33 05 05.43 Mandrel Testing.pdf

PDF 88 KB Posted

Attached to
2027 Sewer System Improvements Project
Solicitation number
Not on record
Issued by
Dauphin County, Harveys Lake Borough, Pennsylvania

About this file

This is a technical specification document for mandrel testing procedures related to plastic sewer piping installation, applicable to Capital Region Water's 2027 Sewer System Improvements Project in Harrisburg, Pennsylvania. The specification outlines deflection testing requirements for plastic sewer piping following backfill installation and compaction. The contractor must perform vertical ring deflection testing after backfilling has been in place for at least 30 days but no longer than 12 months using properly sized rigid ball or "go, no go" mandrels with diameters not less than 95 percent of the pipe's base or average internal diameter. Testing must be conducted without mechanical pulling devices, and allowable maximum deflection is limited to five percent of the original vertical internal diameter as specified in ASTM D2122.

Prior to testing initiation, the contractor must submit testing procedures, equipment lists, testing sequence schedules, and test gage calibration certifications. The specification requires lamping operations after flushing and cleaning to verify uniform line and grade installation, with rejected sections to be removed and reinstalled at no cost. All outlets, wye branches, and laterals must be plugged and braced to resist test pressures. Any piping exceeding allowable deflection limits must be located, excavated, replaced, and retested entirely at the contractor's expense with no additional cost to the owner, ensuring compliance with the referenced ASTM International standards and related utility sewer pipe requirements outlined in Section 33 31 00 of the project specifications.

View the file

Other files

File Type Posted
00 41 20 Qualifications Statement (CRW).pdf PDF
00 00 00 Cover.pdf PDF
33 01 30 Operation and Maintenance of Sewer Utilities.pdf PDF
00 43 13 Bid Bond Damages Form.pdf PDF
33 05 05.36 - Vacuum Testing.pdf PDF
00 55 00 Notice to Proceed.pdf PDF
00 21 13 Instructions to Bidders.pdf PDF
00 61 19 - Warranty Bond.pdf PDF
01 41 26-C - Chlorinated Water Discharge - Incident Report Cover Sheet & Form.pdf PDF
00 73 53 - Anti-Pollution Measures.pdf PDF
01 10 00 - Summary.pdf PDF
00 63 36 - Field Order Form.pdf PDF
00 51 00 Notice of Award.pdf PDF
31 23 19 Dewatering.pdf PDF
01 22 00 - Unit Prices.pdf PDF
00 52 00 Agreement.pdf PDF
03 11 00 Concrete Forming.pdf PDF
00 45 36 EEO Certificate.pdf PDF
01 73 00 - Execution Requirements.pdf PDF
33 05 05.31 - Hydrostatic Testing.pdf PDF
33 13 00 - Disinfection of Water Utility Distribution.pdf PDF
2026.09.29 Contract Drawings for Upload to PennBid.pdf PDF
01 25 00 - Substitution Procedures.pdf PDF
01 50 00 - Temporary Facilities and Controls.pdf PDF
00 73 46 - Wage Determination Schedule Cover.pdf PDF
01 31 19 - Project Meetings.pdf PDF
00 01 10 Table of Contents.pdf PDF
33 05 53 - Identification For Utilities Piping and Equipment.pdf PDF
01 35 15 - Notifications and Other Coordination.pdf PDF
01 78 39 - Project Record Documents.pdf PDF
03 30 00 Cast-in-Place Concrete.pdf PDF
01 29 00 - Payment Procedures.pdf PDF
01 31 13 - Project Coordination.pdf PDF
00 65 19.23 - Notice of Acceptability of Work.pdf PDF
32 13 13 - Concrete Paving.pdf PDF
00 21 13-1 Owner Minority, Women and Other DBE Forms.pdf PDF
01 77 00 - Closeout Procedures.pdf PDF
01 41 26-A - City of Harrisburg Street Closure Request Form.pdf PDF
33 14 17 - Site Water Service Utility Laterals.pdf PDF
00 65 16 Certificate of Substantial Completion.pdf PDF
03 60 00 Grouting.pdf PDF
00 45 33 Certification of Non-Segregated Facilities and Non-Employment of Illegal Alien Labor.pdf PDF
33 05 05.41 - Air Testing.pdf PDF
00 31 43 Permit Applications.pdf PDF
00 45 19 Non Collusion Affidavit.pdf PDF
01 41 26 - Permit Requirements.pdf PDF
01 78 36 - Warranties.pdf PDF
33 01 31 TV Inspection of Sewer Pipelines.pdf PDF
00 72 00 - General Conditions 2013.pdf PDF
33 14 13 - Public Water Utility Distribution Piping.pdf PDF
Show 40 more

Latest 50 of 116 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

33 05 05.43 Mandrel Testing

33 05 05.43 - 1

1.0 GENERAL

1.1 Summary

A. Section Includes: Deflection testing of plastic sewer piping.

B. Related Requirements:

1. Section 33 31 00 – Utility Sewer Pipe and Accessories: Pipe materials and accessories normally encountered with gravity sewerage piping.

1.2 Reference Standards

A. ASTM International:

1. ASTM D2122 - Standard Test Method for Determining Dimensions of Thermoplastic Pipe and Fittings.

1.3 Submittals

A. Section 01 33 00 - Submittal Procedures: Requirements for submittals.

B. The Contractor shall submit following items prior to start of testing:

1. Testing procedures.

2. List of test equipment.

3. Testing sequence schedule.

4. Certification of test gage calibration.

C. Test and Evaluation Reports: Indicate results of piping tests.

2.0 PRODUCTS

2.1 Deflection Testing

A. Equipment:

1. Properly sized rigid ball or "go, no go" mandrel.

2. Pull/retrieval ropes.

3.0 EXECUTION

3.1 Examination

A. Section 01 73 00 - Execution Requirements: Requirements for installation examination.

B. The Contractor shall verify that piping is ready for testing.

C. The Contractor shall verify that trenches are backfilled and properly compacted.

3.2 Preparation

A. Section 01 73 00 - Execution Requirements: Requirements for preparation.

33 05 05.43 Mandrel Testing

33 05 05.43 - 2

B. Lamping – the Contractor shall:

1. Lamp gravity piping after flushing and cleaning.

2. Perform lamping operation by shining light at one end of each pipe section between manholes.

3. Observe light at other end.

4. Pipe not installed with uniform line and grade will be rejected.

5. Remove and reinstall rejected pipe sections.

6. Clean and lamp until pipe section is installed to uniform line and grade.

C. Plugs:

1. The Contractor shall plug outlets, wye branches, and laterals.

2. The Contractor shall brace plugs to resist test pressures.

3.3 Field Quality Control

A. Section 01 40 00 - Quality Requirements: Requirements for inspecting and testing.

B. Deflection Testing of Plastic Sewer Piping:

1. The Contractor shall perform vertical ring deflection testing on plastic sewer piping after backfilling has been in place for at least 30 days, but not longer than 12 months.

2. Allowable maximum deflection for installed plastic sewer pipe is no greater than five(5) percent of original vertical internal diameter.

3. The Contractor shall perform deflection testing using properly sized rigid ball or "go, no go" mandrel.

4. Rigid Ball or Mandrel Diameter:

a. Not less than 95 percent of base or average ID of pipe.

b. Pipe Diameter: Comply with ASTM D2122.

5. The Contractor shall perform testing without mechanical pulling devices.

6. The Contractor shall locate, excavate, replace, and retest piping that exceeds allowable deflection, at no additional cost to the Owner.

END OF SECTION