01 74 19 - Construction Waste Management and Disposal.pdf

PDF 95 KB Posted

Attached to
2027 Sewer System Improvements Project
Solicitation number
Not on record
Issued by
Dauphin County, Harveys Lake Borough, Pennsylvania

About this file

This is a Scope of Work specification document for Construction Waste Management and Disposal (Section 01 74 19) applicable to capital improvement projects managed by Capital Region Water in Pennsylvania, specifically for the 2027 Sewer System Improvements Project. The specification requires contractors to develop and implement a comprehensive construction waste management plan that diverts demolition and construction debris from landfill disposal while redirecting recyclable materials back to manufacturing processes. The plan must identify transportation companies, recycling and adaptive reuse processing facilities, on-site sorting methods, and anticipated materials for recycling. Contractors are required to employ source separation or comingling methods suitable to their selected recycling center and must collect construction waste in marked bins or containers for transport to appropriate facilities. Materials identified for recycling include packing materials, recyclable plastics, organic plant debris, earth materials, native stone, asphalt and concrete paving, wood, glass, metals, and equipment oil. Storage areas must be maintained in orderly condition to prevent environmental pollution, fire hazards, and material contamination, with waste materials subject to disintegration covered to prevent air, water, and soil pollution. The contractor must obtain receipts for all deliveries to recycling centers and legal disposal facilities.

The specification establishes waste prevention requirements that include ensuring correct material quantities are delivered to the site, selecting products with minimal packaging, requiring suppliers to use returnable pallets or containers, and implementing supplier buyback programs for rejected or unused items. No specific budget allocation is provided within this specification document, as waste management requirements are typically integrated into overall project budgeting. The specification emphasizes cost savings or minimal additional cost to the project for waste disposal implementation and requires contractor oversight to instruct construction personnel on plan compliance and document results. The construction waste management plan must be submitted to the Engineer and Owner if requested, reviewed at preconstruction and progress meetings, and distributed to all affected subcontractors prior to implementation.

View the file

Other files

File Type Posted
00 41 20 Qualifications Statement (CRW).pdf PDF
00 00 00 Cover.pdf PDF
33 01 30 Operation and Maintenance of Sewer Utilities.pdf PDF
00 43 13 Bid Bond Damages Form.pdf PDF
33 05 05.36 - Vacuum Testing.pdf PDF
00 55 00 Notice to Proceed.pdf PDF
00 21 13 Instructions to Bidders.pdf PDF
00 61 19 - Warranty Bond.pdf PDF
01 41 26-C - Chlorinated Water Discharge - Incident Report Cover Sheet & Form.pdf PDF
00 73 53 - Anti-Pollution Measures.pdf PDF
01 10 00 - Summary.pdf PDF
00 63 36 - Field Order Form.pdf PDF
00 51 00 Notice of Award.pdf PDF
31 23 19 Dewatering.pdf PDF
01 22 00 - Unit Prices.pdf PDF
00 52 00 Agreement.pdf PDF
03 11 00 Concrete Forming.pdf PDF
00 45 36 EEO Certificate.pdf PDF
01 73 00 - Execution Requirements.pdf PDF
33 05 05.31 - Hydrostatic Testing.pdf PDF
33 13 00 - Disinfection of Water Utility Distribution.pdf PDF
2026.09.29 Contract Drawings for Upload to PennBid.pdf PDF
01 25 00 - Substitution Procedures.pdf PDF
01 50 00 - Temporary Facilities and Controls.pdf PDF
00 73 46 - Wage Determination Schedule Cover.pdf PDF
01 31 19 - Project Meetings.pdf PDF
00 01 10 Table of Contents.pdf PDF
33 05 53 - Identification For Utilities Piping and Equipment.pdf PDF
01 35 15 - Notifications and Other Coordination.pdf PDF
01 78 39 - Project Record Documents.pdf PDF
03 30 00 Cast-in-Place Concrete.pdf PDF
01 29 00 - Payment Procedures.pdf PDF
01 31 13 - Project Coordination.pdf PDF
00 65 19.23 - Notice of Acceptability of Work.pdf PDF
32 13 13 - Concrete Paving.pdf PDF
00 21 13-1 Owner Minority, Women and Other DBE Forms.pdf PDF
01 77 00 - Closeout Procedures.pdf PDF
01 41 26-A - City of Harrisburg Street Closure Request Form.pdf PDF
33 14 17 - Site Water Service Utility Laterals.pdf PDF
00 65 16 Certificate of Substantial Completion.pdf PDF
03 60 00 Grouting.pdf PDF
00 45 33 Certification of Non-Segregated Facilities and Non-Employment of Illegal Alien Labor.pdf PDF
33 05 05.41 - Air Testing.pdf PDF
00 31 43 Permit Applications.pdf PDF
00 45 19 Non Collusion Affidavit.pdf PDF
01 41 26 - Permit Requirements.pdf PDF
01 78 36 - Warranties.pdf PDF
33 01 31 TV Inspection of Sewer Pipelines.pdf PDF
00 72 00 - General Conditions 2013.pdf PDF
33 14 13 - Public Water Utility Distribution Piping.pdf PDF
Show 40 more

