Questions Runway Markings Site Visit

1. Specify the extent of repairing the cracks in the asphalt?

Recommend site visit to visually inspect extent of cracking.

2. Materials that are acceptable:

a. Paint - JOTUN

b. Beads – SWARCO Plus9Beads (Reflective Index 1.90)

c. Concrete/Asphalt – Refer to UFC

3. Can the CAD files of the airfield be sent out?

CAD files are not sent to Contractors.

4. Should the contractor submit a schedule for total duration or one that includes phasing?

Schedule shall be broken into anticipated phasing. Note that phasing schedule is subject to change.

5. Is rubber removal included in the requirement?

No rubber removal required.

6. What areas on the pavement does the paint need to be repaired?

Please refer to 35% drawings.

7. Magnitude of construction for bid option runway?

Between $250,000 and $500,000 IAW FAR 36.204(d).

8. Per the code what is the thickness of the outline supposed to be?

Refer to UFC

9. Are there lines that don’t currently exist on the airfield that need to be created?

Yes. Please refer to 35% drawings and UFC code.

10. How many phases of construction should there be?

Contractor to propose construction phasing for Airfield Manager Approval.

11. Can we submit our proposal higher than the estimated cost mentioned in the Section L of the solicitation?

Yes.

12. Please advise if you intend to conduct Site visit. If this is the intention, please advise date and time. We believe site visit is essential to verify the existing site conditions to provide a compatible Offer.

Recommend site visit.

13. The received drawing C-3.2, 2 photos are included in spot plans 7 & 8. We assumed that both photos were taken in Asphalt Pavements. If Site Visit will not be allowed at tender stage, Please provide photos of existing cracks in concrete pavement areas.

Recommend site visit.

14. Statement of work Section 1.1.2.1.2 state "The Contractor shall repair/seal pavement cracking of Airfield Runway and Taxiway…" please confirm that the scope of repair and seal for both asphalt and concrete pavement is required at markings locations ONLY. Also please confirm that cracks beyond the pavement markings is not in the SOW of this Contract.

Repair/seal pavement cracking of Airfield Runway and Taxiway is only required at marking locations.

15. Solicitation SF1442 indicates 315 calendar days from NTP. But in SOW Section 4/Period of Performance par 4.1.1, POP indicates 180 calendar days inclusive of Design and Construction.

Please advise which POP will be considered.

Contractor to propose PoP.