af05801_TIE2_proposed-profile.pdf
PDF 70 KB Posted
- Solicitation number
- 69056725B000001
About this file
The provided document is a Tie-in Profile for the AK PFH 58(1), Neck Lake Road Reconstruction project. The project involves approximately 6 miles of roadway reconstruction, including excavation, embankment construction, grading, rock blasting, drainage, guardrail installation, erosion control, and other related work. The project is divided into 3 bid schedules (A, B, and C), with only one schedule to be awarded. The work is located 45 miles northwest of Coffman Cove, Alaska and is anticipated to be solicited in Winter 2024/2025. The contract will be a sealed bid, firm-fixed-price procurement with an estimated value between $10,000,000 and $20,000,000. The Federal Highway Administration is the contracting agency.
View the file
Other files
Show 40 more
Latest 50 of 62 listed here. See the rest on GovTribe.
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Schedule A and B
Tie in
Profile
150+95 to 156+75
AK PFH 58(1),
Neck Lake Road Reconstruction: NPOWI Hwy. to Marine Access Facility Jct.
Copyright: (c) 2009 Bentley Systems, Incorporated. All rights reserved.
Project: NeckLake2017 Subject:
Job No. 581 Operator: OC Date: Tuesday August 20, 2024 9:11 am
SYSTEM FIX 3 ASEC 2 AZIM PRI 0 NOR NE STA 2 FILE: 'TIE2_P'
* 1 Print Profile TIE2_P
Beginning profile TIE2_P description:
STATION ELEV GRADE TOTAL L BACK L AHEAD L
VPI 1 150+95.00 104.146
VPC 150+95.00 104.146 ‐0.512 K = 72.0
Low Point 151+31.84 104.051
VPI 2 152+70.00 103.250 350.000 175.000 175.000
VPT 154+45.00 110.864 4.351
VPC 154+45.00 110.864 4.215 K = 19.1 SSD = 203.1
High Point 155+25.59 112.562
VPI 4 155+55.00 115.500 220.000 110.000 110.000
VPT 156+65.00 107.479 ‐7.292
VPI 5 156+75.00 106.750 ‐7.292
Ending profile TIE2_P description