AF Form 66.xlsx
Air Force Form XLSX spreadsheet 23 KB Posted
- Attached to
- Bldg 20 Main Briefing Room Renovation
- Solicitation number
- W50S7G25RA001
- Issued by
-
Department of the Army National Guard
About this file
The file is an AF Form 66, a material submittal tracking document for the Building 20 Main Briefing Room (MBR) Renovation project at Rosecrans MAP in St. Joseph, MO. The form outlines required documentation and approvals for various construction components, including HVAC systems, metal studs, paint, trim, controls, electrical, and plumbing systems.
The associated federal contract opportunity is a small business set-aside solicitation (W50S7G25RA001) issued by the Department of the Army National Guard. The renovation project is valued between $100,000 and $250,000, with NAICS code 236220 and a small business size standard of $45,000,000. The work involves renovating the main briefing room in building 20, with project specifications detailed in a statement of work dated 10 July 2025. The AF Form 66 serves as a comprehensive tracking mechanism for material submittals, ensuring proper documentation and approval of various construction elements throughout the project.
View the file
Other versions and copies of AF Form 66
Show all 20
Who attaches AF Form 66
| State | Files |
|---|---|
| Iowa | 1 |
| Massachusetts | 1 |
Other files
Show all 13
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
AF66
| PROJECT NUMBER | PROJECT TITLE | SOLICITATION/CONTRACT NO. | |||||||||||||||
| SCHEDULE OF MATERIAL SUBMITTALS | ULYB252013 | Bldg 20 MBR Renovation | |||||||||||||||
| TO BE COMPLETED BY PROJECT ENGINEER | TO BE COMPLETED BY CONTRACT ADMINISTRATOR | ||||||||||||||||
| Line Number | NO. OF COPIES REQUIRED | ||||||||||||||||
| Product Data | Shop Drawings | Samples | Color Selection | Manufacurer Recommendations | Manufacturer Warranty | O&M's | DATE | ||||||||||
| ITEM OR DESCRIPTION | REQUIRED | DATE | DATE TO | RETURN | CONTRACTOR | CONTRAC- | |||||||||||
| OF ITEM, CONTRACT | SUB- | RECEIVED | CIVIL | SUS- | FOLLOW-UP | NOTIFIED | TOR RE- | FINAL | REMARKS | ||||||||
| REFERENCE, TYPE OF | MISSION | IN CON- | ENGINEER- | PENSE | SUBMIT- | APPROVAL | |||||||||||
| SUBMITTAL | DATE | TRACTING | ING | DATE | TAL |
| DIS- | |
| APPROVED | APPROVED |
| 1 | HVAC System | x | x | x | x | ||
| 2 | Metal Studs | x | |||||
| 3 | Paint | x | x | ||||
| 4 | Trim | x | x | x | |||
| 5 | Controls | x | x | x | |||
| 6 | Electrical | x | |||||
| 7 | Plumbing | x | |||||
| 8 | |||||||
| 9 | |||||||
| 10 | |||||||
| 11 | |||||||
| 12 | |||||||
| 13 | |||||||
| 14 | |||||||
| 15 | |||||||
| 16 | |||||||
| 17 | |||||||
| 18 | |||||||
| 19 | |||||||
| 20 | |||||||
| 21 | |||||||
| 22 | |||||||
| 23 | |||||||
| 24 |
AF Form 66
Sheet1
| Acoustical Ceilings |
| DDC Controls |
| Doors, Frames, and Hardware |
| Drywall, Tape, and Mud |
| Electrical Equipment |
| Flooring |
| HVAC Equipment |
| Insulation |
| Metal Framing |
| Paint |
| Signage |