af05801_BULK_superelevation.pdf

PDF 67 KB Posted

Attached to
AK PFH 58(1), Neck Lake Road Reconstruction: NPOWI Hwy. to Marine Access Facility Jct.
Solicitation number
69056725B000001
Issued by

About this file

This document appears to be a technical specification related to a federal contract opportunity for the reconstruction of Neck Lake Road in Alaska. The key details are:

The contract opportunity is for the AK PFH 58(1), Neck Lake Road Reconstruction project, which consists of approximately 6 miles of roadway work including excavation, embankment, drainage, guardrail, and other infrastructure improvements. The work is divided into 3 bid schedules, with only one schedule to be awarded. The estimated price range is between $10,000,000 and $20,000,000, and the project is anticipated to be solicited in Winter 2024/2025 with a tentative completion date in Fall 2026. The contracting agency is the Department of Transportation Federal Highway Administration. This is a sealed bid, firm-fixed-price contract opportunity offered on an unrestricted, full and open competition basis.

View the file

Other files

File Type Posted
BidTab Neck Lake Road Reconstruction.pdf PDF
BidSum-AK PFH 58(1).pdf PDF
Amendment A008.pdf PDF
QA_01-08-2025.pdf PDF
QA_01-07-2025.pdf PDF
Amendment A007.pdf PDF
Amendment A006.pdf PDF
QA_12-30-2024.pdf PDF
Amendment A005.pdf PDF
Amendment A004.pdf PDF
Amendment A003.pdf PDF
QA_12-16-2024.pdf PDF
QA_12-13-2024.pdf PDF
Amendment A002.pdf PDF
QA_12-18-2024.pdf PDF
QA_12-06-2024.pdf PDF
Amendment A001.pdf PDF
QA_12-05-2024.pdf PDF
QA_11-26-2024.pdf PDF
af05801_SEGMENT1_proposed-alignment.pdf PDF
af05801_XS_Labeled_SchA.pdf PDF
af05801_SEGMENT1_proposed-profile.pdf PDF
af05801_XS_SchA.pdf PDF
af05801_TIE4_Earthwork.pdf PDF
af05801_SchedA_Earthwork.pdf PDF
af05801_SchedB_Earthwork.pdf PDF
ak pfh 58(1)_Neck Lake ARD Technical Memorandum.pdf PDF
af05801_TIE4_proposed-alignment.pdf PDF
af05801_TIE1_Earthwork.pdf PDF
ak pfh 58(1)_GR1516_pp385-973.pdf PDF
af05801_TIE2_superelevation.pdf PDF
af05801_TIE1_proposed-profile.pdf PDF
af05801_TIE2_proposed-alignment.pdf PDF
af05801_TIE4_proposed-profile.pdf PDF
af05801_TIE4_superelevation.pdf PDF
IFB AK PFH 58(1) Neck Lake Road Reconstruction.pdf PDF
af05801_SchedC_Earthwork.pdf PDF
af05801_BULK_proposed-alignment.pdf PDF
ak pfh 58(1)_FinalHydraulicReport.pdf PDF
ak pfh 58(1)_XS Approaches_SchC.pdf PDF
aka-pfh58-1_SWPPP for compilation_Final.pdf PDF
af05801_BULK_Earthwork.pdf PDF
af05801_Segment1_superelevation.pdf PDF
af05801_TIE2_Earthwork.pdf PDF
af05801_XS_SchB.pdf PDF
ak pfh 58(1)_NeckLakeRoad_Rockery_TM 1.21.2019.pdf PDF
af05801_TIE1_superelevation.pdf PDF
af05801_TIE3_Earthwork.pdf PDF
ak pfh 58(1)_GR1516_pp1-384.pdf PDF
af05801_XS_Labeled_SchC.pdf PDF
Show 40 more

Latest 50 of 62 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Super elevation

Approach Road 3000+00 Fish Hatchery Bulkhead 107+93.79 Mainline Left

AK PFH 58(1),

Neck Lake Road Reconstruction: NPOWI Hwy. to Marine Access Facility Jct.

/* Superelevation Settings and Parameters:

Project Name: F:\HIGHWAYS\FHWA\17500007_af05801_NeckLakeRoad\Design\geopm\NeckLake2017.prj User: F:\HIGHWAYS\FHWA\17500007_af05801_NeckLakeRoad\Design\geopm\projdbs\oc Run Name: Untitled Unit System is english.

Created input file "F:\highways\FHWA\17500007_af05801_NeckLakeRoad\Design\af05801_BULKShapes.inp".

Created activity log file "F:\highways\FHWA\17500007_af05801_NeckLakeRoad\Design\af05801_BULKShapes.log".

Created on Wed, Jan 10, 2018 at 15:40.

Using Preference File "NeckLake25" Using e Selection of "4%‐25mph".

Using Length Selection of "AASHTO English" Using Design Speed of 25.000000.

auto shape job number = 582 auto shape set shape cluster baseline = BULK shape cluster profile = BULK_P shape cluster tie = 0.0000 dependent shape chain / offset

BULK ‐7.0000

BULK ‐0.0000

filler line station / slope 3000+00.000000 ‐1.2428

/* Warning: Curve BULK‐1 Radius of 50.0000 is less than the minimum radius of 154.0000 for the given Design Speed of 25.00. */

3000+10.553818 ‐2.0000 /* Curve BULK‐1 */ 3001+86.665016 ‐2.0000 auto shape set shape cluster baseline = BULK shape cluster profile = BULK_P shape cluster tie = 0.0000 dependent shape chain / offset

BULK 0.0000

BULK 7.0000

filler line station / slope 3000+02.982418 1.3714

/* Warning: Curve BULK‐1 Radius of 50.0000 is less than the minimum radius of 154.0000 for the given Design Speed of 25.00. */

3000+09.268138 2.0000 /* Curve BULK‐1 */ 3001+86.665016 2.0000

Plot Parameters Dependent Shape lvname = X_Geopak_Cell co = 6 lc = 0 wt = 2

Dependent Text lvname = X_Geopak_Cell co = 6

Independent Shape lvname = X_Geopak_Cell co = 1 lc = 0 wt = 2 Independent Text lvname = X_Geopak_Cell co = 1

Write shapes into dgn = F:\highways\FHWA\17500007_af05801_NeckLakeRoad\Design\af05801sa05.dgn

File details come from the government source that posted it. Updated .