00 01 10 Table of Contents.pdf

PDF 116 KB Posted

Attached to
2027 Sewer System Improvements Project
Solicitation number
Not on record
Issued by
Dauphin County, Harveys Lake Borough, Pennsylvania

About this file

This Table of Contents document outlines the comprehensive bid package and contract specifications for the 2027 Sewer System Improvements Project administered by Capital Region Water (CRW) in Harrisburg, Pennsylvania. The project encompasses sewer system improvements including gravity piping installation, concrete manhole construction, hydrostatic testing, vacuum testing, air testing, mandrel testing, and related utility work. The contract is structured on a unit price basis with sealed bids to be received online through the PennBid Procurement Portal until October 27, 2026, at 10:00 a.m. EST, at which time bids will be opened. The work includes all materials, equipment, labor, and miscellaneous items necessary to complete the contract as detailed in the project documents. The project will take place in Harrisburg, Pennsylvania, with multiple CRW facilities potentially involved. No mandatory pre-bid meeting is specified in the available information, though bidders may request site visits to evaluate project conditions.

The bid package includes standard procurement and contracting requirements such as a Minority/Women/Disadvantaged Business Enterprise (MWDBE) Plan, wage rate requirements and wage determination schedules, performance and payment bonds, anti-pollution measures, and steel origin certifications. Capital Region Water intends to award the contract to the overall lowest responsible bidder as determined by its Board of Directors in the best interest of the organization. The contract documents encompass detailed specifications across multiple divisions covering general requirements, concrete work, earthwork, exterior improvements, and utility construction, with comprehensive quality requirements, submittal procedures, and closeout specifications. Performance bonds and payment bonds are required in accordance with contract documents, and all bid documents are available at no cost through the PennBid Procurement Portal.

View the file

Other files

File Type Posted
00 41 20 Qualifications Statement (CRW).pdf PDF
00 00 00 Cover.pdf PDF
33 01 30 Operation and Maintenance of Sewer Utilities.pdf PDF
00 43 13 Bid Bond Damages Form.pdf PDF
33 05 05.36 - Vacuum Testing.pdf PDF
00 55 00 Notice to Proceed.pdf PDF
00 21 13 Instructions to Bidders.pdf PDF
00 61 19 - Warranty Bond.pdf PDF
01 41 26-C - Chlorinated Water Discharge - Incident Report Cover Sheet & Form.pdf PDF
00 73 53 - Anti-Pollution Measures.pdf PDF
01 10 00 - Summary.pdf PDF
00 63 36 - Field Order Form.pdf PDF
00 51 00 Notice of Award.pdf PDF
31 23 19 Dewatering.pdf PDF
01 22 00 - Unit Prices.pdf PDF
00 52 00 Agreement.pdf PDF
03 11 00 Concrete Forming.pdf PDF
00 45 36 EEO Certificate.pdf PDF
01 73 00 - Execution Requirements.pdf PDF
33 05 05.31 - Hydrostatic Testing.pdf PDF
33 13 00 - Disinfection of Water Utility Distribution.pdf PDF
2026.09.29 Contract Drawings for Upload to PennBid.pdf PDF
01 25 00 - Substitution Procedures.pdf PDF
01 50 00 - Temporary Facilities and Controls.pdf PDF
00 73 46 - Wage Determination Schedule Cover.pdf PDF
01 31 19 - Project Meetings.pdf PDF
33 05 53 - Identification For Utilities Piping and Equipment.pdf PDF
01 35 15 - Notifications and Other Coordination.pdf PDF
01 78 39 - Project Record Documents.pdf PDF
03 30 00 Cast-in-Place Concrete.pdf PDF
01 29 00 - Payment Procedures.pdf PDF
01 31 13 - Project Coordination.pdf PDF
00 65 19.23 - Notice of Acceptability of Work.pdf PDF
32 13 13 - Concrete Paving.pdf PDF
00 21 13-1 Owner Minority, Women and Other DBE Forms.pdf PDF
01 77 00 - Closeout Procedures.pdf PDF
01 41 26-A - City of Harrisburg Street Closure Request Form.pdf PDF
33 14 17 - Site Water Service Utility Laterals.pdf PDF
00 65 16 Certificate of Substantial Completion.pdf PDF
03 60 00 Grouting.pdf PDF
00 45 33 Certification of Non-Segregated Facilities and Non-Employment of Illegal Alien Labor.pdf PDF
33 05 05.41 - Air Testing.pdf PDF
00 31 43 Permit Applications.pdf PDF
00 45 19 Non Collusion Affidavit.pdf PDF
01 41 26 - Permit Requirements.pdf PDF
01 78 36 - Warranties.pdf PDF
33 01 31 TV Inspection of Sewer Pipelines.pdf PDF
00 72 00 - General Conditions 2013.pdf PDF
33 14 13 - Public Water Utility Distribution Piping.pdf PDF
01 41 26-B - City of Harrisburg Notice of Construction Cover Sheet.pdf PDF
Show 40 more

