01 61 00 - Product Requirements.pdf

PDF 97 KB Posted

Attached to
2027 Sewer System Improvements Project
Solicitation number
Not on record
Issued by
Dauphin County, Harveys Lake Borough, Pennsylvania

About this file

This is a Product Requirements document for Capital Region Water (CRW), a Pennsylvania-based water and wastewater utility, related to the 2027 Sewer System Improvements Project. The project encompasses general construction work including sewer system improvements, water main replacement and installation, water service line replacement, fire hydrant replacement, and surface restoration. Bids are requested on a unit price basis for Contract No. 2026-12 and must be submitted online through the PennBid Bonfire Program by October 27, 2026, at 10:00 a.m. EST, at which time bids will be opened. All bid documents are available at no cost through the PennBid Bonfire Hub website. The work includes all materials, equipment, labor, necessary apparatuses, and miscellaneous labor and materials as contemplated by the contract documents.

Capital Region Water has adopted a Minority Women and Disadvantaged Business Enterprise (MWDBE) Plan to ensure equal opportunity for participation by minority, women, and other disadvantaged business enterprises in all project-related construction contracts. Bidders must submit MWDBE documentation in compliance with contract documents, and CRW intends to ensure nondiscrimination in the award and administration of contracts. No specific budget amount, incumbent vendor information, or pricing terms are disclosed in the available documentation. Interested bidders can access the complete solicitation details and bid documents at no cost through the PennBid portal at https://pennbid.bonfirehub.com/portal, with assistance available from PennBid Representatives at 610-693-4769.

View the file

Other files

File Type Posted
00 41 20 Qualifications Statement (CRW).pdf PDF
00 00 00 Cover.pdf PDF
33 01 30 Operation and Maintenance of Sewer Utilities.pdf PDF
00 43 13 Bid Bond Damages Form.pdf PDF
33 05 05.36 - Vacuum Testing.pdf PDF
00 55 00 Notice to Proceed.pdf PDF
00 21 13 Instructions to Bidders.pdf PDF
00 61 19 - Warranty Bond.pdf PDF
01 41 26-C - Chlorinated Water Discharge - Incident Report Cover Sheet & Form.pdf PDF
00 73 53 - Anti-Pollution Measures.pdf PDF
01 10 00 - Summary.pdf PDF
00 63 36 - Field Order Form.pdf PDF
00 51 00 Notice of Award.pdf PDF
31 23 19 Dewatering.pdf PDF
01 22 00 - Unit Prices.pdf PDF
00 52 00 Agreement.pdf PDF
03 11 00 Concrete Forming.pdf PDF
00 45 36 EEO Certificate.pdf PDF
01 73 00 - Execution Requirements.pdf PDF
33 05 05.31 - Hydrostatic Testing.pdf PDF
33 13 00 - Disinfection of Water Utility Distribution.pdf PDF
2026.09.29 Contract Drawings for Upload to PennBid.pdf PDF
01 25 00 - Substitution Procedures.pdf PDF
01 50 00 - Temporary Facilities and Controls.pdf PDF
00 73 46 - Wage Determination Schedule Cover.pdf PDF
01 31 19 - Project Meetings.pdf PDF
00 01 10 Table of Contents.pdf PDF
33 05 53 - Identification For Utilities Piping and Equipment.pdf PDF
01 35 15 - Notifications and Other Coordination.pdf PDF
01 78 39 - Project Record Documents.pdf PDF
03 30 00 Cast-in-Place Concrete.pdf PDF
01 29 00 - Payment Procedures.pdf PDF
01 31 13 - Project Coordination.pdf PDF
00 65 19.23 - Notice of Acceptability of Work.pdf PDF
32 13 13 - Concrete Paving.pdf PDF
00 21 13-1 Owner Minority, Women and Other DBE Forms.pdf PDF
01 77 00 - Closeout Procedures.pdf PDF
01 41 26-A - City of Harrisburg Street Closure Request Form.pdf PDF
33 14 17 - Site Water Service Utility Laterals.pdf PDF
00 65 16 Certificate of Substantial Completion.pdf PDF
03 60 00 Grouting.pdf PDF
00 45 33 Certification of Non-Segregated Facilities and Non-Employment of Illegal Alien Labor.pdf PDF
33 05 05.41 - Air Testing.pdf PDF
00 31 43 Permit Applications.pdf PDF
00 45 19 Non Collusion Affidavit.pdf PDF
01 41 26 - Permit Requirements.pdf PDF
01 78 36 - Warranties.pdf PDF
33 01 31 TV Inspection of Sewer Pipelines.pdf PDF
00 72 00 - General Conditions 2013.pdf PDF
33 14 13 - Public Water Utility Distribution Piping.pdf PDF
Show 40 more

Latest 50 of 116 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

01 61 00 - Product Requirements

1.0 General

1.1 Section Includes

A. Products.

B. Product delivery requirements.

C. Product storage and handling requirements.

D. Product options.

E. Equipment electrical characteristics and components.

1.2 Definitions

A. Products: Items purchased for incorporating into the Work, whether purchased for

Project or taken from previously purchased stock. The term "product" includes the terms "material," "equipment," "system," and terms of similar intent:

1. Named Products: Items identified by manufacturer's product name, including make or model number or other designation shown or listed in manufacturer's published product literature that is current as of date of the Contract Documents.

2. New Products: Items that have not previously been incorporated into another project or facility. Products salvaged or recycled from other projects are not considered new products.

