About this file
This is a specification document for erosion and sedimentation controls related to the 2027 Sewer System Improvements Project, a general construction contract administered by Capital Region Water (CRW) in Pennsylvania. The project encompasses sewer system improvements including installation, replacement, and restoration work as identified in the contract documents. Bids are requested on a unit price basis and must be submitted online through the PennBid Bonfire Program portal at https://pennbid.bonfirehub.com/ by October 27, 2026, at 10:00 a.m. EST, at which time bids will be opened. All bid documents are available at no cost through the PennBid Bonfire Hub website. The contract is designated as Contract No. 2026-12 and represents a general construction undertaking with work including all materials, equipment, labor, and miscellaneous labor and materials as contemplated by the contract documents. No mandatory pre-bid meeting is specified in the available documentation, though site visit requests may be accommodated upon inquiry.
Capital Region Water has adopted a Minority Women and Disadvantaged Business Enterprise (MWDBE) Plan to ensure equal opportunity for minority, women, and disadvantaged business enterprises to receive and participate in all project-related construction contracts. Bidders must submit MWDBE documentation in compliance with contract documents, and CRW intends to ensure nondiscrimination in award and administration. The document does not disclose specific budget ranges, funding sources, or award values. Performance and payment bond requirements, if applicable, would be detailed within the complete contract documents available through the PennBid portal. Bidders seeking additional assistance can contact a PennBid Representative at 610-693-4769.
View the file
Other files
Show 40 more
Latest 50 of 116 listed here. See the rest on GovTribe.
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
31 25 00 – Erosion and
Sedimentation Controls
1.0 General
1.1 Description
A. Section includes requirements for erosion and sedimentation controls.
1.2 Erosion and Sedimentation Controls
A. Purpose: The purpose of this Erosion and Sedimentation Controls is to provide the
Contractor with general guidelines as well as specific techniques for minimizing erosion and sedimentation and stormwater pollution during and after construction of the project.
B. Additional controls may be required at problem areas that develop during construction above and beyond those included in the Contract Drawings.
1.3 Quality Assurance
A. Regulatory Agency Requirements:
1. The Contractor is advised that all Work will be completed in compliance with the requirements of the details and the rules and regulations of the Pennsylvania
Department of Environmental Protection and the Dauphin County Conservation
District. Any fines and associated costs resulting from the Contractor's failure to provide adequate protection against soil erosion and sedimentation shall be borne by the Contractor.
1.4 Submittals
A. Submit under provisions of Section 01 33 00 – Submittal Procedures.
B. If the Contractor anticipates any Work which is not as shown on the Contract Drawings and Specifications (such as associated with spoil or borrow areas) the Contractor shall prepare and submit for approval an appropriate Erosion and Sediment Pollution Control
Plan for that Work. Such plan shall receive the approval of the Dauphin County
Conservation District prior to the start of earth moving activities in those areas.
2.0 Products
2.1 Materials: Refer to Contract Drawings.
3.0 Execution
3.1 Preparation, Installation, and Maintenance: Refer to Contract Drawings.
END OF SECTION