00 73 46 - Wage Determination Schedule Cover.pdf

PDF 82 KB Posted

Attached to
2027 Sewer System Improvements Project
Solicitation number
Not on record
Issued by
Dauphin County, Harveys Lake Borough, Pennsylvania

About this file

This is a Wage Determination Schedule Cover document related to Capital Region Water's 2027 Sewer System Improvements Project in Pennsylvania. The file serves as supporting documentation for a general construction contract (Contract No. 2026-12) that includes sewer system improvements, water main replacement and installation, water service line replacement, fire hydrant replacement, and surface restoration work. Sealed bids for this project will be received through the online PennBid Bonfire Program until October 27, 2026, at 10:00 a.m. EST, at which time bids will be opened online. All bid documents are available at no cost through the PennBid Bonfire Hub website at https://pennbid.bonfirehub.com/portal. Bids shall be submitted on a unit price basis. The contract work encompasses all materials, equipment, labor, necessary apparatuses, and other miscellaneous labor and materials as contemplated by the Contract Documents.

Capital Region Water has adopted a Minority Women and Disadvantaged Business Enterprise Plan to ensure that minority, women, and other disadvantaged business enterprises have equal opportunity to receive and participate in all project-related construction contracts. Following the submission of MWDBE documentation in compliance with contract documents, Capital Region Water intends to ensure nondiscrimination in the award and administration of contracts and to create a level playing field for all qualified bidders. The wage determination schedule serves as the prevailing wage requirement for this publicly funded infrastructure project. Contract award will be made to the overall lowest responsible bidder as determined by Capital Region Water's Board of Directors in the best interest of the organization.

View the file

Other files

File Type Posted
00 41 20 Qualifications Statement (CRW).pdf PDF
00 00 00 Cover.pdf PDF
33 01 30 Operation and Maintenance of Sewer Utilities.pdf PDF
00 43 13 Bid Bond Damages Form.pdf PDF
33 05 05.36 - Vacuum Testing.pdf PDF
00 55 00 Notice to Proceed.pdf PDF
00 21 13 Instructions to Bidders.pdf PDF
00 61 19 - Warranty Bond.pdf PDF
01 41 26-C - Chlorinated Water Discharge - Incident Report Cover Sheet & Form.pdf PDF
00 73 53 - Anti-Pollution Measures.pdf PDF
01 10 00 - Summary.pdf PDF
00 63 36 - Field Order Form.pdf PDF
00 51 00 Notice of Award.pdf PDF
31 23 19 Dewatering.pdf PDF
01 22 00 - Unit Prices.pdf PDF
00 52 00 Agreement.pdf PDF
03 11 00 Concrete Forming.pdf PDF
00 45 36 EEO Certificate.pdf PDF
01 73 00 - Execution Requirements.pdf PDF
33 05 05.31 - Hydrostatic Testing.pdf PDF
33 13 00 - Disinfection of Water Utility Distribution.pdf PDF
2026.09.29 Contract Drawings for Upload to PennBid.pdf PDF
01 25 00 - Substitution Procedures.pdf PDF
01 50 00 - Temporary Facilities and Controls.pdf PDF
01 31 19 - Project Meetings.pdf PDF
00 01 10 Table of Contents.pdf PDF
33 05 53 - Identification For Utilities Piping and Equipment.pdf PDF
01 35 15 - Notifications and Other Coordination.pdf PDF
01 78 39 - Project Record Documents.pdf PDF
03 30 00 Cast-in-Place Concrete.pdf PDF
01 29 00 - Payment Procedures.pdf PDF
01 31 13 - Project Coordination.pdf PDF
00 65 19.23 - Notice of Acceptability of Work.pdf PDF
32 13 13 - Concrete Paving.pdf PDF
00 21 13-1 Owner Minority, Women and Other DBE Forms.pdf PDF
01 77 00 - Closeout Procedures.pdf PDF
01 41 26-A - City of Harrisburg Street Closure Request Form.pdf PDF
33 14 17 - Site Water Service Utility Laterals.pdf PDF
00 65 16 Certificate of Substantial Completion.pdf PDF
03 60 00 Grouting.pdf PDF
00 45 33 Certification of Non-Segregated Facilities and Non-Employment of Illegal Alien Labor.pdf PDF
33 05 05.41 - Air Testing.pdf PDF
00 31 43 Permit Applications.pdf PDF
00 45 19 Non Collusion Affidavit.pdf PDF
01 41 26 - Permit Requirements.pdf PDF
01 78 36 - Warranties.pdf PDF
33 01 31 TV Inspection of Sewer Pipelines.pdf PDF
00 72 00 - General Conditions 2013.pdf PDF
33 14 13 - Public Water Utility Distribution Piping.pdf PDF
01 41 26-B - City of Harrisburg Notice of Construction Cover Sheet.pdf PDF
Show 40 more