Latest 50 of 116 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

2027 Sewer System Improvements Project

Table of Contents

DIVISION 00 – PROCUREMENT AND CONTRACTING REQUIREMENTS DOCUMENT: PAGES

Procurement Requirements

ADVERTISEMENT FOR BIDS ..................................................................... 00 11 13: 1-2

INSTRUCTIONS TO BIDDERS .................................................................... 00 21 13: 1-13

A. MINORITY/WOMEN/DISADVANTAGED BUSINESS ENTERPRISE PLAN 00 21 13: 1-15

PERMIT APPLICATIONS ............................................................................ 00 31 43: 1

BID FORM SIGNATURE PAGES .................................................................. 00 41 16: 1-4

QUALIFICATION STATEMENT .................................................................... 00 41 20: 1-18

BID BOND (DAMAGES FORM) .................................................................. 00 43 13: 1-3

NON-COLLUSION AFFIDAVIT .................................................................... 00 45 19: 1-2

CERTIFICATION OF NON-SEGREGATED FACILITIES

& NON-EMPLOYMENT OF ILLEGAL ALIEN LABOR ............................... 00 45 33: 1

CERTIFICATION OF BIDDER REGARDING EQUAL EMPLOYMENT OPPORTUNITY 00 45 36: 1

PUBLIC WORKS EMPLOYMENT VERIFICATION FORM .................................... 00 45 46: 1

Contracting Requirements

STEEL ORIGIN CERTIFICATION ................................................................. 00 45 60: 1

NOTICE OF AWARD ................................................................................. 00 51 00: 2

AGREEMENT BETWEEN OWNER AND CONTRACTOR .................................... 00 52 00: 1-8

NOTICE TO PROCEED .............................................................................. 00 55 00: 1

PROJECT FORMS ..................................................................................... 00 60 00: 1

PERFORMANCE BOND .............................................................................. 00 61 13: 1-10

PAYMENT BOND ...................................................................................... 00 61 14: 1-4

WARRANTY BOND ................................................................................... 00 61 19: 1-3

APPLICATION FOR PAYMENT FORM ........................................................... 00 62 76: 1-4

REQUEST FOR INFORMATION/INTERPRETATION FORM ................................ 00 63 13: 1

FIELD ORDER FORM ................................................................................ 00 63 36: 1

CHANGE ORDER FORM ............................................................................ 00 63 63: 1-2

CERTIFICATE OF SUBSTANTIAL COMPLETION ............................................. 00 65 16: 1-2

AFFIDAVIT OF RELEASE OF LIENS ............................................................. 00 65 19.16: 1-2

CONSENT OF SURETY TO FINAL PAYMENT .................................................. 00 65 19.19: 1-2

NOTICE OF ACCEPTABILITY OF WORK ....................................................... 00 65 19.23: 1

GENERAL CONDITIONS ............................................................................ 00 72 00: 1-102

WAGE RATE REQUIREMENTS .................................................................... 00 73 43: 1-4

WAGE DETERMINATION SCHEDULE ........................................................... 00 73 46: 1-7

ANTI-POLLUTION MEASURES .................................................................... 00 73 53: 1

STATUTORY REQUIREMENTS .................................................................... 00 73 73: 1-5

Specifications

DIVISION 01 - GENERAL REQUIREMENTS SECTION: PAGES

01 10 00 – SUMMARY .............................................................................. 01 10 00: 1-4

01 22 00 – UNIT PRICES .......................................................................... 01 22 00: 1-14

01 25 00 – SUBSTITUTION PROCEDURES .................................................. 01 25 00: 1-6

01 26 00 – CONTRACT MODIFICATION PROCEDURES .................................. 01 26 00: 1-3

01 26 13 – REQUESTS FOR INTERPRETATION ............................................ 01 26 13: 1-3

01 29 00 – PAYMENT PROCEDURES ........................................................... 01 29 00: 1-4

01 31 13 – PROJECT COORDINATION ........................................................ 01 31 13: 1-2

01 31 19 – PROJECT MEETINGS ................................................................ 01 31 19: 1-3

01 32 16 – CONSTRUCTION PROGRESS SCHEDULE ..................................... 01 32 16: 1-4

