00 65 16 Certificate of Substantial Completion.pdf

PDF 96 KB Posted

Attached to
2027 Sewer System Improvements Project
Solicitation number
Not on record
Issued by
Dauphin County, Harveys Lake Borough, Pennsylvania

About this file

This is a Certificate of Substantial Completion document issued by Herbert, Rowland & Grubic, Inc., the engineer for Capital Region Water's 2027 Sewer System Improvements Project. The certificate establishes the date of substantial completion for the project work, marking the commencement of the contractual correction period and applicable warranties. The document certifies that authorized representatives of the owner, contractor, and engineer have inspected the work and found it to be substantially complete. A punch list of items to be completed or corrected is attached to the certificate, though this list may not be all-inclusive and does not alter the contractor's responsibility to complete all work in accordance with contract documents. The certificate addresses amendments to both owner and contractor responsibilities regarding security, operation, safety, maintenance, heat, utilities, insurance, and warranties upon the owner's use or occupancy of the work.

The certificate does not constitute acceptance of work not in accordance with contract documents, nor does it release the contractor's obligation to complete all work as specified. The document includes signature lines for the engineer issuing the certificate and acknowledgment of receipt by the contractor. This standard EJCDC form serves as a critical contractual document that establishes the transition point between active construction and the warranty correction period, with any amendments to contractual responsibilities requiring mutual agreement between owner and contractor as specified in the general conditions.

View the file

Other files

File Type Posted
00 41 20 Qualifications Statement (CRW).pdf PDF
00 00 00 Cover.pdf PDF
33 01 30 Operation and Maintenance of Sewer Utilities.pdf PDF
00 43 13 Bid Bond Damages Form.pdf PDF
33 05 05.36 - Vacuum Testing.pdf PDF
00 55 00 Notice to Proceed.pdf PDF
00 21 13 Instructions to Bidders.pdf PDF
00 61 19 - Warranty Bond.pdf PDF
01 41 26-C - Chlorinated Water Discharge - Incident Report Cover Sheet & Form.pdf PDF
00 73 53 - Anti-Pollution Measures.pdf PDF
01 10 00 - Summary.pdf PDF
00 63 36 - Field Order Form.pdf PDF
00 51 00 Notice of Award.pdf PDF
31 23 19 Dewatering.pdf PDF
01 22 00 - Unit Prices.pdf PDF
00 52 00 Agreement.pdf PDF
03 11 00 Concrete Forming.pdf PDF
00 45 36 EEO Certificate.pdf PDF
01 73 00 - Execution Requirements.pdf PDF
33 05 05.31 - Hydrostatic Testing.pdf PDF
33 13 00 - Disinfection of Water Utility Distribution.pdf PDF
2026.09.29 Contract Drawings for Upload to PennBid.pdf PDF
01 25 00 - Substitution Procedures.pdf PDF
01 50 00 - Temporary Facilities and Controls.pdf PDF
00 73 46 - Wage Determination Schedule Cover.pdf PDF
01 31 19 - Project Meetings.pdf PDF
00 01 10 Table of Contents.pdf PDF
33 05 53 - Identification For Utilities Piping and Equipment.pdf PDF
01 35 15 - Notifications and Other Coordination.pdf PDF
01 78 39 - Project Record Documents.pdf PDF
03 30 00 Cast-in-Place Concrete.pdf PDF
01 29 00 - Payment Procedures.pdf PDF
01 31 13 - Project Coordination.pdf PDF
00 65 19.23 - Notice of Acceptability of Work.pdf PDF
32 13 13 - Concrete Paving.pdf PDF
00 21 13-1 Owner Minority, Women and Other DBE Forms.pdf PDF
01 77 00 - Closeout Procedures.pdf PDF
01 41 26-A - City of Harrisburg Street Closure Request Form.pdf PDF
33 14 17 - Site Water Service Utility Laterals.pdf PDF
03 60 00 Grouting.pdf PDF
00 45 33 Certification of Non-Segregated Facilities and Non-Employment of Illegal Alien Labor.pdf PDF
33 05 05.41 - Air Testing.pdf PDF
00 31 43 Permit Applications.pdf PDF
00 45 19 Non Collusion Affidavit.pdf PDF
01 41 26 - Permit Requirements.pdf PDF
01 78 36 - Warranties.pdf PDF
33 01 31 TV Inspection of Sewer Pipelines.pdf PDF
00 72 00 - General Conditions 2013.pdf PDF
33 14 13 - Public Water Utility Distribution Piping.pdf PDF
01 41 26-B - City of Harrisburg Notice of Construction Cover Sheet.pdf PDF
Show 40 more

Latest 50 of 116 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Modified EJCDC® C-625. Prepared and published 2018 by the EJCDC.

00 65 16 Certificate of Substantial Completion

00 65 16 - 1

Owner: Capital Region Water Owner’s Project No.:

Engineer: Herbert, Rowland & Grubic, Inc. Engineer’s Project No.: 004379.0510

Contractor: Contractor’s Project No.:

Project: 2027 Sewer System Improvements Project

Contract Name:

This Certificate of Substantial Completion applies to:

☐ All Work ☐ The following specified portions of the Work:

[Describe the portion of the work for which Certificate of Substantial Completion is issued]

Date of Substantial Completion: [Enter date, as determined by Engineer]

The Work to which this Certificate applies has been inspected by authorized representatives of Owner, Contractor, and Engineer, and found to be substantially complete. The Date of Substantial

Completion of the Work or portion thereof designated above is hereby established, subject to the provisions of the Contract pertaining to Substantial Completion. The date of Substantial Completion in the final Certificate of Substantial Completion marks the commencement of the contractual correction period and applicable warranties required by the Contract.

A punch list of items to be completed or corrected is attached to this Certificate. This list may not be all-inclusive, and the failure to include any items on such list does not alter the responsibility of the

Contractor to complete all Work in accordance with the Contract Documents.

Amendments of contractual responsibilities recorded in this Certificate should be the product of mutual agreement of Owner and Contractor; see Paragraph 15.03.D of the General Conditions.

The responsibilities between Owner and Contractor for security, operation, safety, maintenance, heat, utilities, insurance, and warranties upon Owner's use or occupancy of the Work must be as provided in the Contract, except as amended as follows:

Amendments to Owner’s Responsibilities: ☐ None ☐ As follows:

[List amendments to Owner’s Responsibilities]

Amendments to Contractor’s Responsibilities: ☐ None ☐ As follows:

[List amendments to Contractor’s Responsibilities]

The following documents are attached to and made a part of this Certificate:

[List attachments such as punch list; other documents]

This Certificate does not constitute an acceptance of Work not in accordance with the Contract

Documents, nor is it a release of Contractor's obligation to complete the Work in accordance with the

Contract Documents.

Issued by Engineer:

Modified EJCDC® C-625. Prepared and published 2018 by the EJCDC.

00 65 16 Certificate of Substantial Completion

00 65 16 - 2

By (signature):

Name (printed):

Title:

RECEIPT ACKNOWLEDGED BY CONTRACTOR:

By (signature):

Name (printed):

Title:

Date:

Copy: Owner