Latest 50 of 116 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

00 73 46 - Wage Determination

Schedule Cover

WAGE DETERMINATION SCHEDULE

Pennsylvania Prevailing Wage Determination

2027 Sewer System Improvements Project

Date of Determination: 9/8/2026

Number of pages: 6

Project Name: 2027 Sewer System Improvements Project

General Description: The Project includes the replacement and installation of new sanitary sewer manholes and facilities.

Project Locality City of Harrisburg

Awarding Agency: CRW

Contract Award Date: 7/10/2026

Serial Number: 26-08109

Project Classification: Highway

Determination Date: 9/8/2026

Assigned Field Office: Harrisburg

Field Office Phone Number: (717)787-4763

Toll Free Phone Number: (800)932-0665

Project County: Dauphin County

BUREAU OF LABOR LAW COMPLIANCE

PREVAILING WAGES PROJECT RATES

Commonwealth of Pennsylvania Department of Labor & Industry Report Date: 9/8/2026 Page 1 of 6

Project: 26-08109 - Building Effective Date

Expiration Date

Hourly Rate Fringe Benefits

Total

Asbestos & Insulation Workers 6/30/2025 $41.50 $29.86 $71.36

Asbestos & Insulation Workers 6/29/2026 $43.50 $31.11 $74.61

Boilermaker (Commercial, Institutional, and Minor Repair Work)

3/1/2026 $41.34 $19.23 $60.57

Boilermakers 1/1/2026 $58.00 $36.57 $94.57

Bricklayers, Stone Masons, Pointers, Caulkers, Cleaners

5/4/2025 $40.47 $19.68 $60.15

Bricklayers, Stone Masons, Pointers, Caulkers, Cleaners

5/3/2026 $40.49 $21.51 $62.00

Carpenters - Piledriver/Welder 1/1/2025 $43.38 $22.72 $66.10

Carpenters - Piledriver/Welder 1/1/2026 $44.63 $23.47 $68.10

Carpenters, Drywall Hangers, Framers, Instrument Men, Lathers, Soft Floor Layers

6/1/2026 $36.84 $22.69 $59.53

Carpenters, Drywall Hangers, Framers, Instrument Men, Lathers, Soft Floor Layers

6/1/2027 $36.84 $24.94 $61.78

Cement Finishers & Plasterers 5/3/2026 $34.23 $22.27 $56.50

Cement Finishers & Plasterers 5/3/2027 $33.49 $25.01 $58.50

Cement Masons 5/1/2024 $33.80 $22.80 $56.60

Cement Masons 5/1/2025 $34.65 $22.95 $57.60

Drywall Finisher 5/1/2025 $31.83 $23.26 $55.09

Drywall Finisher 5/1/2026 $33.02 $24.00 $57.02

Electricians 6/1/2025 $40.00 $27.78 $67.78

Electricians 6/1/2026 $41.40 $28.33 $69.73

Elevator Constructor 1/1/2025 $63.40 $40.03 $103.43

Elevator Constructor 1/1/2026 $61.26 $45.78 $107.04

Glazier 5/1/2023 $31.23 $20.66 $51.89

Glazier 5/1/2024 $32.46 $20.93 $53.39

Iron Workers (Bridge, Structural Steel, Ornamental, Precast, Reinforcing)

