This document appears to be a technical specification related to a federal contract opportunity for the reconstruction of Neck Lake Road in Alaska. The key details are:
The contract opportunity is for the AK PFH 58(1), Neck Lake Road Reconstruction project, which consists of approximately 6 miles of roadway work including excavation, embankment, drainage, guardrail, and other infrastructure improvements. The work is divided into 3 bid schedules, with only one schedule to be awarded. The estimated price range is between $10,000,000 and $20,000,000, and the project is anticipated to be solicited in Winter 2024/2025 with a tentative completion date in Fall 2026. The contracting agency is the Department of Transportation Federal Highway Administration. This is a sealed bid, firm-fixed-price contract opportunity offered on an unrestricted, full and open competition basis.
View the file
Other files
Show 40 more
Latest 50 of 62 listed here. See the rest on GovTribe.
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Super elevation
Approach Road 3000+00 Fish Hatchery Bulkhead 107+93.79 Mainline Left
AK PFH 58(1),
Neck Lake Road Reconstruction: NPOWI Hwy. to Marine Access Facility Jct.
/* Superelevation Settings and Parameters:
Project Name: F:\HIGHWAYS\FHWA\17500007_af05801_NeckLakeRoad\Design\geopm\NeckLake2017.prj User: F:\HIGHWAYS\FHWA\17500007_af05801_NeckLakeRoad\Design\geopm\projdbs\oc Run Name: Untitled Unit System is english.
Created input file "F:\highways\FHWA\17500007_af05801_NeckLakeRoad\Design\af05801_BULKShapes.inp".
Created activity log file "F:\highways\FHWA\17500007_af05801_NeckLakeRoad\Design\af05801_BULKShapes.log".
Created on Wed, Jan 10, 2018 at 15:40.
Using Preference File "NeckLake25" Using e Selection of "4%‐25mph".
Using Length Selection of "AASHTO English" Using Design Speed of 25.000000.
auto shape job number = 582 auto shape set shape cluster baseline = BULK shape cluster profile = BULK_P shape cluster tie = 0.0000 dependent shape chain / offset
BULK ‐7.0000
BULK ‐0.0000
filler line station / slope 3000+00.000000 ‐1.2428
/* Warning: Curve BULK‐1 Radius of 50.0000 is less than the minimum radius of 154.0000 for the given Design Speed of 25.00. */
3000+10.553818 ‐2.0000 /* Curve BULK‐1 */ 3001+86.665016 ‐2.0000 auto shape set shape cluster baseline = BULK shape cluster profile = BULK_P shape cluster tie = 0.0000 dependent shape chain / offset
BULK 0.0000
BULK 7.0000
filler line station / slope 3000+02.982418 1.3714
/* Warning: Curve BULK‐1 Radius of 50.0000 is less than the minimum radius of 154.0000 for the given Design Speed of 25.00. */
3000+09.268138 2.0000 /* Curve BULK‐1 */ 3001+86.665016 2.0000
Plot Parameters Dependent Shape lvname = X_Geopak_Cell co = 6 lc = 0 wt = 2
Dependent Text lvname = X_Geopak_Cell co = 6
Independent Shape lvname = X_Geopak_Cell co = 1 lc = 0 wt = 2 Independent Text lvname = X_Geopak_Cell co = 1
Write shapes into dgn = F:\highways\FHWA\17500007_af05801_NeckLakeRoad\Design\af05801sa05.dgn