AF FORM 66.pdf
Air Force Form PDF 157 KB Posted
- Solicitation number
- W50S9323B0002
- Issued by
-
Department of the Army National Guard
About this file
This document is a schedule of material submittals for the repair of Building 80 HVAC system at an Air National Guard facility. It lists 26 line items requiring submittals from the contractor, including bonds, progress schedules, quality control plans, environmental protection plans, warranties, shop drawings, samples, catalog data and operating instructions. For each line item it specifies the number of copies required and type of submittal, as well as required submission dates that range from within 5 working days of an activity to 30 days after award. It also includes columns to be completed by the project engineer and contract administrator tracking dates for submittals received, returned, approved, and final approval.
The related federal contract opportunity is a pre-solicitation to replace the 156th Wing Building 80 HVAC system. The solicitation will be issued by the Department of the Army National Guard for an Air National Guard facility. The schedule of material submittals provides details on documentation required from the contractor selected for this project.
View the file
Other versions and copies of AF Form 66
Show all 20
Who attaches AF Form 66
| State | Files |
|---|---|
| Iowa | 1 |
| Massachusetts | 1 |
Other files
| File | Type | Posted |
|---|---|---|
| 2. QASP TUMR232120.pdf | ||
| TUMR 232120 Repair Bldg 80 HVAC SOW.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
PROJECT NUMBER PROJECT TITLE SOLICITATION/CONTRACT NUMBER
SCHEDULE OF MATERIAL SUBMITTALS
TUMR232120 REPAIR BLDG.80 HVAC SYSTEM
W912XX-XX-X-XXXX
TO BE COMPLETED BY PROJECT ENGINEER TO BE COMPLETED BY CONTRACT ADMINISTRATOR
NUMBER OF COPIES
REQUIRED
DATE
CONTRACTOR
NOTIFIED
LI
N
E N
U M
B E
R
ITEM OR DESCRIPTION OF ITEM,
CONTRACT REFERENCE,
TYPE OF SUBMITTAL
C E
R
TI
F.
O
F C
O M
P
LI
A N
C
S H
O P
D R
A W
IN
G
A
M P
LE
O
LO
R
S E
LE
C
TI
N
M
FR
'S W
A R
R A
N
TY
C A
TA
LO
G D
A
TA
O P
E R
A
TI
N G
IN
S
TR
U
C
TI
O N
S
A D
M
IN
IS
TR
A
TI
V E
S U
B M
IT
TA
LS
-B U
IL
T
D R
A W
IN
Q U
IR
D
U
B M
IS
S
IO
N
D
TE
TE
R
E C
E
IV
E
IN
N
TR
A C
TI
TE
T
IV
IL
E
N G
IN
E
E R
TU
S P
E N
S E
D
B M
IT
L
M B
E
APPRVD DISAPPR
O
N
TR
A C
TO
S
U B
M
IT
TA
L
FI
N
P P
R O
V A
L
REMARKS
1 01300 Bonds 1 A
2 01300 1.02c Progress Schedule 4 A
3 01300 1.03 Proposed or “Equal” Products/Materials 4 A
4 01300 1.05 Construction Progress Schedule Report 4 D
5 01450 1.02.1 Quality Control Plan 4 A
6 01450 1.03B Field Test Report 4 F
7 01450 1.03C Monthly Summary of Reports 4 G
8 01015 MSDS
6 A
9 16011 1.04A Electrical License 4 A
10 01575 1.04.1a Environmental Protection Plan 4 A
11 01575 1.04.2b Environmental Training Documentation 4 A
12 01575 1.04.2c Hazardous Waste Certification 4 A
13 01600 1.02 Material and Equipment of Acceptable Manufacturer 4 A
PROJECT NUMBER PROJECT TITLE SOLICITATION/CONTRACT NUMBER
SCHEDULE OF MATERIAL SUBMITTALS
TUMR232120 REPAIR BLDG. 80 HVAC SYSTEM
W912XX-XX-X-XXXX
TO BE COMPLETED BY PROJECT ENGINEER TO BE COMPLETED BY CONTRACT ADMINISTRATOR
NUMBER OF COPIES REQUIRED
DATE
CONTRACTOR
NOTIFIED
LI
N
E N
U M
B
ITEM OR DESCRIPTION OF ITEM,
CONTRACT REFERENCE,
TYPE OF SUBMITTAL
C E
R
TI
F.
O
F C
O M
P
LI
A N
H
O P
D R
A W
IN
M P
LE
LO
R
S E
LE
C
TI
M
FR
'S W
A R
R A
TY
TA
LO
G D
E R
A
TI
N G
IN
S
TR
U
C
TI
O
M
IN
IS
TR
A
TI
V E
S U
B M
IT
LS
-B U
IL
T
D R
A W
IN
Q U
IR
B M
IS
S
IO
N
D
TE
R
E C
E
IV
E
N
TR
A C
TI
TE
T
IV
IL
E
N G
IN
E
E R
TU
S P
E N
S E
D
B M
IT
M B
E
APPRVD DISAPPR
O
N
TR
A C
TO
S
U B
M
IT
TA
L
FI
N
P
R O
V A
L
REMARKS
14 01700 1.04 Warranties 6 C
15 16100 1.04B LED Flat Panels Lamps 4 A
16 16100 1.04C Wire and Cable 4 4 A
17 16100 1.04D Boxes 4 A
18 16100 1.04E Paint 4 4 A
19 16100 1.04F Disconnecting Means 4 A
20 16100 1.04G Wiring Devices 4 A
16100
16100
16100
Air Handling Units
80 Tons Chiller
VAV
16100 Water Pump
16100 Insulation
16100 BacNet
A
A
A
A
A
A
A – Submit within 10 working days after award B – Submit within 5 working days after activity is complete
C – Submit at the end of the job D – Every two weeks after NTP
E – By 1000 AM the next working day after each working day the work is performed F – Within 2 working days after the test is performed
G – At the end of each month H – Within 2 working days of meeting
I - Before pre-final inspection J – After test
K – 14 days after environmental Protection Meeting L – Submit within 30 days after award of DO
File details come from the government source that posted it. Updated .