This is an AF Form 66 Material Submittals document associated with roof repair services for the Iowa Department of Public Defense (DPD) in Sioux City. The form establishes a schedule of material submittals required for the roof repair project covering Buildings 253, 281, and 283. Required submittals include as-builts, schedules, shop drawings, samples, color selections, EPDM membrane vent stack boots, curb flashing details, deck board screws, manufacturer recommendations, warranties, catalogs, product data, certificates of compliance, and LEED submittal information. The form designates approval and disapproval columns for each submittal item, with fields for required submission dates to the architect/engineer, prime contractor notification dates, project engineer completion dates, contract administrator completion dates, and contractor resubmittal follow-up tracking. The document was updated on November 13, 2013, and includes 21 line items for material tracking throughout the project execution.

The AF Form 66 serves as the submittal control mechanism for the roofing repair project, requiring contractors to submit materials and documentation according to specified schedules. This form functions as a quality control and documentation tool, ensuring that all materials, products, and construction details meet project specifications before installation. The document does not specify pricing information, set-asides, incumbent vendors, or funding sources, as it is exclusively a submittal tracking instrument. Contractors must adhere to the submission timelines established in this form to maintain project progress and compliance with contract requirements established by the Iowa DPD.

View the file

Other versions and copies of AF Form 66

File Revision Posted Attached to
Attachment 2 AF Form 66.pdf Revision not stated REPAIR AC PAVING
AF form 66 Blank.pdf Revision not stated Demo Mini mute sites
Attach 9_AF Form 66 Submittal Register.pdf Revision not stated PKAA Dorm Water Damage Repair (Construction)
AF Form 66-EEPZ260842 Renovate Convert Comm to SAPR B730.xlsx Revision not stated B730 Renovate Convert Comm to SAPR
AF Form 66_EEPZ254664-B972 UOQ.xlsx Revision not stated B972 Renovate UOQ Community Commons
AF Form 66 B268.xlsx Revision not stated B268 Replace STUS Backup Generator
AF Form 66 B730.xlsx Revision not stated B730 - Renovate RM106 for Emergency Operations Center
AF Form 66.xlsx Revision not stated B836 Replace Electrical in Airfield Lighting Vault
AF Form 66 OSI Flooring.xlsx Revision not stated OSI B926 Flooring
EEPZ254660 Repair Control Tower HVAC B1806 - AF Form 66.xlsx Revision not stated B1806 Repair Control Tower HVAC
AF Form 66 Template.xlsx Revision not stated Replace AAS BAK-15 Controls, B2001, B2003
AF Form 66 EEPZ216808 Replace Security Forces Elevator B926.xlsx Revision not stated B926 Replace Security Forces Elevator
WT 17518487 AF Form 66.xlsx Revision not stated Repair Structural Fire Trainer B17903, 17904
AF Form 66.xlsx Revision not stated RENOVATE/CONVERT 50th 49th SQ OPS, B230
AF Form 66.xlsx Revision not stated T-6 Flightline Shacks
AF Form 66 Template.xlsx Revision not stated Replace Fire Alarms, Multi Facility
EEPZ248229 -- AF Form 66.xlsx Revision not stated Repair Kiddie Pool
Atch 2 AF Form 66.pdf Revision not stated Removal of Underground Storage Tank at Launch Facility E-10 (Laramie County, WY)
Attachment 4 - AF Form 66 Submittal Register.pdf Revision not stated Bldg 65 - Renovation of Telephone Office Area, FE Warren AFB, WY AMENDMENT 03
Attachment 7 - AF Form 66.xlsx Revision not stated Replace Chapel Windows B912
Show all 20

Who attaches AF Form 66

State Files
Iowa 1
Massachusetts 1

Other files

File Type Posted
1338330-event.pdf PDF
Roof Repairs SOW.pdf PDF
AF 3052 (IGE) Roof Repairs 253,281,283.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Apprv. Disapprv.

1 1

X X

X X

X X

X X

X X

L i n e

N u m b e r

Item or Description of Item, Contract Reference, Type of Submittal

S u b m i t

N u m b e r

No. of Copies Required

AS

-B

U

IL

TS

SC

H

ED

U

LE

S

To Be Completed By Project Engineer

Date Contractor Notified

To Be Completed By Contract Administrator

Contractor Re-submittal Follow-Up

O

M

IN

ST

R

U C

TI

O

N S

SA

M

PL

ES

M

AN

U F

R

EC

O M

M

EN

D A

Contract No.:

Req'd date to A/E rec'd

Req'd date to prime rec'd RemarksFinal

Approval

Schedule of Materials Submittals

C O

LO

R

S

EL

EC

TI

O N

PROJECT NO:

Req'd date to P & C rec'd

Req'd date to COR rec'd

Project Title: Repair Roofs Bldgs. 253, 281, 283

C

ER

T.

O

F C

O M

PL

IA

N C

LE

ED

S U

BM

IT

TA

L

IN

FO

SH

O

P D

R

AW

IN

G

S

EPDM Membrane

Vent Stack Boots

M

AN

U F

W

AR

R

AN

TY

C

AT

AL

O

G /P

R O

D U

C T

D A

Curb Flashing Details

Deck Board

Screws

AR Form 66 SEP 86 USPFO-IA

Footnotes:

Page 1 UPDATED 12 NOV 13

File details come from the government source that posted it. Updated .