7/1/2025 $38.76 $33.38 $72.14

Iron Workers (Bridge, Structural Steel, Ornamental, Precast, Reinforcing)

7/1/2026 $40.51 $33.88 $74.39

Laborers (Class 01 - See notes) 5/1/2026 $28.06 $19.08 $47.14

Laborers (Class 02 - See notes) 5/1/2026 $30.06 $19.08 $49.14

Laborers (Class 03 - See notes) 5/1/2026 $32.06 $19.08 $51.14

Laborers (Class 04 - See notes) 5/1/2026 $33.56 $19.08 $52.64

Laborers (Class 05 - See notes) 5/1/2026 $34.06 $19.08 $53.14

Laborers (Class 06 - See notes) 5/1/2026 $30.06 $19.08 $49.14

Marble Mason 5/1/2025 $37.20 $19.24 $56.44

Marble Mason 5/1/2026 $39.15 $19.24 $58.39

Millwright 6/1/2025 $43.00 $22.95 $65.95

Millwright 6/1/2026 $44.97 $22.95 $67.92

Operators (Building, Class 01 - See Notes) 5/1/2025 $44.89 $30.92 $75.81

Operators (Building, Class 01 - See Notes) 5/1/2026 $46.05 $31.76 $77.81

Operators (Building, Class 01A - See Notes) 5/1/2025 $47.14 $31.58 $78.72

Operators (Building, Class 01A - See Notes) 5/1/2026 $48.30 $32.42 $80.72

Operators (Building, Class 02 - See Notes) 5/1/2025 $44.61 $30.83 $75.44

Operators (Building, Class 02 - See Notes) 5/1/2026 $45.77 $31.67 $77.44

BUREAU OF LABOR LAW COMPLIANCE

PREVAILING WAGES PROJECT RATES

Report Date: 9/8/2026 Page 2 of 6

Expiration Date

Hourly Rate Fringe Benefits

Total

Operators (Building, Class 02A - See Notes) 5/1/2025 $46.86 $31.50 $78.36

Operators (Building, Class 02A - See Notes) 5/1/2026 $48.02 $32.34 $80.36

Operators (Building, Class 03 - See Notes) 5/1/2025 $41.88 $30.03 $71.91

Operators (Building, Class 03 - See Notes) 5/1/2026 $43.04 $30.87 $73.91

Operators (Building, Class 04 - See Notes) 5/1/2025 $40.74 $29.70 $70.44

Operators (Building, Class 04 - See Notes) 5/1/2026 $41.90 $30.54 $72.44

Operators (Building, Class 05 - See Notes) 5/1/2025 $40.30 $29.56 $69.86

Operators (Building, Class 05 - See Notes) 5/1/2026 $41.45 $30.41 $71.86

Operators (Building, Class 06 - See Notes) 5/1/2025 $39.42 $29.30 $68.72

Operators (Building, Class 06 - See Notes) 5/1/2026 $40.58 $30.14 $70.72

Operators (Building, Class 07A- See Notes) 5/1/2025 $54.56 $35.21 $89.77

Operators (Building, Class 07A- See Notes) 5/1/2026 $56.03 $36.14 $92.17

Operators (Building, Class 07B- See Notes) 5/1/2025 $54.22 $35.10 $89.32

Operators (Building, Class 07B- See Notes) 5/1/2026 $55.69 $36.03 $91.72

Painters Class 1 (see notes) 5/1/2025 $28.42 $18.36 $46.78

Painters Class 1 (see notes) 5/1/2026 $29.70 $18.78 $48.48

Painters - Line Stripping 12/1/2024 $44.12 $27.91 $72.03

Painters - Line Stripping 12/1/2025 $45.12 $29.41 $74.53

