01 32 36 - Video Monitoring and Documentation.pdf

PDF 165 KB Posted

Attached to
2027 Sewer System Improvements Project
Solicitation number
Not on record
Issued by
Dauphin County, Harveys Lake Borough, Pennsylvania

About this file

This is a technical specification document for video monitoring and documentation procedures applicable to the 2027 Sewer System Improvements Project being procured by Capital Region Water (CRW) in Harrisburg, Pennsylvania. The specification requires contractors to provide both preconstruction and periodic construction video recordings using digital video disc format. Preconstruction videos must document the project site and surrounding properties from multiple vantage points before work begins, including existing conditions, adjacent properties, and on-site buildings. Periodic construction videos must be recorded monthly, aligned with each Application for Payment submission, with a minimum recording time of 15 minutes per session. All video submissions must include a key plan identifying vantage points, compass directions, elevation or story references, weather conditions at time of recording, photographer information, project name, contractor name, engineer name, and date of recording. Videos must be submitted within seven days of recording.

Video recordings must be taken during periods of good visibility without precipitation or snow coverage, with clear focus and maximum depth of field throughout. The specification requires outdoor coverage to include driveways, sidewalks, curbs, ditches, full street width, landscaping, utilities, building exteriors, and protective measures employed by the contractor. All media storage must be properly identified by number, date, locations, and project name, with each storage device beginning with the current date, project name, and municipality. An index run sheet must accompany all submissions, documenting contents by location, station numbers, and line numbers referenced to time and date encoding. Copyright usage rights for all video documentation must be transferred to the Owner for unlimited use and reproduction. Videos containing blurry or out-of-focus areas will be rejected.

View the file

Other files

File Type Posted
00 41 20 Qualifications Statement (CRW).pdf PDF
00 00 00 Cover.pdf PDF
33 01 30 Operation and Maintenance of Sewer Utilities.pdf PDF
00 43 13 Bid Bond Damages Form.pdf PDF
33 05 05.36 - Vacuum Testing.pdf PDF
00 55 00 Notice to Proceed.pdf PDF
00 21 13 Instructions to Bidders.pdf PDF
00 61 19 - Warranty Bond.pdf PDF
01 41 26-C - Chlorinated Water Discharge - Incident Report Cover Sheet & Form.pdf PDF
00 73 53 - Anti-Pollution Measures.pdf PDF
01 10 00 - Summary.pdf PDF
00 63 36 - Field Order Form.pdf PDF
00 51 00 Notice of Award.pdf PDF
31 23 19 Dewatering.pdf PDF
01 22 00 - Unit Prices.pdf PDF
00 52 00 Agreement.pdf PDF
03 11 00 Concrete Forming.pdf PDF
00 45 36 EEO Certificate.pdf PDF
01 73 00 - Execution Requirements.pdf PDF
33 05 05.31 - Hydrostatic Testing.pdf PDF
33 13 00 - Disinfection of Water Utility Distribution.pdf PDF
2026.09.29 Contract Drawings for Upload to PennBid.pdf PDF
01 25 00 - Substitution Procedures.pdf PDF
01 50 00 - Temporary Facilities and Controls.pdf PDF
00 73 46 - Wage Determination Schedule Cover.pdf PDF
01 31 19 - Project Meetings.pdf PDF
00 01 10 Table of Contents.pdf PDF
33 05 53 - Identification For Utilities Piping and Equipment.pdf PDF
01 35 15 - Notifications and Other Coordination.pdf PDF
01 78 39 - Project Record Documents.pdf PDF
03 30 00 Cast-in-Place Concrete.pdf PDF
01 29 00 - Payment Procedures.pdf PDF
01 31 13 - Project Coordination.pdf PDF
00 65 19.23 - Notice of Acceptability of Work.pdf PDF
32 13 13 - Concrete Paving.pdf PDF
00 21 13-1 Owner Minority, Women and Other DBE Forms.pdf PDF
01 77 00 - Closeout Procedures.pdf PDF
01 41 26-A - City of Harrisburg Street Closure Request Form.pdf PDF
33 14 17 - Site Water Service Utility Laterals.pdf PDF
00 65 16 Certificate of Substantial Completion.pdf PDF
03 60 00 Grouting.pdf PDF
00 45 33 Certification of Non-Segregated Facilities and Non-Employment of Illegal Alien Labor.pdf PDF
33 05 05.41 - Air Testing.pdf PDF
00 31 43 Permit Applications.pdf PDF
00 45 19 Non Collusion Affidavit.pdf PDF
01 41 26 - Permit Requirements.pdf PDF
01 78 36 - Warranties.pdf PDF
33 01 31 TV Inspection of Sewer Pipelines.pdf PDF
00 72 00 - General Conditions 2013.pdf PDF
33 14 13 - Public Water Utility Distribution Piping.pdf PDF
Show 40 more

Latest 50 of 116 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

01 32 36 Video Monitoring and

Documentation

1.0 General

1.1 Summary

A. Section Includes:

1. Preconstruction video recordings.

2. Periodic construction video recordings.

B. Related Sections:

1. Section 01 33 00 – Submittal Procedures: Procedures for submitting photographic documentation.

2. Section 01 77 00 – Closeout Procedures: Procedures for submitting photographic documentation as Project record documents at Project closeout.