Latest 50 of 116 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

01 74 19 – Construction Waste

Management and Disposal

1.0 General

1.1 Summary

A. Section Includes:

1. Construction waste management plan.

2. Construction waste salvage and recycling.

3. Disposing of nonhazardous demolition and construction waste.

1.2 Plan Requirements

A. Develop and implement construction waste management plan as approved by

Engineer.

B. Intent:

1. Divert construction, demolition, and land-clearing debris from landfill disposal.

2. Redirect recyclable material back to manufacturing process.

3. Generate cost savings or increase minimal additional cost to Project for waste disposal.

1.3 Submittals

A. Section 01 33 00 – Submittal Procedures contains requirements for submittals.

B. Construction Waste Management Plan: Submit construction waste management plan, if requested by the Engineer and/or Owner, describing methods and procedures for implementation and monitoring compliance including the following:

1. Transportation company hauling construction waste to waste processing facilities.

2. Recycling and adaptive reuse processing facilities and waste type each facility will accept.

3. Construction waste materials anticipated for recycling and adaptive reuse.

4. On-Site sorting and Site storage methods.

1.4 Construction Waste Management Plan

A. Implement construction waste management plan at start of construction.

B. Review construction waste management plan at preconstruction meeting and progress meetings specified in Section 01 31 13 – Project Coordination.

C. Distribute approved construction waste management plan to Subcontractors and others affected by plan requirements.

D. Oversee plan implementation, instruct construction personnel for plan compliance, and document plan results.

E. Purchase products to prevent waste by:

1. Ensuring correct quantity of each material is delivered to Site.

2. Choosing products with minimal or no packaging.

3. Requiring suppliers to use returnable pallets or containers.

4. Requiring suppliers to take or buy back rejected or unused items.

1.5 Construction Waste Recycling

A. Use source separation method or comingling method suitable to sorting and processing method of selected recycling center. Dispose nonrecyclable trash separately into landfill:

B. Source Separation Method: Recyclable materials separated from trash and sorted into separate bins or containers, identified by waste type, prior to transportation to recycling center.

C. Comingling Method: Recyclable materials separated from trash and placed in unsorted bins or container for sorting at recycling center.

D. Materials suggested for recycling include:

1. Packing materials including paper, cardboard, foam plastic, and sheeting.

2. Recyclable plastics.

3. Organic plant debris.

4. Earth materials.

5. Native stone and granular fill.

6. Asphalt and concrete paving.

7. Wood without embedded nails and staples.

8. Glass, clear and colored types.

9. Metals.

10. Equipment oil.

2.0 Products – Not Used.

3.0 Execution

A. Collect construction waste materials in marked bins or containers and arrange for transportation to recycling centers or adaptive salvage and reuse processing facilities.

B. Maintain recycling and adaptive reuse storage and collection area in orderly arrangement with materials separated to eliminate co-mingling of materials required to be delivered separately to waste processing facility.

C. Store construction waste materials to prevent environmental pollution, fire hazards, hazards to persons and property, and contamination of stored materials.

D. Cover construction waste materials subject to disintegration, evaporation, settling, or runoff to prevent polluting air, water, and soil.

3.2 Construction Waste Disposal

A. Deliver construction waste to waste processing facilities. Obtain receipt for deliveries.

B. Dispose of construction waste not capable of being recycled or adaptively reused by delivery to landfill, incinerator, or other legal disposal facility. Obtain receipt for deliveries.

END OF SECTION

1. Ensuring correct quantity of each material is delivered to Site.
2. Choosing products with minimal or no packaging.
3. Requiring suppliers to use returnable pallets or containers.
4. Requiring suppliers to take or buy back rejected or unused items.
B. Dispose of construction waste not capable of being recycled or adaptively reused by delivery to landfill, incinerator, or other legal disposal facility. Obtain receipt for deliveries.

File details come from the government source that posted it. Updated .