31 25 00 Erosion and Sedimentation Controls.pdf

PDF 79 KB Posted

Attached to
2027 Sewer System Improvements Project
Solicitation number
Not on record
Issued by
Dauphin County, Harveys Lake Borough, Pennsylvania

About this file

This is a specification document for erosion and sedimentation controls related to the 2027 Sewer System Improvements Project, a general construction contract administered by Capital Region Water (CRW) in Pennsylvania. The project encompasses sewer system improvements including installation, replacement, and restoration work as identified in the contract documents. Bids are requested on a unit price basis and must be submitted online through the PennBid Bonfire Program portal at https://pennbid.bonfirehub.com/ by October 27, 2026, at 10:00 a.m. EST, at which time bids will be opened. All bid documents are available at no cost through the PennBid Bonfire Hub website. The contract is designated as Contract No. 2026-12 and represents a general construction undertaking with work including all materials, equipment, labor, and miscellaneous labor and materials as contemplated by the contract documents. No mandatory pre-bid meeting is specified in the available documentation, though site visit requests may be accommodated upon inquiry.

Capital Region Water has adopted a Minority Women and Disadvantaged Business Enterprise (MWDBE) Plan to ensure equal opportunity for minority, women, and disadvantaged business enterprises to receive and participate in all project-related construction contracts. Bidders must submit MWDBE documentation in compliance with contract documents, and CRW intends to ensure nondiscrimination in award and administration. The document does not disclose specific budget ranges, funding sources, or award values. Performance and payment bond requirements, if applicable, would be detailed within the complete contract documents available through the PennBid portal. Bidders seeking additional assistance can contact a PennBid Representative at 610-693-4769.

View the file

Other files

File Type Posted
00 41 20 Qualifications Statement (CRW).pdf PDF
00 00 00 Cover.pdf PDF
33 01 30 Operation and Maintenance of Sewer Utilities.pdf PDF
00 43 13 Bid Bond Damages Form.pdf PDF
33 05 05.36 - Vacuum Testing.pdf PDF
00 55 00 Notice to Proceed.pdf PDF
00 21 13 Instructions to Bidders.pdf PDF
00 61 19 - Warranty Bond.pdf PDF
01 41 26-C - Chlorinated Water Discharge - Incident Report Cover Sheet & Form.pdf PDF
00 73 53 - Anti-Pollution Measures.pdf PDF
01 10 00 - Summary.pdf PDF
00 63 36 - Field Order Form.pdf PDF
00 51 00 Notice of Award.pdf PDF
31 23 19 Dewatering.pdf PDF
01 22 00 - Unit Prices.pdf PDF
00 52 00 Agreement.pdf PDF
03 11 00 Concrete Forming.pdf PDF
00 45 36 EEO Certificate.pdf PDF
01 73 00 - Execution Requirements.pdf PDF
33 05 05.31 - Hydrostatic Testing.pdf PDF
33 13 00 - Disinfection of Water Utility Distribution.pdf PDF
2026.09.29 Contract Drawings for Upload to PennBid.pdf PDF
01 25 00 - Substitution Procedures.pdf PDF
01 50 00 - Temporary Facilities and Controls.pdf PDF
00 73 46 - Wage Determination Schedule Cover.pdf PDF
01 31 19 - Project Meetings.pdf PDF
00 01 10 Table of Contents.pdf PDF
33 05 53 - Identification For Utilities Piping and Equipment.pdf PDF
01 35 15 - Notifications and Other Coordination.pdf PDF
01 78 39 - Project Record Documents.pdf PDF
03 30 00 Cast-in-Place Concrete.pdf PDF
01 29 00 - Payment Procedures.pdf PDF
01 31 13 - Project Coordination.pdf PDF
00 65 19.23 - Notice of Acceptability of Work.pdf PDF
32 13 13 - Concrete Paving.pdf PDF
00 21 13-1 Owner Minority, Women and Other DBE Forms.pdf PDF
01 77 00 - Closeout Procedures.pdf PDF
01 41 26-A - City of Harrisburg Street Closure Request Form.pdf PDF
33 14 17 - Site Water Service Utility Laterals.pdf PDF
00 65 16 Certificate of Substantial Completion.pdf PDF
03 60 00 Grouting.pdf PDF
00 45 33 Certification of Non-Segregated Facilities and Non-Employment of Illegal Alien Labor.pdf PDF
33 05 05.41 - Air Testing.pdf PDF
00 31 43 Permit Applications.pdf PDF
00 45 19 Non Collusion Affidavit.pdf PDF
01 41 26 - Permit Requirements.pdf PDF
01 78 36 - Warranties.pdf PDF
33 01 31 TV Inspection of Sewer Pipelines.pdf PDF
00 72 00 - General Conditions 2013.pdf PDF
33 14 13 - Public Water Utility Distribution Piping.pdf PDF
Show 40 more

Latest 50 of 116 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

31 25 00 – Erosion and

Sedimentation Controls

1.0 General

1.1 Description

A. Section includes requirements for erosion and sedimentation controls.

1.2 Erosion and Sedimentation Controls

A. Purpose: The purpose of this Erosion and Sedimentation Controls is to provide the

Contractor with general guidelines as well as specific techniques for minimizing erosion and sedimentation and stormwater pollution during and after construction of the project.

B. Additional controls may be required at problem areas that develop during construction above and beyond those included in the Contract Drawings.

1.3 Quality Assurance

A. Regulatory Agency Requirements:

1. The Contractor is advised that all Work will be completed in compliance with the requirements of the details and the rules and regulations of the Pennsylvania

Department of Environmental Protection and the Dauphin County Conservation

District. Any fines and associated costs resulting from the Contractor's failure to provide adequate protection against soil erosion and sedimentation shall be borne by the Contractor.

1.4 Submittals

A. Submit under provisions of Section 01 33 00 – Submittal Procedures.

B. If the Contractor anticipates any Work which is not as shown on the Contract Drawings and Specifications (such as associated with spoil or borrow areas) the Contractor shall prepare and submit for approval an appropriate Erosion and Sediment Pollution Control

Plan for that Work. Such plan shall receive the approval of the Dauphin County

Conservation District prior to the start of earth moving activities in those areas.

2.0 Products

2.1 Materials: Refer to Contract Drawings.

3.0 Execution

3.1 Preparation, Installation, and Maintenance: Refer to Contract Drawings.

END OF SECTION

File details come from the government source that posted it. Updated .