1.2 Submittals

A. Key Plan: Submit key plan of Project site with notation of vantage points marked for location and direction of each video recording. Include same information as corresponding video documentation.

B. Video Recordings: Submit video recordings within seven days of recording:

1. Submit video recordings in digital video disc format acceptable to Engineer.

2. Identification: With each submittal, provide the following information:

a. Name of Project.

b. Name and address of photographer.

c. Name of Engineer.

d. Name of Contractor.

e. Date video recording was recorded.

f. Description of vantage point, indicating location, direction (by compass point, and elevation or story of construction.

g. Weather conditions at time of recording.

1.3 Usage Rights

A. Transfer copyright usage rights to Owner for unlimited use and reproduction of video documentation.

2.0 Products - Not Used.

3.0 Execution

3.1 General

A. Take videos using the maximum range of depth of field, and that are in focus, to clearly show the Work. Videos with blurry or out-of-focus areas will not be accepted:

01 32 36 Video Monitoring and

Documentation

1. Maintain key plan with each set of construction photographs that identifies each location.

3.2 Video Taping Procedure

A. All video to be done during periods of good visibility and not during periods of visible precipitation or while ground is covered by snow.

B. Control direction of travel, panning rates, and zoom in-out rates in a manner that produces clarity of subject during playback.

C. Include in outdoor video coverage driveways, sidewalks, curbs, ditches (to show drainage patterns), street (as full width as possible), landscaping, trees, shrubs, culverts, catch basins, retaining walls, headwalls, fences, visible utilities, and building exteriors within the zones of influence. Buildings should be identified both audibly and visibly when possible.

D. Properly identify all media storage by number, date, locations, and project name.

Begin each storage media with current date, project name and municipality.

E. Supply an index run sheet with a record of each media storage device’s contents and identify locations, station numbers, line numbers, etc., referenced to time and date encoded in video.

3.3 Construction Video Recordings

A. Preconstruction Video Recording: Before starting construction, record video recording of Project site and surrounding properties from sufficiently different vantage points to completely record the state of the site and existing buildings in and around the construction area. Coordinate with Owner Representative to ensure no sensitive areas outside of the limits of construction are videotaped:

1. Flag construction limits before recording construction video recordings.

2. Show existing conditions adjacent to Project site before starting the Work.

3. Show existing buildings on site to accurately record physical conditions at the start of construction.

4. Show protection efforts by Contractor.

B. Periodic Construction Video Recordings: Record video recording monthly with the cutoff date associated with each Application for Payment. Select vantage points to show status of construction and progress since last video recordings were recorded:

1. Video shall sufficiently show how construction is affecting the existing structure and site, and the efforts of the Contractor to protect the existing site and structures.

2. Minimum recording time shall be 15 minutes.

END OF SECTION

1.0 General
1.1 Summary
A. Section Includes:
1. Preconstruction video recordings.
2. Periodic construction video recordings.
B. Related Sections:
1. Section 01 33 00 – Submittal Procedures: Procedures for submitting photographic
documentation.
2. Section 01 77 00 – Closeout Procedures: Procedures for submitting photographic
documentation as Project record documents at Project closeout.
1.2 Submittals
A. Key Plan: Submit key plan of Project site with notation of vantage points marked for
location and direction of each video recording. Include same information as corresponding video documentation.
B. Video Recordings: Submit video recordings within seven days of recording:
1. Submit video recordings in digital video disc format acceptable to Engineer.
2. Identification: With each submittal, provide the following information:
1.3 Usage Rights
A. Transfer copyright usage rights to Owner for unlimited use and reproduction of video
documentation.
2.0 Products - Not Used.
3.0 Execution
3.1 General
A. Take videos using the maximum range of depth of field, and that are in focus, to clearly show the Work. Videos with blurry or out-of-focus areas will not be accepted:
1. Maintain key plan with each set of construction photographs that identifies each location.
3.2 Video Taping Procedure
A. All video to be done during periods of good visibility and not during periods of visible precipitation or while ground is covered by snow.
B. Control direction of travel, panning rates, and zoom in-out rates in a manner that produces clarity of subject during playback.
C. Include in outdoor video coverage driveways, sidewalks, curbs, ditches (to show drainage patterns), street (as full width as possible), landscaping, trees, shrubs, culverts, catch basins, retaining walls, headwalls, fences, visible utilities, and b...
D. Properly identify all media storage by number, date, locations, and project name. Begin each storage media with current date, project name and municipality.
E. Supply an index run sheet with a record of each media storage device’s contents and identify locations, station numbers, line numbers, etc., referenced to time and date encoded in video.
3.3 Construction Video Recordings
A. Preconstruction Video Recording: Before starting construction, record video recording of Project site and surrounding properties from sufficiently different vantage points to completely record the state of the site and existing buildings in and aro...
1. Flag construction limits before recording construction video recordings.
2. Show existing conditions adjacent to Project site before starting the Work.
3. Show existing buildings on site to accurately record physical conditions at the start of construction.
4. Show protection efforts by Contractor.
B. Periodic Construction Video Recordings: Record video recording monthly with the cutoff date associated with each Application for Payment. Select vantage points to show status of construction and progress since last video recordings were recorded:
1. Video shall sufficiently show how construction is affecting the existing structure and site, and the efforts of the Contractor to protect the existing site and structures.
2. Minimum recording time shall be 15 minutes.