Painters Class 2 (see notes) 5/1/2020 $27.43 $15.99 $43.42

Painters Class 3 (see notes) 5/1/2020 $33.18 $15.99 $49.17

Pile Driver Divers (Building, Heavy, Highway) 1/1/2025 $62.82 $22.72 $85.54

Pile Driver Divers (Building, Heavy, Highway) 1/1/2026 $64.70 $23.47 $88.17

Piledrivers 1/1/2025 $41.88 $22.72 $64.60

Piledrivers 1/1/2026 $43.13 $23.47 $66.60

Plasterers 5/1/2024 $32.93 $21.08 $54.01

Plasterers 5/1/2025 $34.68 $21.23 $55.91

Plumber/Pipefitter 5/1/2025 $45.30 $29.91 $75.21

Plumber/Pipefitter 5/1/2026 $48.30 $30.66 $78.96

Roofers (Composition) 5/1/2025 $46.03 $34.77 $80.80

Roofers (Composition) 5/1/2026 $47.53 $35.22 $82.75

Roofers (Shingle) 5/1/2024 $34.35 $22.20 $56.55

Roofers (Slate & Tile) 5/1/2024 $37.35 $22.20 $59.55

Sheet Metal Workers 6/1/2025 $45.02 $44.71 $89.73

Sheet Metal Workers 6/1/2026 $46.62 $46.36 $92.98

Sign Makers and Hangars 7/15/2025 $33.48 $26.41 $59.89

Sign Makers and Hangars 7/15/2026 $36.38 $25.01 $61.39

Sprinklerfitters 4/1/2025 $49.75 $29.21 $78.96

Sprinklerfitters 4/1/2026 $52.82 $30.56 $83.38

Terrazzo Finisher 5/1/2025 $36.32 $21.68 $58.00

Terrazzo Finisher 5/1/2026 $37.12 $22.76 $59.88

Terrazzo Grinder 5/1/2025 $37.10 $21.68 $58.78

Terrazzo Grinder 5/1/2026 $37.93 $22.76 $60.69

Terrazzo Mechanics 5/1/2025 $37.17 $23.43 $60.60

Terrazzo Mechanics 5/1/2026 $38.06 $24.51 $62.57

BUREAU OF LABOR LAW COMPLIANCE

PREVAILING WAGES PROJECT RATES

Report Date: 9/8/2026 Page 3 of 6

Expiration Date

Hourly Rate Fringe Benefits

Total

Tile & Marble Finisher 5/1/2025 $35.31 $16.99 $52.30

Tile & Marble Finisher 5/1/2026 $37.26 $16.99 $54.25

Tile Setter 5/1/2025 $38.70 $17.74 $56.44

Tile Setter 5/1/2026 $39.15 $19.24 $58.39

Truckdriver class 1(see notes) 5/1/2025 $41.87 $0.00 $41.87

Truckdriver class 2 (see notes) 5/1/2025 $41.94 $0.00 $41.94

Truckdriver class 3 (see notes) 5/1/2025 $42.43 $0.00 $42.43

Window Film / Tint Installer 6/1/2025 $27.42 $15.13 $42.55

Window Film / Tint Installer 6/1/2026 $28.35 $15.60 $43.95

BUREAU OF LABOR LAW COMPLIANCE

PREVAILING WAGES PROJECT RATES

Report Date: 9/8/2026 Page 4 of 6

Project: 26-08109 - Heavy/Highway Effective

Expiration Date

Hourly Rate Fringe Benefits

Total

Carpenter 5/1/2026 $37.63 $21.18 $58.81

Carpenter Welder 5/1/2026 $38.38 $21.18 $59.56

Carpenters - Piledriver/Welder 1/1/2026 $38.38 $21.18 $59.56

Cement Finishers 5/1/2016 $26.40 $22.35 $48.75

Electric Lineman 6/3/2024 $52.80 $30.61 $83.41

Electric Lineman 6/2/2025 $55.42 $31.04 $86.46

Iron Workers (Bridge, Structural Steel, Ornamental, Precast, Reinforcing)

