af05801_SchedB_Earthwork.pdf PDF
ak pfh 58(1)_Neck Lake ARD Technical Memorandum.pdf PDF
af05801_TIE4_proposed-alignment.pdf PDF
af05801_TIE1_Earthwork.pdf PDF
ak pfh 58(1)_GR1516_pp385-973.pdf PDF
af05801_TIE2_superelevation.pdf PDF
af05801_TIE1_proposed-profile.pdf PDF
af05801_TIE2_proposed-alignment.pdf PDF
af05801_TIE4_proposed-profile.pdf PDF
af05801_TIE4_superelevation.pdf PDF
IFB AK PFH 58(1) Neck Lake Road Reconstruction.pdf PDF
af05801_SchedC_Earthwork.pdf PDF
af05801_BULK_proposed-alignment.pdf PDF
ak pfh 58(1)_FinalHydraulicReport.pdf PDF
ak pfh 58(1)_XS Approaches_SchC.pdf PDF
aka-pfh58-1_SWPPP for compilation_Final.pdf PDF
af05801_BULK_Earthwork.pdf PDF
af05801_Segment1_superelevation.pdf PDF
af05801_TIE2_Earthwork.pdf PDF
af05801_XS_SchB.pdf PDF
ak pfh 58(1)_NeckLakeRoad_Rockery_TM 1.21.2019.pdf PDF
af05801_TIE3_Earthwork.pdf PDF
ak pfh 58(1)_GR1516_pp1-384.pdf PDF
af05801_XS_Labeled_SchC.pdf PDF
af05801_SEGMENT1_proposed-alignment.pdf PDF
Show 40 more

Latest 50 of 62 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Schedule A

Super Elevations stations 73+67.06 to 76+29.25

AK PFH 58(1),

Neck Lake Road Reconstruction: NPOWI Hwy. to Marine Access Facility Jct.

/* Superelevation Settings and Parameters:

Project Name:

F:\HIGHWAYS\FHWA\24500048_af05801_NeckLakeRoad\Design\geopm\NeckLake2017.prj User:

F:\HIGHWAYS\FHWA\24500048_af05801_NeckLakeRoad\Design\geopm\projdbs\oc Run Name: TIE1 Unit System is english.

Created input file "Superelevation.inp".

Created activity log file "Superelevation.log".

Created on Thu, Jul 18, 2024 at 14:15.

Using Preference File "FHWA_US_2004_80_20" Using e Selection of "6%‐30mph".

Using Length Selection of "AASHTO English" Using Design Speed of 30.000000.

auto shape job number = 581 auto shape set shape cluster baseline = TIE1 shape cluster profile = TIE1_P shape cluster tie = 0.0000 independent shape chain / offset

TIE1 ‐10.0000

TIE1 0.0000

filler line station / slope 73+67.060000 ‐2.0000 75+50.670000 ‐2.0000 76+29.250000 5.8000 auto shape set shape cluster baseline = TIE1 shape cluster profile = TIE1_P shape cluster tie = 0.0000 dependent shape chain / offset

TIE1 0.0000

TIE1 10.0000

filler line station / slope 73+67.060000 ‐2.0000 75+90.970000 ‐2.0000 76+29.250000 ‐5.8000

Plot Parameters Dependent Shape lvname = X_Geopak_Cell co = 6 lc = 0 wt = 2 Dependent Text lvname = X_Geopak_Cell co = 6 Independent Shape lvname = X_Geopak_Cell co = 1 lc = 0 wt = 2 Independent Text lvname = X_Geopak_Cell co = 1

Write shapes into dgn = F:\highways\FHWA\24500048_af05801_NeckLakeRoad\Design\af05801Sa02.dgn

File details come from the government source that posted it. Updated .