4. AF Form 66 Schedule of Material Submittals.xls
Air Force Form XLS spreadsheet 91 KB Posted
- Attached to
- Runway and Taxiway Markings
- Solicitation number
- FA5702-21-R-0003
View the file
Other versions and copies of AF Form 66
Show all 20
Who attaches AF Form 66
| State | Files |
|---|---|
| Iowa | 1 |
| Massachusetts | 1 |
Other files
Show all 18
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Material Submittals Schedule
| SCHEDULE OF MATERIAL SUBMITTALS | PROJECT NUMBER | PROJECT TITLE | SOLICITATION / CONTRACT NO. | |||||||||||||||||||
| 20-0052 & 21-0037 | Repair Runway and Taxiway Markings | FA570221R0006 | ||||||||||||||||||||
| (To be completed by Project Engineer) | (To be completed by Contract Administrator) | |||||||||||||||||||||
| NUMBER OF COPIES REQUIRED | ||||||||||||||||||||||
| LINE NUMBER | ITEM OR DESCRIPTION OF ITEM, CONTRACT REFERENCE, TYPE OF SUBMITTAL | CERTIF. OF COMPLIANCE | SHOP DRAWINGS | COLOR SELECTION | MANUFATURUR'S RECOMMENDATION | CATALOG DATA | O&M RECOMMENDATIONS | CALCULATIONS | WARRANTY | DRAWINGS | REPORTS | TEST RESULTS | REQUIRED SUBMISSION DATE | DATE RECEIVED IN CONTRACTING | DATE TO CIVIL ENGINEERING | RETURN SUSPENSE DATE | SUBMITTAL NUMBERS | DATE CONTRACTOR NOTIFIED | CONTRACTOR RESUBMITTAL | FINAL APPROVAL | REMARKS | |
| APPROVED | DISAPPROVED | |||||||||||||||||||||
| GENERAL | This document shall be a "live document" | |||||||||||||||||||||
| 1 | Project Specific Form 66 | X | ANTP + 5 | |||||||||||||||||||
| 2 | Construction Schedule | X | ANTP + 5 | |||||||||||||||||||
| 3 | Contractor's Health, Safety, and Environment Plan | X | ANTP + 5 | |||||||||||||||||||
| 4 | Contractor's QA/QC Plan | X | ANTP + 5 | |||||||||||||||||||
| 5 | Copy of Engineering License(s) of person or consultancy responsible for design | X | ANTP + 5 | Provide certified translation if not in English. | ||||||||||||||||||
| DESIGN | ||||||||||||||||||||||
| 6 | All submissions to be provided electronically. | X | X | X | X | X | X | X | X | X | X | X | ||||||||||
| 7 | 65% Design & Form 66 | X | X | |||||||||||||||||||
| 8 | 95% Design, Form 66, & Draft 1354 | X | X | |||||||||||||||||||
| 9 | Construction Schedule | X | CNTP + 5 | |||||||||||||||||||
| Material Submittals-Contractor to complete this section with all materials to be used in construction (Ex. Below) | ||||||||||||||||||||||
| TEST RESULTS | ||||||||||||||||||||||
| 10 | All submissions to be provided electronically. | X | ||||||||||||||||||||
| 11 | Hydrostatic Test | |||||||||||||||||||||
| 12 | Leakage Test | |||||||||||||||||||||
| 13 | Bacteriolocgical Testing | X | X | |||||||||||||||||||
| 14 | Backflow Preventer Tests | |||||||||||||||||||||
| 15 | Electrical Inspections/Testing | |||||||||||||||||||||
| CLOSEOUT | ||||||||||||||||||||||
| 16 | Warranty Documents | X | Final + 7 | |||||||||||||||||||
| 17 | O&M Manuals | Final + 7 | ||||||||||||||||||||
| 18 | DD 1354 | Final + 7 | ||||||||||||||||||||
| 19 | As-Builts (electronic in AutoCAD & PDF) | X | Final + 7 | |||||||||||||||||||
| Schedule of Material Submittals Template, Apr 18 (SAF/AQCP) |
Enter the due date from the Contractor (MM/DD/YY) Enter the date received from the Contractor. (MM/DD/YY) Enter the date submittal was given to CE for review. (MM/DD/YY) Enter the date the submittal is due back from CE
(MM/DD/YY)
Enter the Submittal Number Enter date the Contractor was notified of submittal approval
(MM/DD/YY)
Enter date the Contractor was notified of submittal disapproval
(MM/DD/YY)
Enter Resubmittal Number Enter the submittal final approval date
(MM/DD/YY)
Enter any comments pertaining to the submittal