01 32 26 – CONSTRUCTION PROGRESS REPORTING ................................... 01 32 26: 1-2

01 32 33 – PHOTOGRAPHIC DOCUMENTATION ........................................... 01 32 33: 1-2

01 32 36 – VIDEO MONITORING AND DOCUMENTATION .............................. 01 32 36: 1-2

01 33 00 – SUBMITTAL PROCEDURES ........................................................ 01 33 00: 1-8

01 35 15 – NOTIFICATIONS AND OTHER COORDINATION ............................ 01 35 15: 1-3

01 40 00 – QUALITY REQUIREMENTS ........................................................ 01 40 00: 1-5

01 41 26 – PERMIT REQUIREMENTS .......................................................... 01 41 26: 1-5

A. CITY OF HARRISBURG STREET CLOSURE REQUEST FORM ......... 01 41 26A: 1-1

B. CITY OF HARRISBURG NOTICE OF CONSTRUCTION .................. 01 41 26B: 1-2

C. CHLORINATED WATER DISCHARGE – INCIDENT REPORT FORM . 01 41 26C: 1-2

01 42 00 – REFERENCES .......................................................................... 01 42 00: 1-7

01 50 00 – TEMPORARY FACILITIES AND CONTROLS................................... 01 50 00: 1-7

01 61 00 – PRODUCT REQUIREMENTS ....................................................... 01 61 00: 1-4

01 73 00 – EXECUTION REQUIREMENTS .................................................... 01 73 00: 1-6

01 74 19 – CONSTRUCTION WASTE MANAGEMENT AND DISPOSAL ............... 01 74 19: 1-3

01 77 00 – CLOSEOUT PROCEDURES ......................................................... 01 77 00: 1-3

01 78 36 – WARRANTIES ......................................................................... 01 78 36: 1-2

01 78 39 – PROJECT RECORD DOCUMENTS ................................................ 01 78 39: 1-11

DIVISION 02 – EXISTING CONDITIONS SECTION: PAGES

02 41 16 – STRUCTURE DEMOLITION ........................................................ 02 41 16: 1-5

DIVISION 03 – CONCRETE SECTION: PAGES

03 11 00 – CONCRETE FORMING .............................................................. 03 11 00: 1-5

03 20 00 – CONCRETE REINFORCING ........................................................ 03 20 00: 1-3

03 30 00 – CAST-IN-PLACE CONCRETE ...................................................... 03 30 00: 1-10

03 39 00 – CONCRETE CURING ................................................................ 03 39 00: 1-3

03 60 00 – GROUTING ............................................................................. 03 60 00: 1-3

DIVISION 31 – EARTHWORK SECTION: PAGES

31 23 19 – DEWATERING ......................................................................... 31 23 19: 1-4

31 23 33 – TRENCHING AND BACKFILLING FOR UTILITIES .......................... 31 23 33: 1-13

31 25 00 – EROSION AND SEDIMENTATION CONTROLS .............................. 31 25 00: 1

31 40 00 – SHORING AND UNDERPINNING ................................................ 31 40 00: 1-2

DIVISION 32 – EXTERIOR IMPROVEMENTS SECTION: PAGES

32 12 16 – ASPHALT PAVING ................................................................... 32 12 16: 1-7

32 13 13 – CONCRETE PAVING ................................................................. 32 13 13: 1-4

32 92 00 – TURF AND GRASSES ............................................................... 32 92 00: 1-8

DIVISION 33 – UTILITIES SECTION: PAGES

33 01 30 – OPERATION AND MAINTENANCE OF SEWER UTILITIES ................ 33 01 10: 1-4

33 01 31 – TV INSPECTION OF SEWER PIPELINES ...................................... 33 01 31: 1-3

33 05 05.31 – HYDROSTATIC TESTING ...................................................... 33 05 05.31: 1-7

33 05 05.36 – VACUUM TESTING .............................................................. 33 05 05.36: 1-3

33 05 05.41 – AIR TESTING ..................................................................... 33 05 05.41: 1-5

33 05 05.43 – MANDREL TESTING ............................................................ 33 05 05.43: 1-2

33 05 53 – IDENTIFICATION FOR UTILITIES PIPING AND EQUIPMENT ........... 33 05 53: 1-2

33 05 61 – CONCRETE MANHOLES ............................................................ 33 05 61: 1-14

33 13 00 – DISINFECTION OF WATER UTILITY DISTRIBUTION ..................... 33 13 00: 1-16

33 14 13 – PUBLIC WATER UTILITY DISTRIBUTION PIPING .......................... 33 14 13: 1-9

33 14 17 – SITE WATER SERVICE UTILITY LATERALS .................................. 33 14 17: 1-7

33 14 19 – VALVES AND HYDRANTS FOR WATER UTILITY SERVICE ............... 33 14 19: 1-6

33 31 11 – PUBLIC SANITARY SEWERAGE GRAVITY PIPING ......................... 33 31 11: 1-9

File details come from the government source that posted it. Updated .