7/1/2024 $37.26 $32.63 $69.89

Laborers (Class 01 - See notes) 5/1/2025 $26.61 $19.99 $46.60

Laborers (Class 01 - See notes) 5/1/2026 $27.61 $20.44 $48.05

Laborers (Class 02 - See notes) 5/1/2025 $33.23 $19.99 $53.22

Laborers (Class 02 - See notes) 5/1/2026 $34.23 $20.44 $54.67

Laborers (Class 03 - See notes) 5/1/2025 $30.22 $19.99 $50.21

Laborers (Class 03 - See notes) 5/1/2026 $31.22 $20.44 $51.66

Laborers (Class 04 - See notes) 5/1/2025 $30.57 $19.99 $50.56

Laborers (Class 04 - See notes) 5/1/2026 $31.57 $20.44 $52.01

Laborers (Class 05 - See notes) 5/1/2025 $31.24 $19.99 $51.23

Laborers (Class 05 - See notes) 5/1/2026 $32.24 $20.44 $52.68

Laborers (Class 06 - See notes) 5/1/2025 $30.66 $19.99 $50.65

Laborers (Class 06 - See notes) 5/1/2026 $31.66 $20.44 $52.10

Laborers (Class 07 - See notes) 5/1/2025 $30.95 $19.99 $50.94

Laborers (Class 07 - See notes) 5/1/2026 $31.95 $20.44 $52.39

Laborers (Class 08 - See notes) 5/1/2025 $31.43 $19.99 $51.42

Laborers (Class 08 - See notes) 5/1/2026 $32.43 $20.44 $52.87

Millwright 6/1/2025 $45.46 $23.33 $68.79

Millwright 6/1/2026 $47.52 $23.33 $70.85

Operators (Heavy, Class 01 - See Notes) 5/1/2025 $43.46 $30.50 $73.96

Operators (Heavy, Class 01 - See Notes) 5/1/2026 $44.61 $31.35 $75.96

Operators (Heavy, Class 01A - See Notes) 5/1/2025 $45.71 $31.16 $76.87

Operators (Heavy, Class 01A - See Notes) 5/1/2026 $46.86 $32.01 $78.87

Operators (Heavy, Class 02 - See Notes) 5/1/2025 $43.18 $30.41 $73.59

Operators (Heavy, Class 02 - See Notes) 5/1/2026 $44.34 $31.25 $75.59

Operators (Heavy, Class 02A - See Notes) 5/1/2025 $45.43 $31.08 $76.51

Operators (Heavy, Class 02A - See Notes) 5/1/2026 $46.59 $31.92 $78.51

Operators (Heavy, Class 03 - See Notes) 5/1/2025 $40.26 $29.55 $69.81

Operators (Heavy, Class 03 - See Notes) 5/1/2026 $41.43 $30.38 $71.81

Operators (Heavy, Class 04 - See Notes) 5/1/2025 $39.12 $29.22 $68.34

Operators (Heavy, Class 04 - See Notes) 5/1/2026 $40.28 $30.06 $70.34

Operators (Heavy, Class 05 - See Notes) 5/1/2025 $38.67 $29.09 $67.76

Operators (Heavy, Class 05 - See Notes) 5/1/2026 $39.83 $29.93 $69.76

Operators (Heavy, Class 06 - See Notes) 5/1/2025 $37.80 $28.82 $66.62

Operators (Heavy, Class 06 - See Notes) 5/1/2026 $38.96 $29.66 $68.62

Operators (Heavy, Class 07A - See Notes) 5/1/2025 $52.85 $34.71 $87.56

Operators (Heavy, Class 07A - See Notes) 5/1/2026 $54.32 $35.64 $89.96

Operators (Heavy, Class 07B - See Notes) 5/1/2025 $52.51 $34.60 $87.11

BUREAU OF LABOR LAW COMPLIANCE

PREVAILING WAGES PROJECT RATES

Report Date: 9/8/2026 Page 5 of 6