3. “Or Equal” Product: Product that is demonstrated and approved through submittal process to have the indicated qualities related to type, function, dimension, in-service performance, physical properties, appearance, and other characteristics that equal or exceed those of specified product.

B. Basis of Design Product: The Project was designed generally around the first or singularly named manufacturers. Where a specific manufacturer's product is named, including make or model number or other designation, it is to establish the significant qualities related to type, function, dimension, in-service performance, physical properties, appearance, and other characteristics. If the Contractor chooses to furnish an alternately named manufacturer or product, a substitution request must be made in accordance with the Contract Documents.

1.3 Products

A. At minimum, the Contractor shall comply with specified requirements and reference standards.

B. Specified products define standard of quality, type, function, dimension, appearance, and performance required.

C. The Contractor shall furnish products of qualified manufacturers that are suitable for intended use. Furnish products of each type by single manufacturer unless specified otherwise. Confirm that manufacturer's production capacity can provide sufficient product, on time, to meet Project requirements.

D. Domestic Products: Except where specified otherwise, domestic products are required and interpreted to mean products mined, manufactured, fabricated, or produced in

United States or its territories.

1.4 Product Delivery Requirements

A. The Contractor shall be responsible for the following:

1. Transport and handle products according to manufacturer's instructions.

2. Deliver products in manufacturer's original sealed container or packaging, complete with labels/instructions for storing, handling, unpacking, protecting, and installing.

3. Promptly inspect shipments to ensure products comply with requirements, quantities are correct, and products are undamaged.

4. Provide equipment and personnel to handle products; use methods to prevent soiling, disfigurement, or damage.

5. Schedule delivery to minimize long-term storage at Project Site and to prevent overcrowding of construction spaces:

a. Coordinate delivery with installation to ensure minimum storage for items that are hazardous, easily damaged, or sensitive to deterioration, theft, and other losses.

1.5 Product Storage and Handling Requirements

A. The Contractor shall be responsible for the following:

1. Store and protect products according to manufacturer's instructions.

2. Store products with seals and labels intact and legible.

3. Store sensitive products in weathertight, climate-controlled enclosures in an environment suitable to product.

4. For exterior storage of fabricated products, place products on sloped supports aboveground.

5. Provide off-Site storage and protection when Site does not permit on-Site storage or protection.

6. Cover products subject to deterioration with impervious sheet covering. Provide ventilation to prevent condensation and degradation of products.

7. Store loose granular materials on solid flat surfaces in well-drained area. Prevent mixing with foreign matter.

B. Provide equipment and personnel to store products; use methods to prevent soiling, disfigurement, or damage.

C. Arrange storage of products to permit access for inspection. Periodically inspect to verify products are undamaged and are maintained in acceptable condition.

1.6 Product Options

A. Products Specified by Reference Standards or by Description Only: Products complying with specified reference standards or description.

B. Products Specified by Naming One or More Manufacturers: Products of one of manufacturers named and complying with Specifications; no options or substitutions allowed.

C. Products Specified by Naming One or More Manufacturers with Provision for

Substitutions: Submit Request for Substitution for any manufacturer not named, according to Section 01 25 00 - Substitution Procedures.

2.0 Products

2.1 Product Selection Procedures

A. General Product Requirements: The Contractor shall provide products that comply with the Contract Documents, that are undamaged and that are new at time of installation:

1. Provide products complete with accessories, trim, finish, fasteners, and other items needed for a complete installation and indicated use and effect.

2. Standard Products: If available, and unless custom products or nonstandard options are specified, provide standard products of types that have been produced and used successfully in similar situations on other projects.

3. Engineer reserves the right to limit selection to products with warranties not in conflict with requirements of the Contract Documents, at no additional cost to the

Owner.

B. Product Selection Procedures:

1. Product: Where Specifications name a single product and manufacturer, the

Contractor shall provide the named product. Where Specifications include a list of names of both products and manufacturers, provide one of the products listed that complies with requirements.

2. Manufacturer/Source: Where Specifications name a single manufacturer or source, the Contractor shall provide a product by the named manufacturer or equal source that complies with requirements. Where Specifications include a list of manufacturers' names, provide a product by one of the manufacturers listed that complies with requirements.

3. Basis-of-Design Product: Where Specifications name a product and manufacturer, the Contractor shall provide the specified product. Where Contract Drawings and

Specifications indicate sizes, profiles, dimensions, and other characteristics that are based on the product named provide named product. Comply with provisions in Part 2 "Product Substitutions" Article for consideration of an unnamed product or system.

4. Visual Selection Specification: Where Specifications include the phrase "as selected from manufacturer's colors, patterns, textures" or a similar phrase, the Contractor shall select a product that complies with other specified requirements:

a. Standard Range: Where Specifications include the phrase "standard range of colors, patterns, textures" or similar phrase, Owner and Engineer will select color, pattern, density, or texture from manufacturer's product line that does not include premium items.

b. Full Range: Where Specifications include the phrase "full range of colors, patterns, textures" or similar phrase, Owner and Engineer will select color, pattern, density, or texture from manufacturer's product line that includes both standard and premium items.

c. By submission of their bid, the Contractor acknowledges the requirements of this section. The Contractor shall not be due any additional monies for selections by the Engineer or Owner which are consistent with this section, even if the Contractor made different assumptions during bidding.

3.0 Execution - Not Used.

END OF SECTION