Project: 26-08109 - Heavy/Highway Effective

Expiration Date

Hourly Rate Fringe Benefits

Total

Operators (Heavy, Class 07B - See Notes) 5/1/2026 $53.97 $35.54 $89.51

Operators (Highway, Class 01 - See Notes) 5/1/2025 $42.56 $30.24 $72.80

Operators (Highway, Class 01 - See Notes) 5/1/2026 $43.72 $31.08 $74.80

Operators (Highway, Class 01a - See Notes) 5/1/2025 $44.81 $30.92 $75.73

Operators (Highway, Class 01a - See Notes) 5/1/2026 $45.97 $31.76 $77.73

Operators (Highway, Class 02 - See Notes) 5/1/2025 $41.39 $29.89 $71.28

Operators (Highway, Class 02 - See Notes) 5/1/2026 $42.55 $30.73 $73.28

Operators (Highway, Class 03 - See Notes) 5/1/2025 $40.70 $29.68 $70.38

Operators (Highway, Class 03 - See Notes) 5/1/2026 $41.87 $30.51 $72.38

Operators (Highway, Class 04 - See Notes) 5/1/2025 $40.26 $29.54 $69.80

Operators (Highway, Class 04 - See Notes) 5/1/2026 $41.41 $30.39 $71.80

Operators (Highway, Class 05 - See Notes) 5/1/2025 $39.73 $29.41 $69.14

Operators (Highway, Class 05 - See Notes) 5/1/2026 $40.89 $30.25 $71.14

Operators (Highway, Class 06 - See Notes) 5/1/2025 $42.80 $30.30 $73.10

Operators (Highway, Class 06 - See Notes) 5/1/2026 $43.95 $31.15 $75.10

Operators (Highway, Class 06/A - See Notes) 5/1/2025 $45.05 $30.96 $76.01

Operators (Highway, Class 06/A - See Notes) 5/1/2026 $46.21 $31.80 $78.01

Operators (Highway, Class 07/A - See Notes) 5/1/2025 $51.79 $34.38 $86.17

Operators (Highway, Class 07/A - See Notes) 5/1/2026 $53.25 $35.32 $88.57

Operators (Highway, Class 07/B - See Notes) 5/1/2025 $50.37 $33.97 $84.34

Operators (Highway, Class 07/B - See Notes) 5/1/2026 $51.84 $34.90 $86.74

Painters Class 1 (see notes) 5/1/2018 $23.92 $14.37 $38.29

Painters - Line Stripping 12/1/2024 $44.12 $27.91 $72.03

Painters - Line Stripping 12/1/2025 $45.12 $29.41 $74.53

Painters Class 2 (see notes) 5/1/2025 $30.55 $18.36 $48.91

Painters Class 2 (see notes) 5/1/2026 $33.13 $18.78 $51.91

Painters Class 3 (see notes) 5/1/2025 $36.30 $18.36 $54.66

Painters Class 3 (see notes) 5/1/2026 $38.88 $18.78 $57.66

Piledrivers 5/1/2025 $36.87 $20.49 $57.36

Piledrivers 5/1/2026 $37.63 $21.18 $58.81

Steamfitters (Heavy and Highway - Gas Distribution) 5/1/2022 $48.43 $40.28 $88.71

Truckdriver class 1(see notes) 5/1/2025 $41.87 $0.00 $41.87

Truckdriver class 2 (see notes) 5/1/2025 $41.94 $0.00 $41.94

Truckdriver class 3 (see notes) 5/1/2025 $42.43 $0.00 $42.43

BUREAU OF LABOR LAW COMPLIANCE

PREVAILING WAGES PROJECT RATES

Report Date: 9/8/2026 Page 6 of 6

00 73 46 - Wage Determination Schedule

File details come from the government source that posted it. Updated .